New energy control master station closed-loop test method and device, electronic equipment and storage medium

By building a new energy simulation power station and a new energy simulation control main station to simulate the operation process of the new energy control main station, the problem that existing testing methods cannot simulate the closed-loop process is solved, and the testing accuracy and reliability are significantly improved.

CN119690040APending Publication Date: 2025-03-25GUANGDONG POWER GRID CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411795587.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

The existing new energy control main station testing methods are mainly open-loop testing, and it is impossible to simulate the actual execution status and execution results of the controlled object after receiving the instructions and feedback to the complete closed-loop process of the main station system, which has limitations.

Method used

By building a new energy simulation power station and a new energy simulation control main station, the operation process of the new energy control main station is comprehensively simulated, including power generation simulation equipment, reactive regulation simulation equipment and execution simulation terminals, sending AGC point commands and AVC voltage regulation commands, calculating the difference between the target value and the output value, and judging the consistency of the response of the simulation equipment and the control commands.

Benefits of technology

It significantly improves the accuracy of the new energy control main site test, can quantify the execution effect and feedback accuracy of the control instructions, ensure the reliability of the closed-loop test results, and solve the limitations of traditional open-loop testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119690040A_ABST
    Figure CN119690040A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy control master station closed-loop test method and device, electronic equipment and a storage medium. The method comprises the steps that a new energy power station and a new energy control master station are simulated; and obtaining an active power value output by the power generation simulation equipment after the new energy simulation control master station sends the AGC setting command and a reactive power value and a voltage value output by the reactive regulation simulation equipment after the new energy simulation control master station sends the AVC voltage regulation command. Calculating the absolute value of the difference value between the AGC command target active power value and the output value of the power generation simulation equipment to generate a first difference value; calculating the absolute value of the difference value between the AVC command target reactive power value and the reactive power regulation equipment output value to generate a second difference value; and calculating the absolute value of the difference value between the AVC command target voltage value and the output value of the reactive power regulation equipment to generate a third difference value. And when the three differences are all smaller than the error threshold, determining that the closed-loop test of the new energy control master station succeeds. According to the invention, the test accuracy of the new energy control master station can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to a closed-loop testing method, device, electronic equipment and storage medium for a new energy control master station. Background Art

[0002] With the continuous advancement of the construction of new power systems, the access of large-scale wind power, photovoltaic and other volatile new energy sources has posed a huge challenge to the traditional power grid dispatching automation system. In order to improve the grid's ability to accept new energy and reduce the complexity of dispatchers' regulation of new energy, the new energy control master station has become an important system for realizing the automatic control of new energy such as wind power and photovoltaic. The new energy control master station can automatically complete the issuance of adjustment instructions and feedback reception for new energy stations under the premise of ensuring the safe and stable operation of the power grid. However, in order to ensure that the new energy control master station can perform its functions in actual operation and verify the correctness and reliability of its instruction issuance, the test of the new energy control master station has become an urgent problem to be solved.

[0003] The existing testing methods for new energy control master stations are mainly open-loop testing, the core of which is to verify whether the master station system can correctly generate and issue adjustment instructions. However, this testing method fails to consider the specific response behavior of the controlled object, such as wind turbines, photovoltaic power generation units, etc., and has obvious limitations: open-loop testing cannot simulate the actual execution of the controlled object after receiving the instruction and the complete closed-loop process of the execution result being fed back to the master station system. Summary of the invention

[0004] The embodiments of the present invention provide a closed-loop test method, device, electronic device and storage medium for a new energy control master station. By implementing the present invention, the specific response behavior of the controlled object can be considered, and the accuracy of the new energy control master station test is significantly improved.

[0005] An embodiment of the present invention provides a closed-loop test method for a new energy control master station, comprising:

[0006] Simulate the new energy power station to generate a new energy simulation power station; wherein the new energy simulation power station includes power generation simulation equipment and reactive power regulation simulation equipment;

[0007] Simulate the new energy control master station to generate a new energy simulation control master station;

[0008] Obtain the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command;

[0009] Calculate the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculate the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculate the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference;

[0010] When the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold, it is determined that the closed-loop test of the new energy control master station is successful.

[0011] Furthermore, the new energy simulation power station also includes a simulation execution terminal;

[0012] The simulating of the new energy power station to generate a new energy simulation power station includes:

[0013] Obtain a power generation equipment parameter table, a reactive power regulation equipment parameter table, and an execution terminal parameter table; wherein the power generation equipment parameter table includes a wind turbine parameter table and a photovoltaic module parameter table; the reactive power regulation equipment parameter table includes an SVC parameter table and a transformer parameter table; the execution terminal parameter table includes a new energy RTU parameter table and a new energy PLC parameter table;

[0014] According to the wind turbine parameter table and photovoltaic module parameter table, build power generation simulation equipment;

[0015] According to the SVC parameter table and transformer parameter table, construct reactive power regulation simulation equipment;

[0016] According to the new energy RTU parameter table and the new energy PLC parameter table, build an execution simulation terminal.

[0017] Further, the execution simulation terminal includes a new energy RTU and a new energy PLC;

[0018] The method of obtaining the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command includes:

[0019] Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; wherein, after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction;

[0020] After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

[0021] Further, the reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command include:

[0022] Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction;

[0023] After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

[0024] Based on the above method embodiment, the present invention provides a corresponding device embodiment.

[0025] An embodiment of the present invention provides a closed-loop test device for a new energy control master station, comprising: a new energy power station simulation module, a new energy control master station simulation module, a device response result acquisition module, an error calculation module and a closed-loop test determination module;

[0026] The new energy power station simulation module is used to simulate the new energy power station and generate a new energy simulation power station; wherein the new energy simulation power station includes power generation simulation equipment and reactive power regulation simulation equipment;

[0027] The new energy control master station simulation module is used to simulate the new energy control master station and generate a new energy simulation control master station;

[0028] The device response result acquisition module is used to obtain the active power value output by the power generation simulation device after the new energy simulation control master station sends an AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends an AVC voltage regulation command;

[0029] The error calculation module is used to calculate the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculate the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculate the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference;

[0030] The closed-loop test determination module is used to determine that the closed-loop test of the new energy control master station is successful when the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold.

[0031] Further, the new energy control master station closed-loop test device, the new energy simulation power station also includes an execution simulation terminal;

[0032] The new energy power station simulation module includes: an equipment parameter table acquisition unit, a power generation simulation equipment construction unit, a reactive power regulation simulation equipment construction unit and an execution simulation terminal construction unit;

[0033] The equipment parameter table acquisition unit is used to acquire the power generation equipment parameter table, the reactive power regulation equipment parameter table and the execution terminal parameter table; wherein the power generation equipment parameter table includes the fan parameter table and the photovoltaic module parameter table; the reactive power regulation equipment parameter table includes the SVC parameter table and the transformer parameter table; the execution terminal parameter table includes the new energy RTU parameter table and the new energy PLC parameter table;

[0034] The power generation simulation device construction unit is used to construct the power generation simulation device according to the wind turbine parameter table and the photovoltaic module parameter table;

[0035] The reactive power regulation simulation device construction unit is used to construct a reactive power regulation simulation device according to the SVC parameter table and the transformer parameter table;

[0036] The execution simulation terminal construction unit is used to construct the execution simulation terminal according to the new energy RTU parameter table and the new energy PLC parameter table.

[0037] Further, the new energy control master station closed-loop test device, the execution simulation terminal includes a new energy RTU and a new energy PLC;

[0038] The device response result acquisition module acquires the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, including:

[0039] Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC; the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction;

[0040] After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

[0041] Further, the closed-loop test device of the new energy control master station, the device response result acquisition module, the acquisition of the reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command, includes:

[0042] Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction;

[0043] After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

[0044] Based on the above method item embodiments, the present invention provides corresponding electronic device item embodiments.

[0045] An embodiment of the present invention provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the closed-loop test method for the new energy control master station described in any one of the above method embodiments can be implemented.

[0046] Based on the above method item embodiments, the present invention provides a corresponding storage medium item embodiment.

[0047] An embodiment of the present invention provides a storage medium on which a computer program is stored. When the computer program is executed by a processor, the closed-loop test method for the new energy control master station described in any one of the above method embodiments can be implemented.

[0048] Compared with the prior art, the present invention has the following beneficial effects:

[0049] The embodiment of the present invention provides a closed-loop test method, device, electronic device and storage medium for a new energy control master station. The method constructs a new energy simulation power station and a new energy simulation control master station, and comprehensively simulates the operation process of the new energy control master station. The new energy simulation power station includes a power generation simulation device, a reactive power regulation simulation device and an execution simulation terminal, which are used to simulate the response behavior of the device; the new energy simulation control master station is used to send an AGC set point command and an AVC voltage regulation command to command the new energy simulation power station to perform corresponding control operations. By calculating the difference between the target value and the output value, the consistency between the response of the simulation device and the control instruction is judged, and the result of the closed-loop test of the new energy simulation control master station is verified by the error threshold, which can quantitatively verify the execution effect and feedback correctness of the control instruction, and provide an accurate quantitative judgment basis for the closed-loop test. Whether it is an AGC set point command or an AVC voltage regulation command, strict error judgment is used to ensure that the execution result meets the requirements, and effectively improve the reliability of the closed-loop test of the new energy simulation control master station. By implementing the present invention, the specific response behavior of the controlled object can be considered, the accuracy of the instruction execution verification is significantly improved, the limitations of the traditional open-loop test are solved, and a solid guarantee is provided for the safe operation and efficient control of the new energy dispatching system. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a flow chart of a closed-loop testing method of a new energy control master station provided by an embodiment of the present invention.

[0051] Figure 2 It is a structural schematic diagram of a closed-loop test device for a new energy control master station provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] like Figure 1 As shown, an embodiment of the present invention provides a closed-loop test method for a new energy control master station, which at least includes the following steps:

[0054] Step S1, simulating a new energy power station to generate a new energy simulation power station; wherein the new energy simulation power station includes a power generation simulation device and a reactive power regulation simulation device;

[0055] It should be noted here that the simulation of the new energy power station generates a new energy simulation power station to simulate the operating characteristics and behaviors of the actual new energy power station. Among them, the new energy simulation power station consists of multiple core modules, including power generation simulation equipment and reactive power regulation simulation equipment. The power generation simulation equipment is mainly used to simulate the active power output characteristics of new energy power generation devices (such as wind turbines or photovoltaic power generation equipment), and can respond to external control commands and adjust the power output in real time. The reactive power regulation simulation equipment is used to simulate the reactive compensation device in the power system, and maintain the voltage stability of the system by adjusting the reactive power and voltage. The simulation models of the two types of equipment not only take into account the dynamic characteristics of the equipment, but also cover the actual operating factors such as the system's response delay and output fluctuations, thereby providing an accurate simulation environment for the performance test of the new energy control system.

[0056] In a preferred embodiment, the new energy simulation power station further includes a simulation execution terminal;

[0057] The simulating of the new energy power station to generate a new energy simulation power station includes:

[0058] Obtain a power generation equipment parameter table, a reactive power regulation equipment parameter table, and an execution terminal parameter table; wherein the power generation equipment parameter table includes a wind turbine parameter table and a photovoltaic module parameter table; the reactive power regulation equipment parameter table includes an SVC parameter table and a transformer parameter table; the execution terminal parameter table includes a new energy RTU parameter table and a new energy PLC parameter table;

[0059] According to the wind turbine parameter table and photovoltaic module parameter table, build power generation simulation equipment;

[0060] According to the SVC parameter table and transformer parameter table, construct reactive power regulation simulation equipment;

[0061] According to the new energy RTU parameter table and the new energy PLC parameter table, build an execution simulation terminal.

[0062] It should be explained here that the execution simulation terminal includes a new energy RTU and a new energy PLC;

[0063] The method of obtaining the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command includes:

[0064] Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; wherein, after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction;

[0065] After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

[0066] Step S2, simulating the new energy control master station to generate a new energy simulation control master station;

[0067] Specifically, in a preferred embodiment, the new energy simulation power station further includes a simulation execution terminal; the simulation of the new energy power station to generate the new energy simulation power station includes:

[0068] Obtain a power generation equipment parameter table, a reactive power regulation equipment parameter table, and an execution terminal parameter table; wherein the power generation equipment parameter table includes a wind turbine parameter table and a photovoltaic module parameter table; the reactive power regulation equipment parameter table includes an SVC parameter table and a transformer parameter table; the execution terminal parameter table includes a new energy RTU parameter table and a new energy PLC parameter table;

[0069] According to the power generation equipment parameter table, reactive power regulation equipment parameter table and execution terminal parameter table, the new energy power station is simulated to generate a new energy simulation power station.

[0070] Optionally, set the fan parameter table to define the parameters and properties of the new energy fan, including the fan name, upper limit of adjustment, lower limit of adjustment, adjustment speed, adjustment dead zone, delayed response time and other fixed properties. In addition, status telemetering, whether to participate in AGC adjustment telemetering, AGC adjustment telemetering, active telemetering, reactive telemetering, power factor telemetering and other telemetering parameter point numbers are used for data interaction functions. Considering that each new energy RTU contains multiple fans, each fan has corresponding status and measurement, and the fan output adjustment adopts PLC, the fan parameter table has the corresponding PLC number.

[0071] Optionally, set the PV module parameter table to define the parameters and properties of the PV power generation equipment, including the fixed properties of the PV power generation equipment similar to the wind turbine parameter table and the telesignaling and telemetry parameter point numbers. At the same time, each PV power generation equipment has the corresponding status and measurement, and has a corresponding PLC number.

[0072] Optionally, an SVC parameter table is set to record control parameters of the SVC device, including adjustment speed, capacity, etc.

[0073] Optionally, a transformer parameter table is set to set the telemetry objects and changes affected by transformer operation, including RTU number, serial number (serial number of the transformer), telemetry RTU number (RTU to which the telemetry objects affected by the transformer gear shifting), telemetry sequence number, upshift adjustment value, and downshift adjustment value attributes.

[0074] Step S3, obtaining the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command;

[0075] Specifically, in the new energy simulation environment, the output data of the power generation simulation equipment in response to the AGC (automatic generation control) set point command sent by the new energy simulation control main station is obtained, including the active power value actually output by the equipment, which is used to evaluate the execution effect of the AGC command. At the same time, the output results of the reactive regulation simulation equipment after the new energy simulation control main station sends the AVC (automatic voltage control) voltage regulation command are obtained, including the reactive power value and voltage value output by the equipment. These data can reflect the response speed, accuracy and stability of the simulation equipment to the control command. Through real-time recording and analysis of the output results, the dynamic characteristics of the equipment in the simulation system and the reliability of the control logic can be further verified, providing an accurate reference basis for the optimization of the control strategy of the new energy power station.

[0076] In a preferred embodiment, the reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command include:

[0077] Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction;

[0078] After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

[0079] Step S4, calculating the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculating the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculating the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference;

[0080] Specifically, in the simulation test, the difference between the target active power value carried in the AGC set point command and the active power value actually output by the power generation simulation device is first calculated, and the absolute value is taken to generate the first difference, which is used to evaluate the accuracy and precision of the power generation simulation device in executing the AGC command. Next, the difference between the target reactive power value carried in the AVC voltage regulation command and the reactive power value actually output by the reactive regulation simulation device is calculated, and the absolute value is taken to generate the second difference, which is used to evaluate the device's responsiveness to the reactive power regulation instruction. Finally, the difference between the target voltage value carried in the AVC voltage regulation command and the voltage value actually output by the reactive regulation simulation device is calculated, and the absolute value is taken to generate the third difference, which further reflects the execution effect and stability of the device during the voltage regulation process. The generation process of these differences is intended to quantify the execution error of the simulation device on the control command, and provide reliable data support for subsequent performance analysis and system optimization.

[0081] Step S5: When the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold, it is determined that the closed-loop test of the new energy control master station is successful.

[0082] Specifically, when the first difference is less than the preset first error threshold, the second difference is less than the preset second error threshold, and the third difference is less than the preset third error threshold, it can be determined that the closed-loop control logic of the new energy control master station under the current test conditions is executed correctly, and the closed-loop test result is successful. This shows that the response of the power generation simulation equipment and the reactive power regulation simulation equipment to the AGC set point command and the AVC voltage regulation command meets the accuracy requirements, and the control master station can achieve accurate adjustment of various operating indicators of the new energy power station. At the same time, this also verifies the coordination and consistency of the closed-loop process of the issuance of the master station instructions, the execution of the equipment, and the feedback in the entire system, which provides an important basis for the reliability and actual deployment of the control strategy of the new energy power station. If all differences are within the error threshold and the results of multiple tests are consistent, the stability and robustness of the control algorithm can be further proved, laying the foundation for subsequent optimization.

[0083] Based on the above method embodiment, the present invention provides a corresponding device embodiment.

[0084] like Figure 2 As shown, an embodiment of the present invention provides a closed-loop test device for a new energy control master station, including: a new energy power station simulation module, a new energy control master station simulation module, a device response result acquisition module, an error calculation module and a closed-loop test determination module;

[0085] The new energy power station simulation module is used to simulate the new energy power station and generate a new energy simulation power station; wherein the new energy simulation power station includes power generation simulation equipment and reactive power regulation simulation equipment;

[0086] The new energy control master station simulation module is used to simulate the new energy control master station and generate a new energy simulation control master station;

[0087] The device response result acquisition module is used to obtain the active power value output by the power generation simulation device after the new energy simulation control master station sends an AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends an AVC voltage regulation command;

[0088] The error calculation module is used to calculate the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculate the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculate the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference;

[0089] The closed-loop test determination module is used to determine that the closed-loop test of the new energy control master station is successful when the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold.

[0090] In a preferred embodiment, the new energy control master station closed-loop test device, the new energy simulation power station further comprises an execution simulation terminal;

[0091] The new energy power station simulation module includes: an equipment parameter table acquisition unit, a power generation simulation equipment construction unit, a reactive power regulation simulation equipment construction unit and an execution simulation terminal construction unit;

[0092] The equipment parameter table acquisition unit is used to acquire the power generation equipment parameter table, the reactive power regulation equipment parameter table and the execution terminal parameter table; wherein the power generation equipment parameter table includes the fan parameter table and the photovoltaic module parameter table; the reactive power regulation equipment parameter table includes the SVC parameter table and the transformer parameter table; the execution terminal parameter table includes the new energy RTU parameter table and the new energy PLC parameter table;

[0093] The power generation simulation device construction unit is used to construct the power generation simulation device according to the wind turbine parameter table and the photovoltaic module parameter table;

[0094] The reactive power regulation simulation device construction unit is used to construct a reactive power regulation simulation device according to the SVC parameter table and the transformer parameter table;

[0095] The execution simulation terminal construction unit is used to construct the execution simulation terminal according to the new energy RTU parameter table and the new energy PLC parameter table.

[0096] In an optional embodiment, the new energy control master station closed-loop test device, the execution simulation terminal includes a new energy RTU and a new energy PLC;

[0097] The device response result acquisition module acquires the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, including:

[0098] Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC; the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction;

[0099] After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

[0100] Optionally, the closed-loop test device of the new energy control master station, the device response result acquisition module, the acquisition of the reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command, includes:

[0101] Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction;

[0102] After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

[0103] It should be noted that the embodiment of the device described above corresponds to the above-mentioned embodiment of the present invention, and it can implement the closed-loop test method of the new energy control master station described in any one of the above-mentioned embodiments of the present invention. In addition, the embodiment of the above-mentioned device is merely schematic, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the embodiment of the device provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which can be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art can understand and implement it without paying any creative labor.

[0104] Based on the above method embodiment of the present invention, a corresponding electronic device embodiment is provided.

[0105] An embodiment of the present invention provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the closed-loop test method of the new energy control master station described in any one of the present invention is implemented, or when the processor executes the computer program, the functions of each module in the above-mentioned device embodiments are implemented.

[0106] Exemplarily, the computer program may be divided into one or more modules, which are stored in the memory and executed by the processor to implement the present invention. The one or more modules may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program in the terminal device.

[0107] The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.

[0108] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire terminal device.

[0109] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the terminal device by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile phone, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0110] Based on the above method embodiment, the present invention provides a storage medium embodiment;

[0111] Another embodiment of the present invention provides a storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the storage medium is located is controlled to execute any one of the above-mentioned new energy control master station closed-loop test methods of the present invention.

[0112] The storage medium is a computer-readable storage medium, and the computer program includes computer program code, which may be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0113] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0114] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A closed-loop test method for a new energy control master station, characterized in that: include: Simulate the new energy power station to generate a new energy simulation power station; wherein the new energy simulation power station includes power generation simulation equipment and reactive power regulation simulation equipment; Simulate the new energy control master station to generate a new energy simulation control master station; Obtain the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command; Calculate the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculate the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculate the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference; When the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold, it is determined that the closed-loop test of the new energy control master station is successful.

2. A closed-loop test method for a new energy control master station as claimed in claim 1, characterized in that: The new energy simulation power station also includes a simulation execution terminal; The simulating of the new energy power station to generate a new energy simulation power station includes: Obtain a power generation equipment parameter table, a reactive power regulation equipment parameter table, and an execution terminal parameter table; wherein the power generation equipment parameter table includes a wind turbine parameter table and a photovoltaic module parameter table; the reactive power regulation equipment parameter table includes an SVC parameter table and a transformer parameter table; the execution terminal parameter table includes a new energy RTU parameter table and a new energy PLC parameter table; According to the wind turbine parameter table and photovoltaic module parameter table, build power generation simulation equipment; According to the SVC parameter table and transformer parameter table, construct reactive power regulation simulation equipment; According to the new energy RTU parameter table and the new energy PLC parameter table, build an execution simulation terminal.

3. A closed-loop test method for a new energy control master station as claimed in claim 2, characterized in that: The execution simulation terminal includes a new energy RTU and a new energy PLC; The method of obtaining the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command includes: Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; wherein, after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction; After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

4. A closed-loop test method for a new energy control master station as claimed in claim 3, characterized in that: The reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command include: Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction; After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

5. A closed-loop test device for a new energy control master station, characterized in that: include: New energy power station simulation module, new energy control master station simulation module, equipment response result acquisition module, error calculation module and closed-loop test judgment module; The new energy power station simulation module is used to simulate the new energy power station and generate a new energy simulation power station; wherein the new energy simulation power station includes power generation simulation equipment and reactive power regulation simulation equipment; The new energy control master station simulation module is used to simulate the new energy control master station and generate a new energy simulation control master station; The device response result acquisition module is used to obtain the active power value output by the power generation simulation device after the new energy simulation control master station sends an AGC set point command, and the reactive power value and voltage value output by the reactive regulation simulation device after the new energy simulation control master station sends an AVC voltage regulation command; The error calculation module is used to calculate the absolute value of the difference between the target active power value carried by the AGC set point command and the active power value output by the power generation simulation device to generate a first difference; calculate the absolute value of the difference between the target reactive power value carried by the AVC voltage regulation command and the reactive power value output by the reactive regulation simulation device to generate a second difference; calculate the absolute value of the difference between the target voltage value carried by the AVC voltage regulation command and the voltage value output by the reactive regulation simulation device to generate a third difference; The closed-loop test determination module is used to determine that the closed-loop test of the new energy control master station is successful when the first difference is less than a preset first error threshold, the second difference is less than a preset second error threshold, and the third difference is less than a preset third error threshold.

6. A closed-loop test device for a new energy control master station as claimed in claim 5, characterized in that: The new energy simulation power station also includes a simulation execution terminal; The new energy power station simulation module includes: an equipment parameter table acquisition unit, a power generation simulation equipment construction unit, a reactive power regulation simulation equipment construction unit and an execution simulation terminal construction unit; The equipment parameter table acquisition unit is used to acquire the power generation equipment parameter table, the reactive power regulation equipment parameter table and the execution terminal parameter table; wherein the power generation equipment parameter table includes the fan parameter table and the photovoltaic module parameter table; the reactive power regulation equipment parameter table includes the SVC parameter table and the transformer parameter table; the execution terminal parameter table includes the new energy RTU parameter table and the new energy PLC parameter table; The power generation simulation device construction unit is used to construct the power generation simulation device according to the wind turbine parameter table and the photovoltaic module parameter table; The reactive power regulation simulation device construction unit is used to construct a reactive power regulation simulation device according to the SVC parameter table and the transformer parameter table; The execution simulation terminal construction unit is used to construct the execution simulation terminal according to the new energy RTU parameter table and the new energy PLC parameter table.

7. A closed-loop test device for a new energy control master station as claimed in claim 6, characterized in that: The execution simulation terminal includes a new energy RTU and a new energy PLC; The device response result acquisition module acquires the active power value output by the power generation simulation device after the new energy simulation control master station sends the AGC set point command, including: Sending an AGC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AGC set point command according to the AGC test instruction, and then sends the AGC set point command to the new energy RTU through the communication protocol; after receiving the AGC set point command from the new energy simulation control master station, the new energy RTU sends an AGC adjustment instruction to the corresponding new energy PLC; the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction; After detecting that the new energy PLC adjusts the active power value output by the power generation equipment according to the AGC adjustment instruction, the active power value output by the power generation equipment is collected.

8. A closed-loop test device for a new energy control master station as claimed in claim 7, characterized in that: The device response result acquisition module, which acquires the reactive power value and voltage value output by the reactive power regulation simulation device after the new energy simulation control master station sends the AVC voltage regulation command, includes: Sending an AVC test instruction to the new energy simulation control master station, so that the new energy simulation control master station generates an AVC voltage adjustment command according to the AVC test instruction, and then sends the AVC voltage adjustment command to the new energy RTU through the communication protocol; wherein, after receiving the AVC voltage adjustment command from the new energy simulation control master station, the new energy RTU sends the AVC adjustment instruction to the corresponding new energy PLC, so that the new energy PLC adjusts the reactive power value and voltage value output by the reactive adjustment simulation device according to the AVC adjustment instruction; After detecting that the new energy PLC adjusts the reactive power value and voltage value output by the reactive regulation simulation device according to the AVC regulation instruction, the reactive power value and voltage value output by the reactive regulation simulation device are collected.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the closed-loop testing method for the new energy control master station described in any one of claims 1 to 4 can be implemented.

10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, it can implement the closed-loop test method for the new energy control master station described in any one of claims 1 to 4.

Citation Information

Patent Citations

  • Automatic detection system and method for new energy AGC or AVC control system

    CN108958216A

  • Performance determination method, device and system of new energy control master station and storage medium

    CN113098139A

  • Method for measuring and calculating deviation between actual measurement data and simulation data of new energy station and electronic equipment

    CN116090196A

  • Vehicle power supply test system, method, device and equipment and storage medium

    CN116643200A

  • Wind farm AGC function test system

    CN202904368U