Power transmission and transformation line construction device with protection function
By designing a power transmission and transformation line construction device including support plate, connection mechanism and cutter, the problems of unstable center of gravity and cumbersome work of maintenance personnel during construction of high tower power transmission and transformation lines are solved, and higher safety and convenience are achieved.
Patent Information
- Application Number
- CN202510450326.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-11
- Publication Date
- 2025-05-09
- Estimated Expiration
- 2045-04-11
AI Technical Summary
When repairing high tower transmission and transformation lines, maintenance personnel are prone to physical and mental fatigue due to unstable center of gravity and cumbersome work, and high-altitude fall accidents are prone to occur during operation.
A construction device including a support plate, an elastic strap, a pull ring, a connecting mechanism, a fixing mechanism, a curved plate, a circular rod, a pull handle, an elastic member and a cutting knife are designed. The device provides stable support through a support plate and elastic strap, and the connecting mechanism ensures a stable connection to the cable, a curved plate and a cutter for insulating layer cutting and cross-connection of the cable.
The device ensures a stable connection between the maintenance personnel and the tower or cable, reduces the risk of falling from high altitude, and reduces the physical and mental fatigue of the maintenance personnel by providing rest and storage facilities, and improves the safety and convenience of the maintenance work.
Smart Images

Figure CN119965730A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of power transmission and transformation line construction, and particularly relates to a power transmission and transformation line construction device with a protective function. Background Art
[0002] Based on existing technology, when maintenance personnel perform maintenance and construction on high-tower power transmission and transformation lines, they need to use protective devices to ensure that they are firmly connected to the tower or the cables in the transmission and transformation lines to prevent high-altitude falls. However, the existing protective devices have relatively limited functions and lack facilities for maintenance personnel to rest. As a result, maintenance personnel are easily exhausted physically and mentally during high-intensity work. When cracks or damage occur in the cables of the power transmission and transformation lines, maintenance personnel need to manually connect new cables to the damaged cables. During this process, they need to hold the cables steady and use maintenance tools to handle the new cables, which makes the maintenance work very cumbersome and can easily cause the center of gravity of the body to shift during the operation, especially for power transmission and transformation lines far away from high towers, which will seriously affect the safety of the maintenance work. Summary of the Invention
[0003] In order to overcome the shortcomings of unstable center of gravity and cumbersome maintenance work when maintenance personnel perform maintenance and construction on high-tower power transmission and transformation lines, the present invention provides a power transmission and transformation line construction device with a protective function.
[0004] The technical solution of the present invention is: a power transmission and transformation line construction device with a protective function, comprising a support plate, an elastic strap and a pull ring; at least two elastic straps are installed on the support plate; at least two pull rings are installed on the support plate; it also includes a connecting mechanism, a fixing mechanism, an arc plate, an arc rod, a pull handle, an elastic member I and a cutter; at least four connecting mechanisms are connected to the support plate, and the connecting mechanism is used to connect the support plate to the cable on the high tower; one of the connecting mechanisms is connected to a fixing mechanism; the fixing mechanism is connected to the arc plate, and the fixing mechanism is used to drive the arc plate to move; a slide groove is provided on the arc plate, and an arc rod is slidably connected in the slide groove; a pull handle is fixed to the arc rod; an elastic member I is fixed between the arc rod and the arc plate, one end of the elastic member I is fixed to the arc rod, and one end of the elastic member I is fixed to the arc plate; a cutter is fixed to the arc rod.
[0005] More preferably, a seat cushion is further included; the upper surface and the lower surface of the support plate are both fixedly mounted with the seat cushion; and the seat cushion is made of rubber material, and a non-slip layer is provided on the surface of the seat cushion.
[0006] More preferably, a storage box is further included; the storage box is slidably connected to the interior of the support plate.
[0007] More preferably, each connecting mechanism consists of a round tube, a sliding rod and a clamp; the round tube is fixedly connected to the inside of the support plate; the sliding rod is slidably connected to the round tube, and a locking piece is connected between the round tube and the sliding rod, and the locking piece is used to lock the sliding rod on the round tube; the end of the sliding rod away from the round tube is fixedly connected to the clamp, and a bolt is provided on the clamp, and the clamp is installed on the cable by the bolt.
[0008] More preferably, the fixing mechanism consists of a bracket, a fixing rod, a support, a coupling and a connecting block; the bracket is connected to a damped rotation on one of the circular tubes; the fixing rod is fixed on the bracket; the support is slidably connected to the fixed rod; the lower part of the support is rotatably connected to the coupling; the connecting block is fixed on the coupling; and the connecting block is fixed to the arc plate.
[0009] More preferably, the fixing rod is provided with scale lines.
[0010] More preferably, it also includes an airbag, a pump and a catheter; the cutter is provided with an airbag; the airbag is fixedly connected to the arc rod; the pump is installed on the support; the air outlet of the pump is connected to the catheter; the end of the catheter away from the pump is fixedly connected to and communicated with the airbag.
[0011] More preferably, it also includes a clamping and limiting system; the clamping and limiting system is connected to the bracket; the clamping and limiting system includes a support frame, a threaded rod, an extrusion block, a sliding rod, a guide wheel and an elastic member II; the support frame is fixedly connected to the lower surface of the bracket; the threaded rod is rotatably connected to the support frame; the end of the threaded rod is rotatably connected to the extrusion block; the sliding rod is slidably connected to the support frame; the lower part of the sliding rod is rotatably connected to the guide wheel; the elastic member II is fixedly connected between the sliding rod and the support frame, one end of the elastic member II is fixed to the sliding rod, and one end of the elastic member II is fixed to the support frame.
[0012] More preferably, the extrusion block is made of rubber.
[0013] More preferably, the guide wheel is made of rubber.
[0014] The advantages and positive effects of the present invention are: (1) The maintenance personnel carry the support plate on their backs and then climb up the tower. Then, they pull out the four slide bars from the corresponding round tubes, and make the clamps on each slide bar be mounted on the cables in the power transmission and transformation line. Then, they connect the four clamps to the cables in the power transmission and transformation line, and then lock the slide bar on the round tube, so that the support plate is firmly connected to the cables in the power transmission and transformation line. Then, they connect the high-altitude work safety belt worn by the maintenance personnel to the two pull rings through the buckle, and at the same time, they connect the high-altitude work safety belt to the cables in the power transmission and transformation line, so as to ensure that the maintenance personnel are firmly connected to the tower or the cables in the power transmission and transformation line, so as to prevent high-altitude falling accidents.
[0015] (2) By placing one leg of the maintenance worker on the front of the support board and the other leg on the back of the support board, the maintenance worker's overall center of gravity is more balanced, allowing the maintenance worker to take a short rest on the support board and replenish food and water to restore physical strength. The seat cushion is made of rubber, which can improve the comfort of the maintenance worker.
[0016] (3) When the maintenance personnel moves, the support plate moves accordingly. When the maintenance personnel detects an abnormal condition in a part of the cable, the maintenance personnel can step on the upper surface of the support plate to make the maintenance personnel's body center of gravity more stable. In addition, since the surface of the seat cushion is provided with an anti-slip layer, the friction between the support plate and the sole of the maintenance personnel's shoe can be increased, thereby reducing the possibility of the maintenance personnel slipping when stepping on the support plate.
[0017] (4) The maintenance personnel sits astride the support plate, takes out the cable, and places one end of the cable against the cutter. The maintenance personnel then pulls the handle by hand, and the movement of the handle drives the arc rod to move, and the movement of the arc rod drives the cutter to move and compresses the elastic member I, so that the cutter moves along the outer surface of the cable in a circle, thereby cutting the insulation layer of the cable. The cable is then pulled to move, so that the insulation layer at the end of the cable falls off, and then the insulation layer at the other end of the cable is stripped off, and the cable is then connected across the damaged cable, thereby maintaining the cable. The maintenance personnel can also keep their body center more balanced when working at height, and can more conveniently handle new cables, thereby improving the safety of maintenance work and reducing the intensity of maintenance work.
[0018] (5) By manually rotating the threaded rod, the rotation of the threaded rod drives the extrusion block to move toward the guide wheel, so that the extrusion block and the guide wheel can press against the cable together and compress the elastic part II, thereby clamping and limiting the cable, thereby further reducing the intensity of the maintenance personnel's work, improving the convenience of maintenance work, and making the length of the cable insulation stripping more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the power transmission and transformation line construction device with protection function of the present invention; Figure 2 This is a schematic diagram of the installation position of the connection mechanism of the power transmission and transformation line construction device with a protective function of the present invention; Figure 3 This is a schematic diagram of the power transmission and transformation line construction device with a protective function according to the present invention in a flipped state; Figure 4 This is a schematic diagram of the three-dimensional structure of the fixing mechanism of the power transmission and transformation line construction device with a protective function of the present invention; Figure 5This is a schematic diagram of the installation position of the curved plate of the power transmission and transformation line construction device with a protective function of the present invention; Figure 6 This is a schematic diagram of the three-dimensional structure of the power transmission and transformation line construction device with protective function of the present invention, including the connecting block, arc plate, arc rod, pull handle, elastic member I, cutter and conduit; Figure 7 This is a schematic diagram of the three-dimensional structure of the arc rod, handle, cutter, air bag and catheter combined in the power transmission and transformation line construction device with protective function of the present invention; Figure 8 It is a schematic diagram of the clamping state structure of the clamping and limiting system of the power transmission and transformation line construction device with protection function of the present invention.
[0020] Explanation of the accompanying drawings: 1-support plate, 2-cable, 3-cable, 11-cushion, 12-elastic strap, 13-pull ring, 14-storage box, 201-round tube, 202-sliding rod, 2021-clamp, 203-bracket, 204-fixing rod, 205-support, 206-coupling shaft, 207-connecting block, 208-arc plate, 209-arc rod, 210-handle, 211-elastic part I, 212-cutter, 213-airbag, 214-pump, 215-catheter, 301-support frame, 302-threaded rod, 303-extrusion block, 304-sliding rod, 305-guide wheel, 306-elastic part II. DETAILED DESCRIPTION
[0021] The following description is merely a preferred embodiment of the present invention and does not limit the scope of protection of the present invention. Example 1
[0022] A power transmission and transformation line construction device with protection function, according to Figure 1-Figure 7 As shown, it includes a support plate 1, an elastic strap 12 and a pull ring 13; two elastic straps 12 are installed on the support plate 1; two pull rings 13 are installed on the support plate 1; It also includes a connecting mechanism, a fixing mechanism, an arc plate 208, an arc rod 209, a handle 210, an elastic member I 211 and a cutter 212; four connecting mechanisms are connected to the support plate 1; one of the connecting mechanisms is connected to the fixing mechanism; the fixing mechanism is connected to the arc plate 208; a sliding groove is provided on the arc plate 208, and the arc rod 209 is slidingly connected in the sliding groove; the handle 210 is fixed to the arc rod 209; an elastic member I 211 is fixed between the arc rod 209 and the arc plate 208, and the elastic member I 211 is a spring, one end of the elastic member I 211 is fixed to the arc rod 209, and one end of the elastic member I 211 is fixed to the arc plate 208; the cutter 212 is fixed to the arc rod 209.
[0023] It also includes a seat cushion 11; the seat cushion 11 is fixedly mounted on the upper surface of the support plate 1 and the lower surface of the support plate 1; and the seat cushion 11 is made of rubber, and a non-slip layer is provided on the surface of the seat cushion 11.
[0024] A storage box 14 is also included; the support plate 1 is slidably connected to the interior of the storage box 14, and the storage box 14 is used to store tools and cables 2.
[0025] Each connecting mechanism consists of a round tube 201, a sliding rod 202 and a clamp 2021; the round tube 201 is fixedly connected to the inside of the support plate 1; the sliding rod 202 is slidably connected to the round tube 201, and a locking piece is connected between the round tube 201 and the sliding rod 202; the end of the sliding rod 202 away from the round tube 201 is fixedly connected to the clamp 2021, and a bolt is provided on the clamp 2021, and the clamp 2021 is installed on the cable 3 by the bolt.
[0026] The fixing mechanism consists of a bracket 203, a fixing rod 204, a support 205, a connecting shaft 206 and a connecting block 207; a bracket 203 is connected to one of the circular tubes 201 in a damped rotation manner; a fixing rod 204 is fixed to the bracket 203; a support 205 is slidably connected to the fixing rod 204; the lower part of the support 205 is rotatably connected to the connecting shaft 206; a connecting block 207 is fixed to the connecting shaft 206; and the connecting block 207 is fixed to the arc plate 208.
[0027] The fixing rod 204 is provided with scale lines to facilitate knowing the moving distance of the support 205 .
[0028] It also includes an airbag 213, a pump 214 and a catheter 215; the airbag 213 is provided in the cutter 212; the airbag 213 is fixedly connected to the arc rod 209; the pump 214 is installed on the support 205; the air outlet of the pump 214 is fixedly connected and connected to the catheter 215; the end of the catheter 215 away from the pump 214 is fixedly connected and connected to the airbag 213.
[0029] In the prior art, when maintenance personnel perform maintenance work on high-tower power transmission and transformation lines, they need to use protective devices to ensure that they are firmly connected to the tower or the cables 3 in the power transmission and transformation lines to prevent accidents caused by falling from heights. However, the existing protective devices have relatively limited functions and lack facilities for maintenance personnel to rest. This results in maintenance personnel easily feeling physically and mentally exhausted during high-intensity work. In order to solve the above problem, when maintaining the cable 3, the maintenance tools and several new cables 2 are placed in the storage box 14 in advance, and then the maintenance personnel carry the support plate 1 with the two elastic straps 12, and then climb the tower, thereby driving all the connected components to move to the tower, and the initial positions of the bracket 203 and all the components connected to the bracket 203 are all located below the support plate 1, and then when the maintenance personnel carry the support plate 1, the bracket 203 and all the components connected to the bracket 203 will not affect the maintenance personnel, and then Pull the four slide bars 202 out of the corresponding round tubes 201 in sequence, so that the clamps 2021 on each slide bar 202 are mounted on the corresponding cables 3 in the power transmission and transformation line, and then connect the four clamps 2021 to the cables 3 in the power transmission and transformation line in sequence, and then lock the slide bar 202 on the round tube 201 through the locking piece between the round tube 201 and the slide bar 202, so that the support plate 1 is firmly connected to the cables 3 in the power transmission and transformation line, and then connect the high-altitude work safety belt worn by the maintenance personnel to the two pull rings 13 through the buckle, as shown in FIG. Figure 1 As shown, at the same time, the maintenance personnel independently connect the high-altitude work safety belt they are wearing to the cable 3 in the power transmission and transformation line, thereby ensuring that they are firmly connected to the high tower or the cable 3 in the power transmission and transformation line to prevent high-altitude falling accidents.
[0030] When maintenance personnel feel tired after long periods of high-intensity work, they can sit on the support board 1 with both legs, that is, with the front of the support board 1 as the reference, one leg of the maintenance personnel is on the front of the support board 1, and the other leg is on the back of the support board 1, so that the overall center of gravity of the maintenance personnel is more balanced, so that the maintenance personnel can take a short rest on the support board 1, and at the same time replenish food and water to restore physical strength. The seat cushion 11 is made of rubber, which can improve the comfort of the maintenance personnel.
[0031] When the maintenance personnel are carrying out maintenance inspections along the line, they step on the cable 3 connected to the clamp 2021 with their feet, and at the same time hold the other two cables 3 above the support plate 1 with their hands, and move along the cable 3 to inspect various parts of the cable 3. The maintenance personnel move by pulling the two pull rings 13 through the high-altitude work safety belt and lock buckle worn on their body, thereby driving the support plate 1 to move, and then driving all the connected parts to move. When it is detected that there is an abnormal state in a part of the cable 3, the maintenance personnel stops moving, and the maintenance personnel's Both feet can be stepped on the upper surface of the support plate 1 so that the center of gravity of the maintenance personnel's body can be more stable. Compared with the existing maintenance personnel, when repairing the cable 3, the maintenance personnel need to step on the cable 3 and then inspect the cable 3, which easily makes the center of gravity of the maintenance personnel unstable. This method can greatly increase the stability of the maintenance personnel when repairing the cable 3, and because the surface of the seat cushion 11 is provided with an anti-slip layer, the friction between the support plate 1 and the sole of the maintenance personnel's shoe can be increased, thereby reducing the possibility of slipping when the maintenance personnel steps on the support plate 1.
[0032] When the cable 3 in the power transmission and transformation line is cracked or damaged, the maintenance personnel need to manually connect a new cable 2 to the damaged cable 3. During this process, the cable 2 needs to be held firmly by the hand and the maintenance tools need to be used to handle the new cable 2, which makes the maintenance work very cumbersome and easily causes the center of gravity of the body to shift during the operation, especially for the power transmission and transformation line far away from the tower, which will seriously affect the safety of the maintenance work. To solve the above problem, when the maintenance personnel connect the cable 2 to the cable 3 in the power transmission and transformation line, the maintenance personnel sit on the support plate 1 in the same way as above, take out the cable 2 stored in the storage box 14, and then pull the bracket 203 so that the bracket 203 is rotated 180 degrees counterclockwise along the circular tube 201 with the right side of the support plate 1 as the reference. The rotation of the bracket 203 drives all the connected parts to rotate, so that the arc plate 208 is located above the support plate 1. Figure 3As shown, the maintenance personnel then holds the cable 2 and places one end of the cable 2 into the inner side of the arc plate 208 and against the cutter 212, and then the maintenance personnel pulls the handle 210 by hand, the handle 210 moves to drive the arc rod 209 to move, the arc rod 209 moves to drive the cutter 212 to move, and compresses the elastic member I 211, so that the cutter 212 moves along the outer surface of the cable 2 for a circle, thereby cutting the insulation layer of the cable 2 and dividing the insulation layer of the cable 2 into two sections. At this time, the cutter 212 is against the space between the two insulation layers, and then the maintenance personnel The maintenance personnel pulls the cable 2 to move, thereby causing the insulation layer at the end of the cable 2 to fall off, and then puts the other end of the cable 2 into the inner side of the arc plate 208 and presses against the cutter 212, and then strips off the insulation layer at the other end of the cable 2, thereby stripping off the insulation layer at both ends of the cable 2, and then cross-connects the cable 2 to the damaged cable 3, thereby maintaining the cable 3, and enabling the maintenance personnel to have a more balanced center of body when working at high altitudes, and to handle the new cable 2 more conveniently, thereby improving the safety of the maintenance work and reducing the intensity of the maintenance work.
[0033] It should be noted that in order to adapt to cables 2 of different specifications, the pump 214 is controlled to start operating to inflate or suck air into the catheter 215, thereby causing the airbag 213 to deform. The deformation of the airbag 213 drives the cutter 212 to deform, thereby allowing the cutter 212 to adapt to cables 2 of different specifications, thereby stripping the insulation layer of cables 2 of different specifications. Example 2
[0034] On the basis of Example 1, according to Figure 4 and Figure 8 As shown, it also includes a clamping and limiting system; the clamping and limiting system is connected to the bracket 203; the clamping and limiting system includes a support frame 301, a threaded rod 302, an extrusion block 303, a sliding rod 304, a guide wheel 305 and an elastic member II 306; the support frame 301 is fixed to the lower surface of the bracket 203; the threaded rod 302 is rotatably connected to the support frame 301; the end of the threaded rod 302 is rotatably connected to the extrusion block 303; the sliding rod 304 is slidably connected to the support frame 301; the lower part of the sliding rod 304 is rotatably connected to the guide wheel 305; an elastic member II 306 is fixed between the sliding rod 304 and the support frame 301, and the elastic member II 306 is a spring, one end of the elastic member II 306 is fixed to the sliding rod 304, and one end of the elastic member II 306 is fixed to the support frame 301.
[0035] The squeezing block 303 is made of rubber and is used to prevent damage to the cable 2 .
[0036] The guide wheel 305 is made of rubber and is used to increase the friction between the guide wheel 305 and the cable 2.
[0037] When the insulation layer of the new cable 2 is stripped, in order to further reduce the intensity of the maintenance personnel's work, improve the convenience of the maintenance work, and make the length of the insulation layer of the cable 2 stripped more accurately, the maintenance personnel place the new cable 2 between the extrusion block 303 and the guide wheel 305, and manually rotate the threaded rod 302. The rotation of the threaded rod 302 drives the extrusion block 303 to move toward the guide wheel 305. The movement of the extrusion block 303 drives the cable 2 to move until the cable 2 is against the guide wheel 305. The movement of the guide wheel 305 drives the sliding rod 304 to move, thereby stretching the elastic member II 306, thereby making the extrusion block 30 3 and the guide wheel 305 jointly press against the cable 2, thereby clamping and limiting the cable 2, and then the end of the cable 2 is pressed against the cutter 212, and the support 205 is moved, so that the support 205 moves along the fixed rod 204. Since the fixed rod 204 is provided with a scale line, the moving distance of the support 205 can be known, so that the length of the insulation layer stripped at both ends of the cable 2 is consistent, so that the maintenance personnel no longer need to hold the cable 2 during the process of stripping the insulation layer of the cable 2, thereby further reducing the intensity of the maintenance personnel's work, improving the convenience of the maintenance work, and making the length of the insulation layer stripped of the cable 2 more accurate.
[0038] The above embodiments are only preferred embodiments of the present invention and are not intended to limit the scope of implementation of the present invention. Therefore, any equivalent changes made to the contents described in the claims of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A power transmission and transformation line construction device with a protective function, comprising a support plate (1), an elastic strap (12) and a pull ring (13); at least two elastic straps (12) are installed on the support plate (1); at least two pull rings (13) are installed on the support plate (1); the characteristics are: It also includes a connecting mechanism, a fixing mechanism, an arc plate (208), an arc rod (209), a handle (210), an elastic member I (211) and a cutter (212); at least four connecting mechanisms are connected to the support plate (1), and the connecting mechanisms are used to connect the support plate (1) to the cable (3) on the tower; one of the connecting mechanisms is connected to a fixing mechanism; the fixing mechanism is connected to the arc plate (208), and the fixing mechanism is used to drive the arc plate (208) to move A sliding groove is provided on the arc plate (208), and an arc rod (209) is slidably connected in the sliding groove; a pull handle (210) is fixedly connected to the arc rod (209); an elastic member I (211) is fixedly connected between the arc rod (209) and the arc plate (208), one end of the elastic member I (211) is fixedly connected to the arc rod (209), and one end of the elastic member I (211) is fixedly connected to the arc plate (208); a cutting knife (212) is fixedly connected to the arc rod (209).
2. A power transmission and transformation line construction device with protection function according to claim 1, characterized in that: It also includes a seat cushion (11); the seat cushion (11) is fixedly mounted on the upper surface of the support plate (1) and the lower surface of the support plate (1); and the seat cushion (11) is made of rubber material, and a non-slip layer is provided on the surface of the seat cushion (11).
3. A power transmission and transformation line construction device with protection function according to claim 1, characterized in that: It also includes a storage box (14); the storage box (14) is slidably connected inside the support plate (1).
4. A power transmission and transformation line construction device with protection function according to claim 1, characterized in that: Each connection mechanism is composed of a round tube (201), a sliding rod (202) and a clamp (2021); the round tube (201) is fixedly connected inside the support plate (1); the sliding rod (202) is slidably connected to the round tube (201), and a locking member is connected between the round tube (201) and the sliding rod (202), and the locking member is used to lock the sliding rod (202) on the round tube (201); the clamp (2021) is fixedly connected to one end of the sliding rod (202) away from the round tube (201), and a bolt is provided on the clamp (2021), and the clamp (2021) is installed on the cable (3) by the bolt.
5. The power transmission and transformation line construction device with protection function according to claim 1, characterized in that: The fixing mechanism is composed of a bracket (203), a fixing rod (204), a support (205), a connecting shaft (206) and a connecting block (207); the bracket (203) is connected to one of the circular tubes (201) in a damping rotational manner; the fixing rod (204) is fixedly connected to the bracket (203); the support (205) is slidably connected to the fixing rod (204); the lower part of the support (205) is connected to the connecting shaft (206) in a rotational manner; the connecting block (207) is fixedly connected to the connecting shaft (206); and the connecting block (207) is fixedly connected to the arc plate (208).
6. A power transmission and transformation line construction device with protection function according to claim 5, characterized in that: The fixing rod (204) is provided with scale lines.
7. A power transmission and transformation line construction device with protection function according to any one of claims 1 to 6, characterized in that: The invention also comprises an air bag (213), a pump (214) and a conduit (215); the air bag (213) is arranged inside the cutter (212); the air bag (213) is fixedly connected to the arc rod (209); the pump (214) is installed on the support (205); the air outlet of the pump (214) is connected to the conduit (215); and one end of the conduit (215) away from the pump (214) is fixedly connected to and communicated with the air bag (213).
8. A power transmission and transformation line construction device with protection function according to claim 7, characterized in that: The invention also comprises a clamping and limiting system; the bracket (203) is connected with the clamping and limiting system; the clamping and limiting system comprises a support frame (301), a threaded rod (302), an extrusion block (303), a sliding rod (304), a guide wheel (305) and an elastic member II (306); the lower surface of the bracket (203) is fixedly connected with the support frame (301); the threaded rod (302) is rotatably connected with the support frame (301); the end of the threaded rod (302) is rotatably connected with the extrusion block (303); the support frame (301) is slidably connected with the sliding rod (304); the lower part of the sliding rod (304) is rotatably connected with the guide wheel (305); an elastic member II (306) is fixedly connected between the sliding rod (304) and the support frame (301), one end of the elastic member II (306) is fixedly connected to the sliding rod (304), and one end of the elastic member II (306) is fixedly connected to the support frame (301).
9. A power transmission and transformation line construction device with protection function according to claim 8, characterized in that: The extrusion block (303) is made of rubber.
10. A power transmission and transformation line construction device with protection function according to claim 8, characterized in that: The guide wheel (305) is made of rubber.
Citation Information
Patent Citations
10kV operation auxiliary device
CN111244816A
Automatic hot-line work operation platform
CN115085101A
High voltage transmission lines overhauling work platform
CN207612009U
Wiring device with cutting function for electromechanical engineering
CN211812671U
Indirect live wire work auxiliary device
JP2011024283A