Steel structure building with integrated decoration module
By designing a steel structure building with integrated decoration modules, using open holes and bottom support steel beams, the complex problem of existing modular prefabricated building installation is solved, and a more efficient and standardized construction process and structural strength is achieved.
Patent Information
- Application Number
- CN202510076121.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2025-04-18
AI Technical Summary
The existing modular prefabricated buildings have high requirements and complex installation process, resulting in high construction difficulty, long construction period, high cost, poor structural comfort and high net requirements.
Design a steel structure building with integrated decoration modules, including the steel structure frame body and the integrated module. Open holes are set around, at the bottom and top of the steel structure frame body, bottom supporting steel beams are set at the bottom of the integrated module, and placement grooves and suspended ceilings are set at the top.
The steel structure frame body with open holes facilitates the hoisting and installation of the integrated module, reducing installation difficulty; the bottom support steel beam improves structural strength and installation convenience; the placement of grooves on the integrated module realizes the pre-installation of the electromechanical system, simplifies the on-site construction process, and improves the degree of decoration standardization.
Smart Images

Figure CN119843764A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel structure building construction, and in particular to a steel structure building with an integrated decoration module. Background Art
[0002] The introduction of low-carbon green buildings has effectively reduced the workload and building pollution on the construction site. With the vigorous promotion and development of modular prefabricated buildings, the workload on site has been greatly reduced, the pollution on site construction has been reduced, the construction period and cost have been saved, and the requirements of low-carbon emission reduction green buildings have been met.
[0003] In traditional building interior decoration work, the installation of mechanical and electrical equipment in the building is generally carried out after the civil construction is completed, and during the installation work, the main line of the equipment needs to be installed first, and then the decoration and the insertion of secondary mechanical and electrical equipment are carried out. However, this traditional decoration method will lead to a large number of labor operations on the construction site, and because the construction quality completed by different laborers is uneven, the on-site decoration also brings uncontrollable factors to the project schedule and construction cost.
[0004] The existing modular prefabricated buildings use prefabricated building modules to meet the integration and standardization of decoration, saving a lot of labor for decoration construction and greatly improving construction efficiency. However, the embedded modules of the existing modular buildings are embedded module boxes in the completed main structure. The main structure is a modular structure, and the installation requires floor lowering or later backfilling. This requires a lot of later wet work to be completed after the installation of the prefabricated modules. The traditional prefabricated modules need to have a floor system inside because of the full prefabrication decoration, which leads to the easy formation of cavities in the floor slab and the floor system, and the comfort of the structure is relatively poor. In addition, the double-layer board plus the cavity will increase the thickness of the floor, and the net height requirements in the building are high. Embedded modules usually adopt the push method, which has extremely high requirements for the flatness of the ground and the clearance of the path for on-site installation. There must be no equipment pipe shafts and stairwells in the path where the prefabricated modules are pushed, resulting in extremely limited installation conditions. In addition, the equipment system on the path needs to be installed after the prefabricated modules are in place. Multiple processes are interspersed and complicated, and the installation process is cumbersome. Compared with traditional hoisting modules, the existing push-type prefabricated modules require the setting up of a module installation platform during installation, which places extremely high demands on the structural measures of the installation platform. Summary of the invention
[0005] Therefore, the present invention aims to solve the problems of high installation requirements and complex installation of modular prefabricated buildings in the prior art, thereby providing a steel structure building with integrated decoration modules.
[0006] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0007] A steel structure building with an integrated decoration module comprises a steel structure frame body and an integrated module arranged in the steel structure frame body, the steel structure frame body is elevated so that its bottom is suspended in the air, and open holes are arranged on the four sides, bottom and top of the steel structure frame body; a bottom supporting steel beam suitable for connecting with the steel structure frame body is arranged at the bottom of the integrated module, and a placement groove suitable for placing an electromechanical system is arranged on the integrated module.
[0008] Furthermore, the integrated module is an integrated box, a concrete base plate is arranged at the bottom of the integrated box, the bottom supporting steel beam is arranged on the concrete base plate away from the bottom of the integrated box, and the bottom supporting steel beam is located in the same plane as the bottom structure of the steel structure frame body.
[0009] Furthermore, the bottom supporting steel beam includes a first bottom bar and a second bottom bar respectively arranged on opposite sides of the bottom of the integrated box body, a fixed bar connected between the first bottom bar and the second bottom bar, and two oblique bars connected between the first bottom bar and the fixed bar, one end of the two oblique bars are respectively connected to the two ends of the first bottom bar, and the other end of the two oblique bars is connected to an end of the fixed bar away from the first bottom bar.
[0010] Furthermore, a suspended ceiling is arranged on the top of the integrated box, and the placement groove is arranged on the suspended ceiling.
[0011] Furthermore, a top supporting steel beam located above the suspended ceiling is also provided on the top of the integrated box.
[0012] Furthermore, the top supporting steel beam includes a supporting frame having the same circumference shape as the top of the integrated box, longitudinal beams connected to opposite ends of the supporting frame, and multiple cross beams connected to opposite sides of the supporting frame at intervals, and the multiple cross beams are vertically connected to the longitudinal beams.
[0013] Furthermore, an electromechanical installation steel frame located below the bottom supporting steel beam is provided at the bottom of the integrated box, and the electromechanical installation steel frame is located in a suspended position at the bottom of the steel structure frame body.
[0014] Furthermore, the main body of the steel structure frame includes a plurality of vertically arranged columns, a plurality of top beams connected between the tops of the plurality of columns, and a plurality of bottom beams connected between the plurality of columns and close to the bottoms of the columns; the inner sides of the two top beams and the two bottom beams located on opposite sides are provided with fixings suitable for connecting with the bottom supporting steel beams.
[0015] Furthermore, the fixing part includes two fixing steel plates fixed to the main body of the steel structure frame, the fixing steel plates are provided with connecting holes, the connecting holes are provided with connecting steel nails, and the spacing between the two fixing steel plates is adapted to the length of the bottom supporting steel beam.
[0016] Furthermore, the integrated box includes a plurality of light steel frame partition walls enclosing a rectangular frame, an exterior surface is provided on the exterior of the light steel frame partition wall, an interior surface is provided on the interior of the light steel frame partition wall, and wire holes are provided on the concrete bottom plate and the ceiling.
[0017] The technical solution of the present invention has the following advantages:
[0018] 1. The steel structure building with integrated decoration modules provided by the present invention is convenient for hoisting and installing the integrated modules in the steel structure frame body through the open holes by setting a steel structure frame body with open holes on all sides, bottom and top, so that the installation of the integrated modules is not restricted, and the integrated modules can be installed from the side or bottom after the steel structure frame body is capped, which greatly reduces the installation difficulty of the prefabricated modules. By setting the bottom support steel beam on the prefabricated module, the structural strength weakening problem of the open holes at the bottom of the steel structure body can be filled; the structural strength of the integrated module can also be improved during the transportation process, and after the integrated module is subsequently connected to the steel structure frame body, the bottom support steel beam can also be used to disperse part of the force, thereby improving the structural strength of the integrated module. A placement slot suitable for placing the electromechanical system is provided on the integrated module, so that the required electromechanical system can be directly installed before decoration. After entering the site, it is only necessary to connect the pipelines on the electromechanical system to the on-site power supply, and there is no need to open holes and install the electromechanical system at the construction site, which saves a lot of construction processes and labor for on-site electromechanical installation. This type of steel structure building can be fully prefabricated and integrated in the factory. It can meet the functional requirements of the building only after hoisting and connection at the construction site, reducing on-site wet work processes and improving the standardization of steel structure building decoration.
[0019] 2. The steel structure building with integrated decoration modules provided by the present invention has an integrated module which is an integrated box, a concrete bottom plate is arranged at the bottom of the integrated box, a bottom support steel beam is arranged at the bottom of the concrete bottom plate away from the bottom of the integrated box, and the bottom support steel beam is located in the same plane as the bottom structure of the steel structure frame body. In this arrangement, only one floor plate, the concrete bottom plate, is arranged between the integrated module and the steel structure frame body, which can save the building height and is also conducive to increasing the net height within the limited height of the building; and the structure with only one floor plate between the integrated module and the steel structure frame body reduces the floor pouring amount at the construction site.
[0020] 3. The steel structure building with integrated decoration module provided by the present invention comprises a first bottom bar and a second bottom bar respectively arranged on opposite sides of the bottom of the integrated box, a fixed bar connected between the first bottom bar and the second bottom bar, and two diagonal bars connected between the first bottom bar and the fixed bar, one end of the two diagonal bars is respectively connected to the two ends of the first bottom bar, and the other end of the two diagonal bars is connected to the end of the fixed bar away from the first bottom bar. In this way, the bottom support steel beam is used to provide the horizontal rigidity requirement for the main body of the steel structure frame, and the weakening of the plane rigidity of the bottom of the structure due to the opening of open holes in the main body of the steel structure frame is avoided. At the same time, after the integrated box is connected to the main body of the steel structure frame, the bottom support steel beam can be used to provide a strong rigidity for the module, and the bottom steel beam can be used as a bottom tray when the integrated module is hoisted, providing a hoisting anchor point during the hoisting process of the integrated module, and the hoisting device can be directly connected to the bottom support steel beam when the integrated module is hoisted, so as to ensure the rigidity of the integrated module and reduce other hoisting reinforcement measures.
[0021] 4. The steel structure building with integrated decoration modules provided by the present invention has a ceiling on the top of the integrated box, and a placement slot is provided on the ceiling. This arrangement facilitates the arrangement of the electromechanical system and the wiring of the lines on the top of the integrated box, and does not require opening holes on the wall surface of the side wall of the integrated box for wiring, thus simplifying the construction process.
[0022] 5. The steel structure building with integrated decoration modules provided by the present invention has a top supporting steel beam located above the ceiling on the top of the integrated box. This arrangement can provide support for the electromechanical system and line routing installed in the placement slot, thereby improving the structural strength of the top of the integrated box.
[0023] 6. The steel structure building with integrated decoration module provided by the present invention comprises a fixing piece including two fixing steel sheets fixed to the main body of the steel structure frame, a connecting hole is provided on the fixing steel sheet, a connecting steel nail is provided on the connecting hole, and the spacing between the two fixing steel sheets is adapted to the length of the bottom supporting steel beam. In this way, the bottom supporting steel beam can be fixedly installed on the main body of the steel structure frame by the fixing steel sheet and the fixing steel nail. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A three-dimensional structural diagram of a steel structure building with integrated decoration modules provided by an embodiment of the present invention;
[0026] Figure 2 is a three-dimensional structural diagram of an integrated module in an embodiment of the present invention;
[0027] Figure 3 An isometric split diagram of an integrated module in an embodiment of the present invention;
[0028] Figure 4 A three-dimensional structural diagram of a steel structure building with integrated decoration modules provided as an alternative embodiment of the present invention;
[0029] Figure 5 It is a three-dimensional structural diagram of an integrated module in an alternative embodiment of the present invention;
[0030] Explanation of the reference numerals: 1. Main body of steel structure frame; 2. Integrated module; 3. Open hole; 4. Bottom supporting steel beam; 5. Placement groove; 6. Concrete bottom plate; 7. First bottom bar; 8. Second bottom bar; 9. Fixed bar; 10. Diagonal bar; 11. Ceiling; 12. Top supporting steel beam; 13. Support frame; 14. Longitudinal beam; 15. Cross beam; 16. Mechanical and electrical installation steel frame; 17. Column; 18. Top beam; 19. Fixing parts; 20. Light steel keel partition wall; 21. Exterior finish; 22. Interior finish; 23. Mechanical and electrical system. DETAILED DESCRIPTION
[0031] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0035] like Figure 1-Figure 5 A steel structure building with an integrated decoration module is shown, comprising a steel structure frame body 1 and an integrated module 2 arranged in the steel structure frame body 1. The steel structure frame body 1 is elevated so that its bottom is suspended in the air, and open holes 3 are arranged around the steel structure frame body 1, at the bottom and at the top; a bottom supporting steel beam 4 suitable for connecting to the steel structure frame body 1 is arranged at the bottom of the integrated module 2, and a placement groove 5 suitable for placing an electromechanical system 23 is arranged on the integrated module 2.
[0036] This steel structure building with integrated decoration module is convenient for hoisting and installing the integrated module 2 in the steel structure frame body 1 through the open holes 3 by setting the steel structure frame body 1 with open holes 3 on all sides, bottom and top, so that the installation of the integrated module 2 is not restricted, and the integrated module 2 can be installed from the side or bottom after the steel structure frame body 1 is capped, which greatly reduces the installation difficulty of the prefabricated module. By setting the bottom support steel beam 4 on the prefabricated module, the structural strength weakening problem of the open hole 3 at the bottom of the steel structure body can be filled; the structural strength of the integrated module 2 can also be improved during the transportation process, and after the integrated module 2 is subsequently connected to the steel structure frame body 1, the bottom support steel beam 4 can also be used to disperse part of the force, thereby improving the structural strength of the integrated module 2. A placement slot 5 suitable for placing the electromechanical system 23 is provided on the integrated module 2, so that the required electromechanical system 23 can be directly installed before decoration. After entering the site, it is only necessary to connect the pipeline on the electromechanical system 23 to the on-site power supply, and there is no need to open holes and install the electromechanical system 23 at the construction site, which saves a lot of construction processes and labor for on-site electromechanical installation. This type of steel structure building can be prefabricated and integrated in the factory. It can meet the functional requirements of the building after only hoisting and connection at the construction site, reducing the wet operation process on site and improving the standardization of steel structure building decoration. It reduces the number of on-site floor slabs and steel secondary beams, saves the number of hoisting times, reduces the amount of on-site wet operations, and hoisting is all dry construction, saving materials and green construction. The level of civilization on site is high.
[0037] In a replaceable embodiment, a mechanical and electrical installation steel frame 16 located below the bottom supporting steel beam 4 is provided at the bottom of the integrated box, and the mechanical and electrical installation steel frame 16 is located in a suspended position at the bottom of the steel structure frame body 1.
[0038] In this embodiment, the steel structure frame body 1 includes a plurality of vertically arranged columns 17, a plurality of top beams 18 connected between the tops of the plurality of columns 17, and a plurality of bottom beams connected between the plurality of columns 17 and close to the bottoms of the columns 17; the two top beams 18 located on opposite sides and the inner sides of the two bottom beams are provided with fixing parts 19 suitable for connecting with the bottom supporting steel beams 4.
[0039] Specifically, the fixing member 19 includes a fixing steel sheet fixed to two compartments on the steel structure frame body 1, a connection hole is provided on the fixing steel sheet, a connection steel nail is provided on the connection hole, and the spacing between the two fixing steel sheets is adapted to the length of the bottom support steel beam 4; the bottom support steel beam 4 is provided with mounting holes adapted to the connection holes at both opposite ends. In this way, the bottom support steel beam 4 can be fixedly installed on the steel structure frame body 1 by the fixing steel sheet and the fixing steel nail. Specifically, two groups of fixing members 19 are provided on the inner side of each top beam 18 and bottom beam (the number of fixing members 19 provided on the top beam 18 and bottom beam on the same steel structure frame body 1 is the same), and each group of fixing members 19 includes two fixing steel sheets arranged at intervals. In this way, two integrated boxes can be installed on a steel structure frame body 1 to form two building spaces, or a wall adjacent to the two integrated boxes can be opened to form a larger indoor space. In a replaceable embodiment, three or four groups of fixing parts 19 may be arranged on the inner side of each top beam 18 and bottom beam, and the specific number may be set according to requirements.
[0040] In this embodiment, the integrated module 2 is an integrated box, and a concrete bottom plate 6 is arranged at the bottom of the integrated box. The bottom support steel beam 4 is arranged at the bottom of the concrete bottom plate 6 away from the bottom of the integrated box, and the bottom support steel beam 4 is located in the same plane as the bottom structure of the steel structure frame body 1. In this arrangement, only one floor plate, the concrete bottom plate 6, is arranged between the integrated module 2 and the steel structure frame body 1, which can save the building height and is also conducive to increasing the net height within the limited height of the building; and the structure of only one floor plate between the integrated module 2 and the steel structure frame body 1 reduces the floor pouring amount at the construction site.
[0041] In this embodiment, the integrated box includes a plurality of light steel frame partition walls 20 enclosing a rectangular frame. An exterior surface 21 is provided on the exterior side of the light steel frame partition wall 20 , and an interior surface 22 is provided on the interior side of the light steel frame partition wall 20 .
[0042] In this embodiment, the bottom support steel beam 4 includes a first bottom bar 7 and a second bottom bar 8 respectively arranged on opposite sides of the bottom of the integrated box, a fixed bar 9 connected between the first bottom bar 7 and the second bottom bar 8, and two inclined bars 10 connected between the first bottom bar 7 and the fixed bar 9, one end of the two inclined bars 10 is respectively connected to the two ends of the first bottom bar 7, and the other end of the two inclined bars 10 is connected to the end of the fixed bar 9 away from the first bottom bar 7. In this way, the bottom support steel beam 4 is used to provide the horizontal rigidity requirement for the steel structure frame body 1, and the weakening of the plane rigidity of the bottom of the structure by the steel structure frame body 1 due to the opening of the open hole 3 is avoided. At the same time, after the integrated box is connected to the steel structure frame body 1, the bottom support steel beam 4 can provide a strong rigidity for the module, and the bottom steel beam can be used as a bottom tray when the integrated module 2 is hoisted, providing a hoisting anchor point during the hoisting process of the integrated module 2. When the integrated module 2 is hoisted, the hoist can be directly connected to the bottom support steel beam 4 to ensure the rigidity of the integrated module 2 and reduce other hoisting reinforcement measures. Since the bottom supporting steel beam 4 is arranged at the bottom of the integrated box, the decoration, structural setting and electromechanical arrangement of the integrated box can be completed in the factory. After the integrated box is hoisted, it is only necessary to connect the pipelines on site with the electromechanical connections on the integrated box, which has high integration and high standardization. It reduces on-site decoration work and electromechanical installation work.
[0043] Specifically, a ceiling 11 is provided on the top of the integrated box, and a placement slot 5 is provided on the ceiling 11. This arrangement facilitates the installation of the electromechanical system 23 and the wiring of the line on the top of the integrated box, without the need to open holes on the wall surface of the side wall of the integrated box for wiring, thus simplifying the construction process. Specifically, the concrete bottom plate 6 and the ceiling 11 are both provided with threading holes.
[0044] In this embodiment, the top of the integrated box is also provided with a top support steel beam 12 located above the ceiling 11. Such a configuration can provide support for the electromechanical system 23 installed in the placement slot 5 and the routing of the lines, thereby improving the structural strength of the top of the integrated box. Specifically, the top support steel beam 12 includes a support frame 13 having the same circumference shape as the top of the integrated box, a longitudinal beam 14 connected to opposite ends of the support frame 13, and a plurality of cross beams 15 connected to opposite sides of the support frame 13 at intervals, and the plurality of cross beams 15 are vertically connected to the longitudinal beam 14.
[0045] In summary, this steel structure building with integrated decoration modules, by setting up a steel structure frame body 1 with open holes 3 on all sides, bottom and top, is convenient for hoisting and installing the integrated module 2 in the steel structure frame body 1 through the open holes 3, so that the installation of the integrated module 2 is not restricted, and the integrated module 2 can be installed from the side or bottom after the steel structure frame body 1 is capped, which greatly reduces the difficulty of installing the prefabricated module. By setting the bottom support steel beam 4 in the prefabricated module, the structural strength weakening problem of the open hole 3 at the bottom of the steel structure body can be compensated; the structural strength of the integrated module 2 can also be improved during transportation, and after the integrated module 2 is subsequently connected to the steel structure frame body 1, the bottom support steel beam 4 can also be used to disperse part of the force, thereby improving the structural strength of the integrated module 2. The integrated module 2 is provided with a placement slot 5 suitable for placing the electromechanical system 23, so that the required electromechanical system 23 can be installed directly before decoration. After entering the site, it is only necessary to connect the pipelines on the electromechanical system 23 to the on-site power supply, and there is no need to drill holes and install the electromechanical system 23 on the construction site, thus eliminating a large number of construction processes and labor for on-site electromechanical installation. This type of steel structure building can realize full factory prefabrication and integration, and can meet the functional requirements of the building after only hoisting and connection at the construction site, reducing on-site wet operation processes and improving the standardization of steel structure building decoration.
[0046] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A steel structure building with integrated decoration modules, characterized in that: The invention comprises a steel structure frame body (1) and an integrated module (2) arranged in the steel structure frame body (1); the steel structure frame body (1) is elevated so that its bottom is suspended in the air; the steel structure frame body (1) is provided with open holes (3) on all sides, bottom and top; the bottom of the integrated module (2) is provided with a bottom support steel beam (4) suitable for connecting to the steel structure frame body (1); and the integrated module (2) is provided with a placement groove (5) suitable for placing an electromechanical system (23).
2. The steel structure building with integrated decoration modules according to claim 1, characterized in that: The integrated module (2) is an integrated box, a concrete base plate (6) is provided at the bottom of the integrated box, the bottom support steel beam (4) is provided on the concrete base plate (6) away from the bottom of the integrated box, and the bottom support steel beam (4) and the bottom structure of the steel structure frame body (1) are located in the same plane.
3. The steel structure building with integrated decoration modules according to claim 2, characterized in that: The bottom supporting steel beam (4) comprises a first bottom bar (7) and a second bottom bar (8) respectively arranged on opposite sides of the bottom of the integrated box body, a fixing bar (9) connected between the first bottom bar (7) and the second bottom bar (8), and two oblique bars (10) connected between the first bottom bar (7) and the fixing bar (9), one end of the two oblique bars (10) being respectively connected to the two ends of the first bottom bar (7), and the other end of the two oblique bars (10) being connected to the end of the fixing bar (9) away from the first bottom bar (7).
4. The steel structure building with integrated decoration modules according to claim 2, characterized in that: A suspended ceiling (11) is arranged on the top of the integrated box, and the placement groove (5) is arranged on the suspended ceiling (11).
5. The steel structure building with integrated decoration modules according to claim 4, characterized in that: The top of the integrated box is also provided with a top supporting steel beam (12) located above the suspended ceiling (11).
6. The steel structure building with integrated decoration modules according to claim 5, characterized in that: The top supporting steel beam (12) comprises a supporting frame (13) having the same circumference shape as the top of the integrated box, a longitudinal beam (14) connected to opposite ends of the supporting frame (13), and a plurality of transverse beams (15) connected to opposite sides of the supporting frame (13) at intervals, wherein the plurality of transverse beams (15) are vertically connected to the longitudinal beams (14).
7. The steel structure building with integrated decoration modules according to claim 2, characterized in that: The bottom of the integrated box is provided with an electromechanical installation steel frame (16) located below the bottom supporting steel beam (4); the electromechanical installation steel frame (16) is located in a suspended position at the bottom of the steel structure frame body (1).
8. The steel structure building with integrated decoration modules according to claim 1, characterized in that: The steel structure frame body (1) comprises a plurality of vertically arranged columns (17), a plurality of top beams (18) connected between the tops of the plurality of columns (17), and a plurality of bottom beams connected between the plurality of columns (17) and close to the bottoms of the columns (17); fixing parts (19) suitable for connecting to the bottom support steel beam (4) are arranged on the inner sides of the two top beams (18) and the two bottom beams located on opposite sides.
9. The steel structure building with integrated decoration modules according to claim 8, characterized in that: The fixing member (19) comprises two fixing steel plates fixed to the main body (1) of the steel structure frame, the fixing steel plates being provided with connecting holes, the connecting holes being provided with connecting steel nails, and the spacing between the two fixing steel plates being adapted to the length of the bottom supporting steel beam (4).
10. The steel structure building with integrated decoration modules according to claim 4, characterized in that: The integrated box body comprises a plurality of light steel keel partition walls (20) enclosing a rectangular frame, an outer surface (21) being arranged on the outer side of the light steel keel partition wall (20), an inner surface (22) being arranged on the inner side of the light steel keel partition wall (20), and wire threading holes being provided on both the concrete bottom plate (6) and the suspended ceiling (11).