A multi-mode hydrocarbon gas preparation apparatus and preparation method
By designing a multi-mode hydrocarbon gas preparation device and employing dead volume removal pipe section and solenoid valve linkage control, the automated preparation of solid and liquid samples was achieved, solving the problems of gas residue and interference, improving preparation efficiency and accuracy, and adapting to the needs of different types of samples.
Patent Information
- Application Number
- CN202611294667.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-10
AI Technical Summary
Existing hydrocarbon gas preparation devices suffer from serious gas residue and interference, poor automation, and limited adaptability. They cannot effectively process solid and liquid samples, especially samples with high carbonate content, which may cause safety hazards due to excessively rapid reactions.
A multi-mode hydrocarbon gas preparation device was designed, which includes a dead volume removal pipe section and solenoid valve linkage control. It achieves automated operation through alkaline solution addition, acid reaction, pure water rinsing and waste liquid discharge. It is compatible with solid and liquid sample preparation and prevents bumping by heating a magnetic rotator.
It significantly reduces interference in the quantitative analysis of hydrocarbon gases, improves the efficiency and repeatability of single sample processing, expands the scope of application, and ensures the safe and stable preparation of high-carbonate samples.
Smart Images

Figure CN123065832A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of oil and gas geochemical exploration technology, and in particular to a multi-mode hydrocarbon gas preparation apparatus and preparation method. Background Technology
[0002] In oil and gas geochemical exploration, the preparation of hydrocarbon gas samples is a core prerequisite for subsequent detection and analysis. It mainly includes various types such as acid-hydrolyzed hydrocarbons, dissolved hydrocarbons, thermally released hydrocarbons, and physically adsorbed hydrocarbons (free gas). The preparation of different types of hydrocarbons requires dedicated equipment and processes.
[0003] In existing technologies, hydrocarbon gas preparation methods mainly rely on the acid hydrolysis and dissolved hydrocarbon test methods in the national standard GB / T 29173-2012. However, existing equipment suffers from the following core problems: 1. Severe gas residue and interference: In the pipeline of traditional preparation device (such as spiral absorption tube), after the reaction, the gas remaining in the pipeline between the sample reaction bottle and the absorption tube cannot be driven to the absorption tube, resulting in a large dead volume, which causes random errors in the degassing volume of hydrocarbon components. 2. Poor automation: Existing processes rely heavily on manual step-by-step operations (such as manual addition of acid, water, and alkali for gas collection, and manual reading of degassing volume), resulting in large operational errors. Furthermore, the preparation steps are not interconnected, and the preparation time for a single sample can be as long as 40 minutes to 1 hour. There are no automated methods, making it difficult to meet the needs of batch sample analysis. 3. Limited adaptability: The preparation devices for solid samples (soil, rock cuttings) and liquid samples (water samples, oilfield water) are independent of each other, making it impossible to achieve compatible processing of samples in different states using the same equipment; and there is a lack of targeted design for samples with high carbonate content, which can easily lead to excessively rapid boiling. Summary of the Invention
[0004] This application aims to propose a multi-mode hydrocarbon gas preparation device and method, which can solve the problems of severe gas residue and interference in existing hydrocarbon gas preparation methods.
[0005] In a first aspect, embodiments of this application provide a multi-mode hydrocarbon gas preparation apparatus, comprising: The reaction apparatus has a liquid inlet pipe and a gas outlet pipe for the reaction flask. The reaction apparatus is used to hold solid or liquid samples and to carry out hydrocarbon gas preparation reactions. A gas collection metering tube has a gas inlet at the top, a vacuum port at the upper part of the side wall, a waste liquid outlet at the lower part of the side wall, and a gas inlet and liquid inlet at the middle of the side wall. The gas collection metering tube has a connecting device inside, the inlet of which is connected to the gas inlet and liquid inlet, and the outlet of which is lower than the height of the gas inlet and liquid inlet. A vacuum device is connected to the vacuum port; The dead volume removal pipe section includes a first horizontal pipe section, a first vertical pipe section, a second horizontal pipe section, a second vertical pipe section, a third vertical pipe section, a third horizontal pipe section, a fourth vertical pipe section, a fourth horizontal pipe section, and a fifth vertical pipe section. The first horizontal pipe section has a first opening at its upper middle portion, the second horizontal pipe section has a second opening at its lower middle portion, and the third horizontal pipe section has a third opening at its upper middle portion. One end of the first horizontal pipe section is connected to the air inlet / liquid injection port, and the other end of the first horizontal pipe section is connected to one end of the first vertical pipe section. The other end of the first vertical pipe section is connected to one end of the second horizontal pipe section, and the other end of the second horizontal pipe section... One end of the third vertical pipe section is connected to one end of the second vertical pipe section; the third vertical pipe section is connected between the second opening and the third opening; one end of the third horizontal pipe section is connected to the waste liquid outlet; one end of the fourth vertical pipe section is connected to the first opening; the other end of the fourth vertical pipe section is connected to one end of the fourth horizontal pipe section; the other end of the fourth horizontal pipe section is connected to one end of the fifth vertical pipe section; the other end of the fifth vertical pipe section is connected to the gas outlet pipe of the reaction bottle; a first solenoid valve is provided on the fourth vertical pipe section; a second solenoid valve is provided between one end of the second horizontal pipe section and the second opening; and a third solenoid valve is provided on the third vertical pipe section. The alkali solution injection device is connected to the other end of the second vertical pipe section; A waste liquid collection device is connected to the other end of the third transverse pipe section; An acid filling device is connected to the inlet pipe of the reaction flask; A pure water filling device is connected to the inlet pipe of the reaction flask.
[0006] Secondly, embodiments of this application provide a multi-mode hydrocarbon gas preparation method, applied to the multi-mode hydrocarbon gas preparation apparatus described in the first aspect embodiment above, the multi-mode hydrocarbon gas preparation method comprising: Place the sample in the reaction device, open the third solenoid valve to add alkaline solution into the gas collection metering tube until the liquid level is higher than the waste liquid outlet, then close the third solenoid valve; Open the first solenoid valve and the vacuum device, evacuate to a preset pressure and maintain it for a preset time, then close the vacuum device. Open the third solenoid valve, raise the alkaline liquid level in the gas collection metering tube to a level higher than the outlet of the connecting device, and ensure that the alkaline liquid does not flow back into the reaction device, then close the third solenoid valve. Open the acid injection device to carry out the acid injection reaction, and close the acid injection device after the reaction is completed; Open the pure water filling device to add pure water to the reaction device until the pure water reaches the fifth vertical pipe section, close the pure water filling device, and then close the first solenoid valve; Open the second solenoid valve so that the alkaline solution sequentially fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section and the connecting device, so as to drive all the residual gas in the pipe into the gas collection metering tube; Open the gas inlet to collect gas; After gas collection is completed, close the gas inlet and the second solenoid valve, open the waste liquid collection device, lower the alkaline liquid level in the gas collection metering tube to below the outlet of the connecting device, close the waste liquid collection device, and remove the reaction device.
[0007] The multi-mode hydrocarbon gas preparation apparatus and method of this application, through the coordinated structure of the dead volume removal pipe section and the connecting device, effectively eliminates residual gas in the pipeline between the reaction flask and the gas collection and metering tube in traditional devices, significantly reducing the interference of dead volume on the quantitative analysis of hydrocarbon gases. Simultaneously, the processes of alkali addition, acid reaction, pure water rinsing, and waste discharge are all controlled by electromagnetic valve linkage, achieving automated operation of the sample preparation process and greatly improving the processing efficiency and repeatability accuracy of single samples. Furthermore, the apparatus is compatible with the preparation requirements of both solid and liquid samples and can adapt to the stable reaction of samples with high carbonate content by adjusting the acid addition rate and isothermal conditions, thereby expanding its applicability in the preparation of hydrocarbon gases from different types of geological samples.
[0008] Other features and advantages of this application will be set forth in the following description, and will be apparent in part from the description, or may be learned by practicing this application. Attached Figure Description
[0009] The above and / or additional aspects and advantages of this application will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which: Figure 1 This is a schematic diagram of the structure of a multi-mode hydrocarbon gas preparation apparatus according to an embodiment of this application; Figure 2 This is a flowchart of a multi-mode hydrocarbon gas preparation method according to an embodiment of this application.
[0010] Figure label: Heating magnetic rotator 110, reaction vessel 120, liquid sample container 130; Gas collection metering tube 200, gas outlet 201; Vacuum pump 310, electronic vacuum gauge 320; Alkali solution dispensing device 400; Waste liquid collection device 500; Acid dispensing device 600; Pure water filling device 700. Detailed Implementation
[0011] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.
[0012] In the description of this application, the use of terms such as "first," "second," etc., is for the purpose of distinguishing technical features only and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated or the order of the technical features indicated.
[0013] In the description of this application, it should be understood that the orientation descriptions, such as up, down, etc., are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.
[0014] In the description of this application, it should be noted that, unless otherwise explicitly defined, terms such as "setup," "installation," and "connection" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this application in conjunction with the specific content of the technical solution.
[0015] The technical solution of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described below are some embodiments of this application, not all embodiments.
[0016] See Figure 1 , Figure 1 This is a schematic diagram of the structure of a multi-mode hydrocarbon gas preparation device according to an embodiment of this application. The multi-mode hydrocarbon gas preparation device includes a reaction device, a gas collection metering tube 200, a vacuum device, a dead volume removal tube section, an alkali solution filling device 400, a waste liquid collection device 500, an acid solution filling device 600, and a pure water filling device 700.
[0017] The reaction apparatus has a liquid inlet pipe and a gas outlet pipe for the reaction flask. The reaction apparatus is used to hold solid or liquid samples and to carry out hydrocarbon gas preparation reactions. The gas collection metering tube 200 has a gas inlet 201 at the top, a vacuum port at the upper part of the side wall, a waste liquid outlet at the lower part of the side wall, and a gas inlet / liquid inlet at the middle of the side wall. The gas collection metering tube 200 has a connecting device inside, the inlet of the connecting device is connected to the gas inlet / liquid inlet, and the height of the outlet of the connecting device is lower than the height of the gas inlet / liquid inlet. Vacuum device, connected to vacuum port; The dead volume removal pipe section includes a first horizontal pipe section, a first vertical pipe section, a second horizontal pipe section, a second vertical pipe section, a third vertical pipe section, a third horizontal pipe section, a fourth vertical pipe section, a fourth horizontal pipe section, and a fifth vertical pipe section. The upper middle part of the first horizontal pipe section has a first opening, the lower middle part of the second horizontal pipe section has a second opening, and the upper middle part of the third horizontal pipe section has a third opening. One end of the first horizontal pipe section is connected to the air inlet / liquid injection port, and the other end of the first horizontal pipe section is connected to one end of the first vertical pipe section. The other end of the first vertical pipe section is connected to one end of the second horizontal pipe section. The other end of the horizontal pipe section is connected to one end of the second vertical pipe section. The third vertical pipe section is connected between the second opening and the third opening. One end of the third horizontal pipe section is connected to the waste liquid outlet. One end of the fourth vertical pipe section is connected to the first opening. The other end of the fourth vertical pipe section is connected to one end of the fourth horizontal pipe section. The other end of the fourth horizontal pipe section is connected to one end of the fifth vertical pipe section. The other end of the fifth vertical pipe section is connected to the gas outlet pipe of the reaction bottle. A first solenoid valve a is provided on the fourth vertical pipe section. A second solenoid valve b is provided between one end of the second horizontal pipe section and the second opening. A third solenoid valve c is provided on the third vertical pipe section. The alkali solution dispensing device 400 is connected to the other end of the second vertical pipe section; Waste liquid collection device 500 is connected to the other end of the third transverse pipe section; Acid dispensing device 600 is connected to the inlet pipe of the reaction flask; The pure water filling device 700 is connected to the liquid inlet pipe of the reaction flask.
[0018] In this embodiment, by rationally arranging the multi-segment structure of the dead volume removal pipe section and cooperating with the timing control of the first, second, and third solenoid valves, the residual gas in all pipelines between the reaction device and the gas collection metering pipe 200 is completely pushed to the collection area by alkaline hydraulic driving before gas collection, thereby effectively eliminating the gas retention problem caused by dead corners or bends in pipelines in traditional devices.
[0019] In some embodiments, the above-mentioned reaction apparatus includes a heating magnetic rotator 110, a reaction vessel 120, and a liquid sample container 130. The reaction vessel 120 is placed on the heating magnetic rotator 110, and the mouth of the reaction vessel 120 is provided with a reaction flask piston. The reaction flask inlet pipe and the reaction flask outlet pipe both penetrate the reaction flask piston. The liquid sample container 130 includes a liquid sample bottle and a liquid sample outlet pipe. The outlet of the liquid sample bottle is connected to one end of the liquid sample outlet pipe, and the other end of the liquid sample outlet pipe extends through the reaction flask piston into the reaction vessel 120.
[0020] The aforementioned reaction vessel 120 can hold solid samples, and the liquid sample container 130 can hold liquid samples, thus enabling the preparation of hydrocarbon gases from both solid (soil, rock cuttings) and liquid (water samples, oilfield water) samples, reducing the number of equipment required.
[0021] The aforementioned heating magnetic rotator 110 is designed with an anti-boiling mechanism for high carbonate samples. It adds a rotating magnetic rod and anti-boiling polyethylene floats, which broadens the applicability of the device, ensures the stable preparation of samples with different characteristics, shortens the single sample preparation cycle, improves the batch sample processing efficiency, and provides real and reliable hydrocarbon gas samples for subsequent gas chromatography detection or isotope analysis.
[0022] In some embodiments, the aforementioned connecting device includes an inner absorption cylinder and a connecting pipe section. The inner absorption cylinder has an upper opening at the top, a lower opening at the bottom, and a connecting port on its side wall. The diameter of the upper opening is smaller than the diameter of the lower opening, and the positions of the upper opening, lower opening, and connecting port are all lower than the positions of the air inlet and liquid injection port. The connecting pipe section has one end connected to the air inlet and liquid injection port and the other end connected to the connecting port.
[0023] In some embodiments, after the reacted gas enters the alkaline solution in the gas collecting metering tube 200, the carbon dioxide component is absorbed by the alkaline solution, and other gas components enter the upper part of the gas collecting metering tube 200 and are collected through the gas inlet 201 at the top. In this embodiment, a photoelectric level sensor E is provided to read the amount of degassing at the top of the gas collecting metering tube 200.
[0024] The aforementioned inner absorption cylinder and connecting pipe section create a stable liquid seal environment when the gas enters the gas collection metering tube 200, effectively preventing gas backflow or escape. Simultaneously, because the upper opening diameter is smaller than the lower opening, the alkali solution forms a gradually expanding gas-liquid contact interface during its ascent, enhancing the collection efficiency of hydrocarbon gases generated during acidolysis or pyrolysis, and avoiding interference from liquid surface fluctuations caused by airflow disturbances. Furthermore, this structure guides residual gas to rise smoothly along the inner wall of the inner absorption cylinder, further reducing turbulence and dead zones, ensuring that all analyte gases are quantitatively collected, thereby improving the accuracy and repeatability of degassing volume measurement.
[0025] In some embodiments, the vacuum device includes a vacuum pump 310, an electronic vacuum gauge 320, a vacuum extraction section, and a vacuum release section. The vacuum extraction section has one end connected to a vacuum port via a fourth solenoid valve d, and a fourth opening and a fifth opening are provided on the vacuum extraction section. The fourth opening is connected to the vacuum pump 310, and the fifth opening is connected to the electronic vacuum gauge 320. The vacuum release section has one end connected to the other end of the vacuum extraction section, and the other end connected to the outside air via a fifth solenoid valve e.
[0026] In some embodiments, the aforementioned alkali dispensing device 400 includes an alkali dispensing bottle and an L-shaped alkali dispensing pipe. The alkali dispensing bottle has an alkali bottle stopper at its mouth and is used to hold alkali. The L-shaped alkali dispensing pipe penetrates the alkali bottle stopper, with one end connected to the other end of a second vertical pipe section, and the other end extending into the alkali.
[0027] In some embodiments, the waste liquid collection device 500 includes a waste liquid collection bottle and a waste liquid collection pipe. One end of the waste liquid collection pipe is connected to the other end of the third transverse pipe section via a sixth solenoid valve f, and the other end extends into the waste liquid collection bottle.
[0028] In some embodiments, the acid dispensing device 600 includes an acid dispensing bottle, an L-shaped acid outlet pipe, and an acid dispensing pipe section. The acid dispensing bottle has an acid bottle piston at its opening and is used to hold acid. The L-shaped acid outlet pipe penetrates the acid bottle piston, with one end extending into the acid. The acid dispensing pipe section has one end connected to the other end of the L-shaped acid outlet pipe, and the other end connected to the reaction flask inlet pipe via a seventh solenoid valve g.
[0029] In some embodiments, the above-mentioned pure water filling device 700 includes a pure water filling bottle, an L-shaped pure water outlet pipe, and a pure water filling pipe section. The pure water filling bottle has a pure water bottle piston at its opening and is used to hold pure water. The L-shaped pure water outlet pipe penetrates the pure water bottle piston, with one end extending into the pure water. The pure water filling pipe section has one end connected to the other end of the L-shaped pure water outlet pipe, and the other end connected to the reaction flask inlet pipe via an eighth solenoid valve h.
[0030] The aforementioned pure water filling device 700 is used during the gas driving stage to inject pure water into the reaction device and raise its level to the fifth vertical pipe section, forming a water seal to prevent the alkaline solution from flowing back into the reaction bottle during subsequent pressure driving, thus ensuring system sealing and operational safety. Simultaneously, the pure water drives the gas between the reaction device and the first solenoid valve a into the first horizontal pipe section.
[0031] The function of the aforementioned dead volume removal section is as follows: After the pure water filling device 700 drives the gas between the reaction device and the first solenoid valve a into the first horizontal pipe section via pure water, the first solenoid valve a is closed and the second solenoid valve b is opened. Under the drive of gravity or slight positive pressure, the alkaline solution sequentially fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section, and the connecting device. During this process, the alkaline solution, as an incompressible displacement medium, gradually pushes the residual gas trapped in the bends, connections, and inside the connecting device of each pipe section to the gas collection space above the gas collection metering tube 200. Because the dead volume removal section adopts a multi-segment alternating horizontal and vertical structure, and with the precise timing control of the first solenoid valve a, the second solenoid valve b, and the third solenoid valve c, the flow path of the alkaline solution covers all potential gas retention areas, ensuring thorough removal without dead zones. This process not only avoids the "dead volume" effect caused by the complexity of the pipeline in traditional devices, but also significantly improves the recovery rate and component fidelity of hydrocarbon gases, providing high-purity and highly representative sample gases for subsequent gas sampling at the gas sampling port 201.
[0032] In some embodiments, the reaction vessel 120 is equipped with a photoelectric level sensor A, the fifth vertical pipe section is equipped with a photoelectric level sensor B, and the gas collection metering tube 200 is equipped with photoelectric level sensors C, D, and E, for detecting the liquid level at the corresponding positions.
[0033] See Figure 2 , Figure 2 This is a flowchart of a multi-mode hydrocarbon gas preparation method provided in one embodiment of this application. This multi-mode hydrocarbon gas preparation method is applied to the multi-mode hydrocarbon gas preparation apparatus of the first aspect embodiment described above. The multi-mode hydrocarbon gas preparation method includes, but is not limited to, steps S100 to S700: Step S100: Place the sample in the reaction apparatus, open the third solenoid valve c to add alkaline solution into the gas collection metering tube 200 until the liquid level is higher than the waste liquid outlet, then close the third solenoid valve c. Step S200: Open the first solenoid valve a and the vacuum device, evacuate to the preset pressure and maintain it for the preset time, then close the vacuum device, open the third solenoid valve c, raise the alkaline liquid level in the gas collection metering tube 200 to above the outlet of the connecting device, and close the third solenoid valve c after the alkaline liquid does not flow back into the reaction device. Step S300: Open the acid injection device 600 to carry out the acid injection reaction, and close the acid injection device 600 after the reaction is completed. Step S400: Open the pure water filling device 700 to add pure water into the reaction device until the pure water reaches the fifth vertical pipe section, close the pure water filling device 700, and then close the first solenoid valve a. Step S500: Open the second solenoid valve b, so that the alkaline solution sequentially fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section and the connecting device, so as to drive all the residual gas in the pipe into the gas collection metering tube 200. Step S600: Open the gas intake port 201 to collect gas. Step S700: After gas collection is completed, close the gas inlet 201 and the second solenoid valve b, open the waste liquid collection device 500, lower the alkaline liquid level in the gas collection metering tube 200 to below the outlet of the connecting device, close the waste liquid collection device 500, and remove the reaction device.
[0034] In this embodiment, the orderly execution of the above steps achieves closed-loop control of the entire process, from sample loading, reaction initiation, gas expulsion, residue removal to final collection and system reset. The precise coordination between the opening and closing timing of the solenoid valves and liquid level changes in each step ensures quantitative gas transfer without leakage, residue, or cross-contamination. Particularly in step S500, the alkaline solution sequentially fills the complex path of the dead volume removal tube from bottom to top, utilizing its incompressibility to completely push the trace amounts of gas trapped in bends, joints, and connecting devices to the top of the gas collection and metering tube 200, fundamentally solving the problem of hydrocarbon component loss or dilution caused by "dead volume" in traditional methods. Furthermore, the entire process requires no manual intervention, improving preparation efficiency.
[0035] In this embodiment of the application, all devices are initially in a closed state.
[0036] In step S100 above, when placing the sample in the reaction apparatus, the loading method can be selected according to the sample type: for solid samples (such as soil or rock cuttings), they are placed directly into the reaction container 120; for liquid samples (such as water or oilfield water), they are injected into the liquid sample container 130 and introduced into the reaction container 120 through the liquid sample outlet pipe. Subsequently, ensure the reaction flask piston is properly sealed and all solenoid valves are initially closed, preparing for subsequent addition of alkali solution. After opening the third solenoid valve c, the alkali solution flows into the second vertical pipe section through the L-shaped alkali solution outlet pipe under gravity or slight positive pressure, and enters the gas collection metering pipe 200 through the dead volume removal pipe section's connecting path until the liquid level exceeds the waste discharge port. At this point, the alkali solution effectively seals the waste discharge channel, preventing gas from escaping from this port during subsequent vacuuming, ensuring the system's airtightness.
[0037] In step S200 above, the first solenoid valve a and the vacuum device (including starting the vacuum pump 310 and opening the fourth solenoid valve d) are opened to evacuate the gas collection metering tube 200 and the dead volume removal tube section connected to it, as well as the reaction device, until the electronic vacuum gauge 320 displays that the system pressure has reached the preset pressure, and this negative pressure state is maintained for a preset time to fully remove the air adsorbed on the sample surface and the residual ambient gas in the pipeline. After the vacuuming is completed, the vacuum pump 310 and the fourth solenoid valve d are closed, and then the third solenoid valve c is opened again to allow the alkaline solution to continue flowing into the gas collection metering tube 200. The liquid level rises to a position higher than the outlet of the connecting device but lower than the gas inlet, forming an effective liquid seal. This ensures that the gas generated by the subsequent reaction can only enter the upper space of the gas collection metering tube 200, while preventing the alkaline solution from flowing back into the reaction device due to the pressure difference, thus avoiding sample contamination or interference with the reaction process. This step, by precisely controlling the liquid level and the timing of the solenoid valve action, ensures the system's airtightness while creating a clean, low-background gas collection environment for the subsequent acidolysis reaction.
[0038] In some embodiments, the reaction apparatus includes a heating magnetic rotator 110 and a reaction vessel 120. The reaction vessel 120 is placed on the heating magnetic rotator 110. The mouth of the reaction vessel 120 is provided with a reaction vessel piston. The reaction vessel inlet pipe and the reaction vessel outlet pipe are both provided through the reaction vessel piston. In step S100, placing the sample in the reaction apparatus includes: placing the sample in the reaction container 120 and adding polyethylene floats to the reaction container 120; The above step S300 includes, but is not limited to, steps S310 and S320: Step S310: Start the heating magnetic rotator 110 to heat the liquid in the reaction vessel 120 at a constant temperature and stir it magnetically. Step S320: Open the acid injection device 600 to carry out the acid injection reaction, and close the acid injection device 600 after the reaction is completed.
[0039] Through steps S310 and S320, a stable acidolysis reaction can be achieved for samples with high carbonate content. The polyethylene float tumbles with the liquid during heating and stirring, effectively suppressing violent localized gas generation and preventing sudden pressure spikes caused by sample splashing or instantaneous gas release. Simultaneously, the uniform heating and continuous stirring provided by the heating magnetic rotator 110 ensure sufficient contact between the acid and the sample, promoting the efficient release of hydrocarbon gases (such as methane and ethane) and carbon dioxide. The mixed gas generated by the reaction enters the dead volume removal section through the gas outlet pipe of the reaction flask and is then introduced into the gas collection and quantitative tube 200 under alkaline liquid seal isolation. Carbon dioxide is absorbed by the alkaline solution, while the remaining hydrocarbon gases accumulate in the upper space of the quantitative tube, laying the foundation for subsequent accurate collection. The entire reaction process is carried out under closed and controllable conditions, ensuring operational safety while preserving the original proportions of the target gas components to the maximum extent, meeting the requirements of subsequent high-precision analysis.
[0040] In step S400 above, pure water is injected into the reaction device through the pure water injection device 700, causing the liquid level to gradually rise to the fifth vertical pipe section, forming a stable water seal barrier. This water seal effectively blocks the risk of alkali solution flowing back into the reaction vessel 120 through the dead volume removal pipe section during the subsequent alkali hydraulic drive process, preventing side reactions between the alkali solution and residual acid solution or samples, and ensuring the purity of the internal environment of the system and the unidirectionality of the reaction path. At the same time, during the water injection process, the residual gas between the reaction device and the first solenoid valve a is pushed by the pure water, migrating along the fifth vertical pipe section, the fourth horizontal pipe section, and the fourth vertical pipe section to the first horizontal pipe section for temporary storage, creating favorable conditions for the alkali solution to uniformly drive the residual gas to the gas collection metering tube 200 in step S500. After the water injection is completed, the eighth solenoid valve h is closed to stop the water injection, and the first solenoid valve a is immediately closed to temporarily isolate the reaction device from the gas collection system, avoiding disturbance of the reaction system when the alkali solution fills the dead volume removal pipe section later, and ensuring the orderliness and integrity of the entire gas transfer process.
[0041] In step S500 above, the second solenoid valve b is opened, and the alkaline solution sequentially fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section, and the connecting device under gravity or slight positive pressure. During this process, the alkaline solution, as an incompressible displacement medium, gradually pushes the residual gas trapped in the bends, connections, and connecting devices of each pipe section to the gas collection space above the gas collection metering tube 200. Because the dead volume removal pipe section adopts a multi-segment alternating horizontal and vertical structure, and with the precise timing control of the first solenoid valve a, the second solenoid valve b, and the third solenoid valve c, the flow path of the alkaline solution covers all potential gas retention areas, ensuring thorough removal without dead zones. This process not only avoids the "dead volume" effect caused by the complexity of the pipeline in traditional devices, but also significantly improves the hydrocarbon gas recovery rate and component fidelity, providing high-purity and highly representative sample gas for subsequent gas sampling at the gas sampling port 201.
[0042] In step S600 above, after opening the gas intake port 201, a quantified hydrocarbon gas sample is extracted from the top of the gas collection and quantitative tube 200 using a gas sampler or an automatic sampler. Since carbon dioxide has been removed by alkaline absorption and dead volume removal has ensured the absence of residual interfering gases, the collected gas is pure and of accurate volume, and can be directly used for subsequent analysis such as gas chromatography (GC), gas chromatography-mass spectrometry (GC-MS), or isotope ratio mass spectrometry (IRMS). A photoelectric level gauge E monitors the liquid level change in the gas collection and quantitative tube 200 in real time. Combined with the tube's calibrated volume, the volume of extracted gas can be accurately calculated, enabling quantitative recording of gas production. The entire gas extraction process is completed in a closed system, preventing air contamination or sample escape, ensuring the reliability and repeatability of the analytical results.
[0043] In step S700 above, after closing the gas inlet 201 and the second solenoid valve b, the system enters the waste liquid discharge and reset stage. At this time, the sixth solenoid valve f is opened, and the waste liquid collection device 500 is started. The alkaline solution in the gas collection metering tube 200 flows into the waste liquid collection bottle through the third horizontal tube section and the waste liquid collection tube under the action of gravity, and the liquid level drops accordingly. When the photoelectric level gauge E detects that the alkaline solution level has dropped below the outlet position of the connecting device, the sixth solenoid valve f is immediately closed to stop the discharge, ensuring that the outlet of the connecting device is exposed to the gas phase space again, avoiding backflow or leakage of residual liquid during subsequent disassembly. Subsequently, the fifth solenoid valve e can be opened in sequence to slowly vent the system, balance the internal pressure, and finally remove the reaction device to complete the single sample preparation process. This reset operation not only ensures the cleanliness and safety of the equipment, but also provides a standardized initial state for the next round of sample processing, effectively supporting the needs of batch and continuous operation.
[0044] The following is a specific example of acid hydrolysis of hydrocarbons to illustrate the multi-mode hydrocarbon gas preparation method of this application.
[0045] Step 1: Initialize the multi-mode hydrocarbon gas preparation device of this application embodiment, and set all components to the off state; weigh the solid sample, transfer it into the reaction container 120 and add polyethylene float beads, and connect it to the multi-mode hydrocarbon gas preparation device of this application embodiment; open the third solenoid valve c to add alkaline solution into the gas collection metering tube 200 until the liquid level is higher than the waste liquid outlet (D), and then close the third solenoid valve c. Step 2: Open the first solenoid valve a and the fourth solenoid valve d, start the vacuum pump 310 to evacuate to -0.1MPa, maintain for 5 minutes, close the vacuum pump 310 and the fourth solenoid valve d, open the third solenoid valve c, raise the alkaline liquid level in the gas collection metering tube 200 to above the outlet (C) of the connecting device, and ensure that the alkaline liquid does not flow back into the reaction device, then close the third solenoid valve c, so that the alkaline water isolates the reaction vessel 120 from the headspace channel of the gas collection metering tube 200; Step 3: Place the reaction vessel 120 in a heated magnetic rotator 110 at 40°C for magnetic stirring. Open the seventh solenoid valve g and add acid (approximately 30 ml of hydrogen chloride solution) at a rate of 1 drop per second for 10 minutes, then add acid (approximately 60 ml of hydrogen chloride solution) at a rate of 3 drops per second for 20 minutes. Finally, add another 100 ml of acid and close the seventh solenoid valve g. During the acid addition reaction, when the gas released from the acid-hydrolyzed sample enters the alkaline solution in the gas collection metering tube 200, carbon dioxide gas is absorbed by the alkaline solution, while other gases enter the upper space of the gas collection metering tube 200. Step 4: After the acid addition reaction is completed, let it stand for 15 minutes (determine whether more acid needs to be added based on the reaction of the sample); when no bubbles are produced in the gas collection metering tube 200, open the eighth solenoid valve h to add pure water into the reaction device until the pure water reaches the fifth vertical tube section (point B), close the eighth solenoid valve h, and then close the first solenoid valve a. Step 5: Open the second solenoid valve b, so that the alkaline solution fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section and the connecting device in sequence, so as to drive all the residual gas in the pipe into the gas collection metering tube 200. Step 6: Read the degassing volume at the top of the gas collection metering tube 200 using the photoelectric level sensor E, and collect the gas; Step 7: After the gas collection is completed, close the gas inlet 201 and the second solenoid valve b, open the waste liquid collection device 500, lower the alkaline liquid level in the gas collection metering tube 200 to below the outlet (D) of the connecting device, then close the waste liquid collection device 500 and remove the reaction device.
[0046] It should be noted that the specific implementation method of dissolving hydrocarbons is similar to that of acid hydrolysis of hydrocarbons. The difference is that the sample for dissolving hydrocarbons is a liquid sample, and the liquid sample is placed in a liquid sample container 130. The liquid sample is drawn into the reaction container 120 by opening the switch of the liquid sample container 130. The relevant experimental parameters for dissolving hydrocarbons are also different. The specific implementation process will not be described in detail here.
[0047] In some embodiments, three groups of high-carbonate soil standard samples were selected and parallel tests were conducted using both the existing national standard manual device and the multi-mode hydrocarbon gas preparation device and method of this application. The existing national standard manual device had a degassing volume relative error of 9.21%, a carbon dioxide residue content of 12.8%, and a single sample analysis time of 58 minutes, and also posed safety hazards. The multi-mode hydrocarbon gas preparation device and method of this application had a degassing volume relative error of 0.83%, a carbon dioxide residue content of less than 0.1%, a single sample analysis time of 30 minutes, and no safety hazards. Therefore, the multi-mode hydrocarbon gas preparation device and method of this application can significantly reduce measurement errors, completely eliminate dead volume interference, shorten analysis time, solve the safety hazard of boiling over in high-carbonate samples, and exhibit significantly better stability in batch sample analysis than existing traditional equipment.
[0048] The multi-mode hydrocarbon gas preparation apparatus and method of this application have the following beneficial effects: 1. Complete reaction: Add acid slowly throughout the process, keep the temperature constant with magnetic stirring, use a float to prevent bumping, and ensure the acid hydrolysis reaction is fully carried out; 2. No dead volume: The design of the dead volume removal section can eliminate dead volume by filling the reaction device with alkaline solution and the gas collection metering tube 200 through the pipeline. 3. Complete gas collection: The gas collection metering tube 200 has a straight-up design without any bends or curves, which prevents the gas from being trapped and achieves complete collection, ensuring accurate degassing volume. 4. Standardized operation: This ensures uniformity of experimental conditions and avoids human error (experimental conditions). 5. Reduce labor intensity: Only one person is needed to weigh and change the sample, realizing full automation of the process from vacuum to analysis, degassing, enrichment and reading.
[0049] It should be understood that the scope of protection of this application is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the scope of the technology disclosed in this application, and such modifications or substitutions should be covered within the scope of protection of this application.
Claims
1. A multi-mode hydrocarbon gas preparation apparatus, characterized in that, include: The reaction apparatus has a liquid inlet pipe and a gas outlet pipe for the reaction flask. The reaction apparatus is used to hold solid or liquid samples and to carry out hydrocarbon gas preparation reactions. A gas collection metering tube has a gas inlet at the top, a vacuum port at the upper part of the side wall, a waste liquid outlet at the lower part of the side wall, and a gas inlet and liquid inlet at the middle of the side wall. The gas collection metering tube has a connecting device inside, the inlet of which is connected to the gas inlet and liquid inlet, and the outlet of which is lower than the height of the gas inlet and liquid inlet. A vacuum device is connected to the vacuum port; The dead volume removal pipe section includes a first horizontal pipe section, a first vertical pipe section, a second horizontal pipe section, a second vertical pipe section, a third vertical pipe section, a third horizontal pipe section, a fourth vertical pipe section, a fourth horizontal pipe section, and a fifth vertical pipe section. The first horizontal pipe section has a first opening at its upper middle portion, the second horizontal pipe section has a second opening at its lower middle portion, and the third horizontal pipe section has a third opening at its upper middle portion. One end of the first horizontal pipe section is connected to the air inlet / liquid injection port, and the other end of the first horizontal pipe section is connected to one end of the first vertical pipe section. The other end of the first vertical pipe section is connected to one end of the second horizontal pipe section, and the other end of the second horizontal pipe section... One end of the third vertical pipe section is connected to one end of the second vertical pipe section; the third vertical pipe section is connected between the second opening and the third opening; one end of the third horizontal pipe section is connected to the waste liquid outlet; one end of the fourth vertical pipe section is connected to the first opening; the other end of the fourth vertical pipe section is connected to one end of the fourth horizontal pipe section; the other end of the fourth horizontal pipe section is connected to one end of the fifth vertical pipe section; the other end of the fifth vertical pipe section is connected to the gas outlet pipe of the reaction bottle; a first solenoid valve is provided on the fourth vertical pipe section; a second solenoid valve is provided between one end of the second horizontal pipe section and the second opening; and a third solenoid valve is provided on the third vertical pipe section. The alkali solution injection device is connected to the other end of the second vertical pipe section; A waste liquid collection device is connected to the other end of the third transverse pipe section; An acid filling device is connected to the inlet pipe of the reaction flask; A pure water filling device is connected to the inlet pipe of the reaction flask.
2. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The communication device includes: The inner absorption cylinder has an upper opening at the top, a lower opening at the bottom, and a connection port on the side wall. The diameter of the upper opening is smaller than the diameter of the lower opening, and the positions of the upper opening, the lower opening, and the connection port are all lower than the position of the air inlet / liquid injection port. The connecting pipe section has one end connected to the air inlet and the other end connected to the connection port.
3. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The vacuum device includes: Vacuum pump; Electronic vacuum gauge; A vacuum tube section, one end of which is connected to the vacuum port via a fourth solenoid valve, has a fourth opening and a fifth opening. The fourth opening is connected to the vacuum pump, and the fifth opening is connected to the electronic vacuum gauge. The venting tube section has one end connected to the other end of the evacuation tube section, and the other end connected to the outside air through the fifth solenoid valve.
4. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The alkali solution dispensing device includes: An alkali solution filling bottle, the bottle mouth of which is equipped with an alkali solution bottle stopper, the alkali solution filling bottle being used to hold alkali solution; An L-shaped alkali solution outlet pipe is installed through the piston of the alkali solution bottle. One end of the L-shaped alkali solution outlet pipe is connected to the other end of the second vertical pipe section, and the other end of the L-shaped alkali solution outlet pipe extends into the alkali solution.
5. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The waste liquid collection device includes: Waste liquid collection bottle; The waste liquid collection pipe has one end connected to the other end of the third transverse pipe section via a sixth solenoid valve, and the other end extends into the waste liquid collection bottle.
6. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The acid injection device includes: An acid filling bottle, the bottle mouth of which is equipped with an acid bottle piston, the acid filling bottle being used to hold acid; An L-shaped acid outlet tube is installed through the piston of the acid bottle, with one end of the L-shaped acid outlet tube extending into the acid solution; The acid filling pipe section has one end connected to the other end of the L-shaped acid outlet pipe, and the other end connected to the reaction flask inlet pipe through the seventh solenoid valve.
7. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The pure water dispensing device includes: A pure water filling bottle, the bottle mouth of which is equipped with a pure water bottle piston, the pure water filling bottle being used to hold pure water; An L-shaped pure water outlet tube is installed through the piston of the pure water bottle, with one end of the L-shaped pure water outlet tube extending into the pure water. The pure water filling pipe section has one end connected to the other end of the L-shaped pure water outlet pipe, and the other end connected to the reaction flask inlet pipe through the eighth solenoid valve.
8. The multi-mode hydrocarbon gas preparation apparatus according to claim 1, characterized in that, The reaction apparatus includes: Heated magnetic rotator; A reaction vessel is placed on the heating magnetic rotator. The mouth of the reaction vessel is equipped with a reaction vessel piston. The liquid inlet pipe and the gas outlet pipe of the reaction vessel both penetrate the reaction vessel piston. A liquid sample container includes a liquid sample bottle and a liquid sample outlet tube. The outlet of the liquid sample bottle is connected to one end of the liquid sample outlet tube, and the other end of the liquid sample outlet tube extends through the piston of the reaction bottle into the reaction container.
9. A multi-mode hydrocarbon gas preparation method, characterized in that, The multi-mode hydrocarbon gas preparation apparatus as described in any one of claims 1 to 8, wherein the multi-mode hydrocarbon gas preparation method comprises: Place the sample in the reaction device, open the third solenoid valve to add alkaline solution into the gas collection metering tube until the liquid level is higher than the waste liquid outlet, then close the third solenoid valve; Open the first solenoid valve and the vacuum device, evacuate to a preset pressure and maintain it for a preset time, then close the vacuum device. Open the third solenoid valve, raise the alkaline liquid level in the gas collection metering tube to a level higher than the outlet of the connecting device, and ensure that the alkaline liquid does not flow back into the reaction device, then close the third solenoid valve. Open the acid injection device to carry out the acid injection reaction, and close the acid injection device after the reaction is completed; Open the pure water filling device to add pure water to the reaction device until the pure water reaches the fifth vertical pipe section, close the pure water filling device, and then close the first solenoid valve; Open the second solenoid valve so that the alkaline solution sequentially fills the second horizontal pipe section, the first vertical pipe section, the first horizontal pipe section and the connecting device, so as to drive all the residual gas in the pipe into the gas collection metering tube; Open the gas inlet to collect gas; After gas collection is completed, close the gas inlet and the second solenoid valve, open the waste liquid collection device, lower the alkaline liquid level in the gas collection metering tube to below the outlet of the connecting device, close the waste liquid collection device, and remove the reaction device.
10. The multi-mode hydrocarbon gas preparation method according to claim 9, characterized in that, The reaction apparatus includes a heating magnetic rotator and a reaction vessel. The reaction vessel is placed on the heating magnetic rotator. The mouth of the reaction vessel is provided with a reaction vessel piston. The liquid inlet pipe and the gas outlet pipe of the reaction vessel both penetrate the reaction vessel piston. The step of placing the sample in the reaction apparatus includes: The sample is placed in the reaction vessel, and polyethylene float beads are added to the reaction vessel; The step of opening the acid injection device to perform the acid injection reaction and closing the acid injection device after the reaction is completed includes: The heating magnetic rotator is activated to perform constant temperature heating and magnetic stirring of the liquid in the reaction vessel; Open the acid injection device to carry out the acid addition reaction, and close the acid injection device after the reaction is completed.
