Intelligent building curtain wall based on BIM design
Through the intelligent architectural curtain wall system designed based on BIM, the stop mechanism, alignment components and filling components are used to solve the problem of poor sealing status between the curtain wall panel and the support structure, efficient installation and sealing are achieved, and the overall performance of the building is improved.
Patent Information
- Application Number
- CN202510096036.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-04-08
AI Technical Summary
Due to the accuracy limitation of the component processing technology, processing errors and combination errors occur between the curtain wall panel and the support structure, affecting the sealing state.
The intelligent building curtain wall system based on BIM design is adopted to achieve precise alignment and fixation of the building curtain wall through the stop mechanism and alignment components. The filling components use elastic filling strips and compression units to automatically fill and compress to achieve sealing.
It improves the accuracy and efficiency of curtain wall installation, ensures an ideal sealing state between the curtain wall panel and the support structure, reduces rainwater leakage and air penetration problems, improves the sealing and insulation of the building, and reduces energy consumption.
Smart Images

Figure CN119777522A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of building curtain walls, and in particular to an intelligent building curtain wall designed based on BIM. Background Art
[0002] With the development of the construction industry, people's requirements for the aesthetics, functionality and intelligence of buildings are increasing. As an important part of the building facade, the building curtain wall not only bears the function of the enclosure structure, but also plays a key role in the overall image of the building. The traditional building curtain wall design and construction process has many limitations, such as incomplete design information, difficulty in coordination among various disciplines, lack of precise guidance in the construction process, etc. These problems can easily lead to extended construction period, increased costs and difficulty in ensuring quality.
[0003] The emergence of BIM, or Building Information Modeling, has brought innovation to the construction industry. It uses three-dimensional digital models as a carrier to integrate various information from the entire process of building design, construction to operation and maintenance, and realizes a high degree of information sharing and collaborative work. Applying BIM technology to building curtain wall design can effectively solve the shortcomings of traditional design methods and realize the intelligent design and construction of building curtain walls.
[0004] At present, the connection between curtain wall panels and supporting structures mainly adopts two methods: adhesive bonding or component assembly. However, in actual projects, due to certain precision limitations in component processing technology, processing errors are inevitable. At the same time, during the assembly process, operations in various links will also introduce combination errors. These errors are constantly superimposed, making it difficult to ensure that the curtain wall panels and supporting structures achieve an ideal seamless state during the installation process. Summary of the invention
[0005] The purpose of the present invention is to provide an intelligent building curtain wall based on BIM design, so as to solve the technical problem that machining errors will occur due to the precision limitation of component machining technology, thus affecting the sealing state between the curtain wall panel and the supporting structure.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] An intelligent building curtain wall based on BIM design includes: a controller and a mounting frame, on which the building curtain wall is fixed by a fixing mechanism, and the fixing mechanism includes:
[0008] A U-shaped card block, wherein the card blocks are arranged in groups of two, and each group of two card blocks has a limited sliding groove, and a limited sliding block is slidably connected to the limited sliding groove, and a spiral groove is penetrated on the opposite sides of the two limited sliding blocks, and the two spiral grooves are arranged in opposite directions, and the two spiral grooves are spirally connected to the same bidirectional screw rod, and a rubber sleeve is fixedly arranged in the middle of the bidirectional screw rod;
[0009] The slot part is arranged around the installation keel, and grooves are fixedly arranged on the two side walls of the slot part, and protrusions are arranged on the opposite sides of the two limit sliding blocks, and the grooves match the protrusions.
[0010] Furthermore, a stop mechanism is also provided on one side of the bidirectional screw rod, and the stop mechanism is used to keep the bidirectional screw rod stable and immobile after the building curtain wall is installed; the stop mechanism includes:
[0011] A stop rod, wherein two stop rods are provided, and one end of the stop rod is hingedly mounted on the middle part of the slot portion through a torsion spring, a collar is fixedly provided on the bidirectional screw rod, a plurality of openings are circumferentially opened on the collar, and the openings are adapted to the stop rod, an iron block is fixed on the free end of the stop rod, an electromagnet is embedded and connected at a corresponding position on the slot portion, and the electromagnet is electrically connected to the controller.
[0012] Furthermore, the stopping mechanism also includes an alignment component, which includes an infrared transmitter and an infrared receiver. An infrared receiver and an infrared transmitter are respectively provided on the side surfaces of two blocks at relative positions on both sides of the mounting frame. The infrared receiver and infrared transmitter are electrically connected to the controller. When the four groups of infrared transmitters and infrared receivers on the surrounding areas are aligned at the same time, the controller synchronously controls the electromagnets around the mounting frame to cut off power.
[0013] Furthermore, a filling component is provided in the slot portion, and the filling component is used to fill the gap between the building curtain wall and the slot portion to achieve sealing.
[0014] Further, the filling assembly includes an elastic filling strip and a pressing unit;
[0015] The elastic filling strip is made of rubber or silicone material, and its shape matches the gap between the slot and the building curtain wall, so as to tightly fill the gap. The clamping unit is composed of a plurality of clamping sheets and an adjusting screw, and the clamping sheet is located on the outside of the elastic filling strip. The adjusting screw can push the clamping sheet to apply pressure to the elastic filling strip, so that the elastic filling strip fills the gap.
[0016] Furthermore, the stop mechanism also includes a linkage assembly, which is used to transmit the power of the bidirectional screw in the stop mechanism to the adjusting screw and drive the adjusting screw to push the clamping plate.
[0017] Furthermore, the linkage component includes:
[0018] A transmission gear is arranged on the bidirectional screw rod, and the transmission gear is coaxially fixed with the bidirectional screw rod. A transmission rod is arranged in the slot portion, and one end of the transmission rod is provided with an external gear ring meshing with the transmission gear. The other end of the transmission rod is connected to the adjusting screw rod in the filling assembly through a bevel gear set, wherein the bevel gear set includes a bevel gear fixed to the end of the transmission rod and another bevel gear installed on the adjusting screw rod, and the two bevel gears are meshed with each other.
[0019] Furthermore, the bottom of the clamping sheet is slidably connected to a displacement groove provided on the bottom wall of the slot portion, and is spirally connected to the adjusting screw, the adjusting screw is rotationally connected to the bracket, and the bracket is fixedly arranged on the bottom wall of the slot portion.
[0020] Beneficial effects of the present invention:
[0021] (1) The present invention realizes the integrated operation of building curtain wall installation by combining the stop mechanism and the alignment assembly. At the moment of completing the precise alignment, the controller automatically controls the electromagnet to cut off the power, triggers the action of the stop rod, and locks the bidirectional screw rod, thereby avoiding the tedious manual operation and possible errors, and improving the installation efficiency and quality. At the same time, the stop mechanism can prevent the building curtain wall from being offset due to external factors such as wind force, vibration, etc. during use, thereby ensuring the long-term stability of the building curtain wall.
[0022] (2) The filling assembly in the present invention can tightly fill the gap between the building curtain wall and the slot part through the cooperation of the elastic filling strip and the pressing unit; through the linkage assembly, the power of the bidirectional screw is transmitted to the adjusting screw to realize automatic pressing of the elastic filling strip, which not only ensures the high efficiency of the seal, but also reduces the problems of rainwater leakage and air infiltration caused by poor sealing, improves the sealing and thermal insulation of the building curtain wall, and reduces the energy consumption of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The present invention will be further described below in conjunction with the accompanying drawings.
[0024] Figure 1 It is a schematic diagram of the installation framework of the present invention;
[0025] Figure 2 is a three-dimensional schematic diagram of the fixing mechanism in the present invention;
[0026] Figure 3 for Figure 2 A three-dimensional schematic diagram from another angle;
[0027] Figure 4 It is a structural schematic diagram of the linkage component in the present invention.
[0028] Description of the drawings: 1. Mounting frame; 2. Fixing mechanism; 21. Block; 22. Limiting slide groove; 23. Limiting slider; 24. Spiral groove; 25. Bidirectional lead screw; 26. Rubber sleeve; 27. Slot portion; 28. Groove; 29. Protrusion; 3. Stop mechanism; 31. Stop rod; 32. Ring; 33. Opening; 34. Iron block; 35. Electromagnet; 36. Alignment assembly; 361. Infrared transmitter; 362. Infrared receiver; 37. Filling assembly; 371. Elastic filling strip; 372. Pressing plate; 373. Adjusting screw; 38. Linkage assembly; 381. Transmission gear; 382. Transmission rod; 383. Outer gear ring; 384. Bevel gear set. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1-Figure 4 As shown, the present invention is an intelligent building curtain wall based on BIM design, comprising: a controller and a mounting frame 1, on which the building curtain wall is fixed by a fixing mechanism 2, and the fixing mechanism 2 comprises:
[0031] A U-shaped block 21, wherein the blocks 21 are arranged in groups of two, and each group of two blocks 21 has a limited slide groove 22, and a limited slider 23 is slidably connected to the limited slide groove 22. A spiral groove 24 is provided on opposite sides of the two limited sliders 23, and the two spiral grooves 24 are arranged in opposite directions, and the two spiral grooves 24 are commonly spirally connected to the same bidirectional screw rod 25, and a rubber sleeve 26 is fixedly provided in the middle of the bidirectional screw rod 25;
[0032] The slot portion 27 is arranged around the mounting keel, and grooves 28 are fixedly provided on both side walls of the slot portion 27. The two sides of the two limit sliders 23 that are away from each other are provided with protrusions 29, and the grooves 28 cooperate with the protrusions 29.
[0033] The present invention places the building curtain wall on the installation frame 1, and then clamps the U-shaped clamping block 21 on the clamping groove portion 27 on the installation frame 1, and uses four groups of clamping blocks 21 distributed on the four sides of the building curtain wall to realize rapid fixation of the building curtain wall. During the initial installation, the clamping block 21 is kept roughly consistent with the clamping groove portion 27, and then the two-way screw rod 25 is driven to rotate by rotating the rubber sleeve 26, and the two-way screw rod 25 drives the two limit sliders 23 to move away synchronously until the protrusions 29 on the outer sides of the two limit sliders 23 just enter the corresponding grooves 28. At this time, the building curtain wall is quickly installed. If disassembly is required, the rubber sleeve 26 is rotated in the opposite direction to drive the two-way screw rod 25 to rotate, which is convenient and quick; at the same time, the position of the building curtain wall can also be quickly and conveniently adjusted.
[0034] A stop mechanism 3 is also provided on one side of the bidirectional screw rod 25, and the stop mechanism 3 is used to keep the bidirectional screw rod 25 stable and immobile after the building curtain wall is installed; the stop mechanism 3 includes:
[0035] The stop rod 31 is provided with two, and one end of the stop rod 31 is hingedly mounted on the middle part of the slot portion 27 through a torsion spring. A ring 32 is fixedly provided on the bidirectional screw rod 25, and a plurality of openings 33 are opened circumferentially on the ring 32, and the openings 33 are adapted to the stop rod 31. An iron block 34 is fixed on the free end of the stop rod 31, and an electromagnet 35 is embedded and connected at a corresponding position on the slot portion 27, and the electromagnet 35 is electrically connected to the controller.
[0036] The stopping mechanism 3 also includes an alignment component 36, which includes an infrared transmitter 361 and an infrared receiver 362. The infrared receiver 362 and the infrared transmitter 361 are respectively arranged on the side surfaces of the two blocks 21 at relative positions on both sides of the mounting frame 1. The infrared receiver 362 and the infrared transmitter 361 are electrically connected to the controller. When the four groups of infrared transmitters 361 and infrared receivers 362 on the surrounding areas are aligned at the same time, the controller synchronously controls the electromagnets 35 on the surrounding areas of the mounting frame 1 to cut off the power.
[0037] In the present invention, the cooperation between the electromagnet 35 and the stop rod 31 in the stop mechanism 3 ensures that the bidirectional screw rod 25 can be reliably stopped after the installation of the building curtain wall is completed. The electromagnetic force of the electromagnet 35 is sufficient to overcome the elastic force of the stop rod 31 and possible external interference forces, and the mechanical structure design of the stop rod 31 ensures that it can be quickly and firmly inserted into the opening 33 of the ring 32 after the electromagnet 35 is powered off, preventing the bidirectional screw rod 25 from rotating under the action of external forces such as wind loads and earthquakes during long-term use; at the same time, the alignment component 36 realizes the precise alignment of the building curtain wall through infrared signals, and its detection accuracy is high and is not affected by ambient light. When the building curtain wall is slightly offset, the infrared signal will be promptly fed back to the controller to ensure that the building curtain wall always maintains precise flatness and verticality, providing a strong guarantee for subsequent use and aesthetics.
[0038] A filling component 37 is also provided in the slot portion 27 , and the filling component 37 is used to fill the gap between the building curtain wall and the slot portion 27 to achieve sealing.
[0039] The filling assembly 37 includes an elastic filling strip 371 and a pressing unit;
[0040] The elastic filling strip 371 is made of rubber or silicone material. The shape of the elastic filling strip 371 matches the gap between the slot portion 27 and the building curtain wall, and is used to tightly fill the gap. The clamping unit is composed of a plurality of clamping plates 372 and an adjusting screw 373. The clamping plate 372 is located on the outside of the elastic filling strip 371. The adjusting screw 373 can push the clamping plate 372 to apply pressure to the elastic filling strip 371, so that the elastic filling strip 371 fills the gap.
[0041] The stop mechanism 3 further includes a linkage assembly 38 , which is used to transmit the power of the bidirectional screw 25 in the stop mechanism 3 to the adjusting screw 373 , and drive the adjusting screw 373 to push the pressing plate 372 .
[0042] The linkage assembly 38 comprises:
[0043] A transmission gear 381 is arranged on the bidirectional screw rod 25, and the transmission gear 381 is coaxially fixed with the bidirectional screw rod 25. A transmission rod 382 is arranged in the slot portion 27, and one end of the transmission rod 382 is provided with an outer gear ring 383 meshing with the transmission gear 381, and the other end of the transmission rod 382 is connected to the adjusting screw 373 in the filling component 37 through a bevel gear set 384, wherein the bevel gear set 384 includes a bevel gear fixed to the end of the transmission rod 382 and another bevel gear installed on the adjusting screw 373, and the two bevel gears are meshed with each other.
[0044] The bottom of the pressing piece 372 is slidably connected to a displacement groove provided on the bottom wall of the slot portion 27 , and the adjusting screw 373 is rotatably connected to the bracket, and the bracket is fixedly arranged on the bottom wall of the slot portion 27 .
[0045] In the present invention, the elastic filling strip 371 is customized according to the shape and size of the gap between the slot portion 27 and the building curtain wall. The material of the elastic filling strip 371, rubber or silicone, has good elasticity and plasticity and can fit the gap tightly. During the initial installation, the elastic filling strip 371 is in a natural state and may not completely fill the gap, but only plays a preliminary filling and buffering role. The clamping plate 372 of the clamping unit is located on one side of the elastic filling strip 371, and its bottom is slidably connected to the displacement groove of the bottom wall of the slot portion 27, ensuring stable movement in the horizontal direction. The adjusting screw 373 is rotatably connected to the bottom wall of the slot portion 27 through a bracket. When the adjusting screw 373 rotates, according to the principle of spiral transmission, the clamping plate 372 is pushed to move in a straight line along the displacement groove. When the adjusting screw 373 rotates, the rotational motion is converted into linear motion through the thread, so that the clamping plate 372 applies pressure to the elastic filling strip 371. As the pressing piece 372 is pushed forward, the elastic filling strip 371 is gradually compressed, and the elastic potential energy inside it increases, further filling and sealing the gap between the building curtain wall and the slot portion 27. At the same time, the contact surface of the pressing piece 372 and the elastic filling strip 371 can be specially processed, such as adding anti-slip texture or convex points, to increase friction and ensure a good sealing effect.
[0046] The filling component 37 achieves an excellent sealing effect through the combined action of the elastic filling strip 371 and the pressing unit. The elastic filling strip 371 can adapt to different gap shapes and sizes, and under the action of the pressing unit, it can fill complex irregular gaps and effectively prevent the penetration of rainwater, air, dust, etc.; and the improvement of the sealing performance directly brings about the energy-saving effect of the building. By reducing the exchange of indoor and outdoor air, it can effectively reduce the load of the building's HVAC system and reduce energy consumption, especially in cold or hot climate conditions, reducing the heat exchange caused by air infiltration and reducing the operating cost of the building;
[0047] Finally, since the building curtain wall can be accurately installed, reliably stopped and well sealed, the stability of the overall structure is significantly improved; the stopping mechanism 3 prevents the curtain wall from being displaced due to vibration and external force during long-term use, and the sealing of the filling component 37 reduces the erosion of the internal structure of the curtain wall by external factors, thereby extending the service life of the building curtain wall.
[0048] Through the above technical solution, on the one hand, during the installation of the building curtain wall, the rotation of the bidirectional screw 25 can not only complete the rapid installation of the curtain wall, but the power generated by it can also be transmitted to the filling component 37 through the linkage component 38, so as to realize the operation of the filling component 37 without the need for an additional power source; on the other hand, this linkage mechanism realizes the coordinated work of curtain wall installation, stopping, alignment and sealing, reduces the independent steps between different operations, and improves the overall installation and maintenance efficiency.
[0049] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. An intelligent building curtain wall based on BIM design, comprising: A controller and mounting frame (1), characterized in that a building curtain wall is fixed to the mounting frame (1) via a fixing mechanism (2), and the fixing mechanism (2) comprises: A U-shaped clamping block (21), wherein the clamping blocks (21) are arranged in groups of two, each group of two clamping blocks (21) is provided with a limit slide groove (22), a limit slider (23) is slidably connected to the limit slide groove (22), a spiral groove (24) is penetrated on opposite sides of the two limit sliders (23), the two spiral grooves (24) are arranged in opposite directions, and the two spiral grooves (24) are spirally connected to the same bidirectional screw rod (25), and a rubber sleeve (26) is fixedly arranged in the middle of the bidirectional screw rod (25); A slot portion (27) is arranged around the mounting keel, and grooves (28) are fixedly arranged on both side walls of the slot portion (27), and convex blocks (29) are arranged on the opposite sides of the two limit sliders (23), and the grooves (28) are matched with the convex blocks (29).
2. The intelligent building curtain wall based on BIM design according to claim 1 is characterized in that: A stop mechanism (3) is also provided on one side of the bidirectional screw rod (25), and the stop mechanism (3) is used to keep the bidirectional screw rod (25) stable and motionless after the building curtain wall is installed; the stop mechanism (3) comprises: A stop rod (31), wherein two stop rods (31) are provided, and one end of the stop rod (31) is hingedly mounted on the middle part of the slot portion (27) through a torsion spring, a collar (32) is fixedly arranged on the bidirectional screw rod (25), a plurality of openings (33) are circumferentially opened on the collar (32), and the openings (33) are adapted to the stop rod (31), an iron block (34) is fixed on the free end of the stop rod (31), and an electromagnet (35) is embedded and connected at a corresponding position on the slot portion (27), and the electromagnet (35) is electrically connected to the controller.
3. The intelligent building curtain wall based on BIM design according to claim 2 is characterized in that: The stop mechanism (3) further comprises an alignment component (36), the alignment component (36) comprising an infrared transmitter (361) and an infrared receiver (362), the infrared receiver (362) and the infrared transmitter (361) being respectively arranged on the sides of two clamping blocks (21) at relative positions on both sides of the installation frame (1), the infrared receiver (362) and the infrared transmitter (361) being electrically connected to the controller, and when four groups of infrared transmitters (361) and infrared receivers (362) on the surrounding sides are aligned at the same time, the controller synchronously controls the electromagnets (35) on the surrounding sides of the installation frame (1) to be powered off.
4. The intelligent building curtain wall based on BIM design according to claim 3 is characterized in that: A filling component (37) is also provided in the slot portion (27), and the filling component (37) is used to fill the gap between the building curtain wall and the slot portion (27) to achieve sealing.
5. The intelligent building curtain wall based on BIM design according to claim 4 is characterized in that: The filling assembly (37) comprises an elastic filling strip (371) and a pressing unit; The elastic filling strip (371) is made of rubber or silicone material. The shape of the elastic filling strip (371) matches the gap between the slot portion (27) and the building curtain wall, and is used to tightly fill the gap. The pressing unit is composed of a plurality of pressing plates (372) and an adjusting screw (373). The pressing plate (372) is located on the outside of the elastic filling strip (371). The adjusting screw (373) can push the pressing plate (372) to apply pressure to the elastic filling strip (371), so that the elastic filling strip (371) fills the gap.
6. The intelligent building curtain wall based on BIM design according to claim 5 is characterized in that: The stop mechanism (3) further comprises a linkage assembly (38), wherein the linkage assembly (38) is used to transmit the power of the bidirectional screw rod (25) in the stop mechanism (3) to the adjusting screw rod (373), and drives the adjusting screw rod (373) to push the pressing plate (372).
7. The intelligent building curtain wall based on BIM design according to claim 6 is characterized in that: The linkage assembly (38) comprises: A transmission gear (381) is arranged on the bidirectional screw rod (25), and the transmission gear (381) is coaxially fixed with the bidirectional screw rod (25). A transmission rod (382) is arranged in the slot portion (27), and one end of the transmission rod (382) is provided with an outer gear ring (383) meshing with the transmission gear (381). The other end of the transmission rod (382) is connected to the adjusting screw rod (373) in the filling component (37) through a bevel gear set (384), wherein the bevel gear set (384) includes a bevel gear fixed to the end of the transmission rod (382) and another bevel gear installed on the adjusting screw rod (373), and the two bevel gears are meshed with each other.
8. The intelligent building curtain wall based on BIM design according to claim 7 is characterized in that: The bottom of the clamping sheet (372) is slidably connected to a displacement groove provided on the bottom wall of the slot portion (27), and is spirally connected to the adjusting screw (373). The adjusting screw (373) is rotatably connected to the bracket, and the bracket is fixedly arranged on the bottom wall of the slot portion (27).