A sludge dewatering equipment for industrial sewage treatment

By combining centrifugal dehydration and extrusion dehydration technology, a sludge dehydration equipment for industrial sewage treatment was designed, which solved the problem of incomplete dehydration of existing equipment and achieved an efficient and continuous sludge dehydration process.

CN119774847AInactive Publication Date: 2025-04-08SHANGHAI TINGYING ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510288898.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2025-04-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing sludge dewatering equipment needs to be treated again when the dewatering is incomplete, resulting in low dewatering efficiency.

Method used

A sludge dewatering equipment for industrial sewage treatment was designed, combining centrifugal dewatering components and extrusion dewatering components to achieve efficient sludge dewatering by combining centrifugal dewatering and extrusion dewatering.

Benefits of technology

This equipment can effectively reduce the water content of the sludge during a treatment process, improve the efficiency of sludge dehydration, avoid the need for reprocessing, and maintain the dehydration quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119774847A_ABST
    Figure CN119774847A_ABST
Patent Text Reader

Abstract

The present invention discloses a sludge dewatering device for industrial sewage treatment, and the present invention relates to the technical field of sewage treatment. The device comprises a treatment cylinder, a centrifugal dewatering component is installed inside the treatment cylinder, a support frame is fixedly installed on the outer wall of the treatment cylinder, an extrusion dewatering component is fixedly installed on the bottom wall of the support frame, and an automatic pressure bearing component is installed on the right side of the top wall of the extrusion dewatering component. The sludge dewatering device for industrial sewage treatment, through the setting of the centrifugal dewatering component, adopts a rotating centrifugal dewatering method when dewatering the sludge, and the water in the sludge is thrown out and collected uniformly after separation and filtration. The centrifugal dewatering method is more efficient, and the treatment cylinder is set to prevent the sewage from scattering and overflowing. The sewage is uniformly concentrated and stored, which can further reduce the water content of the sludge and improve the efficiency of sludge dewatering. The sludge can be continuously dewatered by the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sewage treatment, in particular to sludge dewatering equipment for industrial sewage treatment. Background Art

[0002] Since the sludge is still in a liquid flow state and has a large volume after concentration or digestion, it cannot be transported and disposed of. In order to further reduce the moisture content and make the sludge moisture content as low as possible, the sludge must be dehydrated to reduce the sludge volume and facilitate transportation.

[0003] Regarding the above-mentioned related technologies, it is believed that: in industrial wastewater treatment, the sludge contains a lot of water, and it needs to be dehydrated to facilitate subsequent transportation and use. However, many sludge dehydration equipment currently uses a single device for treatment, which may result in incomplete dehydration and requires further treatment through other equipment. The overall dehydration efficiency is not high during use. Summary of the invention

[0004] In view of the deficiencies of the prior art, the present invention provides a sludge dewatering device for industrial sewage treatment, which solves the problem that the sludge does not need to be treated again after dewatering.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a sludge dewatering device for industrial sewage treatment, comprising a treatment cylinder, a centrifugal dewatering assembly is installed inside the treatment cylinder, a support frame is fixedly installed on the outer wall of the treatment cylinder, an extrusion dewatering assembly is fixedly installed on the bottom wall of the support frame, and an automatic pressure bearing assembly is installed on the right side of the top wall of the extrusion dewatering assembly; The centrifugal dehydration assembly includes a centrifugal dehydration cylinder, a fixing ring is fixedly installed at the bottom and the middle of the outer wall of the centrifugal dehydration cylinder, a plurality of reinforcing ribs are evenly fixedly installed on the outer walls of the two fixing rings, and the outer walls of the plurality of reinforcing ribs on the same fixing ring are all installed with the same rotating bearing, an annular groove is provided on the inner wall of the processing cylinder and at the position corresponding to the fixing ring, a sealing cover is fixedly installed on the top of the processing cylinder, a U-shaped seat is fixedly installed on the top wall of the sealing cover, a driving motor is fixedly installed on the top wall of the U-shaped seat, a power shaft of the driving motor passes through the U-shaped seat through a bearing and is fixedly connected to the center of the top wall of the centrifugal dehydration cylinder, a plurality of drainage holes are evenly opened on the outer wall of the centrifugal dehydration cylinder, a receiving bucket is fixedly installed on the bottom wall of the processing cylinder, a filter ring is fixedly installed on the outer edge of the top wall of the receiving bucket, a receiving cylinder is fixedly installed on the outer wall of the processing cylinder, a collecting bucket is connected to the bottom end of the receiving cylinder, and a guide groove is fixedly installed on the inner wall of the receiving cylinder.

[0006] Furthermore, the centrifugal dehydration cylinder is located inside the processing cylinder, the bottom of the centrifugal dehydration cylinder is funnel-shaped, the two fixed rings are symmetrically arranged up and down, the inner walls of the two ring grooves are fixedly installed on the corresponding outer walls of the rotating bearings, the top wall of the centrifugal dehydration cylinder is connected to a feed hopper, the height of the feed hopper is lower than the position of the top wall inside the U-shaped seat, the bottom wall of the centrifugal dehydration cylinder is connected to a mud discharge pipe, the outer wall of the mud discharge pipe is installed with a control valve, and the bottom end position of the mud discharge pipe matches the position of the extrusion dehydration assembly.

[0007] Furthermore, the guide groove is located directly below the filter ring, the bottom end of the collecting bucket is connected to a drain pipe, the drain pipe matches the position of the extrusion dehydration component, the rear wall of the guide groove is connected to a drain pipe, the drain pipe is "C" shaped, and the bottom end of the drain pipe is connected to the rear wall of the extrusion dehydration component.

[0008] Furthermore, the extrusion and dehydration assembly includes a pressure-bearing cylinder, the right side of the top wall of the pressure-bearing cylinder is fixedly connected to the bottom wall of the automatic pressure-bearing assembly, the top wall of the pressure-bearing cylinder is fixedly connected to the top wall of the support frame, the top wall of the pressure-bearing cylinder is connected to a material receiving hopper, the material receiving hopper is located directly below the sewage pipe and is connected, and the pressure-bearing cylinder is in an inclined state with the left side higher and the right side lower.

[0009] Furthermore, a water receiving frame is fixedly installed on the bottom wall of the pressure-bearing cylinder, a right side wall of the water receiving frame is connected to a water outlet pipe, and a rear wall of the water receiving frame is connected to the front end of the drainage pipe.

[0010] Furthermore, a hydraulic rod is fixedly installed on the left side wall of the pressure-bearing cylinder, and the movable end of the hydraulic rod slides through the pressure-bearing cylinder and is fixedly installed with an extrusion seat. The outer wall of the extrusion seat is evenly coated with an anti-stick coating, and the outer wall of the extrusion seat is slidably connected to the inner wall of the pressure-bearing cylinder.

[0011] Furthermore, a mounting opening is provided on the bottom wall of the pressure-bearing cylinder, a separation plate is fixedly installed on the inner wall of the mounting opening, and the separation plate is located on the upper part of the water receiving frame.

[0012] Furthermore, the automatic pressure-bearing component includes a U-shaped frame, which is fixedly connected to the right side of the outer wall of the pressure-bearing cylinder. An electric push rod is fixedly installed on the top wall of the U-shaped frame. The movable end of the electric push rod slides through the U-shaped frame and is fixedly installed with a lifting pressure-bearing seat.

[0013] Furthermore, a positioning groove is provided on the right side of the inner wall of the pressure-bearing cylinder, and a through groove is provided on the top wall of the pressure-bearing cylinder at a position corresponding to the positioning groove, and the through groove is connected to the positioning groove.

[0014] Furthermore, the outer wall of the lifting pressure bearing seat is slidably connected to the inner walls of the through groove and the positioning groove, and a sludge discharge frame is fixedly installed on the right side wall of the pressure bearing cylinder.

[0015] The present invention has the following beneficial effects: (1) The sludge dewatering equipment for industrial sewage treatment, through the setting of centrifugal dewatering components, adopts the rotating centrifugal dewatering method when dewatering the sludge, and the water in the sludge is thrown out and collected uniformly after separation and filtration. The centrifugal dewatering method is more efficient, and the treatment cylinder is set to prevent the sewage from scattering and overflowing. The sewage is uniformly concentrated and stored, which can further reduce the water content of the sludge and improve the efficiency of sludge dewatering. The equipment can continuously dewater the sludge, and the mud and water are separated to avoid cross mixing, so as to maintain the quality of sludge dewatering.

[0016] (2) The sludge dewatering equipment for industrial wastewater treatment is provided with an extrusion dewatering component. When the sludge is subjected to centrifugal dewatering and then extruded again, the remaining water in the sludge will be discharged out again. At the same time, during the extrusion dewatering, the centrifugal dewatering component keeps working, which can avoid the problem of processing window period and can continuously dewater the sludge.

[0017] (3) The sludge dewatering equipment for industrial wastewater treatment has a pressure-bearing component. When the sludge is extruded and dewatered, the sludge inside the pressure-bearing cylinder can be blocked by the lifting pressure-bearing seat to prevent it from overflowing. When the extrusion and dewatering is completed, the lifting pressure-bearing seat is opened to discharge the sludge inside the pressure-bearing cylinder to the outside for the next extrusion and dewatering.

[0018] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a front view of the external structure of the present invention; Figure 2 It is a front view of the internal structure of the present invention; Figure 3 An exploded view of the internal structure of the centrifugal dehydration component of the present invention; Figure 4 It is a rear view of the external structure of the present invention; Figure 5 This is an exploded view of the internal structure of the receiving tube and the processing tube of the present invention; Figure 6 This is a schematic diagram of the external structure of the extrusion dehydration component and the automatic pressure bearing component of the present invention; Figure 7 An exploded view of the internal structure of the extrusion dehydration component of the present invention; Figure 8 It is an exploded view of the internal structure of the automatic pressure-bearing component of the present invention.

[0020] In the figure, 1, treatment cylinder; 2, centrifugal dehydration assembly; 21, sealing cover; 22, U-shaped seat; 23, driving motor; 24, centrifugal dehydration cylinder; 25, drainage hole; 26, fixing ring; 27, reinforcing rib; 28, rotating bearing; 29, mud discharge pipe; 210, control valve; 211, receiving bucket; 212, filter ring; 213, ring groove; 214, receiving cylinder; 215, guide groove; 216, collecting bucket; 217, drainage pipe; 218. Drain pipe; 3. Extrusion dehydration assembly; 31. Pressure cylinder; 32. Hydraulic rod; 33. Extrusion seat; 34. Anti-stick coating; 35. Mounting port; 36. Separation plate; 37. Water receiving frame; 38. Water outlet pipe; 39. Receiving hopper; 4. Automatic pressure-bearing assembly; 41. Electric push rod; 42. U-shaped frame; 43. Lifting pressure-bearing seat; 44. Positioning slot; 45. Through slot; 46. Sludge discharge rack; 5. Support frame; 6. Feed hopper. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] In the description of the present invention, it should be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inside", "all around" and the like indicating orientation or positional relationship are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0023] See also Figure 1-Figure 8 The embodiment of the present invention provides a technical solution: a sludge dewatering device for industrial sewage treatment, comprising a treatment cylinder 1, a centrifugal dewatering component 2 is installed inside the treatment cylinder 1, a support frame 5 is fixedly installed on the outer wall of the treatment cylinder 1, an extrusion dewatering component 3 is fixedly installed on the bottom wall of the support frame 5, and an automatic pressure bearing component 4 is installed on the right side of the top wall of the extrusion dewatering component 3; The centrifugal dehydration assembly 2 includes a centrifugal dehydration cylinder 24, a fixing ring 26 is fixedly installed at the bottom and the middle of the outer wall of the centrifugal dehydration cylinder 24, a plurality of reinforcing ribs 27 are evenly fixedly installed on the outer walls of the two fixing rings 26, and a plurality of reinforcing ribs 27 located on the same fixing ring 26 are all installed with the same rotating bearing 28 on the outer wall, and an annular groove 213 is opened on the inner wall of the treatment cylinder 1 and at the position corresponding to the fixing ring 26, and a sealing cover 21 is fixedly installed on the top of the treatment cylinder 1, and a U-shaped seat 22 is fixedly installed on the top wall of the sealing cover 21, and the top of the U-shaped seat 22 is fixedly installed. A driving motor 23 is fixedly installed on the wall, and the power shaft of the driving motor 23 passes through the U-shaped seat 22 through a bearing and is fixedly connected to the center of the top wall of the centrifugal dehydration cylinder 24. A number of drainage holes 25 are evenly opened on the outer wall of the centrifugal dehydration cylinder 24. A receiving bucket 211 is fixedly installed on the bottom wall of the processing cylinder 1, and a filter ring 212 is fixedly installed on the outer edge of the top wall of the receiving bucket 211. A receiving cylinder 214 is fixedly installed on the outer wall of the processing cylinder 1, and a collecting bucket 216 is connected to the bottom end of the receiving cylinder 214, and a guide groove 215 is fixedly installed on the inner wall of the receiving cylinder 214.

[0024] In this embodiment, the setting of the centrifugal dehydration component 2 can perform centrifugal dehydration treatment on the sludge, and the water contained in the sludge is thrown out by rotating the centrifugal dehydration cylinder 24. The sewage thrown into the inside of the treatment cylinder 1 is collected by the receiving bucket 211 to prevent overflow, and then falls into the guide groove 215 inside the receiving cylinder 214 after being filtered by the filter ring 212, and is discharged to the outside through the drain pipe 217.

[0025] Specifically, the centrifugal dehydration cylinder 24 is located inside the processing cylinder 1, the bottom of the centrifugal dehydration cylinder 24 is funnel-shaped, the two fixed rings 26 are symmetrically arranged up and down, the inner walls of the two ring grooves 213 are fixedly installed with the corresponding outer walls of the rotating bearings 28, the top wall of the centrifugal dehydration cylinder 24 is connected to the feed hopper 6, and the height of the highest point of the feed hopper 6 is lower than the position of the inner top wall of the U-shaped seat 22, the bottom wall of the centrifugal dehydration cylinder 24 is connected to the mud discharge pipe 29, and the outer wall of the mud discharge pipe 29 is installed with a control valve 210, and the bottom end position of the mud discharge pipe 29 matches the position of the extrusion dehydration component 3.

[0026] In this embodiment, the centrifugal dehydration drum 24 rotates and dehydrates inside the treatment drum 1, and sludge is added through the feed hopper 6. After the centrifugal dehydration drum 24 rotates for a certain period of time, the control valve 210 is used to randomly discharge the sludge through the bottom end of the sludge discharge pipe 29.

[0027] Specifically, the guide groove 215 is located directly below the filter ring 212, and the bottom end of the collecting bucket 216 is connected to a drain pipe 218, which matches the position of the extrusion dehydration component 3. The rear wall of the guide groove 215 is connected to a drain pipe 217, which is "C" shaped, and the bottom end of the drain pipe 217 is connected to the rear wall of the extrusion dehydration component 3.

[0028] In this embodiment, when the sludge inside the centrifugal dehydration drum 24 is discharged through the bottom end of the sludge discharge pipe 29 and falls into the collecting bucket 216, it is discharged from the sewage discharge pipe 218, and the sewage inside the guide groove 215 is discharged into the water receiving frame 37 through the drainage pipe 217.

[0029] Specifically, the extrusion and dehydration assembly 3 includes a pressure-bearing cylinder 31, the right side of the top wall of the pressure-bearing cylinder 31 is fixedly connected to the bottom wall of the automatic pressure-bearing assembly 4, the top wall of the pressure-bearing cylinder 31 is fixedly connected to the top wall of the support frame 5, the top wall of the pressure-bearing cylinder 31 is connected to a receiving hopper 39, the receiving hopper 39 is located directly below the sewage pipe 218 and is connected, and the pressure-bearing cylinder 31 is in an inclined state with the left side higher and the right side lower.

[0030] In this embodiment, the pressure cylinder 31 is mainly used to contain the sludge that has been dehydrated, and receives the sludge discharged from the sewage pipe 218 through the receiving hopper 39.

[0031] Specifically, a water receiving frame 37 is fixedly installed on the bottom wall of the pressure-bearing cylinder 31 , a water outlet pipe 38 is connected to the right side wall of the water receiving frame 37 , and a rear wall of the water receiving frame 37 is connected to the front end of the drain pipe 217 .

[0032] In this embodiment, the water receiving frame 37 is mainly used to collect the discharged sewage and then perform subsequent purification treatment.

[0033] Specifically, a hydraulic rod 32 is fixedly installed on the left side wall of the pressure-bearing cylinder 31, and the movable end of the hydraulic rod 32 slides through the pressure-bearing cylinder 31 to fix an extrusion seat 33, the outer wall of the extrusion seat 33 is evenly coated with an anti-stick coating 34, and the outer wall of the extrusion seat 33 is slidably connected to the inner wall of the pressure-bearing cylinder 31.

[0034] In this embodiment, the hydraulic rod 32 pushes the extrusion seat 33 to slide inside the pressure cylinder 31 to squeeze and dehydrate the sludge. The provision of the anti-stick coating 34 can reduce the degree of adhesion of the sludge.

[0035] Specifically, a mounting opening 35 is opened on the bottom wall of the pressure-bearing cylinder 31 , and a separation plate 36 is fixedly installed on the inner wall of the mounting opening 35 . The separation plate 36 is located on the upper part of the water receiving frame 37 .

[0036] In this embodiment, the sewage squeezed out of the pressure tube 31 is filtered and separated by the separation plate 36 and then falls into the water receiving frame 37 .

[0037] Specifically, the automatic pressure-bearing assembly 4 includes a U-shaped frame 42, which is fixedly connected to the right side of the outer wall of the pressure-bearing cylinder 31, and an electric push rod 41 is fixedly installed on the top wall of the U-shaped frame 42. The movable end of the electric push rod 41 slides through the U-shaped frame 42 and is fixedly installed with a lifting pressure-bearing seat 43.

[0038] In this embodiment, the lifting and lowering of the lifting pressure-bearing seat 43 is controlled by the extension and retraction of the movable end of the electric push rod 41. When the sludge is squeezed and dehydrated, the lifting pressure-bearing seat 43 is mainly used to prevent the sludge from being discharged from the pressure cylinder 31. When the extrusion and dehydration are completed, the lifting pressure-bearing seat 43 lifts the sludge and discharges it from the right side of the pressure cylinder 31.

[0039] Specifically, a positioning groove 44 is opened on the right side of the inner wall of the pressure-bearing cylinder 31 , and a through groove 45 is opened on the top wall of the pressure-bearing cylinder 31 at a position corresponding to the positioning groove 44 , and the through groove 45 is connected to the positioning groove 44 .

[0040] In this embodiment, the positioning groove 44 and the through groove 45 are provided to limit the lifting and lowering pressure bearing seat 43 to prevent the lifting and lowering pressure bearing seat 43 from being displaced when the lifting and lowering pressure bearing seat 43 is lifted.

[0041] Specifically, the outer wall of the lifting pressure bearing seat 43 is slidably connected with the inner wall of the through groove 45 and the positioning groove 44 , and the sludge discharge frame 46 is fixedly installed on the right side wall of the pressure bearing cylinder 31 .

[0042] In this embodiment, after the sludge is squeezed and dehydrated, the lifting pressure seat 43 is raised, and the sludge is pushed by the hydraulic rod 32 to slide the squeezing seat 33 inside the pressure cylinder 31 through the sludge discharge frame 46 to be discharged outward for unified collection.

[0043] During operation, the drive motor 23, the hydraulic rod 32 and the electric push rod 41 are first electrically connected through an external power supply and a controller. When the sludge needs to be dehydrated, the sludge is injected into the centrifugal dehydration cylinder 24 through the feed hopper 6, and then the centrifugal dehydration cylinder 24 is driven by the drive motor 23 to start rotating. The centrifugal dehydration cylinder 24 drives the sludge inside it to start rotating at the same time, and the water contained in the sludge is thrown outward through the drainage hole 25 to the inside of the treatment cylinder 1. When the centrifugal dehydration cylinder 24 rotates, it will drive the fixed ring 26 and the reinforcing rib 27 to rotate. The reinforcing rib 27 rotates in the inner wall of the rotating bearing 28, and the water thrown out through the drainage hole 25 is discharged to the inside of the treatment cylinder 1. After passing through the inner wall of the treatment cylinder 1, it flows downward to the outer wall of the receiving bucket 211 and is collected. After passing through the filter ring 212, the sewage enters the guide groove 215 of the receiving cylinder 214. The sewage inside the guide groove 215 passes through the drain pipe 217 and is discharged into the water receiving frame 37 for storage. After the centrifugal dehydration cylinder 24 drives the sludge to rotate for a certain period of time, the control valve 210 is opened, so that the sludge inside the centrifugal dehydration cylinder 24 is discharged from the sludge discharge pipe 29 into the collection bucket 216 in the receiving cylinder 214 and is discharged from the sewage discharge pipe 218 into the receiving bucket 39. When the sludge passes through the receiving bucket 39 and enters the pressure cylinder 31, the sludge is discharged from the receiving bucket 39 to the receiving bucket 39. Afterwards, the hydraulic rod 32 is controlled by an external controller to start working, and the movable end of the hydraulic rod 32 pushes the squeezing seat 33 along the inner wall of the pressure-bearing cylinder 31 to start approaching the internal sludge. The squeezing seat 33 and the anti-stick coating 34 cooperate with each other to squeeze the sludge inside the pressure-bearing cylinder 31, so that the sewage inside the sludge is further discharged, and the sewage is discharged into the water receiving frame 37 through the separation plate 36 installed on the installation port 35 and collected uniformly. After the sludge is pushed to the right, it contacts and squeezes the lifting pressure-bearing seat 43. After squeezing the sludge, the movable end of the hydraulic rod 32 contracts and drives the squeezing seat 33 to slide to the left, and the movable end of the electric push rod 41 The contraction drives the lifting pressure-bearing seat 43 to slide upward along the inner walls of the positioning groove 44 and the through groove 45, thereby driving the positioning groove 44 to disengage from the pressure-bearing cylinder 31, so that the right side of the pressure-bearing cylinder 31 opens, and the movable end of the hydraulic rod 32 pushes the extrusion seat 33 to slide along the inner wall of the pressure-bearing cylinder 31, and the sludge inside the pressure-bearing cylinder 31 is discharged from the right side of the pressure-bearing cylinder 31, and is collected uniformly after passing through the sludge discharge rack 46. When the extrusion dehydration component 3 is working, it is a working window period of the centrifugal dehydration component 2. During this working period, the sludge continues to be centrifugally dehydrated by the centrifugal dehydration component 2 and the above-mentioned work process is repeated to continuously dehydrate the sludge.

[0044] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0045] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A sludge dewatering device for industrial wastewater treatment, comprising a treatment cylinder (1), characterized in that: A centrifugal dehydration component (2) is installed inside the treatment cylinder (1); a support frame (5) is fixedly installed on the outer wall of the treatment cylinder (1); an extrusion dehydration component (3) is fixedly installed on the bottom wall of the support frame (5); and an automatic pressure-bearing component (4) is installed on the right side of the top wall of the extrusion dehydration component (3); The centrifugal dehydration assembly (2) comprises a centrifugal dehydration cylinder (24), a fixing ring (26) is fixedly mounted on the bottom and middle of the outer wall of the centrifugal dehydration cylinder (24), a plurality of reinforcing ribs (27) are evenly fixedly mounted on the outer walls of the two fixing rings (26), a plurality of reinforcing ribs (27) located on the same fixing ring (26) are all mounted on the outer wall with a same rotating bearing (28), an annular groove (213) is formed on the inner wall of the treatment cylinder (1) at a position corresponding to the fixing ring (26), a sealing cover (21) is fixedly mounted on the top of the treatment cylinder (1), a U-shaped seat (22) is fixedly mounted on the top wall of the sealing cover (21), and the U-shaped seat (22) is ) is fixedly mounted on the top wall of the centrifugal dehydration cylinder (24); a power shaft of the drive motor (23) passes through a U-shaped seat (22) through a bearing and is fixedly connected to the center of the top wall of the centrifugal dehydration cylinder (24); a plurality of drainage holes (25) are evenly arranged on the outer wall of the centrifugal dehydration cylinder (24); a receiving bucket (211) is fixedly mounted on the bottom wall of the treatment cylinder (1); a filter ring (212) is fixedly mounted on the outer edge of the top wall of the receiving bucket (211); a receiving cylinder (214) is fixedly mounted on the outer wall of the treatment cylinder (1); a collecting bucket (216) is connected to the bottom end of the receiving cylinder (214); and a guide groove (215) is fixedly mounted on the inner wall of the receiving cylinder (214).

2. The sludge dewatering equipment for industrial wastewater treatment according to claim 1, characterized in that: The centrifugal dehydration cylinder (24) is located inside the processing cylinder (1), the bottom of the centrifugal dehydration cylinder (24) is funnel-shaped, the two fixing rings (26) are symmetrically arranged up and down, the inner walls of the two ring grooves (213) are fixedly mounted on the outer walls of the corresponding rotating bearings (28), the top wall of the centrifugal dehydration cylinder (24) is connected to a feed hopper (6), the height of the highest point of the feed hopper (6) is lower than the position of the inner top wall of the U-shaped seat (22), the bottom wall of the centrifugal dehydration cylinder (24) is connected to a mud discharge pipe (29), the outer wall of the mud discharge pipe (29) is installed with a control valve (210), and the bottom end position of the mud discharge pipe (29) matches the position of the extrusion dehydration component (3).

3. The sludge dewatering equipment for industrial wastewater treatment according to claim 1, characterized in that: The guide groove (215) is located directly below the filter ring (212); the bottom end of the collecting bucket (216) is connected to a sewage pipe (218); the sewage pipe (218) matches the position of the extrusion dehydration component (3); the rear wall of the guide groove (215) is connected to a drainage pipe (217); the drainage pipe (217) is in a "C" shape; the bottom end of the drainage pipe (217) is connected to the rear wall of the extrusion dehydration component (3).

4. The sludge dewatering equipment for industrial wastewater treatment according to claim 1, characterized in that: The extrusion dehydration assembly (3) comprises a pressure-bearing cylinder (31), the right side of the top wall of the pressure-bearing cylinder (31) is fixedly connected to the bottom wall of the automatic pressure-bearing assembly (4), the top wall of the pressure-bearing cylinder (31) is fixedly connected to the top wall of the support frame (5), the top wall of the pressure-bearing cylinder (31) is connected to a material receiving hopper (39), the material receiving hopper (39) is located directly below the sewage pipe (218) and is connected thereto, and the pressure-bearing cylinder (31) is in an inclined state with the left side higher and the right side lower.

5. The sludge dewatering equipment for industrial wastewater treatment according to claim 4, characterized in that: A water receiving frame (37) is fixedly mounted on the bottom wall of the pressure-bearing cylinder (31); a right side wall of the water receiving frame (37) is connected to a water outlet pipe (38); and a rear wall of the water receiving frame (37) is connected to the front end of a drainage pipe (217).

6. The sludge dewatering equipment for industrial wastewater treatment according to claim 4, characterized in that: A hydraulic rod (32) is fixedly mounted on the left side wall of the pressure-bearing cylinder (31); a movable end of the hydraulic rod (32) slides through the pressure-bearing cylinder (31) and a pressing seat (33) is fixedly mounted thereon; an outer side wall of the pressing seat (33) is evenly coated with an anti-stick coating (34); and the outer side wall of the pressing seat (33) is slidably connected to the inner side wall of the pressure-bearing cylinder (31).

7. The sludge dewatering equipment for industrial wastewater treatment according to claim 4, characterized in that: The bottom wall of the pressure-bearing cylinder (31) is provided with a mounting opening (35), and a separation plate (36) is fixedly mounted on the inner wall of the mounting opening (35), wherein the separation plate (36) is located on the upper part of the water receiving frame (37).

8. The sludge dewatering equipment for industrial wastewater treatment according to claim 1, characterized in that: The automatic pressure-bearing assembly (4) comprises a U-shaped frame (42), the U-shaped frame (42) being fixedly connected to the right side of the outer wall of the pressure-bearing cylinder (31), an electric push rod (41) being fixedly mounted on the top wall of the U-shaped frame (42), and a movable end of the electric push rod (41) slidingly passing through the U-shaped frame (42) and being fixedly mounted with a lifting pressure-bearing seat (43).

9. The sludge dewatering equipment for industrial wastewater treatment according to claim 4, characterized in that: A positioning groove (44) is provided on the right side of the inner wall of the pressure-bearing cylinder (31), and a through groove (45) is provided on the top wall of the pressure-bearing cylinder (31) at a position corresponding to the positioning groove (44), and the through groove (45) is connected to the positioning groove (44).

10. The sludge dewatering equipment for industrial wastewater treatment according to claim 8, characterized in that: The outer wall of the lifting pressure bearing seat (43) is slidably connected to the inner wall of the through groove (45) and the positioning groove (44), and a sludge discharge frame (46) is fixedly mounted on the right side wall of the pressure bearing cylinder (31).

Citation Information

Patent Citations

  • Automatic collection sludge dewatering and filtering device and dewatering and filtering method

    CN116943319A

  • Sludge dewatering treatment device

    CN117361835A

  • Sludge drying and granulating integrated equipment

    CN215712535U