Cable clamp loading and unloading structure for ship and using method thereof

By designing a cable clamp loading and unloading structure for ships, the loading and unloading process of the cable clamp is simplified by using self-locking shackles and wide-distance pulleys, solving the problems of inconvenient operation and cumbersome steps in the prior art, and improving efficiency and safety.

CN119651400APending Publication Date: 2025-03-18CCCC GUANGZHOU DREDGING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411692239.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

During the loading and unloading of existing ship cables, there are problems such as insufficient tension of the guardrail hanging on the wire, inconvenient operation, cumbersome and unsafe traction wire passing through the pulley, time-consuming and labor-intensive removal of the pulley and the pulling wire, and cumbersome shackle screwing operation.

Method used

A cable clamp loading and unloading structure for ships is designed, including a lying fixed on the upper side of the bracket guardrail, connecting the first self-locking shackle, the steel wire is connected to the second self-locking shackle, and a third self-locking shackle is arranged on the wide-distance pulling of the steel wire through a nylon rope and a twister to simplify the loading and unloading process of the cable clamp.

Benefits of technology

It improves loading and unloading efficiency, reduces working time, avoids cumbersome steps of the pulley and traction wire, enhances the safety and convenience of operation, and reduces time cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119651400A_ABST
    Figure CN119651400A_ABST
Patent Text Reader

Abstract

The invention discloses a ship cable clamp loading and unloading structure and a using method thereof, and belongs to the technical field of ship equipment. A cable clamp loading and unloading structure for a ship comprises a ground olivary fixedly arranged on the upper side of a support guardrail, a first self-locking shackle is connected to the ground olivary, a steel wire buckle is connected to the first self-locking shackle, a second self-locking shackle is connected to the end, away from the first self-locking shackle, of the steel wire buckle, a wide-distance pulley is arranged on the second self-locking shackle, and a short rope is connected to the upper end of the wide-distance pulley. The end, away from the wide-distance pulley, of the short rope penetrates through the first self-locking shackle and is connected with the support guardrail, a long rope is slidably connected to the wide-distance pulley, one end of the long rope is arranged on a ship deck, and the other end of the long rope is connected with a traction steel wire on a barge twisting machine. The method is easy and reliable to operate, improves the time benefit on the premise of ensuring the safety, and compared with the conventional method, avoids the tedious steps of using a tackle and a traction steel wire, saves half of the operation time, increases the time utilization rate and reduces the time cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ship equipment, and in particular to a ship cable clamp loading and unloading structure and a use method thereof. Background Art

[0002] Every time the dredging vessel changes the cable or the grab bucket, it is necessary to remove the cable and remove the entire cable clamp to the deck surface for operation. After the cable is removed from the grab bucket electrical box, the unloading of the cable clamp requires the cooperation of the small steel wire of the deck surface winch. The previous method is: prepare a 1-meter-long, 18mm diameter steel wire buckle, a 6T shackle, a 3T conventional pulley, a 2-meter-long nylon rope, a 40-meter-long nylon rope, and then pull the deck surface winch small steel wire to a sufficient length as a traction wire. Two operators climbed up the upper and middle part of the bar with a 40-meter-long nylon rope and worked directly above the cable clamp. At the work area, fasten your safety belt, wrap the wire buckle around the bottom of the guardrail of the working area, connect the pulley with a shackle, tie a 2-meter small nylon rope to the end of the shackle, and tie the other end to the railing. Then throw the long nylon rope to the deck, pull up the small steel wire, pass it through the pulley, throw the long nylon rope down to the deck, untie the short nylon rope, loosen the pulley until it is stressed, and the deck personnel then pull the traction wire down to the cable clamp, connect the cable clamp with a shackle, and after the cable clamp is loosened, it can be pulled out and slowly lowered to the deck.

[0003] However, after going through the entire operation process above, several defects were found: 1. The guardrail for hanging wire buckles does not have enough pulling force; the position is too low, which is inconvenient to operate and easy to pinch hands; 2. It is very difficult to pull the traction wire up from above. The diameter of the conventional pulley slide is not large enough, and the traction wire cannot pass directly through the pulley. The pulley cover needs to be opened and the traction wire needs to be installed in, which is cumbersome and unsafe; 3. When the pulley and traction wire need to be untied after completion, it is time-consuming and laborious to pull up the pulley with the traction wire; 4. The unfastening operation of the buckle is cumbersome and inconvenient to operate during use. Summary of the invention

[0004] The purpose of the present invention is to solve the problems existing in the prior art and to propose a ship cable clamp loading and unloading structure and a use method thereof.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A cable clamp loading and unloading structure for ships, comprising a ground collar fixed on the upper side of a support guardrail, the ground collar being connected to a first self-locking shackle, the first self-locking shackle being connected to a wire buckle, the end of the wire buckle away from the first self-locking shackle being connected to a second self-locking shackle, the second self-locking shackle being provided with a wide-pitch pulley, the upper end of the wide-pitch pulley being connected to a short rope, the end of the short rope away from the wide-pitch pulley passing through the first self-locking shackle and connected to the support guardrail, the wide-pitch pulley being slidably connected to a long rope, one end of the long rope being placed on the ship deck, the other end of the long rope being connected to a traction wire on a winch, and the end of the traction wire away from the long rope being provided with a third self-locking shackle for connecting the cable clamp.

[0007] Preferably, the first self-locking shackle, the second self-locking shackle and the third self-locking shackle have the same structure, and all include a shackle seat and a cross bar slidably connected to the two sides of the shackle seat, the two ends of the cross bars that are close to each other are movably abutted against each other, a slider is fixed on the cross bar, and a sliding groove for sliding the slider is provided on the shackle seat, and an elastic telescopic rod is provided between the inner wall of the sliding groove and the slider.

[0008] Preferably, the ends of the two cross bars that are close to each other are each provided with an extrusion inclined surface, and the extrusion inclined surface is provided on a side away from the shackle seat.

[0009] Preferably, each of the cross bars is slidably connected with a first wedge block and a second wedge block that are movably opposed to each other, one of the cross bars is provided with a slot for inserting the second wedge block in the other cross bar, and a force-bearing plate is fixed on the top of the first wedge block.

[0010] Preferably, a moving block is fixedly disposed on each of the first wedge block and the second wedge block, a groove for sliding of the moving block is provided in the cross bar, and an elastic element is provided between the inner wall of the groove and the moving block.

[0011] Preferably, a movable groove is provided on the cross bar, a rotating rod is rotatably connected in the movable groove, a driven gear is provided on the rotating rod, a rack plate meshing with the driven gear is fixed on the force plate, a swing rod is fixed on the rotating rod, and a positioning groove for the swing rod in the other cross bar is provided at the bottom of one of the cross bars.

[0012] Preferably, an inclined support plate is fixedly provided on the shackle seat, and the inclined support plate is movably abutted against the bottom of the cross bar, and an opening for the movement of the swing rod is opened on the inclined support plate.

[0013] Preferably, the short rope and the long rope are both made of nylon rope, the length of the short rope is 2m, the length of the long rope is 40m, and the size of the steel wire buckle is 1m and the diameter is 18mm.

[0014] Preferably, the maximum load of the first self-locking shackle, the second self-locking shackle and the third self-locking shackle is 6T, and the maximum load of the wide-pitch pulley is 3T.

[0015] The present invention also discloses a method for using the ship cable clamp loading and unloading structure, comprising the following steps:

[0016] S1: First, a ground collar is welded at a suitable position on the upper end wall plate of the support railing, and the ground collar is connected to the first self-locking shackle;

[0017] S2: Then one end of the wire buckle is connected and locked with the first self-locking shackle, and the other end is connected to the wide-gauge pulley through the second self-locking shackle;

[0018] S3: Then the long rope passes through the wide-spaced pulley, and both ends of the long rope are dropped to the deck surface;

[0019] S4: The short rope passes through the first self-locking shackle at the ground, one end of the short rope is tied to the guardrail of the nearby support, and the other end is tied to the top of the wide-span pulley. The short rope is slowly released to put the wide-span pulley under stress;

[0020] S5: The deck personnel use a long rope to tie the traction wire at one end, connect the other end of the long rope to the traction wire and pull the traction wire upward through the wide-spaced pulley to the cable clamp position, and connect the traction wire to the cable clamp with the second self-locking shackle;

[0021] S6: Operate the winch to control the traction wire and lift the cable clamp to the deck surface;

[0022] S7: When the wide-gauge block needs to be released after completion, slowly loosen the long rope on the deck, lower the traction wire to the deck, and then use the short rope to pull up the wide-gauge block to release it.

[0023] Compared with the prior art, the present invention provides a ship-use cable clamp loading and unloading structure and a method for using the same, which has the following beneficial effects:

[0024] 1. The cable clamp loading and unloading structure for ships and the method of using the same improve time efficiency while ensuring safety by welding a ground wire on the upper side of the support guardrail. In addition, by using a long rope to pull the traction wire on the deck, compared with the previous common method, the cumbersome steps of using pulleys and traction wires are avoided, half of the operation time is saved, time utilization is increased, and time cost is reduced.

[0025] 2. The ship-use cable clamp loading and unloading structure and the use method thereof adjust the conventional shackle so that the shackle can be quickly opened and disassembled, thereby improving the work efficiency of the installation and use of the shackle, reducing the time cost, and thus improving the work efficiency of the cable clamp loading and unloading. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the present invention;

[0027] Figure 2 It is a schematic diagram of the external structure of the wide-distance pulley of the present invention;

[0028] Figure 3 The structure of the first self-locking shackle of the present invention is schematically shown in FIG. Figure 1 ;

[0029] Figure 4 The structure of the first self-locking shackle of the present invention is schematically shown in FIG. Figure 2 ;

[0030] Figure 5 The cross-sectional structure of the shackle seat of the present invention is shown in FIG. Figure 1 ;

[0031] Figure 6 The cross-sectional structure of the shackle seat of the present invention is shown in FIG. Figure 2 ;

[0032] Figure 7 The cross-sectional structure of the crossbar of the present invention is shown in FIG. Figure 1 ;

[0033] Figure 8 The cross-sectional structure of the crossbar of the present invention is shown in FIG. Figure 2 .

[0034] In the figure: 1, support guardrail; 2, ground ring; 3, first self-locking shackle; 4, wire buckle; 5, second self-locking shackle; 6, wide-pitch pulley; 7, short rope; 8, long rope; 9, traction wire; 10, third self-locking shackle; 11, shackle seat; 12, cross bar; 121, extrusion slope; 122, first wedge block; 123, second wedge block; 124, slot; 125, force plate; 1251, rack plate; 126, groove; 1261, moving block; 1262, elastic element; 13, slide groove; 131, slider; 132, elastic telescopic rod; 14, movable groove; 141, rotating rod; 142, driven gear; 143, swing rod; 15, positioning groove; 16, diagonal support plate; 161, opening. DETAILED DESCRIPTION

[0035] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.

[0036] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0037] In the description of the present invention, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "mounted / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two components; for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] Example: Refer to Figure 1 and Figure 2 A cable clamp loading and unloading structure for ships, comprising a ground ridge 2 fixedly arranged on the upper side of a support guardrail 1, a first self-locking shackle 3 being connected to the ground ridge 2, a wire buckle 4 being connected to the first self-locking shackle 3, a second self-locking shackle 5 being connected to one end of the wire buckle 4 away from the first self-locking shackle 3, a wide-pitch block 6 being arranged on the second self-locking shackle 5, a short rope 7 being connected to the upper end of the wide-pitch block 6, an end of the short rope 7 away from the wide-pitch block 6 passing through the first self-locking shackle 3 and being connected to the support guardrail 1, a long rope 8 being slidably connected to the wide-pitch block 6, one end of the long rope 8 being placed on the deck of the ship, the other end of the long rope 8 being connected to a traction wire 9 on a winch, and a third self-locking shackle 10 for connecting a cable clamp being arranged at one end of the traction wire 9 away from the long rope 8.

[0039] Furthermore, both the short rope 7 and the long rope 8 are made of nylon rope, the length of the short rope 7 is 2m, the length of the long rope 8 is 40m, and the size of the wire buckle 4 is 1m and the diameter is 18mm.

[0040] Furthermore, the maximum loads of the first self-locking shackle 3 , the second self-locking shackle 5 and the third self-locking shackle 10 are 6 tons, and the maximum load of the wide-pitch block 6 is 3 tons.

[0041] Specifically, when the cable clamp is disassembled, first, a ground ring 2 is welded at a suitable position on the upper end wall plate of the support railing, and the ground ring 2 is connected to the first self-locking shackle 3, and then one end of the wire buckle 4 is connected and locked with the first self-locking shackle 3, and the other end is connected to the 3T wide-pitch pulley 6 through the second self-locking shackle 5, and then the 40m long rope 8 passes through the wide-pitch pulley 6, and both ends of the long rope 8 are dropped to the deck surface, and the 2m short rope 7 passes through the first self-locking shackle 3 at the ground ring 2, one end of the short rope 7 is tied to the side support guardrail 1, and the other end is tied to the top of the wide-pitch pulley 6, and the short rope 7 is slowly released to put the wide-pitch pulley 6 under stress, and the deck personnel use one end of the long rope 8 to tie the traction wire 9, and the other end of the long rope 8 is tied to the traction wire 9. The steel wires 9 are connected and the traction steel wire 9 is pulled up through the wide-pitch pulley 6 to reach the cable clamp position. The traction steel wire 9 is connected to the cable clamp with the second self-locking shackle 5. The winch is operated to control the traction steel wire 9, and the cable clamp is lifted out and placed on the deck surface. When the wide-pitch pulley 6 needs to be untied after completion, the long rope 8 is slowly loosened on the deck surface, the traction steel wire 9 is lowered to the deck surface, and then the wide-pitch pulley 6 is pulled up with the short rope 7 to be untied. The present application is simple and reliable to operate. Under the premise of ensuring safety, it improves time efficiency. Compared with the previous commonly used methods, it avoids the cumbersome steps of using pulleys and traction steel wires 9, saves half of the operation time, increases time utilization, and reduces time cost.

[0042] Reference Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 As a preferred technical solution of the present invention, the first self-locking shackle 3, the second self-locking shackle 5 and the third self-locking shackle 10 have the same structure, and all include a shackle seat 11 and a cross bar 12 slidably connected to both sides of the shackle seat 11, and the two cross bars 12 are movably abutted against each other at one end thereof, a slider 131 is fixedly provided on the cross bar 12, and a slide groove 13 for sliding of the slider 131 is provided on the shackle seat 11, and an elastic telescopic rod 132 is provided between the inner wall of the slide groove 13 and the slider 131.

[0043] Furthermore, an extrusion slope 121 is formed at one end of the two cross bars 12 that are close to each other. The extrusion slope 121 is formed at a side away from the shackle seat 11 .

[0044] Specifically, when the self-locking shackle is used, the staff only needs to push the part to be connected to the extrusion inclined surface 121, so that the extrusion inclined surface 121 is subjected to force to drive the two cross bars 12 on the shackle seat 11 to move relatively away, so that the part to be connected is placed between the shackle seat 11 and the cross bar 12, and the cross bar 12 is reset and moved back under the push of the elastic telescopic rod 132, thereby realizing the connection locking of the part to be connected.

[0045] Reference Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7and Figure 8 As a preferred technical solution of the present invention, each cross bar 12 is slidably connected with a first wedge block 122 and a second wedge block 123 that are movably opposed to each other. A slot 124 is opened on one of the cross bars 12 for inserting the second wedge block 123 in the other cross bar 12, and a force plate 125 is fixed on the top of the first wedge block 122.

[0046] Furthermore, a moving block 1261 is fixedly disposed on the first wedge block 122 and the second wedge block 123 , a groove 126 for the moving block 1261 to slide is provided in the cross bar 12 , and an elastic element 1262 is provided between the inner wall of the groove 126 and the moving block 1261 .

[0047] Specifically, when the connected parts are placed between the shackle seat 11 and the cross bar 12, the connected parts such as the wire buckle 4, the wide-pitch pulley 6, the ground ling 2 and other items will squeeze the force plate 125, and the force plate 125 will approach the cross bar 12. The force plate 125 drives the first wedge block 122 to squeeze the second wedge block 123, so that the second wedge block 123 is forced to move toward the slot 124 at the other cross bar 12, thereby realizing the connection between the two cross bars 12, thereby improving the overall support stability of the cross bar 12 to the connecting parts.

[0048] Reference Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 As a preferred technical solution of the present invention, a movable groove 14 is provided on the cross bar 12, a rotating rod 141 is rotatably connected in the movable groove 14, a driven gear 142 is provided on the rotating rod 141, a rack plate 1251 meshing with the driven gear 142 is fixed on the force plate 125, a swing rod 143 is fixed on the rotating rod 141, and a positioning groove 15 for the swing rod 143 in the other cross bar 12 is provided at the bottom of one of the cross bars 12.

[0049] Specifically, when the force plate 125 is squeezed and approaches the cross bar 12, the force plate 125 drives the rack plate 1251 to move and mesh with the driven gear 142, so that the driven gear 142 drives the swing rod 143 to rotate through the rotating rod 141. After the swing rod 143 rotates, the bottom end is buckled in the positioning groove 15 of the other cross bar 12, effectively preventing the two cross bars 12 from separating during use.

[0050] Reference Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8As a preferred technical solution of the present invention, a diagonal support plate 16 is fixedly provided on the shackle seat 11, and the diagonal support plate 16 is movably abutted against the bottom of the cross bar 12, and an opening 161 for the swing rod 143 to move is opened on the diagonal support plate 16; specifically, the diagonal support plate 16 supports the lower side of the cross bar 12, thereby improving the supporting stability of the cross bar 12 on the connecting piece and avoiding the cross bar 12 from breaking.

[0051] The present invention also discloses a method for using the ship cable clamp loading and unloading structure, comprising the following steps:

[0052] S1: First, a ground collar 2 is welded at a suitable position on the upper end wall plate of the support railing, and the ground collar 2 is connected to the first self-locking shackle 3;

[0053] S2: Then one end of the wire buckle 4 is connected and locked with the first self-locking shackle 3, and the other end is connected to the wide-gauge pulley 6 through the second self-locking shackle 5;

[0054] S3: Then the long rope 8 passes through the wide-spaced block 6, and both ends of the long rope 8 are dropped to the deck surface;

[0055] S4: The short rope 7 passes through the first self-locking shackle 3 at the ground 2, one end of the short rope 7 is tied to the side support guardrail 1, and the other end is tied to the top of the wide-spacing block 6, and the short rope 7 is slowly released to put the wide-spacing block 6 under stress;

[0056] S5: The deck personnel use a long rope 8 to tie the traction wire 9 at one end, and the other end of the long rope 8 is connected to the traction wire 9 and pulls the traction wire 9 upward through the wide-spacing pulley 6 to the cable clamp position, and the traction wire 9 is connected to the cable clamp with the second self-locking shackle 5;

[0057] S6: operate the winch to control the traction wire 9 and lift the cable clamp out to the deck surface;

[0058] S7: When the wide-gauge block 6 needs to be untied after completion, the long rope 8 is slowly loosened on the deck surface, the traction wire 9 is lowered to the deck surface, and then the wide-gauge block 6 is pulled up with the short rope 7 to untie it.

[0059] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A cable clamp loading and unloading structure for a ship, comprising a ground collar (2) fixedly mounted on the upper side of a support guardrail (1), characterized in that: The ground hook (2) is connected to a first self-locking shackle (3), the first self-locking shackle (3) is connected to a wire buckle (4), the end of the wire buckle (4) away from the first self-locking shackle (3) is connected to a second self-locking shackle (5), the second self-locking shackle (5) is provided with a wide-pitch pulley (6), the upper end of the wide-pitch pulley (6) is connected to a short rope (7), the end of the short rope (7) away from the wide-pitch pulley (6) passes through the first self-locking shackle (3) and is connected to the support guardrail (1), the wide-pitch pulley (6) is slidably connected to a long rope (8), one end of the long rope (8) is placed on the deck of the ship, the other end of the long rope (8) is connected to a traction wire (9) on a winch, and the end of the traction wire (9) away from the long rope (8) is provided with a third self-locking shackle (10) for connecting a cable clamp.

2. A ship cable clamp loading and unloading structure according to claim 1, characterized in that: The first self-locking shackle (3), the second self-locking shackle (5) and the third self-locking shackle (10) have the same structure, and all comprise a shackle seat (11) and a cross bar (12) slidably connected to the two sides of the shackle seat (11), the two ends of the cross bars (12) being close to each other are movable against each other, a slider (131) is fixedly provided on the cross bar (12), a slide groove (13) for the slider (131) to slide is provided on the shackle seat (11), and an elastic telescopic rod (132) is provided between the inner wall of the slide groove (13) and the slider (131).

3. A ship cable clamp loading and unloading structure according to claim 2, characterized in that: The ends of the two cross bars (12) that are close to each other are each provided with an extrusion inclined surface (121), and the extrusion inclined surface (121) is provided on a side away from the shackle seat (11).

4. A ship cable clamp loading and unloading structure according to claim 3, characterized in that: Each of the cross bars (12) is slidably connected with a first wedge block (122) and a second wedge block (123) that are movably opposed to each other, one of the cross bars (12) is provided with a slot (124) for inserting the second wedge block (123) in the other cross bar (12), and a force-bearing plate (125) is fixed on the top of the first wedge block (122).

5. A ship cable clamp loading and unloading structure according to claim 4, characterized in that: A moving block (1261) is fixedly mounted on the first wedge block (122) and the second wedge block (123); a groove (126) for the moving block (1261) to slide is provided in the cross bar (12); and an elastic element (1262) is provided between the inner wall of the groove (126) and the moving block (1261).

6. A ship cable clamp loading and unloading structure according to claim 5, characterized in that: The cross bar (12) is provided with a movable groove (14), a rotating rod (141) is rotatably connected in the movable groove (14), a driven gear (142) is arranged on the rotating rod (141), a rack plate (1251) meshing with the driven gear (142) is fixedly arranged on the force-bearing plate (125), a swing rod (143) is fixedly arranged on the rotating rod (141), and a positioning groove (15) for the swing rod (143) in the other cross bar (12) is provided at the bottom of one cross bar (12).

7. A ship cable clamp loading and unloading structure according to claim 6, characterized in that: The shackle seat (11) is fixedly provided with an inclined support plate (16), the inclined support plate (16) movably abuts against the bottom of the cross bar (12), and the inclined support plate (16) is provided with an opening (161) for the swing rod (143) to move.

8. A ship cable clamp loading and unloading structure according to claim 1, characterized in that: The short rope (7) and the long rope (8) are both made of nylon rope, the length of the short rope (7) is 2m, the length of the long rope (8) is 40m, and the size of the steel wire buckle (4) is 1m and the diameter is 18mm.

9. A ship cable clamp loading and unloading structure according to claim 1, characterized in that: The maximum load of the first self-locking shackle (3), the second self-locking shackle (5) and the third self-locking shackle (10) is 6 ton, and the maximum load of the wide-spaced pulley (6) is 3 ton.

10. A method for using the ship cable clamp loading and unloading structure according to claim 1, characterized in that: The following steps are involved: S1: First, a ground collar (2) is welded at a suitable position on the upper end wall plate of the support railing, and the ground collar (2) is connected to the first self-locking shackle (3); S2: Then one end of the wire buckle (4) is connected and locked to the first self-locking shackle (3), and the other end is connected to the wide-spaced pulley (6) through the second self-locking shackle (5); S3: Then the long rope (8) passes through the wide-spaced pulley (6), and both ends of the long rope (8) are dropped to the deck surface; S4: The short rope (7) passes through the first self-locking shackle (3) at the ground pin (2), one end of the short rope (7) is tied to the side support guardrail (1), and the other end is tied to the top of the wide-spacing pulley (6), and the short rope (7) is slowly released to put the wide-spacing pulley (6) under stress; S5: The deck personnel use a long rope (8) to tie the traction wire (9) with one end, the other end of the long rope (8) is connected to the traction wire (9), and the traction wire (9) is pulled up through the wide-spaced pulley (6) to the cable clamp position, and the traction wire (9) is connected to the cable clamp with the second self-locking shackle (5); S6: operate the winch to control the traction wire (9) to lift the cable clamp out and place it on the deck; S7: When the wide-pitch block (6) needs to be untied after completion, the long rope (8) is slowly loosened on the deck surface, the traction wire (9) is lowered to the deck surface, and then the wide-pitch block (6) is pulled up with the short rope (7) to untie it.