Driving early warning control system of electric locomotive
By predicting the icy track in front of the locomotive and preheating the sand particles in advance, the problem of reducing adhesion caused by track icing is solved, and efficient sand blasting and resource conservation are achieved.
Patent Information
- Application Number
- CN202510729276.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-03
- Publication Date
- 2025-07-04
- Estimated Expiration
- 2045-06-03
AI Technical Summary
In severe weather conditions such as rain and snow, track freezing leads to a reduction in adhesion between the locomotive wheels and the track, increasing braking distance and possibly causing wear. The existing sand-spreading technology has low resource utilization and high energy consumption.
By setting up an image acquisition module and an environmental information acquisition module in front of the locomotive, predict the length and starting position of the icing track, preheat the sand particles in advance, and efficiently blast sandblasting in the early stages of entering the icing section, avoiding increasing the amount of sandblasting to increase the friction coefficient.
It improves the utilization rate of sand particles, reduces energy consumption during preheating, avoids the situation of heating sand particles with high power, and improves resource utilization.
Smart Images

Figure CN120246023A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of rail transit, and particularly relates to a driving warning control system for a locomotive. Background Art
[0002] Under harsh weather conditions such as rain and snow, due to the icing of the track, the adhesion between the wheels of the locomotive and the track will be significantly reduced, resulting in wheel slip or idling. This not only increases the braking distance of the locomotive but also may cause unnecessary wear to the wheels and rails, affecting the smooth operation of the locomotive and the comfort of passengers. Currently, sanding is generally used to improve the problem of the reduced friction coefficient between the wheels and the rails.
[0003] In related technologies, generally, sanding measures are taken as an emergency when traveling on an icy track, which is prone to problems such as low resource utilization rate and high energy consumption. Summary of the Invention
[0004] This application provides a driving warning control system for a locomotive, which can predict the icing condition of the road section ahead of the train during travel, preheat the sand grains in advance, and achieve efficient sandblasting at the initial stage of entering the icy section, reducing the energy consumption during the preheating process; in addition, since the sandblasting temperature can be stabilized when entering the icy section, the situation of increasing the sandblasting amount to improve the friction coefficient at the initial stage can be avoided, thereby improving the utilization rate of sand grains, avoiding the situation of high-power heating of sand grains, and improving the resource utilization rate.
[0005] A driving warning control system for a locomotive provided by this application includes: A locomotive, an environmental information collection module, and a server; The locomotive travels on the track. A first image collection module and a sandblasting preheating module are arranged at the front end of the locomotive. Both the first image collection module and the sandblasting preheating module are connected to the server. The first image collection module is used to collect the first track image in front of the locomotive during travel and upload the first track image to the server. The sandblasting preheating module is used to receive the preheating start instruction sent by the server to preheat the sand grains according to the preheating start instruction; The environmental information collection module is installed at a preset position beside the track in front of the locomotive during travel. The environmental information collection module is used to collect meteorological information and a second track image, and upload the meteorological information and the second track image to the server; the meteorological information includes humidity, temperature, wind direction, and wind force; the second track image is the track image collected by the environmental information collection module at the preset position facing the locomotive; The server is used to receive the first track image, meteorological information, and the second track image; determine the length and starting position of the icing track based on the meteorological information, the first track image, and the second track image; determine the preheating time and sandblasting volume based on the length of the icing track; determine the time interval for the locomotive to reach the starting position of the icing track based on the current position of the locomotive, the starting position of the icing track, and the current traveling speed of the locomotive; when the time interval is greater than the preheating time, send a preheating start instruction to the sandblasting preheating module after the waiting time, so that the sandblasting preheating module preheats the sand grains based on the sandblasting volume, and the waiting time is the difference between the time interval and the preheating time; when the time interval is less than or equal to the preheating time, send a preheating start instruction to the sandblasting preheating module.
[0006] Optionally, the server is further used to determine the icing thickness based on the meteorological information and the second track image; determine the target sandblasting strategy based on the icing thickness and the preset sandblasting strategy, and send the target sandblasting strategy to the sandblasting control module. The locomotive further includes a sandblasting control module, which is used to receive the target sandblasting strategy sent by the server and perform sandblasting based on the target sandblasting strategy when the locomotive reaches the starting position of the icing track.
[0007] Optionally, the preset sandblasting strategy includes: When the icing thickness is less than 1 mm, the sand grain type is fine sand, and the sandblasting method is pulse injection; the diameter of the fine sand is any value from 0.3 mm to 0.5 mm. When the icing thickness is greater than or equal to 1 mm and less than 3 mm, the sand grain type is a mixed sand of sand grains with a diameter of 0.5 mm and sand grains with a diameter of 1 mm, and the sandblasting method is pulse injection. When the icing thickness is greater than or equal to 3 mm and less than 10 mm, the sand grain type is coarse sand, and the sandblasting method is continuous injection; the diameter of the coarse sand is any value from 1 mm to 1.5 mm. When the icing thickness is greater than or equal to 10 mm, the sand grain type is a sand-salt mixture, and the sandblasting method is pulse injection.
[0008] Optionally, determining the length and starting position of the icing track based on the meteorological information, the first track image, and the second track image includes: Based on the meteorological information, the first track image, the second track image, and a pre-trained icing recognition model, obtain the length and starting position of the icing track. The icing recognition model is used to output the length and starting position of the icing track based on the input meteorological information, the first track image, and the second track image.
[0009] Optionally, determining the preheating time and sandblasting volume based on the length of the icing track includes: Determine the preheating time and sandblasting volume based on the mapping relationship between the icing thickness, the length of the icing track, the sandblasting volume, and the preheating time.
[0010] Optionally, when the arrival time is less than or equal to the preheating time, a preheating start instruction is sent to the sandblasting preheating module, including: When the arrival time is less than the preheating time, a preheating start instruction is sent to the sandblasting preheating module, a warning message is generated and sent to the warning module of the locomotive.
[0011] Optionally, the locomotive further includes a communication module, and the first image acquisition module and the sandblasting preheating module are connected to the server through the communication module.
[0012] Optionally, cameras are installed at both the front end and the rear end of the locomotive to obtain real-time monitoring images of the front and rear of the locomotive. The cameras are connected to the cloud, and the cameras upload the real-time monitoring images to the server; The server is configured to receive the real-time monitoring images uploaded by the cameras and store the real-time monitoring images.
[0013] Optionally, ultrasonic radars are installed at both the front end and the rear end of the locomotive. The ultrasonic radars are used to detect objects within a preset distance in front of or at the rear end of the locomotive.
[0014] Optionally, an alarm module is installed in the cab of the locomotive. When an object exists within a preset distance in front of or at the rear end of the locomotive, the ultrasonic radar sends an alarm activation message to the alarm module in the cab of the locomotive; The alarm module is configured to receive the alarm activation message and give an alarm warning.
[0015] As described above, a driving warning control system for a motor locomotive provided by the present application has the following beneficial effects: A driving warning control system for a battery locomotive in the present application. The driving warning control system for the battery locomotive includes a locomotive, an environmental information collection module, and a server. The first track image is obtained through the first image collection module provided at the front end of the locomotive, the meteorological information and the second track image are obtained through the environmental information collection module, and the server predicts the length and starting position of the icing track based on the first track image, the second track image, and the meteorological information. The sending time of the preheating start command is determined based on the current position of the locomotive, the current driving speed of the locomotive, and the starting position of the icing track, so that the sand blasting preheating module on the locomotive preheats the sand grains after receiving the preheating start command. By predicting the starting position and length of the icing section and preparing for sand preheating in advance, efficient sand blasting can be achieved at the initial stage of entering the icing section, reducing the energy consumption during the preheating process; in addition, since the sand blasting temperature can be stabilized when entering the icing section, the situation of increasing the sand blasting amount to increase the friction coefficient at the initial stage can be avoided, thereby improving the utilization rate of sand grains, avoiding the situation of high-power heating of sand grains, and improving the resource utilization rate.
[0016] It should be understood that the above general description and the following detailed description are only exemplary and explanatory, and cannot limit the present application. Brief Description of the Drawings
[0017] The drawings here are incorporated into the specification and form a part of this specification, showing the embodiments consistent with the present application, and are used together with the specification to explain the principles of the present application. Obviously, the drawings in the following description are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts. In the drawings: Figure 1 is a schematic diagram of the driving warning control system of a battery locomotive shown in an exemplary embodiment of the present application; Figure 2 is a schematic diagram of the driving warning control system of a battery locomotive shown in another exemplary embodiment of the present application.
[0018] Description of the Reference Numerals: 110 - Locomotive; 111 - First Image Collection Module; 112 - Sand Blasting Preheating Module; 113 - Sand Blasting Control Module; 114 - Communication Module; 115 - Camera; 116 - Ultrasonic Radar; 117 - Alarm Module; 120 - Environmental Information Collection Module; 121 - Humidity Sensor; 122 - Temperature Sensor; 123 - Wind Direction Sensor; 124 - Anemometer; 125 - Second Image Collection Module; 130 - Server; 200 - Track. Detailed Description of the Embodiments
[0019] The embodiments of the present application will be described below with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present application from the content disclosed in this specification. The present application can also be implemented or applied through other different specific embodiments. Various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present application. It should be understood that the preferred embodiments are only for illustrating the present application, rather than for limiting the protection scope of the present application.
[0020] It should be noted that the diagrams provided in the following embodiments only illustrate the basic concept of the present application in a schematic manner. Therefore, only the components related to the present application are shown in the diagrams, rather than being drawn according to the number, shape, and size of the components in actual implementation. The type, quantity, and proportion of each component in actual implementation can be arbitrarily changed, and the component layout type may also be more complex.
[0021] In the following description, a large number of details are explored to provide a more thorough explanation of the embodiments of the present application. However, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present application difficult to understand.
[0022] Please refer to Figure 1 , Figure 1 which is a schematic diagram of the driving warning control system of a motor vehicle shown in an exemplary embodiment of the present application. Referring to Figure 1 it can be seen that the driving warning control system of the motor vehicle may include: a locomotive 110, an environmental information collection module 120, and a server 130.
[0023] Among them, each module of the locomotive 110 and the environmental information collection module 120 can be connected to the server 130. Figure 1 As shown, the locomotive 110 and the environmental information collection module 120 are wirelessly connected to the server 130. The server 130 can be a single server, a server cluster, or the cloud. The modules provided on the locomotive 110 can be connected to the server 130 to upload relevant data collected during the driving of the locomotive to the server 130. The environmental information collection module 120 can be connected to the server 130 and upload the collected meteorological information and the second track image to the server 130. The server 130 can execute relevant processes based on the locomotive 110 and the data uploaded by the environmental information collection module 120.
[0024] The locomotive 110 travels on the track 200. A first image collection module and a sandblasting preheating module are provided at the front end of the locomotive 110 ( Figure 1(not shown). The first image acquisition module and the sandblasting preheating module are both connected to the server. The first image acquisition module is used to acquire the first track image in front of the locomotive and upload the first track image to the server. The sandblasting preheating module is used to receive the preheating start instruction sent by the server to preheat the sand grains according to the preheating start instruction.
[0025] In an embodiment of the present application, the locomotive 110 can run on the track 200. In low-temperature rain and snow weather, the track 200 may be covered with ice. At this time, it is necessary to use sandblasting on the icy track of the track 200. By embedding the sand grains into the ice surface, the friction between the wheel and the rail is increased to prevent the wheels from slipping or the braking from failing.
[0026] The first image acquisition module can be installed at the front end of the locomotive 110, and the orientation of the first image acquisition module is the same as the forward direction of the locomotive 110. The first image acquisition module can be a camera. The sandblasting preheating module can be used to heat the sand grains to increase the temperature of the sand grains to avoid the situation where the sand grains cannot be ejected due to freezing in rain and snow weather.
[0027] It should be noted that ice layers may adhere to the surface of the low-temperature sand grains, and the friction coefficient between the ejected sand grains and the track ice surface is relatively low. Preheating the sand grains can melt the ice frost on the surface of the sand grains, ensuring that the sand grains contact the track in a dry state, directly providing a higher friction coefficient. Moreover, in rain and snow weather, the sand grains may absorb moisture and freeze into blocks. If not preheated, the frozen sand blocks in the sand box will block the pipeline or nozzle, resulting in the paralysis of the sandblasting function. After preheating, the sand grains are relatively dry and can be evenly sprayed through air pressure or mechanical mechanisms, avoiding local accumulation or interruption. In addition, when the preheated sand grains contact the ice surface, the heat can slightly melt the surface ice layer, prompting the sand grains to embed into the ice surface rather than slide, which can strengthen the anchoring effect of the sand grains and extend the anti-slip duration.
[0028] The environmental information acquisition module 120 is installed at a preset position beside the track 200 in front of the locomotive 110. The environmental information acquisition module 120 is used to acquire meteorological information and the second track image, and upload the meteorological information and the second track image to the server 130. Among them, the meteorological information includes humidity, temperature, wind direction and wind force; the second track image is the track image acquired by the environmental information acquisition module facing the locomotive at the preset position.
[0029] In rain and snow weather, the length of the icy track will be affected by humidity, temperature, wind direction and wind force. When the humidity is high, the frozen length of the track is longer. Especially under the conditions of long-term low temperature accompanied by precipitation or humid air, the ice layer will extend a longer distance along the track. Low temperature will extend the frozen length of the track. A single wind direction may cause the ice layer to extend farther along one side of the track. Strong winds may blow snow, ice or freezing rain towards the distance of the track, expanding the icing area, that is, the stronger the wind force, the longer the icing length on the track.
[0030] In one embodiment of the present application, the environmental information collection module 120 may include a humidity sensor, a temperature sensor, a wind direction sensor, and an anemometer. The humidity sensor can be used to collect the humidity of the environment, the temperature sensor can be used to collect the temperature of the environment, the wind direction sensor can be used to detect the wind direction of the environmental wind, and the anemometer can be used to collect the wind force of the environmental wind. After the environmental information collection module 120 collects the meteorological information, the meteorological information can be uploaded to the server 130.
[0031] It should be noted that a plurality of environmental information collection modules 120 can be arranged beside the track at preset intervals.
[0032] The server 130 is configured to receive the first track image, the meteorological information, and the second track image; determine the length and starting position of the ice-covered track based on the meteorological information, the first track image, and the second track image; determine the preheating time and the sandblasting amount based on the length of the ice-covered track; determine the time interval for the locomotive to reach the starting position of the ice-covered track based on the current position of the locomotive, the starting position of the ice-covered track, and the current traveling speed of the locomotive; when the time interval is greater than the preheating time, send a preheating start instruction to the sandblasting preheating module when the time interval is equal to the preheating time, so that the sandblasting preheating module preheats the sand grains based on the sandblasting amount, and the waiting time is the difference between the time interval and the preheating time; when the time interval is less than or equal to the preheating time, send a preheating start instruction to the sandblasting preheating module.
[0033] In one embodiment of the present application, a wheel axle speed sensor may be provided on the locomotive 110, and the current traveling speed of the locomotive can be obtained through the wheel axle speed sensor. The current traveling speed of the locomotive can also be obtained through the global positioning system.
[0034] Optionally, after receiving the meteorological information, the first orbital image, and the second orbital image, the server 130 may determine the length and starting position of the icing track based on the meteorological information, the first orbital image, and the second orbital image. Based on the length of the icing track, the preheating time and the sandblasting amount can be determined. A first mapping relationship of the icing length, the sandblasting amount, and the preheating time can be set in advance according to expert experience. After the server determines the length of the icing track, the sandblasting amount and the preheating time can be determined in the first mapping relationship based on the length of the icing track. The preheating time can indicate the time required to preheat the sand grains of the sandblasting amount. Based on the current position of the locomotive, the starting position of the icing track, and the current traveling speed of the locomotive, the time interval for the locomotive to reach the starting position of the icing track can be determined; the time interval can characterize the time required for the locomotive to reach the starting position of the icing track from the current position. The ratio of the difference between the starting position of the icing track and the current position of the locomotive to the current traveling speed of the locomotive can be determined as the time interval. When the time interval is greater than the preset time, a preheating start instruction can be sent to the sandblasting preheating module after a waiting time to preheat the sand grains based on the sandblasting amount; the time interval being greater than the preset time can characterize that the time required for the locomotive to reach the icing section is greater than the preheating time required for the sand grains. Taking the current moment as a reference, a preheating start instruction can be sent to the sandblasting preheating module after a waiting time. When the time interval is less than or equal to the preheating time, a preheating start instruction can be sent to the sandblasting preheating module; the time interval being less than or equal to the preheating time can characterize that the time required for the locomotive to reach the icing section is less than or equal to the preheating time required for the sand grains. At this time, a preheating start instruction can be sent to the sandblasting preheating module.
[0035] It should be noted that the operator can pre-model and mark the track on which the locomotive travels to facilitate determining the position of the locomotive, the length of the icing track, and the starting position of the icing track.
[0036] Optionally, the environmental information acquisition module 120 further includes a second image acquisition module. The second image acquisition module is connected to the server. The orientation of the second image acquisition module is opposite to the traveling direction of the locomotive. The second image acquisition module is used to acquire a second orbital image and upload the second orbital image to the server.
[0037] Optionally, the server 130 can also be used to determine the icing thickness based on the meteorological information and the second orbital image; determine a target sandblasting strategy based on the icing thickness and a preset sandblasting strategy, and send the target sandblasting strategy to the sandblasting control module. The locomotive 110 may further include a sandblasting control module for receiving the target sandblasting strategy sent by the server to perform sandblasting based on the target sandblasting strategy when the locomotive reaches the starting position of the icing track.
[0038] In a possible implementation manner, the process of determining the icing thickness based on the meteorological information and the second orbital image may include: Obtain the first training sample set. The first training sample set includes multiple first training samples. A first training sample includes meteorological information and a second orbital image. A first training sample may also include a corresponding sample label. The meteorological information may be data obtained by synchronously aligning and normalizing the original meteorological data. The second orbital image may be an image obtained by performing ROI cutting, normalization, and standardization processing on the original second orbital image. The initial dual-branch neural network can be trained based on the first training sample set to obtain the target dual-branch neural network. The initial dual-branch neural network may include an image feature extraction branch and a meteorological data branch. The image feature extraction branch may be a MobileNetV3 network, and the last classification layer of the MobileNetV3 network needs to be removed. The meteorological data branch may be a temporal convolutional network. Input the second orbital image into the image feature extraction branch and input the meteorological information into the meteorological data branch. Concatenate the image feature vector obtained by the image feature extraction branch and the meteorological feature vector output by the meteorological data branch to obtain a concatenated feature. Apply an activation function based on the concatenated feature to obtain the predicted icing thickness. Select the Huber Loss function and aim to minimize the loss function to obtain the target dual-branch neural network.
[0039] Optionally, the preset sandblasting strategy may include: When the icing thickness is less than 1 mm, the sand grain type is fine sand and the sandblasting method is pulse injection; the diameter of the fine sand is any value from 0.3 mm to 0.5 mm; When the icing thickness is greater than or equal to 1 mm and less than 3 mm, the sand grain type is a mixture of sand grains with a diameter of 0.5 mm and sand grains with a diameter of 1 mm, and the sandblasting method is pulse injection; When the icing thickness is greater than or equal to 3 mm and less than 10 mm, the sand grain type is coarse sand, the sandblasting method is continuous injection, and the diameter of the coarse sand is any value from 1 mm to 1.5 mm; When the icing thickness is greater than or equal to 10 mm, the sand grain type is a sand-salt mixture and the sandblasting method is pulse injection.
[0040] It should be noted that the dynamic matching of the icing thickness and sand grain parameters can improve the safety of the system; the gradient material system reduces the energy consumption per unit thickness of treatment.
[0041] Optionally, determining the length and starting position of the icing track based on the meteorological information, the first orbital image, and the second orbital image may include: obtaining the length and starting position of the icing track based on the meteorological information, the first orbital image, the second orbital image, and a pre-trained icing recognition model.
[0042] In a possible implementation, a second training sample set can be obtained. The second training sample set can include multiple second training samples, and each second training sample includes meteorological information, a first orbital image, a second orbital image, and a corresponding sample label. Train an icing recognition model based on the second training sample set to obtain a pre-trained icing recognition model. Feature extraction can be performed on the first orbital image through a first branch (such as ResNet-50) to obtain a first orbital feature vector. Feature extraction can be performed on the second orbital image through a second branch (such as ResNet-50) to obtain a second orbital feature vector. Feature extraction can be performed on the meteorological information through a multi-layer perceptron to obtain a first feature vector. Concatenate the first orbital feature vector, the second orbital feature vector, and the first feature vector to obtain a fused feature. Input the fused feature into a first fully connected layer to obtain the starting position of the icing track, and input the fused feature into a second fully connected layer to obtain the length of the icing track. Determine the sum of the loss function corresponding to the starting position of the icing track (mean squared error loss function) and the loss function corresponding to the length of the icing track (mean squared error loss function) as the joint loss function, and aim to minimize the joint loss function to obtain a pre-trained icing recognition model.
[0043] Optionally, determining the preheating time and sandblasting amount based on the length of the icing track can include: determining the preheating time and sandblasting amount based on the mapping relationship between the icing thickness, the length of the icing track, the sandblasting amount, and the preheating time.
[0044] It should be noted that by combining the icing thickness and the length of the icing track to determine the preheating time and sandblasting amount, a relatively accurate sandblasting amount can be obtained, which can improve the efficiency of sand preheating and avoid energy loss caused by too little or too much preheat.
[0045] Optionally, when the arrival time is less than or equal to the preheating time, sending a preheating start instruction to the sandblasting preheating module can include: when the arrival time is less than the preheating time, send a preheating start instruction to the sandblasting preheating module, generate a warning message, and send the warning message to the warning module of the locomotive 110. A warning module can also be set on the locomotive 110. The warning module can be a terminal, and the warning message can be used to prompt the driver of the locomotive 110 that the time required to drive to the starting position of the icing section is less than the preheating time of the sand grains, and the driver needs to adjust the heating power. The warning message is used to prompt the driver to adjust the preheating power.
[0046] Optionally, the locomotive further includes a communication module, and the first image acquisition module and the sandblasting preheating module are connected to the server through the communication module. By using the communication module as a relay, the stability of data transmission and the operation of each module can be ensured. The sandblasting control module can be connected to the server through the communication module, and the sandblasting control module can also be directly connected to the server.
[0047] Optionally, cameras are installed at both the front end and the rear end of the locomotive to obtain real-time monitoring images of the front and rear of the locomotive. The cameras are connected to the cloud, and the cameras upload the real-time monitoring images to the server; the server is used to receive the real-time monitoring images uploaded by the cameras and store the real-time monitoring images. By storing the monitoring images, it is convenient for the operator to query later. The real-time monitoring images can also be displayed on the terminal of the locomotive so that the driver of the locomotive can observe the road conditions in front of and behind the locomotive, ensuring the safety of personnel and driving.
[0048] Optionally, ultrasonic radars are installed at both the front end and the rear end of the locomotive. The ultrasonic radars are used to detect objects within a preset distance in front of or at the rear end of the locomotive.
[0049] Optionally, an alarm module is installed in the cab of the locomotive. The ultrasonic radar is connected to the alarm module in the cab of the locomotive. When there is an object within the preset distance in front of or at the rear end of the locomotive, the ultrasonic radar sends an alarm activation message to the alarm module; the alarm module is used to receive the alarm activation message and give an alarm warning. The alarm warning can be used to prompt the driver of the locomotive to take deceleration or stop operations, thereby achieving the effect of timely anti-collision and safe driving.
[0050] Exemplarily, please refer to Figure 2 , which is a schematic diagram of the driving warning control system of an electric locomotive shown in another exemplary embodiment of the present application. The driving warning control system of the electric locomotive may include a locomotive 110, an environmental information collection module 120, and a server 130. The locomotive 110 may include a first image collection module 111, a sandblasting preheating module 112, a sandblasting control module 113, a communication module 114, a camera 115, an ultrasonic radar 116, and an alarm module 117. The first image collection module 111, the sandblasting preheating module 112, and the sandblasting control module 113 are connected to the server 130 through the communication module 114, and the camera 115 can also be connected to the server 130.
[0051] The environmental information collection module 120 includes a humidity sensor 121, a temperature sensor 122, a wind direction sensor 123, an anemometer 124, and a second image collection module 125.
[0052] In the embodiments of the present application, the terms "first" and "second" are only used for descriptive purposes and cannot be construed as indicating or implying relative importance. The terms "comprising" and "including" mentioned throughout the specification and claims are open-ended terms and should be construed as "including but not limited to".
[0053] The above embodiments are only used to exemplarily illustrate the principles and effects of the present application, rather than to limit the present application. Any person familiar with this technology can modify or change the above embodiments without departing from the spirit and scope of the present application. Therefore, all equivalent modifications or changes completed by those with ordinary knowledge in the technical field without departing from the spirit and technical ideas disclosed in the present application should still be covered by the claims of the present application.
Claims
1. A driving warning control system for a motor vehicle, characterized in that, Including: A locomotive, an environmental information collection module, and a server; The locomotive runs on a track. A first image acquisition module and a sand blasting preheating module are arranged at the front end of the locomotive. Both the first image acquisition module and the sand blasting preheating module are connected to the server. The first image acquisition module is used to acquire a first track image in front of the locomotive and upload the first track image to the server. The sand blasting preheating module is used to receive a preheating start instruction sent by the server to preheat the sand grains according to the preheating start instruction; The environmental information collection module is installed at a preset position beside the track in front of the locomotive. The environmental information collection module is used to collect meteorological information and a second track image, and upload the meteorological information and the second track image to the server; the meteorological information includes humidity, temperature, wind direction, and wind force; the second track image is a track image collected by the environmental information collection module at the preset position facing the locomotive; The server is used to receive the first track image, meteorological information, and the second track image; Based on the meteorological information, the first track image, and the second track image, determine the length and starting position of the icy track; determine the preheating time and sand blasting amount based on the length of the icy track; based on the current position of the locomotive, the starting position of the icy track, and the current traveling speed of the locomotive, determine the time interval for the locomotive to reach the starting position of the icy track; when the time interval is greater than the preheating time, send a preheating start instruction to the sand blasting preheating module after a waiting time, so that the sand blasting preheating module preheats the sand grains based on the sand blasting amount, and the waiting time is the difference between the time interval and the preheating time; when the time interval is less than or equal to the preheating time, send a preheating start instruction to the sand blasting preheating module.
2. The driving warning control system of the battery locomotive according to claim 1, characterized in that, The server is further used to determine the ice thickness based on the meteorological information and the second track image; determine a target sand blasting strategy based on the ice thickness and a preset sand blasting strategy, and send the target sand blasting strategy to the sand blasting control module; The locomotive further includes a sand blasting control module, which is used to receive the target sand blasting strategy sent by the server to perform sand blasting based on the target sand blasting strategy when the locomotive reaches the starting position of the icy track.
3. The driving warning control system of the battery locomotive according to claim 2, wherein, The preset sand blasting strategy includes: When the ice thickness is less than 1 mm, the sand grain type is fine sand, and the sand blasting method is pulse spraying; the diameter of the fine sand is any value from 0.3 mm to 0.5 mm; When the ice thickness is greater than or equal to 1 mm and less than 3 mm, the sand grain type is a mixed sand of sand grains with a diameter of 0.5 mm and sand grains with a diameter of 1 mm, and the sand blasting method is pulse spraying; When the ice thickness is greater than or equal to 3 mm and less than 10 mm, the sand grain type is coarse sand, and the sand blasting method is continuous spraying. The diameter of the coarse sand is any value from 1 mm to 1.5 mm; When the ice thickness is greater than or equal to 10 mm, the sand grain type is a sand-salt mixture, and the sand blasting method is pulse spraying.
4. The driving warning control system of the electric locomotive according to claim 1, characterized in that, Determining the length and starting position of the icy track based on the meteorological information, the first track image, and the second track image includes: Based on the meteorological information, the first track image, the second track image, and a pre-trained ice recognition model, obtain the length and starting position of the icy track. The ice recognition model is used to output the length and starting position of the icy track based on the input meteorological information, the first track image, and the second track image.
5. The driving warning control system of the electric locomotive according to claim 2, characterized in that, Determining the preheating time and sandblasting amount based on the length of the icing track, including: Determining the preheating time and sandblasting amount based on the mapping relationship among the icing thickness, the length of the icing track, the sandblasting amount, and the preheating time.
6. The driving warning control system of the battery locomotive according to claim 1, characterized in that, When the arrival time is less than or equal to the preheating time, sending a preheating start instruction to the sandblasting preheating module, including: When the arrival time is less than the preheating time, sending a preheating start instruction to the sandblasting preheating module, generating a warning message and sending the warning message to the warning module of the locomotive.
7. The driving warning control system of the electric locomotive according to claim 1, wherein, The locomotive further includes a communication module, and the first image acquisition module and the sandblasting preheating module are connected to the server through the communication module.
8. The driving warning control system of the battery locomotive according to any one of claims 1-7, characterized in that, Video cameras are installed at both the front end and the rear end of the locomotive to obtain real-time monitoring images of the front and rear of the locomotive. The video cameras are connected to the cloud, and the video cameras upload the real-time monitoring images to the server; The server is used to receive the real-time monitoring images uploaded by the video cameras and store the real-time monitoring images.
9. The driving warning control system of the electric locomotive according to any one of claims 1-7, characterized in that, Ultrasonic radars are installed at both the front end and the rear end of the locomotive, and the ultrasonic radars are used to detect objects within a preset distance in front of or at the rear end of the locomotive.
10. The driving warning control system of the electric locomotive according to claim 9, characterized in that, An alarm module is installed in the cab of the locomotive. The ultrasonic radar is connected to the alarm module in the cab of the locomotive. When there is an object within a preset distance in front of or at the rear end of the locomotive, the ultrasonic radar sends an alarm activation message to the alarm module; The alarm module is used to receive the alarm activation message and give an alarm warning.
Citation Information
Patent Citations
Heat-carrying micro-sand jet type high-speed train bogie rapid snow removing and deicing system and method
CN109131433A
Intelligent spreading vehicle and spreading method based on road surface condensed ice and accumulated snow
CN115075182A
Train idling slip intelligent prediction method and device and storage medium
CN117508237A
Seven-element high-speed rail meteorological acquisition method and system based on multi-source data fusion
CN117970528A
Locomotive sanding device and method
CN118977740A