Construction operation platform based on deepwater area large-dip-angle bare rock pier

By designing a construction platform for deep-water piers, the combination of lifting platforms, mobile components and stop components is used to solve the problem of shaking of the operating platform caused by undercurrent underwater, and the safety and efficiency of construction are improved.

CN119686223APending Publication Date: 2025-03-25POLY CHANGDA ENGINEERING CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411902125.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

When installing bridge piers in deep water areas, the operating platform shakes due to undercurrents at the sea, which affects the construction speed and efficiency of construction personnel and reduces the construction progress of the bridge pier.

Method used

Design a construction platform based on large-inclined bare rock piers in deep water areas, including internal hollow lifting platforms, mobile components and stop components. The lifting platform can be lifted and lowered on the bridge pier, the moving component matches the side wall surface of the bridge pier, and the stopping component realizes the fixing of the lifting platform through the telescopic unit and the abutment block.

Benefits of technology

Through the design of stop components, the lifting platform will not shake violently when impacted by undersea undercurrents, ensuring the construction safety and efficiency of construction personnel and improving the construction progress of the bridge piers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686223A_ABST
    Figure CN119686223A_ABST
Patent Text Reader

Abstract

The invention relates to a large-dip-angle bare rock pier construction operation platform based on a deepwater area, and belongs to the technical field of engineering construction. By arranging the stop assembly, after the lifting platform moves to the corresponding height of the pier, the telescopic unit enables the abutting block to be attached to the side wall face of the pier by extending the output end, the lifting platform is fixed to a certain height of the pier, and even if the lifting platform located on the seabed is impacted by seabed undercurrent at the moment, the abutting block can abut against the side wall face of the pier. And the lifting platform does not shake violently, and construction treatment of constructors located on the lifting platform on the pier is not affected. It is worthy of being explained that after the abutting block relieves the attaching arrangement relation between the abutting block and the side wall face of the bridge pier, the lifting table can ascend and descend again along the bridge pier; in addition, due to the arrangement of the moving assembly, the friction resistance between the lifting table and the bridge pier is reduced when the lifting table slides.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering construction, and in particular relates to a construction operation platform for bare rock bridge piers with large inclination angles in deep water areas. Background Art

[0002] When carrying out bridge pier construction work, in order to ensure the safety of construction workers and the convenience of operation, it is necessary to install a stable and reliable working platform so that construction workers can stand steadily on the working platform and efficiently carry out various construction operations on the bridge piers, such as concrete pouring, steel bar binding, formwork installation, etc.

[0003] For example, the utility model patent with patent authorization announcement number: CN216108117U discloses an assembled viaduct pier construction platform, which relates to the field of engineering construction. The assembled viaduct pier construction platform includes a base, wheels, a holding portion, and a telescopic mechanism. The base includes a first surface for contacting the ground when the assembled viaduct pier construction platform is in working state, and the wheels are rotatably arranged on the holding portion; the telescopic mechanism is arranged on the base, and the telescopic mechanism is connected to the holding portion. The telescopic mechanism drives the wheels to move between an extended position and a retracted position. When the assembled viaduct pier construction platform is in working state, in the extended position, at least part of the wheel is located below the first surface to support the base, and in the retracted position, the wheel is located above the first surface, and the base is supported by the ground.

[0004] Based on the search of the above patent authorization announcement number and the shortcomings found therein:

[0005] For bridge piers installed in deep water areas, it is generally necessary to install a work platform to assist workers in the installation of the piers; however, due to the existence of submarine undercurrents in deep water areas, after the work platform is installed on the pier, the submarine undercurrents will impact the work platform, causing the work platform to shake, thereby affecting the construction speed and efficiency of the workers standing on the work platform, thereby reducing the construction progress of the entire pier. Summary of the invention

[0006] In order to solve the problem that for bridge piers installed in deep water areas, it is generally necessary to install a working platform to assist workers in the installation of the piers; however, due to the existence of submarine undercurrents in deep water areas, after the working platform is installed on the pier, the submarine undercurrents will impact the working platform, causing the working platform to shake, thereby affecting the construction speed and efficiency of the workers standing on the working platform, thereby reducing the construction progress of the entire pier. The present invention provides a working platform for the construction of large-angle bare rock piers in deep water areas.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] A construction work platform for high-angle bare rock bridge piers in deep water areas, characterized in that it includes a hollow lifting platform, a plurality of moving components and a plurality of stop components, the lifting platform can be lifted and lowered on the bridge pier on the seabed, the plurality of moving components are matched one-to-one with the side wall surfaces enclosed by the bridge pier, the moving component includes a roller and a connecting shaft, one end of the connecting shaft is connected to the roller, the other end of the connecting shaft is connected to the inner side wall of the lifting platform, and the roller is slidably connected to the corresponding side wall surface of the bridge pier;

[0009] A plurality of stop components are matched one-to-one with the side wall surfaces enclosed by the bridge pier. The stop components include a telescopic unit and an abutment block. The two ends of the telescopic unit are respectively connected to the lifting platform and the abutment block. The abutment block can lock or release its fitting relationship with the side wall surface corresponding to the bridge pier.

[0010] As a preferred technical solution of the present invention, it also includes a rope, the crane is set on the shore, and the two ends of the rope are respectively connected to the output end of the crane and the lifting platform to control the height of the lifting platform.

[0011] As a preferred technical solution of the present invention, the telescopic unit includes a fixed rod with a hollow interior, a sliding rod and a telescopic spring, one end of the fixed rod is connected to the side wall of the lifting platform, the sliding rod is slidably arranged at the other end of the fixed rod, the telescopic spring is arranged in the fixed rod, the two ends of the telescopic spring are respectively connected to the fixed rod and the sliding rod, and the end of the sliding rod away from the fixed rod is connected to the abutment block.

[0012] As a preferred technical solution of the present invention, the stop assembly also includes a sealing block, the lifting platform is provided with a plurality of driving grooves and a plurality of connecting grooves, the plurality of driving grooves are not connected to each other, the plurality of driving grooves are matched one-to-one with the plurality of telescopic units, the interior of any of the fixed rods is connected to the corresponding driving grooves; the plurality of connecting grooves are matched one-to-one with the plurality of driving grooves, any of the connecting grooves is arranged in the corresponding driving groove, and the connecting grooves are respectively connected to the external environment and the corresponding driving groove; any of the sealing blocks is slidably arranged in the corresponding driving groove; the fixed rod can lock or release the mutual connection relationship between it and the corresponding connecting groove.

[0013] As a preferred technical solution of the present invention, the stop assembly also includes a plurality of driving blocks, the lifting platform is provided with a plurality of sliding grooves, the plurality of sliding grooves are matched one-to-one with the plurality of driving grooves, any of the sliding grooves is arranged at the top of the corresponding driving groove, the setting direction of the sliding groove is the same as the setting direction of the corresponding driving groove, the plurality of sliding grooves are connected to each other, any of the driving blocks can be slidably and sealed in the corresponding sliding groove, the driving block is connected to the corresponding sealing block, the sliding groove space between two adjacent driving blocks forms a hydraulic space, and the hydraulic oil is filled in the hydraulic space.

[0014] As a preferred technical solution of the present invention, the stop assembly also includes a plurality of sealing belts, the lifting platform is provided with a plurality of annular sealing grooves, and the plurality of annular sealing grooves are matched one-to-one with the plurality of sliding grooves. Any of the annular sealing grooves is arranged at the connection between the corresponding sliding groove and the driving groove, and one end of the annular sealing groove is connected to the connection between the sliding groove and the driving groove. Any of the sealing belts can be slidably and sealedly arranged in the corresponding annular sealing groove, and the sealing belt is also provided with a sealing hole, and the sealing hole is sealed with the driving block.

[0015] As a preferred technical solution of the present invention, it also includes two groups of closing components and drainage devices, the two groups of closing components are respectively arranged at the top and bottom of the lifting platform; the closing components include a plurality of closing units, and the plurality of closing units are matched one-to-one with the side wall surfaces enclosed by the pier; the closing unit includes a closing cylinder and a closing block, the closing cylinder is arranged on the lifting platform, the closing block is connected to the output end of the closing cylinder, the closing block is slidably and sealedly arranged on the surface of the lifting platform, and the closing block is driven to move by the closing cylinder, so that the closing block and the side wall surface of the pier can be fitted with each other, thereby forming a closed space inside the lifting platform, and the drainage device is arranged in the closed space to discharge the seawater in the closed space.

[0016] As a preferred technical solution of the present invention, it also includes a support unit, which includes a plurality of telescopic rods with hollow interiors and a support cylinder. The support cylinder is arranged on the outer side wall of the lifting platform. The telescopic direction of the output end of the support cylinder is consistent with the setting direction of the driving groove close to it. The outer diameters of the plurality of telescopic rods are different. The plurality of telescopic rods are coaxially slidably arranged in adjacent telescopic rods in a mutually nested manner. The telescopic rod with the largest outer diameter is connected to the outer side wall of the lifting platform, and the output end of the support cylinder is connected to the telescopic rod with the smallest outer diameter.

[0017] As a preferred technical solution of the present invention, it also includes a linkage rod, and a linkage slot is opened on the side wall surface of the lifting platform close to the supporting cylinder, and the linkage slot is connected with the sliding slot. One end of the linkage rod is connected to the output end of the supporting cylinder, and the other end thereof passes through the linkage slot and is connected to the driving block. The distance between the telescopic rod with the smallest outer diameter and the bare rock is greater than the distance between the connecting point between the fixed rod and the driving slot and the connecting slot.

[0018] As a preferred technical solution of the present invention, it also includes a waterstop belt, the lifting platform is also provided with an annular linkage groove, one end of the annular linkage groove is interconnected with the linkage groove hole, the waterstop belt can be slidably and sealedly arranged in the annular linkage groove, the waterstop belt is provided with a waterstop groove hole, and the linkage rod is sealed and connected with the waterstop groove hole.

[0019] The beneficial effects of the present invention are:

[0020] This solution is provided with a stop assembly. When the lifting platform moves to the corresponding height of the bridge pier, the telescopic unit extends the output end so that the abutment block and the side wall of the bridge pier are fitted together, so that the lifting platform is fixed at a certain height of the bridge pier. Even if the lifting platform on the seabed is impacted by the undercurrent, the lifting platform will not shake violently, and will not affect the construction workers on the lifting platform to carry out construction work on the bridge pier. This solves the problem that for bridge piers installed in deep water areas, it is generally necessary to install an operating platform to assist the workers in installing the bridge piers; however, due to the existence of undercurrents in deep water areas, after the operating platform is installed on the bridge pier, the undercurrents will impact the operating platform, causing the operating platform to shake, thereby affecting the construction speed and efficiency of the workers standing on the operating platform, thereby reducing the construction progress of the entire bridge pier. It is worth noting that when the abutment block releases its fitting relationship with the side wall of the bridge pier, the lifting platform can be lifted and moved along the bridge pier again; in addition, the setting of the moving assembly is to reduce the friction resistance between the lifting platform and the bridge pier when it slides. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0022] Figure 1 It is an overall schematic diagram of a construction operation platform for bare rock bridge piers with large inclination angles in deep water areas according to the present invention;

[0023] Figure 2 A top view of a lifting platform of the present invention based on a construction platform for bare rock bridge piers with large inclination angles in deep water areas;

[0024] Figure 3 A side view of a lifting platform of the present invention based on a construction work platform for bare rock bridge piers with large inclination angles in deep water areas;

[0025] Figure 4 This is an internal cross-sectional view of the bottom of a lifting platform of a construction work platform for bare rock bridge piers with a large inclination angle in deep water areas according to the present invention;

[0026] Figure 5 The present invention is an internal cross-sectional view of the top of a lifting platform of a construction work platform for bare rock bridge piers with a large inclination angle in deep water areas.

[0027] Description of main symbols

[0028] In the figure: 1. lifting platform; 2. moving component; 201. roller; 202. connecting shaft; 3. stop component; 301. abutment block; 302. fixed rod; 303. sliding rod; 304. telescopic spring; 305. sealing block; 306. driving block; 307. sealing belt; 4. rope; 5. supporting unit; 501. telescopic rod; 502. supporting cylinder; 6. linkage rod; 7. water stop belt; 8. closing unit; 801. closing cylinder; 802. closing block; 9. drainage device. DETAILED DESCRIPTION

[0029] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0030] See also Figure 1-Figure 5The present embodiment provides a construction work platform for high-angle bare rock piers in deep water areas, comprising a hollow lifting platform 1, a plurality of moving components 2 and a plurality of stop components 3. The lifting platform 1 can be lifted and lowered on the pier on the seabed. The plurality of moving components 2 are matched one-to-one with the side wall surfaces of the piers. The moving component 2 comprises a roller 201 and a connecting shaft 202. One end of the connecting shaft 202 is connected to the roller 201, and the other end of the connecting shaft 202 is connected to the inner wall of the lifting platform 1. The roller 201 is slidably connected to the corresponding side wall surface of the pier. The plurality of stop components 3 are matched one-to-one with the side wall surfaces of the piers. The stop components 3 comprise a telescopic unit and an abutment block 301. The two ends of the telescopic unit are respectively connected to the lifting platform 1 and the abutment block 301. The abutment block 301 can lock or release its fitting setting relationship with the side wall surface corresponding to the pier. By setting There is a stop assembly 3. When the lifting platform 1 moves to the corresponding height of the pier, the telescopic unit extends the output end so that the abutment block 301 and the side wall of the pier are fitted together, so that the lifting platform 1 is fixed at a certain height of the pier. Even if the lifting platform 1 on the seabed is impacted by the submarine undercurrent at this time, the lifting platform 1 will not shake violently, and will not affect the construction workers on the lifting platform 1 to carry out construction work on the pier, which solves the problem that for piers installed in deep water areas, it is generally necessary to install an operating platform to assist workers in installing the piers; however, due to the presence of submarine undercurrents in deep water areas, after the operating platform is installed on the pier, the submarine undercurrent will impact the operating platform, causing the operating platform to shake, thereby affecting the construction speed and efficiency of the workers standing on the operating platform, thereby reducing the construction progress of the entire pier. It is worth noting that when the abutment block 301 releases its fitting relationship with the side wall of the pier, the lifting platform 1 can be lifted and moved along the pier again; in addition, the setting of the moving component 2 is to reduce the friction resistance between the lifting platform 1 and the pier when it slides.

[0031] In addition, in order to realize the lifting and lowering of the lifting platform 1, the present solution also includes a rope 4. The crane is arranged on the shore. The two ends of the rope 4 are respectively connected to the output end of the crane and the lifting platform 1 to control the height of the lifting platform 1.

[0032] Furthermore, the telescopic unit of the present scheme includes an internally hollow fixed rod 302, a sliding rod 303 and a telescopic spring 304, one end of the fixed rod 302 is connected to the side wall of the lifting platform 1, the sliding rod 303 is slidably set at the other end of the fixed rod 302, the telescopic spring 304 is set in the fixed rod 302, the two ends of the telescopic spring 304 are respectively connected to the fixed rod 302 and the sliding rod 303, and the end of the sliding rod 303 away from the fixed rod 302 is connected to the abutment block 301; it is worth mentioning that when the sliding rod 303 extends out of the fixed rod 302, the abutment block 301 realizes its fitting setting with the side wall of the pier; when the sliding rod 303 is reset due to the action of the telescopic spring 304, the abutment block 301 releases its relationship of fitting setting with the side wall of the pier.

[0033] According to the above embodiment, the telescopic spring 304 functions to drive the sliding rod 303 to retract into the fixed rod 302 for resetting, so an external force is required to drive the sliding rod 303 to extend out of the fixed rod 302; in order to solve this problem, the stop assembly 3 of the present scheme also includes a sealing block 305, and the lifting platform 1 is provided with a plurality of driving grooves and a plurality of connecting grooves, and the plurality of driving grooves are not connected to each other, and the plurality of driving grooves are matched one-to-one with the plurality of telescopic units, and the interior of any fixed rod 302 is connected to the corresponding driving groove; the plurality of connecting grooves are matched one-to-one with the plurality of driving grooves, and any connecting groove The groove is arranged in the corresponding driving groove, and the connecting groove is connected with the external environment and the corresponding driving groove respectively; any sealing block 305 is slidably arranged in the corresponding driving groove; the fixed rod 302 can lock or release the interconnection relationship between it and the corresponding connecting groove; the sealing block 305 is driven to move, and when the sealing block 305 moves to a certain distance away from the corresponding connecting groove, the inside of the fixed rod 302 is interconnected with the seawater, and the sliding rod 303 will be extended due to the water pressure until the abutment block 301 is arranged in contact with the side wall of the pier. Similarly, when the sealing block 305 moves in the direction close to the corresponding connecting groove, while discharging the seawater in the driving groove, the structural effect that the inside of the fixed rod 302 is no longer interconnected with the seawater can be achieved, and the sliding rod 303 is reset due to the force of the telescopic spring 304.

[0034] It should be noted that when the interior of the fixed rod 302 is interconnected with the seawater, if the sliding rod 303 needs to be extended due to the water pressure, a condition is also required, that is, the force exerted by the seawater pressure on the sliding rod 303 is greater than the force exerted by the seawater pressure on the abutment block 301; based on this, in order to solve this problem, the present scheme also includes two sets of closing components and drainage devices 9, the two sets of closing components are respectively arranged at the top and bottom of the lifting platform 1; the closing components include a plurality of closing units 8, and the plurality of closing units 8 are matched one by one with the side wall surfaces of the enclosed piers; the closing units 8 include a closing cylinder 801 and a closing block 802, the closing cylinder 801 is arranged on the lifting platform 1, and the closing block 802 is connected to the output end of the closing cylinder 801, and the closing block 802 is slidably and sealedly arranged on the surface of the lifting platform 1. The closing block 802 is driven to move by the closing cylinder 801, so that the closing block 802 and the side wall of the pier can be fitted together. When each closing block 802 is fitted together with the side wall of the pier, each closing block 802 and the lifting platform 1 can form a closed space together. The drainage device 9 is arranged in the closed space, and the drainage device 9 located in the closed space starts to discharge the seawater in the closed space, thereby achieving that the force of the seawater water pressure in the closed space on the abutment block 301 is smaller than the force of the seawater water pressure outside the closed space on the sliding rod 303.

[0035] In order to enable several sealing blocks 305 to move simultaneously and to enable each sliding rod 303 to extend or retract synchronously; the stop assembly 3 of this scheme also includes several driving blocks 306, and the lifting platform 1 is provided with several sliding grooves, and the several sliding grooves are matched one by one with the several driving grooves. Any sliding groove is set at the top of the corresponding driving groove, and the setting direction of the sliding groove is the same as the setting direction of the corresponding driving groove. The several sliding grooves are connected to each other, and any driving block 306 can be slidably sealed in the corresponding sliding groove. The driving block 306 is connected to the corresponding sealing block 305, and the sliding groove space between two adjacent driving blocks 306 forms a hydraulic space, and the hydraulic oil is filled in the hydraulic space; by providing the sliding groove, since the adjacent sliding grooves are connected to each other, and the driving block 306 is set in the corresponding sliding groove, the sliding groove space between two adjacent driving blocks 306 forms a hydraulic space, and the hydraulic oil is filled in the hydraulic space. When one driving block 306 moves, the remaining driving blocks 306 will also move synchronously due to the action of the hydraulic oil. In addition, since each driving block 306 is connected to the corresponding sealing block 305 , each sealing block 305 can move simultaneously in the corresponding driving groove, and each sliding rod 303 can be extended or retracted synchronously.

[0036] According to the above embodiments, the present solution ensures that the driving block 306 and the sealing block 305 are connected to each other and slide synchronously, and also needs to ensure that the hydraulic oil in the hydraulic space does not leak; based on this, the stop assembly 3 of the present solution also includes a plurality of sealing belts 307, and the lifting platform 1 is provided with a plurality of annular sealing grooves, and the plurality of annular sealing grooves are matched one by one with the plurality of sliding grooves, and any annular sealing groove is arranged at the connection between the corresponding sliding groove and the driving groove, and one end of the annular sealing groove is connected to the connection between the sliding groove and the driving groove, and any sealing belt 307 is slidably sealed in the corresponding annular sealing groove, and the sealing belt 307 is also provided with a sealing hole, and the sealing hole is sealed with the driving block 306; by providing the sealing belt 307, the function of the sealing belt 307 is to seal the connection between the driving groove and the sliding groove, and the sealing hole provided with the sealing belt 307 enables the driving block 306 to pass through the sealing hole and be connected with the sealing block 305, and because the driving block 306 and the sealing hole are sealed with each other, the sealing of the hydraulic space is further achieved.

[0037] It is also worth mentioning that in order to further improve the stability of the lifting platform 1, the present solution also includes a support unit 5, which includes a plurality of telescopic rods 501 with hollow interiors and a support cylinder 502. The support cylinder 502 is arranged on the outer wall of the lifting platform 1, and the telescopic direction of the output end of the support cylinder 502 is consistent with the setting direction of the driving groove close to it. The outer diameters of the plurality of telescopic rods 501 are different. The plurality of telescopic rods 501 are coaxially slidably arranged in adjacent telescopic rods 501 in sequence by mutual sleeve arrangement. The telescopic rod 501 with the largest outer diameter is connected to the outer wall of the lifting platform 1, and the output end of the support cylinder 502 is connected to the telescopic rod 501 with the smallest outer diameter. The telescopic rod 501 with the smallest outer diameter can lock or release its fitting relationship with the bare rock; by providing the support cylinder 502, when the output end of the support cylinder 502 is extended, the support cylinder 502 will control the telescopic rod 501 with the smallest outer diameter to extend, thereby realizing its counter-fitting relationship with the bare rock, thereby further increasing the stability of the lifting platform 1.

[0038] In addition, it is worth mentioning that the present solution also includes a linkage rod 6. A linkage slot is provided on the side wall of the lifting platform 1 close to the supporting cylinder 502. The linkage slot is interconnected with the sliding slot. One end of the linkage rod 6 is connected to the output end of the supporting cylinder 502, and the other end thereof is connected to the driving block 306 through the linkage slot. The distance between the telescopic rod 501 with the smallest outer diameter and the bare rock is greater than the distance between the connecting point between the fixed rod 302 and the driving slot and the connecting slot. By such a setting, it can be ensured that when the output end of the supporting cylinder 502 begins to extend, the stop assembly 3 has started to work, so that the abutment block 301 and the side wall of the pier are abutted against each other, thereby achieving the stopping effect of the lifting platform 1, and facilitating the subsequent setting of the telescopic rod 501 with the smallest outer diameter and the bare rock. In addition, when the telescopic rod 501 with the smallest outer diameter is contracted, since the stop assembly 3 is still working, it is avoided that the height of the lifting platform 1 changes during the contraction of the telescopic rod 501, thereby causing the telescopic rod 501 to collide with seabed debris, thereby causing the structure of the telescopic rod 501 to deform.

[0039] It is also worth mentioning that in order to further ensure the sealing of the lifting platform 1, the present solution also includes a waterstop 7. The lifting platform 1 is also provided with an annular linkage groove, one end of which is interconnected with the linkage groove hole, and the waterstop 7 is slidably and sealedly arranged in the annular linkage groove. The waterstop 7 is provided with a waterstop groove hole, and the linkage rod 6 is sealed and connected with the waterstop groove hole; by providing the waterstop 7, the function of the waterstop 7 is to seal the annular linkage groove. Since one end of the annular linkage groove is overlapped and connected with the linkage groove hole, the sealing cooperation of the waterstop 7 to the linkage groove hole is achieved; in addition, the waterstop 7 is also provided with a waterstop groove hole. The purpose of the waterstop groove hole is to seal and cooperate with the linkage rod 6, thereby achieving the connection between the linkage rod 6 and the driving block 306, and at the same time, the sealing of the lifting platform 1 can be ensured.

[0040] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A construction platform for high-angle bare rock bridge piers in deep water areas, characterized by: The invention comprises a lifting platform with a hollow interior, a plurality of moving components and a plurality of stop components. The lifting platform can be lifted and lowered on a bridge pier on the seabed. The plurality of moving components are matched one by one with the side wall surfaces enclosed by the bridge pier. The moving components comprise rollers and connecting shafts. One end of the connecting shaft is connected to the rollers, and the other end of the connecting shaft is connected to the inner side wall of the lifting platform. The rollers are slidably connected to the corresponding side wall surfaces of the bridge pier. A plurality of stop components are matched one-to-one with the side wall surfaces enclosed by the bridge pier. The stop components include a telescopic unit and an abutment block. The two ends of the telescopic unit are respectively connected to the lifting platform and the abutment block. The abutment block can lock or release its fitting relationship with the side wall surface corresponding to the bridge pier.

2. The construction platform for high-angle bare rock bridge piers in deep water according to claim 1 is characterized by: It also includes a rope, the crane is arranged on the shore, and the two ends of the rope are respectively connected to the output end of the crane and the lifting platform to control the height of the lifting platform.

3. The construction platform for high-angle bare rock bridge piers in deep water according to claim 1 is characterized by: The telescopic unit includes a fixed rod with a hollow interior, a sliding rod and a telescopic spring, one end of the fixed rod is connected to the side wall of the lifting platform, the sliding rod is slidably arranged at the other end of the fixed rod, the telescopic spring is arranged in the fixed rod, the two ends of the telescopic spring are respectively connected to the fixed rod and the sliding rod, and the end of the sliding rod away from the fixed rod is connected to the abutment block.

4. The construction platform for high-angle bare rock bridge piers in deep water according to claim 3 is characterized by: The stop assembly also includes a sealing block. The lifting platform is provided with a plurality of driving grooves and a plurality of connecting grooves. The plurality of driving grooves are not connected to each other. The plurality of driving grooves are matched one-to-one with the plurality of telescopic units. The interior of any of the fixed rods is connected to the corresponding driving grooves. The plurality of connecting grooves are matched one-to-one with the plurality of driving grooves. Any of the connecting grooves is arranged in the corresponding driving groove. The connecting grooves are respectively connected to the external environment and the corresponding driving groove. Any of the sealing blocks is slidably arranged in the corresponding driving groove. The fixed rod can lock or release the interconnection relationship between it and the corresponding connecting groove.

5. The construction platform for high-angle bare rock bridge piers in deep water according to claim 4 is characterized by: The stop assembly also includes a plurality of drive blocks, and the lifting platform is provided with a plurality of sliding grooves, and the plurality of sliding grooves are matched one-to-one with the plurality of drive grooves. Any of the sliding grooves is arranged at the top of the corresponding drive groove, and the setting direction of the sliding groove is the same as the setting direction of the corresponding drive groove. The plurality of sliding grooves are interconnected, and any of the drive blocks can be slidably and sealedly arranged in the corresponding sliding groove. The drive block is connected to the corresponding sealing block, and the sliding groove space between two adjacent drive blocks forms a hydraulic space, and the hydraulic oil is filled in the hydraulic space.

6. The construction platform for high-angle bare rock bridge piers in deep water according to claim 5 is characterized by: The stop assembly also includes a plurality of sealing belts, and the lifting platform is provided with a plurality of annular sealing grooves, and the plurality of annular sealing grooves are matched one by one with the plurality of sliding grooves. Any of the annular sealing grooves is arranged at the connection between the corresponding sliding groove and the driving groove, and one end of the annular sealing groove is connected with the connection between the sliding groove and the driving groove. Any of the sealing belts can be slidably and sealedly arranged in the corresponding annular sealing groove, and the sealing belt is also provided with a sealing hole, and the sealing hole is sealed with the driving block.

7. The construction platform for high-angle bare rock bridge piers in deep water according to claim 4 is characterized by: It also includes two groups of closing components and drainage devices, the two groups of closing components are respectively arranged at the top and bottom of the lifting platform; the closing components include a plurality of closing units, and the plurality of closing units are matched one by one with the side wall surfaces enclosed by the bridge pier; the closing unit includes a closing cylinder and a closing block, the closing cylinder is arranged on the lifting platform, the closing block is connected to the output end of the closing cylinder, the closing block is slidably and sealedly arranged on the surface of the lifting platform, and the closing block is driven to move by the closing cylinder, so that the closing block and the side wall surface of the bridge pier can be fitted with each other, thereby forming a closed space inside the lifting platform, and the drainage device is arranged in the closed space to discharge the seawater in the closed space.

8. The construction platform for high-angle bare rock bridge piers in deep water according to claim 5 is characterized by: It also includes a support unit, which includes a plurality of telescopic rods with hollow interiors and a support cylinder. The support cylinder is arranged on the outer side wall of the lifting platform. The telescopic direction of the output end of the support cylinder is consistent with the setting direction of the driving groove close to it. The outer diameters of the plurality of telescopic rods are different. The plurality of telescopic rods are coaxially slidably arranged in adjacent telescopic rods in a mutually sleeved manner. The telescopic rod with the largest outer diameter is connected to the outer side wall of the lifting platform, and the output end of the support cylinder is connected to the telescopic rod with the smallest outer diameter.

9. The construction platform for high-angle bare rock bridge piers in deep water according to claim 8 is characterized by: It also includes a linkage rod, and a linkage slot is opened on the side wall of the lifting platform close to the supporting cylinder, and the linkage slot is connected with the sliding slot. One end of the linkage rod is connected to the output end of the supporting cylinder, and the other end passes through the linkage slot to be connected to the driving block, and the distance between the telescopic rod with the smallest outer diameter and the bare rock is greater than the distance between the connecting point between the fixed rod and the driving slot and the connecting slot.

10. The construction platform for high-angle bare rock bridge piers in deep water according to claim 9, characterized in that: It also includes a waterstop belt, and the lifting platform is also provided with an annular linkage groove, one end of the annular linkage groove is connected with the linkage groove hole, the waterstop belt can be slidably and sealedly arranged in the annular linkage groove, the waterstop belt is provided with a waterstop groove hole, and the linkage rod is sealed and connected with the waterstop groove hole.

Citation Information

Patent Citations

  • Fabricated viaduct pier column construction platform

    CN216108117U

  • Movable bridge pier construction platform for capping beam construction

    CN217629461U

  • Pier repairing device

    JP2001032215A