Prefabricated part maintenance device and maintenance process for road and bridge construction

By designing a prefabricated parts maintenance device for road bridge construction, using structures such as leveling shafts and cam shaft discs, the problem of easy wrinkles and uneven water flow of the maintenance coil film is solved, and efficient and uniform maintenance effect is achieved to ensure the quality of the prefabricated parts.

CN120095950AActive Publication Date: 2025-06-06JIANGSU JUNHAO CONSTR ENG CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202510593737.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-09
Publication Date
2025-06-06
Estimated Expiration
2045-05-09

AI Technical Summary

Technical Problem

The existing coating sprinkler maintenance technology has problems such as the coating being easily wrinkled or damaged, lack of adhesion, and the impact of water flow leads to the movement of the coating, resulting in insufficient local wetness on the surface of the prefabricated parts and affecting the quality.

Method used

A prefabricated parts maintenance device for road bridge construction is designed, including a mobile frame plate, a leveling shaft, a cam shaft disk, a swing rod, a pipe and a water-saving spray head. The curing coil film is rolled and pulled through the leveling shaft, and the cam shaft disk and a swing rod are rotated to achieve a uniform spraying flow, and the curing coil film is locked through the adjustment rod to prevent waste.

Benefits of technology

Effectively prevent wrinkles from occurring in the curing coil film, achieve uniform spraying flow, ensure consistent road maintenance effect, increase the water absorption of the curing coil film, and reduce the waste of the curing coil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120095950A_ABST
    Figure CN120095950A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of road and bridge construction, and discloses a prefabricated part maintenance device for road and bridge construction and a maintenance technology.The prefabricated part maintenance device comprises a movable frame plate, a mounting notch is formed in the middle of the movable frame plate, film rolling shafts are rotationally connected to the front side and the rear side of the mounting notch, and maintenance rolling films are arranged outside the film rolling shafts; a water tank is fixedly connected to the left side of the top end of the movable frame plate, leveling pieces used for laying a curing roll film are arranged on the front side and the rear side of the interior of the movable frame plate, center rollers are rotationally connected to the front side and the rear side of the interior of the movable frame plate, and swing rods are rotationally connected to the front side and the rear side of the exterior of each center roller. The left sides of the bottom ends of the adjacent swing rods are fixedly connected with through pipes. According to the device, water flow is evenly sprayed to the curing roll film, the consistent curing effect is guaranteed, the water absorption amount is increased, the roll film and the leveling shaft can be locked through rotation of the pressing rod, the movable frame plate can be conveniently pushed, it is guaranteed that the roll film is fixed, and waste of the roll film is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of road and bridge construction, and in particular to a prefabricated component maintenance device and a maintenance process for road and bridge construction. Background Art

[0002] Precast concrete components are concrete parts that are prefabricated in a factory or on site according to design specifications. After these components are formed, they must be cured under specific moisture and temperature conditions to ensure that the newly poured concrete can harden normally or faster and increase its strength.

[0003] Concrete curing usually adopts the method of film sprinkling, which requires continuous moistening. However, in actual operation, we found that there are some problems with the existing film sprinkling curing technology: the film on the prefabricated parts is prone to wrinkles or damage. In addition, without sprinkling water, the film lacks sufficient adhesion and is easily blown by the wind; and in the process of sprinkling water, the impact of the water flow will cause the film to move, resulting in film failure and insufficient local wetness on the surface of the prefabricated parts, which will cause cracking during the curing process and affect the quality of the prefabricated parts. To this end, in response to the above problems, a prefabricated part curing device and a curing process for road and bridge construction are proposed to solve the above problems. Summary of the invention

[0004] The object of the present invention is to provide a prefabricated component maintenance device and maintenance process for road and bridge construction to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned objectives, the present invention provides: a prefabricated component maintenance device for road and bridge construction, comprising a movable frame, a mounting groove is opened in the middle of the movable frame, and a film rolling shaft is rotatably connected to the front and rear sides of the mounting groove, a maintenance film is arranged on the outside of the film rolling shaft, a water tank is fixedly connected to the top left side of the movable frame, and leveling members for laying the maintenance film are arranged on the front and rear sides of the interior of the movable frame, a center roller is rotatably connected to the front and rear sides of the movable frame, swing rods are rotatably connected to the front and rear sides of the exterior of the center roller, a through pipe is fixedly connected to the left side of the bottom end adjacent to the swing rod, a plurality of water-saving sprinklers are arranged on the outside of the through pipe, connecting pipes are arranged on the front and rear sides of the water tank, and fixing members for locking the maintenance film are arranged on the front and rear sides of the movable frame.

[0006] Preferably, the leveling member comprises a slide groove, the slide groove is opened at the front and rear sides of the interior of the movable frame plate, the inner top end of the slide groove is fixedly connected to a limit spring, the bottom end of the limit spring is fixedly connected to a sliding block, the middle part of the sliding block is rotatably connected to a leveling shaft, the middle part of the sliding block is movably connected to a camshaft disk, the outer part of the sliding block is slidably connected to the inner part of the slide groove, and the right end of the swing rod is rotatably connected to the outer part of the camshaft disk; Preferably, the fixing member includes a first positioning roller, the first positioning roller is fixedly connected to the front and rear sides of the outer side of the moving frame plate, the first positioning roller is rotatably connected to the outside of the first positioning roller, the front and rear sides of the outer side of the moving frame plate are fixedly connected to the second positioning roller, the second positioning roller is rotatably connected to the outside of the second positioning roller, the middle part of the first adjusting rod is fixedly connected to the second fixed roller, the middle part of the second adjusting rod is fixedly connected to the first fixed roller, the second fixed roller and the first fixed roller are outer sleeved with a tension spring, the bottom end of the second adjusting rod is fixedly connected to a pressure rod, the outer part of the pressure rod is engaged with the outer part of the leveling shaft, the front and rear sides of the pressure rod are rotatably connected to auxiliary wheels, and the top end of the first adjusting rod is fixedly connected to a push rod; Preferably, the bottom end of the connecting pipe is fixedly connected to the front and rear sides of the water-saving sprinkler; Preferably, the top teeth of the second adjusting rod are meshedly connected with the bottom teeth of the first adjusting rod; Preferably, the side of the second adjusting rod close to the water tank is slidably connected to the front and rear sides of the movable frame, and the side of the first adjusting rod close to the water tank is slidably connected to the front and rear sides of the movable frame; Preferably, a handrail is fixedly connected to the right side of the top of the movable frame; Preferably, a loading bucket is detachably connected to the left side of the interior of the mounting slot, and a cleaning shaft is rotatably connected to the bottom end of the loading bucket.

[0007] A maintenance process for prefabricated parts for road and bridge construction, according to the above-mentioned maintenance device for prefabricated parts for road and bridge construction, the specific method comprises the following steps; S1. Start: The user starts the water tank pump through the control terminal, and the water is sent to the through pipe through the connecting pipe and sprayed out by the water-saving sprinkler. S2. Cleaning: Pull the handrail to drive the mobile frame forward. The front cleaning shaft rolls to absorb and collect road dust and other debris into the loading bucket. S3. Laying and spraying curing liquid: The leveling shaft in the middle of the mobile frame rolls in contact with the ground, pulling and leveling the curing film to prevent wrinkles. At the same time, the rotation of the leveling shaft drives the camshaft disc, so that the swing rod pushes the through pipe and the water-saving sprinkler to swing, and evenly sprays water to the curing film.

[0008] S4. Locking the film roll: When there is no need to lay the curing film roll, cut the film roll first, then swing the first adjusting rod backward, and turn the second adjusting rod through the engagement of teeth, driving the pressure rod to squeeze the leveling shaft to make it suspended, lock the curing film roll and the leveling shaft, and facilitate pushing the mobile frame to prevent the curing film roll from rolling prematurely and wasting.

[0009] Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, the leveling shaft in the middle of the mobile frame plate contacts the ground and rolls, pulling the maintenance roll film and leveling it to prevent wrinkles; when the leveling shaft rotates, it drives the camshaft discs on the front and rear sides to rotate, so that the swing rod swings around the positioning roller under the push of the cam, and synchronously drives the through pipe and the water-saving nozzle to swing, so as to achieve uniform spraying of water onto the maintenance roll film, avoid uneven local spraying, ensure consistent road maintenance effect, and increase the water absorption of the maintenance roll film; 2. In the present invention, by swinging the first adjusting rod backward, the teeth at the bottom end thereof mesh with the teeth of the second adjusting rod to make it turn. Since the rotation center of the second adjusting rod is higher than the center axis of the leveling shaft, the rotation drives the pressure rod to squeeze the leveling shaft. The leveling shaft is suspended in the air after the limit spring is squeezed by the sliding block, so that the pressure rod locks the curing roll film and the leveling shaft, making it convenient to push the moving frame plate, and can ensure that the curing roll film remains fixed before reaching the designated laying position, thereby reducing the waste of curing roll film caused by the rolling of the roll film shaft. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a structural cross-sectional view of the movable frame plate of the present invention; Figure 3 It is a schematic diagram of the structure of the slideway, the sliding block and the leveling shaft of the present invention; Figure 4 It is a structural schematic diagram of the swing rod of the present invention; Figure 5 It is a structural schematic diagram of the through pipe and the camshaft disc of the present invention; Figure 6 It is a schematic diagram of the structure of the curing roll film of the present invention; Figure 7 It is a schematic diagram of the structure of the leveling shaft, the second adjusting rod and the pressing rod of the present invention; Figure 8 It is a schematic diagram of the structural coordination of the first adjusting rod, the push rod, the pressure rod and the second adjusting rod of the present invention.

[0011] Legend: 1. Moving frame; 2. Mounting notch; 3. Film roll shaft; 4. Film maintenance; 5. Water tank; 6. Slide; 7. Limit spring; 8. Sliding block; 9. Leveling shaft; 10. Camshaft plate; 11. Center roller; 12. Swing rod; 13. Through pipe; 14. Water-saving sprinkler; 15. Connecting pipe; 16. First positioning roller; 17. First adjusting rod; 18. Second positioning roller; 19. Second adjusting rod; 20. First fixed roller; 21. Second fixed roller; 22. Tension spring; 23. Pressure rod; 24. Auxiliary wheel; 25. Push rod; 26. Handrail; 27. Loading bucket; 28. Cleaning shaft. DETAILED DESCRIPTION

[0012] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0013] Reference Figures 1 to 3 , an embodiment provided by the present invention: a prefabricated component maintenance device for road and bridge construction, comprising a movable frame 1, and wheels are provided at the four corners of the bottom end of the movable frame 1, so that the user can push the maintenance device conveniently. An installation slot 2 is provided in the middle of the movable frame 1, and the installation slot 2 provides an installation space for the film roll shaft 3, so that the film roll shaft 3 can rotate therein, thereby realizing the winding and unwinding operation of the maintenance film roll 4. The front and rear sides of the installation slot 2 are rotatably connected with the film roll shaft 3, and the maintenance film roll 4 is wrapped outside. During the operation of the device, as the leveling shaft 9 pulls the maintenance film roll 4, the film roll shaft 3 will rotate accordingly to realize the release of the maintenance film roll 4.

[0014] The curing film roll 4 is arranged outside the film roll shaft 3, and the curing film roll 4 is used to be evenly laid on the surface of the road prefabricated part, and effectively absorb the sprayed curing liquid and keep it moist, so as to ensure the curing effect of the prefabricated part. A water tank 5 is fixedly connected to the left side of the top of the mobile frame 1, and a water pump is arranged in front and behind the water tank 5. The curing liquid in the water tank 5 can be controlled by the control button to be transported.

[0015] refer to Figure 2 , Figure 4 and Figure 5 The front and rear sides of the leveling shaft 9 are provided with leveling parts for laying the curing film roll 4, and the leveling parts include a slide 6, which is opened on the front and rear sides of the moving frame 1, and the slide 6 is located on the left side of the inner wall of the moving frame 1, and is used to limit the position of the leveling shaft 9. The top of the slide 6 is fixedly connected to the limit spring 7, and the limit spring 7 is used to limit and reset the sliding block 8.

[0016] The bottom end of the limit spring 7 is fixedly connected with a sliding block 8, and the outside of the sliding block 8 is slidably connected to the inside of the slide groove 6. There are two sliding blocks 8, and the leveling shaft 9 is indirectly fixed to the moving frame 1 through the sliding block 8. The middle part of the sliding block 8 is rotatably connected with the leveling shaft 9. The leveling shaft 9 will contact the ground and roll during the movement of the device, pulling and leveling the curing film 4 to prevent wrinkles on the curing film 4. The middle part of the sliding block 8 is movably connected with a camshaft disc 10. When the leveling shaft 9 rotates, it will synchronously drive the camshaft disc 10 to rotate. The camshaft disc 10 is a structure of discs on both sides of the middle cam.

[0017] The front and rear sides of the mobile frame 1 are rotatably connected with the center roller 11, and the center roller 11 provides a stable support point for the rotation of the swing rod 12, so that the swing rod 12 can swing around the center roller 11 under the rotation of the camshaft disc 10. The front and rear sides of the outside of the center roller 11 are rotatably connected with the swing rod 12, and the bottom left side of the adjacent swing rod 12 is fixedly connected with a through pipe 13, and the right end of the swing rod 12 is rotatably connected to the outside of the camshaft disc 10. A plurality of water-saving nozzles 14 are arranged on the outside of the through pipe 13. The swing rod 12 converts the rotation of the camshaft disc 10 into its own swing, and then drives the through pipe 13 and the water-saving nozzle 14 to swing, realizing the swing spraying of the water flow, further expanding the watering coverage, and enabling the maintenance roll film 4 to absorb water more evenly, which is conducive to ensuring the maintenance quality of the road and bridge prefabricated parts.

[0018] Connecting pipes 15 are provided on both the front and rear sides of the water tank 5. The bottom ends of the connecting pipes 15 are fixedly connected to the front and rear sides of the water-saving sprinkler 14. The connecting pipes 15 serve to transport the water in the water tank 5 to the water-saving sprinkler 14, thereby realizing the connection of the water source from the water tank 5 to the spraying component.

[0019] refer to Figure 1 , Figure 7 and Figure 8The front and rear sides of the movable frame 1 are provided with fixing parts for locking the curing roll film 4, and the fixing parts include a first positioning roller 16, the first positioning roller 16 is fixedly connected to the front and rear sides of the outside of the movable frame 1, the outside of the first positioning roller 16 is rotatably connected to the first adjusting rod 17, the side of the first adjusting rod 17 close to the water tank 5 is slidably connected to the front and rear sides of the movable frame 1, the front and rear sides of the outside of the movable frame 1 are fixedly connected to the second positioning roller 18, the outside of the second positioning roller 18 is rotatably connected to the second adjusting rod 19, and the top teeth of the second adjusting rod 19 are meshed with the bottom teeth of the first adjusting rod 17. When the first adjusting rod 17 is swung backward, the first adjusting rod 17 rotates, and the teeth at the bottom end engage with the teeth of the second adjusting rod 19, causing the second adjusting rod 19 to turn. Since the rotation center of the second adjusting rod 19 (the second positioning roller 18) is higher than the center axis position of the leveling shaft 9, the turning of the second adjusting rod 19 will drive the pressure rod 23 to squeeze the outside of the leveling shaft 9. After the leveling shaft 9 is squeezed, the limit spring 7 is squeezed through the sliding block 8, so that the leveling shaft 9 is suspended in the air, so that the pressure rod 23 locks the curing film 4 and the leveling shaft 9, which is convenient for the user to keep the curing film 4 fixed when pushing the movable frame 1.

[0020] The second adjusting rod 19 is slidably connected to the front and rear sides of the movable frame 1 on one side close to the water tank 5, and the middle part of the first adjusting rod 17 is fixedly connected to the second fixed roller 21, and the middle part of the second adjusting rod 19 is fixedly connected to the first fixed roller 20, and the outer parts of the second fixed roller 21 and the first fixed roller 20 are sleeved with a tension spring 22, and the bottom end of the second adjusting rod 19 is fixedly connected to a pressure rod 23, and the outer part of the pressure rod 23 is engaged with the outer part of the leveling shaft 9, and the front and rear sides of the pressure rod 23 are rotatably connected to auxiliary wheels 24, and the top end of the first adjusting rod 17 is fixedly connected to a push rod 25, and the push rod 25 connects the two first adjusting rods 17 to realize the common rotation of the first adjusting rods 17 in the front and rear positions. At the same time, the push rod 25 also provides a convenient operating handle for the user, which makes the operation of the fixed part more labor-saving and convenient, and improves the human-computer interaction of the device.

[0021] refer to Figure 6 The top right side of the mobile frame 1 is fixedly connected with a handrail 26. The user can drive the mobile frame 1 to move by pulling the handrail 26, thereby driving the entire device to move on the road. The left side of the interior of the installation slot 2 is detachably connected with a loading bucket 27. The bottom end of the loading bucket 27 is rotatably connected with a cleaning shaft 28. When the mobile frame 1 moves, the cleaning shaft 28 will first contact the ground and roll, and absorb and collect dust and other debris on the road into the loading bucket 27, which helps to improve the cleanliness of the road environment and prevent debris from causing adverse effects on the laying of the maintenance roll film 4 and the maintenance of road prefabricated parts.

[0022] A maintenance process for prefabricated parts for road and bridge construction, according to the above-mentioned maintenance device for prefabricated parts for road and bridge construction, the specific method comprises the following steps; S1, start: the user starts the water pump of the water tank 5 through the control terminal, and the water is sent to the through pipe 13 through the connecting pipe 15, and sprayed out by the water-saving nozzle 14. S2, cleaning: Pull the handrail 26 to drive the movable frame 1 forward, and the front cleaning shaft 28 rolls to absorb and collect road dust and other debris into the loading bucket 27. S3. Laying and spraying curing liquid: The leveling shaft 9 in the middle of the mobile frame 1 rolls in contact with the ground, pulling and leveling the curing film roll 4 to prevent wrinkles. At the same time, the leveling shaft 9 rotates to drive the camshaft disc 10, so that the swing rod 12 pushes the through pipe 13 and the water-saving nozzle 14 to swing, and evenly sprays water to the curing film roll 4.

[0023] S4. Locking the film roll: When there is no need to lay the curing film roll 4, first cut the film roll, then swing the first adjusting rod 17 backward, and turn the second adjusting rod 19 through the engagement of teeth, driving the pressure rod 23 to squeeze the leveling shaft 9, making it suspended in the air, locking the curing film roll 4 and the leveling shaft 9, making it convenient to push the moving frame 1, and preventing the curing film roll 4 from rolling and wasting in advance.

[0024] Working principle: When in use, the water tank 5 is controlled by the external control end to drive the water pumps at the front and rear positions to transport water to the connecting pipe 15, so that the water flows smoothly into the through pipe 13 through the connecting pipe 15 and is sprayed out from the water-saving nozzle 14. After that, the handrail 26 is pulled to drive the movable frame 1 to move. At this time, the cleaning shaft 28 at the front side of the movable frame 1 will first contact the ground and roll, so as to absorb dust and other debris on the road and collect them into the loading bucket 27. Then, in the middle of the movable frame 1, the leveling shaft 9 will also contact the ground and roll, and pull the maintenance roll film 4 to level the maintenance roll film 4 laid on the ground to prevent wrinkles in the maintenance roll film 4. In addition, camshaft discs 10 are arranged on the front and rear sides of the leveling shaft 9, and the middle part of the camshaft disc 10 is a cam. When the leveling shaft 9 rotates, the leveling shaft 9 will synchronously drive the camshaft disc 10 to rotate. After the camshaft disc 10 rotates, the swing rod 12 in the camshaft disc 10 will slide on the cam through the roller at one end, so that the swing rod 12 synchronously drives the through pipe 13 and the water-saving nozzle 14 to swing with the first positioning roller 11 as the center under the push of the cam outer wheel expansion, so as to realize the area of ​​water spraying on the maintenance roll film 4, avoid the situation of excessive or insufficient local spraying, thereby ensuring the consistency of the road maintenance effect and further increasing the water absorption of the maintenance roll film 4.

[0025] When the user does not need to lay the maintenance film 4, the user can first cut the maintenance film 4, and then swing the first adjusting rod 17 backward. When the first adjusting rod 17 rotates, the teeth at the bottom will engage with the teeth of the second adjusting rod 19, and the second adjusting rod 19 will turn. At this time, since the second positioning roller 18, the center of rotation of the second adjusting rod 19, is higher than the center axis position of the leveling shaft 9, the turning of the second adjusting rod 19 will drive the pressure rod 23 to squeeze the outside of the leveling shaft 9. After the leveling shaft 9 is squeezed, the limit spring 7 is squeezed by the sliding block 8, so that the leveling shaft 9 is suspended in the air, so that the pressure rod 23 locks the maintenance film 4 and the leveling shaft 9, thereby facilitating the user to push the moving frame 1, ensuring that the maintenance film 4 remains fixed before the moving frame 1 reaches the specified laying position, and reducing the waste of the maintenance film 4 caused by the rolling of the film shaft 3.

[0026] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated component maintenance device for road and bridge construction, comprising a movable frame plate (1), characterized in that: The movable frame (1) is provided with an installation slot (2) in the middle part, and a film roll shaft (3) is rotatably connected to the front and rear sides of the installation slot (2), and a curing film roll (4) is arranged outside the film roll shaft (3). The top left side of the movable frame (1) is fixedly connected to a water tank (5), and the front and rear sides of the interior of the movable frame (1) are provided with leveling members for laying the curing film roll (4). The front and rear sides of the movable frame (1) are rotatably connected to a center roller (11), and the front and rear sides of the exterior of the center roller (11) are rotatably connected to a swing rod (12), and the left side of the bottom end adjacent to the swing rod (12) is fixedly connected to a through pipe (13), and a plurality of water-saving nozzles (14) are arranged outside the through pipe (13), and the front and rear sides of the water tank (5) are provided with connecting pipes (15), and the front and rear sides of the movable frame (1) are provided with fixing members for locking the curing film roll (4).

2. A prefabricated component maintenance device for road and bridge construction according to claim 1, characterized in that: The leveling member comprises a slide groove (6), wherein the slide groove (6) is arranged at the front and rear sides of the interior of the movable frame plate (1), the top end of the interior of the slide groove (6) is fixedly connected to a limit spring (7), the bottom end of the limit spring (7) is fixedly connected to a sliding block (8), the middle part of the sliding block (8) is rotatably connected to a leveling shaft (9), the middle part of the sliding block (8) is movably connected to a camshaft disc (10), the outside of the sliding block (8) is slidably connected to the inside of the slide groove (6), and the right end of the swing rod (12) is rotatably connected to the outside of the camshaft disc (10).

3. A prefabricated component maintenance device for road and bridge construction according to claim 2, characterized in that: The fixing member comprises a first positioning roller (16), the first positioning roller (16) being fixedly connected to the front and rear sides of the outside of the movable frame (1), the outside of the first positioning roller (16) being rotatably connected to a first adjusting rod (17), the outside of the movable frame (1) being fixedly connected to a second positioning roller (18) on the front and rear sides of the outside, the outside of the second positioning roller (18) being rotatably connected to a second adjusting rod (19), the middle of the first adjusting rod (17) being fixedly connected to a second fixed roller (21), the middle of the second adjusting rod (19) being fixedly connected to a first fixed roller (20), the outsides of the second fixed roller (21) and the first fixed roller (20) being sleeved with a tension spring (22), the bottom end of the second adjusting rod (19) being fixedly connected to a pressure rod (23), the outside of the pressure rod (23) being engaged with the outside of the leveling shaft (9), the front and rear sides of the pressure rod (23) being rotatably connected to auxiliary wheels (24), and the top end of the first adjusting rod (17) being fixedly connected to a push rod (25).

4. The prefabricated component maintenance device for road and bridge construction according to claim 1, characterized in that: The bottom end of the connecting pipe (15) is fixedly connected to the front and rear sides of the water-saving sprinkler (14).

5. The prefabricated component maintenance device for road and bridge construction according to claim 3 is characterized in that: The top teeth of the second adjusting rod (19) are meshingly connected with the bottom teeth of the first adjusting rod (17).

6. A prefabricated component maintenance device for road and bridge construction according to claim 3, characterized in that: The side of the second adjustment rod (19) close to the water tank (5) is slidably connected to the front and rear sides of the movable frame (1), and the side of the first adjustment rod (17) close to the water tank (5) is slidably connected to the front and rear sides of the movable frame (1).

7. The prefabricated component maintenance device for road and bridge construction according to claim 1, characterized in that: A handrail (26) is fixedly connected to the right side of the top end of the movable frame plate (1).

8. The prefabricated component maintenance device for road and bridge construction according to claim 1, characterized in that: The left side of the interior of the installation slot (2) is detachably connected to a loading bucket (27), and the bottom end of the loading bucket (27) is rotatably connected to a cleaning shaft (28).

9. A maintenance process for prefabricated parts for road and bridge construction, characterized in that: According to a prefabricated component maintenance device for road and bridge construction according to any one of claims 1 to 8, the specific method comprises the following steps; S1, start: the user starts the water pump of the water tank (5) through the control terminal, and the water is sent to the through pipe (13) through the connecting pipe (15) and sprayed out by the water-saving nozzle (14); S2, cleaning: pulling the handrail (26) drives the movable frame (1) forward, and the front cleaning shaft (28) rolls to absorb and collect road dust and other debris into the loading bucket (27); S3, laying and spraying curing liquid: the leveling shaft (9) in the middle of the movable frame (1) contacts the ground and rolls, pulling and leveling the curing film roll (4) to prevent wrinkles. At the same time, the leveling shaft (9) rotates to drive the cam shaft disc (10), so that the swing rod (12) pushes the through pipe (13) and the water-saving nozzle (14) to swing, and evenly sprays water to the curing film roll (4); S4, locking the film roll: when there is no need to lay the curing film roll (4), first cut the film roll, then swing the first adjusting rod (17) backward, and make the second adjusting rod (19) turn by the teeth meshing, so as to drive the pressure rod (23) to squeeze the leveling shaft (9) and make it suspended in the air, thereby locking the curing film roll (4) and the leveling shaft (9), making it easier to push the moving frame (1) and preventing the curing film roll (4) from rolling and wasting in advance.

Citation Information

Patent Citations

  • Building construction concrete film covering device with smoothing function

    CN113668342A

  • Concrete curing device for highway engineering construction

    CN114673059A

  • Concrete road maintenance equipment

    CN118792940A

  • Water stable layer maintenance device and maintenance method for municipal road construction

    CN119243559A

  • Film paving device for highway construction

    CN221740857U