Rail section management method and device based on line resource management and medium
By treating ATS' commands and train resource requests as line resource application/release, combined with the release mechanism of the 'track unlocking point', fine management of track sections is achieved, the problem of improving train operation efficiency when transforming lines is solved, and the compatibility and maintainability of the system are enhanced.
Patent Information
- Application Number
- CN202411818173.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2044-12-11
AI Technical Summary
How to implement track section management based on line resource management to improve train operation efficiency, especially when renovating lines, compatible with the usage habits of existing signal systems.
Through the resource manager, ATS' access processing/cancel command, turntable lock/single solver command and train resource application/release request are all regarded as line resource application/release for management, and the "train unlocking point" is used to release each resource to realize fine-grained management of track sections.
It improves the efficiency of train operation and the compatibility and availability of modified lines, realizes the unity of line resource management and track section management, and enhances the availability and maintainability of the system.
Smart Images

Figure CN119872652A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit resource management, and in particular to a track section management method, device and medium based on line resource management. Background Art
[0002] The Computer Based Interlocking System (CI) in the existing signal system (CBTC) locks the track section according to the route handling command of the Automatic Train Supervisor (ATS), thereby establishing the required path for the train to run to the front.
[0003] In the more efficient next-generation signal system, the interlocking system is replaced by the Resource Management Unit (RMU). The RMU can dynamically lock or release the path required for the train's operation based on its resource application. The path is not divided by traditional track sections, which effectively improves the train's operating efficiency and operational flexibility in the section.
[0004] In order to apply RMU to improve driving efficiency on the reconstructed line and be compatible with the usage habits of the existing signal system, RMU still needs to receive the route processing command from ATS, lock the corresponding path, and provide the locking status in units of track sections.
[0005] How to achieve track section management based on line resource management to improve train operation efficiency has become a technical problem that needs to be solved. Summary of the invention
[0006] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a track section management method, equipment and medium based on line resource management.
[0007] The purpose of the present invention can be achieved by the following technical solutions:
[0008] According to one aspect of the present invention, a track section management method based on line resource management is provided, the method comprising a track section locking sub-method and a track section unlocking sub-method;
[0009] The track section locking sub-method comprises the following steps:
[0010] Step S11, the resource manager regards the route handling command and turnout single locking command of the ATS, as well as the resource application request of the train as line resource application;
[0011] Step S12: After the line resource application passes the hostile check, the corresponding line resource is set to a locked state;
[0012] Step S13: When the range of the track section and the range of any line resource intersect, if any of the line resources included in the track section is in a locked state, the track section is in a locked state;
[0013] The track segment unlocking sub-method comprises the following steps:
[0014] Step S21, the resource manager regards the route cancellation command, route manual unlocking command and turnout single release command of the ATS, and the resource release request of the train as line resource release;
[0015] Step S22: Release of line resources: After the validity check is passed, the corresponding locked line resources are set to unlocked state;
[0016] Step S23: When the range of the track segment and the range of any line resource intersect, if all the line resources included in the track segment are in unlocked state, the track segment is in unlocked state.
[0017] Preferably, the line resources include path resources, side protection resources and cross resources.
[0018] Preferably, the hostile check is used to ensure that the locking state of the resource is consistent with the target of the upper layer line resource application.
[0019] Preferably, the legitimacy check is used to ensure that the unlocking state of the resource is consistent with the target of releasing the upper layer line resource.
[0020] More preferably, the locking states of the path resources include "locked in the uplink direction" and "locked in the downlink direction"; the locking states of the side defense resources include "locked in the positioning path", "locked in the reverse path", "locked in the positioning conflict" and "locked in the reverse conflict"; the locking states of the cross resources include "locked in the path side" and "locked in the conflict side";
[0021] The unlocking status of the path resources, side protection resources and cross resources all include "unlocked".
[0022] More preferably, the resource manager uses a "train unlocking point" to unlock each line resource in a locked state, wherein the "train unlocking point" is the position of the minimum rear safety position of the train and then extends to the rear of the train to set the rear sliding distance.
[0023] More preferably, when the "train unlocking point" passes through the path resource locked in the direction along the train running direction, the path resource is released;
[0024] When the "train unlocking point" passes through a certain track section, all path resources upstream of the track section are unlocked.
[0025] More preferably, when the "train unlocking point" passes through the side defense resource at the first position of the turnout, the side defense resource is released; at the same time, the side defense resource at the second position of the turnout that conflicts with it is also released because the conflicting side resource is released.
[0026] More preferably, when the "train unlocking point" passes through the second crossover resource associated with the crossover, the crossover resource is released; at the same time, the first crossover resource that conflicts with the crossover resource is also released because the conflicting side resource is released.
[0027] Preferably, if the resource manager receives a route cancellation command from the ATS, and the path between the starting point and the end point is clear and no train is about to enter the corresponding area, the corresponding line resources will be released immediately and all track sections therein will be unlocked immediately.
[0028] More preferably, if the resource manager receives a command from the ATS to lock the turnout in the first position, the side defense resource of the turnout in this position will be in a locked state, the side defense resource of the turnout in the second position will be in a locked conflict state, and the corresponding track section will be locked;
[0029] Only when the resource manager receives the turnout single release command sent by ATS can the corresponding line resources be released and the corresponding track section be unlocked.
[0030] More preferably, the first position and the second position both include a positioning position and an anti-position, and the first position is different from the second position.
[0031] According to another aspect of the present invention, an electronic device is provided, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.
[0032] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] 1) The present invention integrates line resource management into track section management. The route handling / cancellation commands of ATS, the single locking / single unlocking commands of switches, and the resource application / release requests of trains are all regarded as line resource application / release for management. When the scope of a track section intersects with the scope of any line resource, if any one of all the line resources included in the track section is in a locked state, then the track section is in a locked state; if all the line resources included in the track section are in an unlocked state, then the track section is in an unlocked state. By integrating the resource locked state and the track section locked state, the line resource management is made compatible with the existing signal system, improving the compatibility and usability of the renovated line, as well as the train operation efficiency.
[0035] 2) The present invention uses the "train unlocking point" to release each resource. When the "train unlocking point" passes through a certain line resource, the corresponding resource is released, and the corresponding track section is also unlocked section by section as the train runs; managing track sections in units of line resources has a finer granularity of division compared to interlocking, so trackside equipment can be controlled more precisely, thereby improving train operation efficiency.
[0036] 3) The present invention integrates the algorithms of line resource management and track section management in a complementary manner, improving the unity of the line resource management software algorithm and enhancing the usability and maintainability of the line resource management algorithm. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a schematic flow chart of the track section management method based on line resource management in the present invention;
[0038] Figure 2 It is a schematic diagram of the track section locking principle based on line resource management in the present invention;
[0039] Figure 3 It is a schematic diagram of the track section unlocking principle based on line resource management in the present invention;
[0040] Figure 4 It is a schematic diagram of the track section management based on path resources in the present invention;
[0041] Figure 5 It is a schematic diagram of the track section management based on side protection resources in the present invention;
[0042] Figure 6 It is a schematic diagram of the track section management based on cross resources in the present invention;
[0043] In the figure, a is a "撇"-shaped cross resource, and b is a "捺"-shaped cross resource. DETAILED DESCRIPTION OF THE INVENTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0045] This embodiment relates to a track section management method based on line resource management, such as Figure 1 , the method comprises the following steps:
[0046] Step A: RMU regards the route handling command and turnout single locking command of ATS and the resource application request of train as line resource application. Figure 2 and Figure 3 , RMU regards the route cancellation command, route manual unlocking command, turnout single release command and train resource release request from ATS as line resource release. The command from ATS and the resource request from train in this step are Figure 1 Request to apply for or release external resources in.
[0047] Step B: After the hostile check is passed, the corresponding path resources, side defense resources and cross resources are locked. Figure 2 and Figure 3 , after the legitimacy check is passed, the line resource release sets the corresponding locked path resources, side protection resources and cross resources to the unlocked state. Figure 1 The internal resources refer to: path resources, side defense resources and cross resources.
[0048] Both the hostile check and the legitimacy check are to avoid locking or unlocking the wrong resources, so as to ensure that the locked or unlocked state of the resources is consistent with the target of the upper-layer line resource application or line resource release.
[0049] Among them, the locking status of path resources includes "locked in the upstream direction" and "locked in the downstream direction"; the locking status of side defense resources includes "locked in the positioning path", "locked in the reverse path", "locked in the positioning conflict" and "locked in the reverse conflict"; the locking status of cross resources includes "locked in the path side" and "locked in the conflict side"; the unlocking status of the above resources includes "unlocked".
[0050] Step C: When the range of a track segment and the range of any line resource intersect, the track segment is said to contain the line resource. If any of the line resources contained in a track segment is in a locked state, the track segment is locked. If all the line resources contained in a track segment are in an unlocked state, the track segment is unlocked.
[0051] Assume that the ATS commands the RMU to handle a route from the starting point to the end point, or the train applies for resources between the starting point and the end point. Figure 4 If agreed Figure 4 If the direction from the start point to the end point is the upward direction, then if these path resources were previously in the "unlocked" state, they will now be in the "locked in the upward direction" state.
[0052] Side defense resources between the starting point and the end point are as follows: Figure 5 As shown. The position of turnout 1 includes the fixed position and the reverse position. If these side defense resources were previously in the "unlocked" state, the side defense resources of turnout 1 reverse position will now be in the "locked in reverse position path" state, and the side defense resources of turnout 1 fixed position will be in the "locked in reverse position conflict" state.
[0053] The cross resources between the starting point and the end point are as follows Figure 6 As shown. The turnout of the crossing line is associated with a pair of crossing resources, namely: the first crossing resource ( Figure 6 The "apostrophe" type cross resource a) and the second cross resource ( Figure 6 b) If these cross-link resources were previously in the "unlocked" state, the second cross-link resource of cross-link 1 will now be in the "locked on the path side" state, and the first cross-link resource of cross-link 1 will be in the "locked on the conflict side" state.
[0054] After the above resources are locked, no matter how the track segments are divided, the track segments that intersect with the ranges of the above resources will be locked.
[0055] In the scenario of processing train resource release, RMU uses the "train unlocking point" (that is, the position where the train's minimum rear end safety positioning is extended to the rear of the train to set the backward sliding distance) to unlock the above resources.
[0056] When the "train unlocking point" passes through the path resource locked in the direction of train operation, the path resource is released. Figure 4 In the example, if a train runs from the starting point to the end point, and its running direction is upward, then after the train unlocking point passes the end point, the path resources "locked in the upward direction" between the starting point and the end point are unlocked. More specifically, when the train unlocking point passes a certain track section, all the path resources upstream of the track section are unlocked.
[0057] exist Figure 5 In the example, when the train unlocking point passes through the side defense resource of the first position (reverse position) of turnout 1 "locked in the reverse position path", the side defense resource is released. At the same time, the side defense resource of the second position (positioning) of turnout 1 "locked in the reverse position conflict" is also released because the conflicting side resource is released.
[0058] The locking and releasing principle of the side defense resources of turnout 1 positioning is the same as that of the reverse position.
[0059] exist Figure 6 In the example, when the "train unlocking point" passes through the second intersection resource "locked on the path side" of intersection 1, the intersection resource is released. At the same time, the first intersection resource "locked on the conflicting side" of intersection 1 that conflicts with it is also released because the conflicting side resource is released.
[0060] When the "train unlocking point" passes through the first cross resource, the locking and unlocking of the corresponding resource are the same as the second cross resource.
[0061] In the above resource release process, if all resources contained in a track section are released, the track section is unlocked. Therefore, according to the division granularity, the track section can also be unlocked section by section as the train runs.
[0062] In addition, if ATS sends a route cancellation command, and the path between the starting point and the end point is clear and there is no train about to enter the area, the above-mentioned line resources will be released immediately and all the track sections therein will be unlocked immediately.
[0063] In another scenario, for example, when the ATS sends a command to lock the second position (positioning) of the single turnout 1, the side defense resources of the second position (positioning) of the turnout 1 will be in the "locked in the positioning path" state, and the side defense resources of the first position (reverse position) of the turnout 1 will be in the "locked in positioning conflict" state, and the corresponding track section will be locked. Only when the ATS sends a command to release the single turnout 1 can these resources be released and the corresponding track section be unlocked.
[0064] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.
[0065] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.
[0066] The processing unit performs the various methods and processes described above. For example, in some embodiments, the method can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method in any other appropriate manner (e.g., by means of firmware).
[0067] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0068] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0069] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0070] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A track section management method based on line resource management, characterized in that: The method comprises a track section locking sub-method and a track section unlocking sub-method; The track section locking sub-method comprises the following steps: Step S11, the resource manager regards the route handling command and turnout single locking command of the ATS, as well as the resource application request of the train as line resource application; Step S12: After the line resource application passes the hostile check, the corresponding line resource is set to a locked state; Step S13: When the range of the track section and the range of any line resource intersect, if any of the line resources included in the track section is in a locked state, the track section is in a locked state; The track segment unlocking sub-method comprises the following steps: Step S21, the resource manager regards the route cancellation command, route manual unlocking command and turnout single release command of the ATS, and the resource release request of the train as line resource release; Step S22: Release of line resources: After the validity check is passed, the corresponding locked line resources are set to unlocked state; Step S23: When the range of the track segment and the range of any line resource intersect, if all the line resources included in the track segment are in unlocked state, the track segment is in unlocked state.
2. A track section management method based on line resource management according to claim 1, characterized in that: The line resources include path resources, side protection resources and cross resources.
3. A track section management method based on line resource management according to claim 1, characterized in that: The hostile check is used to ensure that the locking state of the resource is consistent with the target of the upper layer line resource application.
4. A track section management method based on line resource management according to claim 1, characterized in that: The legitimacy check is used to ensure that the unlocking state of the resource is consistent with the target of releasing the upper layer line resource.
5. A track section management method based on line resource management according to claim 2, characterized in that: The locking states of the path resources include "locked in the uplink direction" and "locked in the downlink direction"; the locking states of the side defense resources include "locked in the positioning path", "locked in the reverse path", "locked in the positioning conflict" and "locked in the reverse conflict"; the locking states of the cross resources include "locked in the path side" and "locked in the conflict side"; The unlocking status of the path resources, side protection resources and cross resources all include "unlocked".
6. A track section management method based on line resource management according to claim 2, characterized in that: The resource manager uses a "train unlocking point" to unlock each line resource that is in a locked state, wherein the "train unlocking point" is the position of the minimum rear safety position of the train and then extends to the rear of the train to set the rear slip distance.
7. A track section management method based on line resource management according to claim 6, characterized in that: When the "train unlocking point" passes through the path resource locked in the direction of train operation, the path resource is released; When the "train unlocking point" passes through a track section, all path resources upstream of the track section are unlocked.
8. A track section management method based on line resource management according to claim 6, characterized in that: When the "train unlocking point" passes through the side defense resource at the first position of the turnout, the side defense resource is released; at the same time, the side defense resource at the second position of the turnout that conflicts with it is also released because the conflicting side resource is released.
9. A track section management method based on line resource management according to claim 6, characterized in that: When the "train unlocking point" passes through the second crossover resource associated with the crossover, the crossover resource is released; at the same time, the first crossover resource that conflicts with it is also released because the conflicting side resource is released.
10. A track section management method based on line resource management according to claim 1, characterized in that: If the resource manager receives a route cancellation command from ATS, and the path between the starting point and the end point is clear and no train is about to enter the corresponding area, the corresponding line resources will be released immediately and all track sections therein will be unlocked immediately.
11. A track section management method based on line resource management according to claim 2, characterized in that: If the resource manager receives a command from ATS to lock the turnout in the second position, the side defense resources at this position of the turnout will be locked, the side defense resources at the first position of the turnout will be locked in conflict, and the corresponding track section will be locked; Only when the resource manager receives the turnout single release command sent by ATS can the corresponding line resources be released and the corresponding track section be unlocked.
12. A track section management method based on line resource management according to claim 8 or 11, characterized in that: The first position and the second position both include a positioning position and an inversion position, and the first position is different from the second position.
13. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 12 is implemented.
14. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 12 is implemented.
Citation Information
Patent Citations
System and method for achieving control handover between vehicle depot and testing line
CN106476855A
Positioning system and method for monorail train
CN107884747A
Train-ground interlocking method and system for rail transit train operation control
CN112429045A
Train running direction determination method and system
CN113548093A
Virtual marshalling train operation control method and system
CN114906187A