A low-voltage alternating current power distribution network residual current distributed synchronous sampling, vector synthesis and insulation fault positioning method
By employing measurement topology, time synchronization, and phase alignment methods in low-voltage AC distribution networks, the problem of current data synchronization and synthesis under complex neutral line topologies is solved, enabling accurate insulation fault location. This method is suitable for scenarios involving high-current copper busbars and conductors distributed across cabinets.
Patent Information
- Application Number
- CN202611214842.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-11
- Publication Date
- 2026-11-10
AI Technical Summary
In low-voltage AC distribution networks, especially in cases of repeated online grounding, dual or multiple power sources sharing a neutral line, line-to-branch connections, separate copper busbar measurements, and long-distance distributed acquisition terminals, existing technologies cannot guarantee that the current data at different measurement points have a consistent time reference, phase reference, and sampling window, leading to measurement distortion and misjudgment.
The system employs a processing approach that combines measurement topology, time synchronization, phase alignment, sampling batch management, power frequency phasor extraction, neutral line topology compensation, and fault contribution matching. Through the collaborative work of the main acquisition terminal and distributed acquisition terminals, it ensures data synchronization and phase consistency, and performs vector synthesis and insulation fault location.
It achieves accurate synthesis of current data under complex neutral topology, reduces misjudgments caused by asynchronous data, incorrect wiring direction and communication anomalies, improves the reliability of insulation fault location, and is suitable for high current copper busbars, conductor cross-cabinet distributed wiring and uninterrupted power supply retrofit scenarios.
Smart Images

Figure CN123066480A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of insulation monitoring and residual current detection technology for low-voltage AC distribution networks, specifically a method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in low-voltage AC distribution networks. Background Technology
[0002] Residual current is an important parameter for judging the insulation condition of low-voltage AC distribution lines. Common solutions will... , , Three phase wires and The conductors all pass through a single residual current transformer, and the residual current is obtained by synthesizing the magnetomotive force inside the transformer. This scheme requires that all conductors be concentrated in the same location through the core, and that all return paths of the normal operating current be within the same measurement boundary. For large-section copper busbars, cross-cabinet wiring, or uninterruptible power supply retrofit scenarios, it is often difficult for conductors to pass through the core together; for dual power supplies with a common neutral conductor, In scenarios involving line-to-branch connections or repeated grounding, some return current may bypass a single measurement window, leading to distorted measurement results.
[0003] Existing technologies have proposed separate sampling and multi-point monitoring schemes. For example, CN111610358A discloses separate sampling... , , , Four-wire current is used to calculate the residual current through synchronous analog-to-digital conversion, buffering, fast Fourier transform, and summation of real and imaginary parts; CN113178850A discloses the use of the difference between the upstream residual current amplitude and the sum of the amplitudes at each downstream measuring point to determine the leakage section; CN115833034B discloses the use of a distributed leakage current protection device to collect time-stamped electrical quantities and perform insulation status analysis and location. The above solutions respectively solve the problems of four-wire separate measurement or multi-point section judgment.
[0004] However, when multiple acquisition terminals are distributed, timestamps alone cannot guarantee that each terminal is acquiring the same power frequency cycle, nor can they guarantee that the phasors use the same phase origin; when the host retrieves data sequentially according to the communication address, it may also bring data from different sampling batches into the same vector synthesis. For common neutral lines or For repeated grounding loops, if the neutral return current boundary and measurement group are not determined first, it is easy to miss, double-count, or incorrectly allocate the data. Line current.
[0005] Therefore, a processing method for complex neutral topologies is needed to integrate measurement topology, confirmatory time synchronization, unified phase marking, batch data acceptance, power frequency complex phasor synthesis, neutral line difference compensation, and branch location into a complete process to improve the reliability of distributed residual current measurement and insulation fault location. Summary of the Invention
[0006] Technical problems to be solved The technical problem to be solved by this invention is: Repeated grounding of lines, dual or multiple power supplies sharing a common neutral line, In low-voltage AC distribution networks with branch line connections, separate copper busbar measurements, and long-distance distributed acquisition terminals, current data from different measurement points should have a consistent time reference, phase reference, and sampling window; this ensures that current data from un-branched branches has a consistent time reference, phase reference, and sampling window. The return current fully covered by the line measurement points can participate in the synthesis according to the actual measurement boundary; and while obtaining the accurate residual current of the measurement group, the change relationship between the branch and the measurement group is used to locate the branch with insulation abnormality, reducing misjudgments caused by asynchronous data, incorrect wiring direction, communication abnormalities and load switching.
[0007] Technical solution To address the aforementioned technical problems, this invention provides a method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in low-voltage AC distribution networks. This method establishes measurement topology, time synchronization, phase alignment, sampling batch management, power frequency phasor extraction, neutral line topology compensation, and fault contribution matching as sequential processing steps. If any step fails to meet the valid conditions, the corresponding data is not included in the subsequent vector synthesis.
[0008] First, establish the measurement topology and distributed sampling network. A main acquisition terminal is installed at the main busbar of the low-voltage AC distribution network, and acquisition terminals are installed at the outgoing ends of each feeder branch or at measurement locations that can cover the corresponding conductor current. Based on the primary wiring diagram... The wiring connections and current transformer installation locations should be considered to ensure that the neutral line completes its return circuit within a single branch, thus establishing an independent branch. This also applies to dual or multiple power supplies. Wire, The relevant circuits where the line is connected across a branch downstream or where there is repeated grounding current shunting are set up as measurement groups.
[0009] Secondly, a unified time and phase reference is established. The main acquisition terminal first initiates acknowledgment-based time synchronization via the differential communication bus. After the acquisition terminal returns confirmation, the main acquisition terminal provides the IRIG-B time code and 1PPS second pulse. The acquisition terminal completes local clock correction and returns to synchronization status. The main acquisition terminal simultaneously detects the bus. The zero-crossing event of the phase voltage is defined and used as the unified phase marker for this sampling. Time synchronization is used to unify the sampling time, and the phase marker is used to unify the angle origin of the power frequency phasor.
[0010] Furthermore, data is sampled synchronously in the same sampling batch, and data validity is checked. The main acquisition terminal generates a sampling batch number and a phase marker number for each sampling, and sends synchronous sampling and data buffering instructions to the acquisition terminals that have successfully synchronized. The acquisition terminals wait for a unified trigger point to... , , Related The line performs multi-channel synchronous sampling and forms data packets. The main acquisition terminal reads the data packets according to the terminal address and checks the topology configuration version, sampling batch number, phase marker number, synchronization status, sampling start time, number of valid points, and check field; data that does not meet the requirements are not included in this calculation.
[0011] Furthermore, the power frequency complex phasors are extracted. The main acquisition terminal performs DC removal processing and Fast Fourier Transform on the sampling sequences of each channel within the same power frequency cycle, extracting the real and imaginary parts of the 50 Hz power frequency component, and forming the power frequency complex phasors of each conductor based on the transformer ratio, sampling channel calibration coefficients, and transformer installation direction. The power frequency phasors of each acquisition terminal are all based on the same... The zero-crossing point of the phase voltage is the origin of the angle.
[0012] Furthermore, perform independent branch synthesis and measurement group neutral line compensation. For independent branches, , , Related The line-frequency complex phasors are vector-summed to obtain the branch residual current phasors. For the measurement group, in the shared... The location where the lines converge or the location that can define the backflow boundary of the measurement group is set as the total location. Line measurement points, with total Linear power frequency complex phasors and branches within the group The difference between the summation results of the line power frequency complex phasors according to the installation direction is used as the compensation phasor of the uncovered neutral line. Then, this compensation phasor is added to the sum of the residual current phasors of the branches in the group to obtain the corrected residual current phasor of the measurement group.
[0013] Furthermore, the insulation anomaly branches are located. The main acquisition terminal stores the normal reference values for the branch residual current phasor and the measurement group calibrated residual current phasor. When an abnormal change occurs in the measurement group residual current, the direction consistency and amplitude contribution of the change vector of each branch with the measurement group calibrated change vector are calculated to identify candidate branches with insulation anomalies within the measurement group. After verification by multiple consecutive valid sampling batches, the candidate results are output as follows: branch number, measurement group number, effective value of residual current, and warning level.
[0014] Furthermore, abnormal data handling and operation logging are implemented. When sampling data is lost, verification fails, phase markers are inconsistent, synchronization deviation exceeds limits, or necessary measurement points in the measurement group are missing, the main acquisition terminal does not use the previous batch of data to replace it, but instead resamples the corresponding acquisition terminal or the corresponding measurement group; when load switching only creates a single-cycle impact, continuous batch verification is used to suppress false alarms. (See attached reference.) Figure 8 The main acquisition terminal saves the original data packets, topology configuration version, calculation results and alarm records in association according to the sampling batch for verification.
[0015] Beneficial effects Compared with the prior art, the present invention provides a method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in low-voltage AC distribution networks, which has the following advantages: 1. This invention does not merely add timestamps to distributed data, but uses acknowledged synchronization states, IRIG-B time codes, 1PPS second pulses, The phase voltage zero-crossing phase marker and the sampling batch number together define the data that can be used in the calculation. Even if the main acquisition terminal reads the acquisition terminals one by one by address, it can still confirm that each data comes from the same power frequency cycle and the same phase coordinate.
[0016] 2. The present invention is based on The actual connection relationship of the lines is used to divide the measurement groups, and then the total measurement group is used as the basis for the measurement. Linear phasors and intra-group branches The directed difference in linear phase quantities forms the compensation for the uncovered neutral line. The compensation target is a measurement group with clearly defined electrical boundaries, rather than arbitrarily distributing a single total quantity across branches. This reduces the impact of shared neutral lines and cross-branch coverage. Omissions or duplicates caused by wires and repeated grounding.
[0017] 3. This invention uses both the direction and amplitude of the branch change vector during branch location, and is constrained by the compensated measurement group change vector. Compared to comparing only the absolute amplitude of the residual current, this process more easily distinguishes between long-term inherent leakage, general load imbalance, and newly added insulation anomalies.
[0018] 4. The data acquisition terminal approaches the current transformer to complete analog-to-digital conversion and buffering. The data transmitted over long distances is digital data containing sampling batch and verification information. , , Related Current transformers can be installed separately for each line. Therefore, this invention is applicable to scenarios such as high-current copper busbars, conductors distributed across cabinets, long-distance wiring, and uninterrupted power supply retrofitting.
[0019] 5. This invention specifies separate processing paths for synchronization failures, data packet corruption, missing measurement points, unstable candidate branches, and load switching impacts, avoiding the forced output of a single positioning result when the data is inconsistent. Raw data, topology versions, and calculation results are saved in association according to sampling batches, facilitating on-site verification and parameter tuning. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the overall architecture of the distributed sampling network and measurement topology of the present invention.
[0021] Figure 2 For the present invention, the confirmatory time synchronization, 1PPS second pulse time correction and Flowchart for zero-crossing phase marking of phase voltage.
[0022] Figure 3 This is a flowchart illustrating the sampling batch generation, synchronous sampling, status query, data reading, and validity check processes of this invention.
[0023] Figure 4 This is a flowchart of the multi-channel current sampling, power frequency phasor extraction, and independent branch residual current synthesis process of the present invention.
[0024] Figure 5 This invention relates to independent branches, common neutral line measurement groups, and uncovered areas. Schematic diagram of line compensation relationship.
[0025] Figure 6 This is a flowchart of the insulation fault branch location method based on measurement group correction change vector of the present invention.
[0026] Figure 7 This is a flowchart of the abnormal data re-sampling, continuous verification of candidate branches, and false alarm suppression process of the present invention.
[0027] Figure 8 This is a schematic diagram illustrating the relationship between the main acquisition terminal, the functional modules of the acquisition terminal, and the sampling data packets of the present invention. Detailed Implementation
[0028] The present invention will be further described below with reference to the accompanying drawings and embodiments. For ease of understanding, the relationships between the embodiments are first explained: Embodiment 1 describes the system and measurement boundaries; Embodiment 2 describes the time and phase reference; Embodiment 3 describes synchronous sampling and data validity; Embodiments 4, 5, and 6 respectively describe power frequency phasors, topology compensation, and fault location; Embodiment 7 describes false alarms and anomaly handling; Embodiment 8 describes the equipment and data recording; Embodiment 9 provides field applications; and Embodiment 10 describes parameter selection and operating boundaries. It is important to note that the embodiments are interconnected; data that is out of sync or has unclear measurement boundaries cannot be directly fed into subsequent formulas.
[0029] Example 1: Main system composition, measurement point installation, and measurement topology Reference Appendix Figure 1 A main data acquisition terminal is installed at the main busbar inlet of the 380V three-phase four-wire low-voltage AC distribution network, and another data acquisition terminal is installed at the outlet of each feeder branch. The inputs of the main data acquisition terminal include the busbar input. Phase voltage zero-crossing signal, total measurement group Line current, sampling data uploaded by each acquisition terminal and synchronization status; the main acquisition terminal's processing content includes time synchronization, phase marking, sampling batch management, data validity judgment, power frequency phasor calculation, neutral line compensation and branch location; the output includes synchronization command, sampling command, location results, alarm information and operation record.
[0030] The inputs to the acquisition terminal are the analog outputs of each current transformer, IRIG-B time code, 1PPS pulses per second, and control commands issued by the main acquisition terminal. The acquisition terminal performs multi-channel analog-to-digital conversion, direct memory access (DMA) caching, acquisition completion status management, and data packet encapsulation locally. The output is digital sampled data with terminal identifier, sampling batch number, phase marker number, and verification field. With this configuration, weak analog signals are transmitted only between the transformers and the nearest acquisition terminal, while digital data is transmitted between the main acquisition terminal and other acquisition terminals.
[0031] Each branch road , , , The conductors are equipped with either 0.2S class open-type or closed-type current transformers. Open-type transformers are suitable for uninterrupted power supply retrofits, while closed-type transformers are suitable for new circuits. For high-current industrial circuits, the transformers should be selected with an overload capacity of at least 10 times the rated current to reduce the possibility of core saturation under large grounding currents or load impacts. , C represents the three phase lines, N represents the neutral line, and the protective ground line is not included in the four-wire phasor summation as a normal operating current conductor.
[0032] Reference Appendix Figure 5 The measurement topology is not established solely by grouping distribution cabinet numbers, but rather by grouping according to the return path of the normal operating current. If a certain feeder... The line only serves this feeder, and , , , If four conductors form a complete boundary within the measuring point of the feeder, it is defined as an independent branch. If two power supply loops share a single conductor... Line, multiple feeders The line is connected downstream. If a line is connected in series with other branches, or if repeated grounding causes part of the return current to return through the protective conductor, then the relevant feeders are defined as the same measurement group and are shared. Set up a total line at the convergence point or the boundary of the measurement group. Line measurement points.
[0033] The main acquisition terminal stores a topology configuration table. Each configuration record includes at least the branch number, acquisition terminal address, and... / / / N channel number, transformer direction coefficient, measurement group, independent Line markings, total Line test point addresses and topology configuration versions. Changes made during on-site maintenance. After establishing the wiring connections, the topology configuration should be updated before allowing new batches of data to participate in the synthesis. If the topology version carried by a sampled data is inconsistent with the current version of the main acquisition terminal, the main acquisition terminal will consider the data invalid instead of continuing the calculation based on the old wiring connections.
[0034] For copper busbar installation scenarios , , , Copper busbars can pass through their respective current transformers individually; it is not required that multiple large-section copper busbars pass through a single residual current transformer. For a seven-channel synchronous acquisition terminal, four channels are used for... , , and The remaining channels can be connected to additional lines within the same measurement group. Line measuring point, busbar side Line measurement points or reserved as backup channels.
[0035] Example 2: Confirmatory Time Synchronization and Unified Phase Marking Reference Appendix Figure 2 The primary challenge in distributed sampling is not summation, but rather determining whether the waveforms acquired by each acquisition terminal belong to the same moment. If the master acquisition terminal only sends an "immediate sampling" command to each terminal via the RS-485 (recommended standard 485) differential serial communication bus, the frame transmission and terminal response times will cause different trigger times for each terminal. Therefore, this embodiment uses the communication command to define the target sampling batch and the independent synchronization signal to determine the actual trigger boundary.
[0036] The master acquisition terminal sends a time synchronization command. Upon receiving this command, the acquisition terminal latches its local received time, clears the previous synchronization state, enters the time synchronization state, and returns an acknowledgment frame. The acknowledgment frame contains at least the terminal address, acknowledgment number, and local clock status. After receiving the acknowledgment frame, the master acquisition terminal outputs IRIG-B time code and 1PPS second pulses through the differential synchronization line. IRIG-B is a B-format time-coded signal used to provide year, day, hour, minute, and second information; 1PPS is a second pulse signal with one pulse per second, used to correct local second boundaries.
[0037] The master acquisition terminal and the acquisition terminals can perform synchronization interactions at least 10 times. The acquisition terminals adjust their local counters based on the continuous synchronization results. After synchronization is complete, the master acquisition terminal sends a synchronization status query command, and the acquisition terminals return success or failure. Failed terminals do not participate in the current sampling, and the master acquisition terminal re-initiates time synchronization with them. The purpose of this confirmation process is to let the master acquisition terminal know "which terminals have entered the synchronized sampling state," avoiding mistakenly identifying terminals that have only received time codes but have not been correctly locked as valid terminals.
[0038] The main acquisition terminal determines a reference time for each sampling batch and simultaneously records the actual time of the first sampling point at each acquisition terminal. To determine whether each terminal has truly achieved synchronization, the deviation between the sampling start time and the reference time needs to be calculated: ; in, Indicates the deviation at the start time of sampling; Indicates the serial number of the data acquisition terminal or branch. Indicates the sampling batch number; Indicates the first The first data acquisition terminal in the... The time of the first sampling point in the batch, This indicates the reference time for this batch as determined by the main acquisition terminal; This indicates the permissible synchronization deviation. In the implementation method described above, It can be set to 1 microsecond. Only. Only then will the data be used for subsequent calculations.
[0039] A unified second boundary alone cannot guarantee that the current phase angle uses the same zero point. If different terminals capture a cycle from any position after receiving 1PPS, although the time error is small, the phase angle calculated by the Fast Fourier Transform (FFT) may still have a fixed offset. Therefore, the main acquisition terminal also acquires data from the bus. The system measures the phase voltage and detects zero-crossing events in a predetermined direction. The predetermined direction can be either from negative to positive zero or from positive to negative zero, but it must remain consistent after the system is put into operation.
[0040] The main acquisition terminal numbers the confirmed zero-crossing events as follows: and put With sampling batch number This information is sent to all successfully synchronized acquisition terminals. To avoid repeated zero-crossings caused by voltage glitches, a hysteresis interval and a minimum event interval can be set. Each acquisition terminal... The corresponding zero-crossing moment is taken as the phase angle zero point of the power frequency phasors in this batch. Thus, IRIG-B and 1PPS are responsible for "when to sample". The phase voltage zero-crossing marker is responsible for determining "where the phase angle starts to be calculated".
[0041] Given that the phase markers have been determined, the first The first data acquisition terminal Batch No. The theoretical sampling time for each sampling point can be expressed as: ; in, Phase marker The corresponding zero crossing time, Indicates the sampling point number within the cycle. Indicates the sampling frequency. This represents the number of sampling points within one power frequency cycle. The aforementioned synchronization deviation. This formula indicates that all terminals use the same zero-crossing time and sampling frequency, and only a synchronization error limited by a threshold is retained between terminals, thereby mapping the current waveforms at different physical locations to the same time axis and phase coordinates.
[0042] Example 3: Synchronous Sampling, Data Packet Formation, and Validity Control Reference Appendix Figure 3 The main data acquisition terminal generates a sampling batch number for each sampling. Phase marker The system synchronizes the current topology configuration version and sends synchronization sampling and data buffering commands to all successfully synchronized acquisition terminals. Upon receiving the commands, the acquisition terminals do not immediately initiate sampling based on the arrival time of the RS-485 frame, but instead wait for the 1PPS, local counter, and... A commonly determined target trigger point. This approach ensures that sequential addressing on the bus does not translate into sampling time differences.
[0043] After reaching the target trigger point, , , , The four channels are sampled by the same analog-to-digital converter trigger source. Sampled data is written to RAM via DMA. Once a set number of points are reached for each channel, the acquisition terminal sets a completion status. DMA stands for Direct Memory Access, and RAM stands for Random Access Memory. During acquisition, the processor does not move data point by point, reducing sampling jitter caused by software interrupts.
[0044] Each data acquisition terminal generates a data packet. The data packet must include at least the terminal identifier, topology configuration version, sampling batch number, phase marker number, synchronization status, sampling start time, sampling frequency, number of valid sampling points, channel identifier, sampling data for each channel, acquisition completion status, and cyclic redundancy check field. The main acquisition terminal first queries the acquisition completion status, and then reads the data packets one by one according to the address. Data transmission can be performed sequentially, but the sampling windows corresponding to the data must be the same.
[0045] To facilitate the unified handling of various exceptions within the program, this embodiment represents each check result as 0 or 1, forming a valid data identifier: ; in, Indicates the first The first data acquisition terminal Batch data validity identifier; , , , , and The results of the checks, corresponding sequentially to cyclic redundancy check, synchronization status, sampling batch, phase marker, number of valid points, and sampling time deviation, are assigned a value of 1 if the requirements are met and 0 if not. Only Only then can the data packet be used for power frequency phasor calculation. This formula does not change the communication protocol, but rather clarifies the processing logic of item-by-item verification during the handover.
[0046] When data from a single acquisition terminal is invalid, while data from other terminals in the measurement group remains valid, the main acquisition terminal only resamples that terminal; when the total... When a line measurement point fails or multiple necessary branches within a measurement group fail simultaneously, the main acquisition terminal resamples the entire measurement group. The main acquisition terminal does not use data from the previous batch to fill gaps in the current batch, as the load state and phase window corresponding to the previous batch may be different. If continuous resampling still fails, a "data insufficient" status is output, and no deterministically faulty branches are output.
[0047] For communication timeouts, the main acquisition terminal records the timeout terminal address and the number of retries; for verification errors, the error frame is discarded and reread; for batch number or phase marker errors, the current cache of the terminal is cleared and retried; for inconsistent topology versions, the topology configuration is synchronized before sampling. The common goal of the above anomaly handling is to ensure that subsequent vector synthesis only uses inputs with consistent time, phase, topology, and data length.
[0048] Example 4: Power Frequency Phasor Extraction and Channel Direction Unification Reference Appendix Figure 4 After the data packet is valid, the main acquisition terminal performs power frequency phasor extraction on each current channel. The technical scenario here is: , , and The amplitudes of line currents can vary greatly, but the final residual current may only be tens of milliamperes. If the effective values of each channel are directly summed algebraically, the phase relationship cannot be reflected, and a large load current error will mask a small leakage component. Therefore, it is necessary to extract the power frequency complex phasor with real and imaginary parts from the same sampling cycle.
[0049] Low-voltage AC distribution network power frequency Typically, it's 50 Hz, with one cycle lasting 20 milliseconds. In power frequency phasor calculation mode, one cycle is acquired. Points, sampling frequency The relationship between the number of sampling points and the frequency is satisfied as follows: ; in, This indicates the number of sampling points per power frequency cycle. Indicates the sampling frequency. This represents the power frequency. When using 256 points, It is 12.8 kHz; when using 512 points, The frequency is 25.6 kHz. The 1 kHz and 8 kHz frequencies mentioned in the instructions can be used for continuous trend monitoring, but cannot be directly used as the sampling frequency for each 256-point or 512-point FFT. The sampling mode should be switched uniformly before entering the power frequency phasor calculation.
[0050] The main acquisition terminal first subtracts the average value of that cycle from the sampling sequence of each channel to reduce the DC bias, and then performs a 256-point or 512-point radix-4 Fast Fourier Transform. For the first... Branch road, No. batch and Conductor channel, Can be taken , , or Its power frequency complex coefficients can be expressed as: ; in, This represents the power frequency complex coefficient of the corresponding channel; Indicates the conductor type, take , , or , Indicates the branch number, Indicates the sampling batch; Indicates the first One current sample value, Indicates the number of sampling points in the cycle. Represents the imaginary unit and , This represents the base of the natural exponential function. Since the sampling window coincides with one power frequency cycle, the exponential term in the formula corresponds to the fundamental frequency. The main acquisition terminal can also use an equivalent radix-4 FFT program to obtain the same real and imaginary parts.
[0051] Different transformer ratios, sampling resistors, and analog-to-digital converter ranges will result in FFT results with different scales. Furthermore, the transformer installation orientation may be reversed. Therefore, it is necessary to unify the channel results to the specified current direction and ampere units. ; in, Indicates the first branch road batch The power frequency complex phasor of the conductor; This represents the installation direction coefficient of the current transformer, which is taken when the installation direction is specified. Take during reverse installation ; This represents the channel calibration coefficient, which consists of the transformer ratio, sampling resistor, analog-to-digital converter range, and FFT scale. After this calibration, the positive direction, unit, and phase origin of each channel phasor are consistent, thus enabling vector addition.
[0052] If the sampled value exceeds the analog-to-digital conversion range, the transformer enters saturation, or the channel noise increases significantly, the main acquisition terminal can mark the channel as abnormal based on the number of clipped vertices, consecutive identical maximum code values, or channel self-test results. The branch containing the abnormal channel does not participate in deterministic localization. For high-frequency components generated by heavy-load switching, anti-aliasing low-pass filtering can be set before analog-to-digital conversion, or only the 50 Hz power frequency component can be extracted in digital processing to reduce the impact of non-power frequency impacts on phasor synthesis.
[0053] Example 5: Vector synthesis of independent branches and compensation for common neutral line This embodiment addresses a core issue in complex topologies. For branches with independent return flows along the neutral line, , , and The line measurement points have covered the entire normal operating current of this branch, and the four-wire power frequency phasors can be directly synthesized. For the first... branch road The initial residual current complex phasor of the batch is: ; in, Indicates the first branch road The initial residual current complex phasor of the batch, symbol This represents the imbalance of current flowing into and out of the measurement boundary; the four terms on the right side of the equation represent respectively... Mutually, Mutually, Related The line's power frequency complex phasor. If there is no leakage to ground in the branch and all normal return flows are covered by the measuring points, the result of the above formula should be close to zero.
[0054] Warning thresholds are usually expressed in terms of effective values, therefore it is necessary to convert the complex phasors into modulo values: ; in, This represents the effective value of the residual current in the branch. To take the real part of a complex number, This indicates taking the imaginary part of a complex number and summing within the range. Take in sequence , , and This formula adds the real parts and imaginary parts of the four wires separately before taking the modulus, avoiding the direct algebraic addition of the effective values of currents with different phases.
[0055] For common neutral line measurement groups, the problem lies in the branches. Line measurement points cannot guarantee coverage of all return current. (See attached reference.) Figure 5 Let the first The set of branches within each measurement group is: Set up a total measurement group boundary. Line measurement points, to obtain the total Line frequency complex phasors. To identify branches not included in the group. The portion covered by the line measurement points needs to be calculated in total. Linear phasors and branches Difference between directed phasors of a line: ; in, Indicates the first The measurement group number Uncovered neutral line compensation phasors in the batch; Indicates the total of the measurement group Linear power frequency complex phasors, among which Indicates total Line measurement points; Indicates the first a side road Line relative to the total measurement group The direction coefficient of the line in the specified direction is taken as... or , This represents the set of branches within the group. The difference reflects the shared... Lines and branch roads The current is diverted to the line or repeated grounding point and not distributed to each branch. The reflow component is fully covered by the line measurement points.
[0056] After obtaining the compensated phasor, the corrected residual current phasor of the measurement group is: ; in, Indicates the first The measurement group number The batch-corrected residual current phasors have the same meanings as above. First, add the initial residual current phasors of each branch within the group, then add the compensation for the uncovered neutral line. This ensures that the measurement group results simultaneously include the phase current of each branch and the total current at the measurement group boundary. Line return current.
[0057] Taking a dual-power common neutral line as an example, the measurement group includes branch 1 and branch 2, two branches. When all line direction coefficients are positive 1, the amount of uncovered compensation equals the total. Linear phasor minus two branches Linear phasors; if the current transformer in branch 2 is installed in reverse, simply set the corresponding direction coefficient to negative 1; no hardware changes are necessary. Compensation phasors are only added to the total measurement result and are not directly and equally distributed to branches 1 and 2, because based solely on the total... Line differences cannot determine the absolute distribution of the difference among branches. Branch location is accomplished by change vector matching in the next embodiment.
[0058] If total Line measurement points and branch lines within the group There are still external connections between the line measurement points that are not included in the topology, which may cause the measurement group calibration results to be consistently too high. The main acquisition terminal can compare the compensated phasor under stable load conditions during commissioning self-test. If the compensation amount continuously exceeds the configured threshold, a verification prompt will be displayed. Instead of directly attributing the fixed deviation to an insulation fault in a particular branch, the measurement should be done by connecting the wires and measuring the boundary.
[0059] Example 6: Insulation Fault Location Based on Variation Vector Contribution Reference Appendix Figure 6 The measurement group's residual current correction can determine if there is an anomaly in that measurement group, but it cannot pinpoint which branch the anomaly is located in. Simply selecting the branch with the largest current residual current amplitude could lead to incorrect selection due to long-standing inherent leakage or residual transformer errors. Therefore, this embodiment uses the phasors during normal operation as a benchmark to compare with the newly added changes.
[0060] The main data acquisition terminal saves the most recent data when the system is within limits, the data is valid, and the load is not significantly impacted. The branch residual current phasor and the measurement group calibrated residual current phasor of each sampling batch. The reference phasor of the branch is: ; in, Indicates the first The first batch calculated Branch reference phasor Indicates the reference, This represents the average number of valid historical batches. This indicates the batch number that is being traced back. The value can be set from 5 to 50 depending on the load stability. Only batches with valid data and not in an alarm state are included in the baseline.
[0061] Similarly, the first The reference phasor for each measurement group is: ; in, Indicates the first The measurement group in the first The reference phasor used in the batch has the same meaning as the other symbols. Establishing separate branch references and measurement group references can eliminate inherent leakage in the branches and fixed compensation deviations in the measurement group, respectively.
[0062] The branch change vector and measurement group correction change vector of the current batch relative to the baseline are as follows: ; ; in, Indicates the first branch road The residual current change vector of the batch, Indicates the first The measurement group number The batch corrected residual current change vector. After using the change vector, a branch that is stable for a long time but has a slightly larger amplitude will not be preferentially identified as the faulty branch in this case simply because its absolute value is larger.
[0063] When a new insulation leak occurs in a branch, the direction of the branch's change vector in the complex plane is usually close to the direction of the measurement group's corrected change vector. To convert this directional relationship into comparable values, a directional consistency coefficient is calculated: ; in, Indicates the first branch road and the first The measurement group in the first Batch orientation consistency coefficient, The overline in the text indicates complex conjugation. Represents the modulus of a complex number. This indicates a positive number that prevents the denominator from being zero. When the value is close to 1, the two changing vectors are in the same direction; The correlation is weak when it is close to 0; At that time, the change in this branch does not contribute in the same direction to the anomaly of the measurement group.
[0064] Branches with the same direction but very small amplitude should not be classified as major fault branches; therefore, the amplitude contribution should be further calculated: ; in, Indicates the first branch road to the first The amplitude contribution of abnormal changes in each measurement group. This indicates taking the larger of two compared values. When When it is negative, the contribution is set to zero; when When positive, the contribution vector magnitude increases with the branch variation. This index utilizes both phase direction and variation amplitude.
[0065] Within the measurement group, the branch with the largest amplitude contribution can be represented as: ; in, Indicates the first Candidate branches selected in batches Indicates obtaining The largest branch number. In actual operation, it is also required that... If the preset positioning threshold is reached, and the maximum and second largest values are close, a unique branch will not be forcibly output. Instead, a set of candidate branches will be output and the sampling resolution will be increased for resampling.
[0066] To suppress single-batch misjudgments caused by load switching or communication jitter, the main acquisition terminal continuously verifies... One valid sampling batch. Candidate branch. The retention ratio within this window can be expressed as: ; in, This indicates that the proportion of candidate branches remains constant. Indicates the number of consecutively verified batches. This indicates an indicator function, which takes the value 1 when the condition in the indicator function is true and 0 when the condition is false. At least 2. Once the set ratio is reached, output a definitive positioning; If the value is low, continue observing or output the candidate set. This continuous verification process corresponds to the requirement for continuous matching of fault characteristics in the briefing.
[0067] After location is completed, the main acquisition terminal classifies the residual current according to its effective value. For example, a level 1 warning is issued if the current exceeds 30 mA, a level 2 warning is issued if the current exceeds 100 mA, and a level 3 alarm is issued if the current exceeds 500 mA. The warning record includes at least the time of occurrence, sampling batch number, topology version, measurement group number, candidate branch number, branch residual current, measurement group calibration residual current, and data validity status.
[0068] Example 7: False Alarm Suppression, Abnormal Scenarios, and Degraded Operation Reference Appendix Figure 7 This embodiment illustrates how to handle situations where input conditions are not ideal. The first type of anomaly is synchronization anomaly, including failure to receive acknowledgment frames, IRIG-B parsing failure, 1PPS loss, exceeding sampling start deviation limits, and inconsistent phase markers. For this type of anomaly, the main acquisition terminal marks the corresponding terminal as out of sync, prohibits its data from participating in vector synthesis, and re-initiates time synchronization. If the measurement group lacks necessary branches or total... For line measurement points, the entire measurement group only outputs "Insufficient synchronization data" and does not output the specific branch.
[0069] The second type of anomaly is data transmission anomalies, including cyclic redundancy check errors, insufficient data length, channel number mismatch, batch number rollback, and duplicate data packets. The main acquisition terminal deduplicates data based on the terminal address, batch number, and data packet sequence number, and rereads the erroneous frames. If the number of retries exceeds the limit, a communication failure is recorded, and the measurement group remains in a pending confirmation state. Results from the previous batch can be used to display trends on the interface, but cannot replace the data from the current batch for positioning.
[0070] The third type of anomaly is measurement anomaly, including incorrect transformer orientation configuration, channel clipping, transformer saturation, and total... Missing measurement points and inconsistent topology configuration with the field conditions. Incorrect transformer orientation typically manifests as a significant increase in the four-wire phasor sum of the branch circuit during load changes, with the direction of change consistently inconsistent with the measurement group. Channel clipping is characterized by a large number of sampling points reaching the analog-to-digital conversion limit. Upon detecting these characteristics, the main acquisition terminal prompts for channel inspection, rather than directly interpreting large values caused by abnormal channels as insulation faults.
[0071] The fourth type of anomaly is load transients. Motor starting, rectifier load switching, and UPS switching may generate non-power frequency impacts within one or a few cycles. The main acquisition terminal only extracts the 50 Hz component and requires that the candidate branch remain consistent across multiple consecutive valid batches. If the measured group's corrected residual current recovers rapidly in subsequent batches, or if the candidate branch changes frequently between batches, it is judged as transient interference and monitoring continues.
[0072] The fifth scenario involves multiple branches experiencing insulation anomalies simultaneously. In this case, the directional consistency and amplitude contribution of multiple branches may be high. The main acquisition terminal can output multiple candidate branches sorted by contribution, instead of only retaining the maximum value. Maintenance personnel first check the branches with higher contributions, process them, and then resample; if the residual current is still abnormal after the measurement group corrects, then the next candidate branch is processed.
[0073] The sixth category is the general case. The line compensation amount has been consistently high but has not changed significantly. This situation is more likely due to unregistered shared... The problem is not a newly occurring single-branch leakage, but rather a faulty wire, repeated grounding point, or incomplete measurement boundary. The main acquisition terminal incorporates the long-term stable portion into the baseline and issues a topology check prompt; it only enters faulty branch matching when a new change relative to the baseline occurs.
[0074] Example 8: Device Implementation, Data Integrity, and Record Association Reference Appendix Figure 8 The main acquisition terminal includes a processor, memory, RS-485 communication interface, and IRIG- and 1PPS differential output interface, bus Phase voltage zero-crossing detection interface, busbar Line acquisition interface and backend communication interface. The processor runs synchronization management, batch management, data verification, FFT, vector synthesis, fault location and alarm programs. The memory stores topology configuration, channel calibration coefficients, historical benchmarks, raw data packets and alarm records.
[0075] The acquisition terminal includes a seven-channel synchronous analog-to-digital converter, analog conditioning circuitry, DMA control unit, RAM, local clock, and IRIG- It includes a 1PPS receiver interface, an RS-485 communication interface, and a terminal processor. Four basic channels are used for... , , and Lines, other channels can be used for additional Line measurement points. Analog conditioning circuitry may include sampling resistors, amplitude limiting protection, and anti-aliasing filtering. All channels use the same sampling trigger source to avoid polling sampling phase differences between channels within the terminal.
[0076] Data integrity is primarily ensured through a combination of factors, including terminal address, topology configuration version, sampling batch number, phase marker number, data length, number of valid points, and cyclic redundancy check. The main acquisition terminal establishes a unique index for each batch, linking and saving the original data packets, calculated power frequency phasors, branch residual current, measurement group compensation, candidate branches, and alarm results. This allows for on-site verification by tracing back from alarm results to the corresponding original waveform and the topology configuration used at the time.
[0077] To prevent accidental modification of parameters, modification permissions and version numbers can be set for topology configuration, transformer direction coefficients, and channel calibration coefficients. A new version is generated after parameter modification, while old data retains the original version identifier. Upon startup, the main acquisition terminal verifies the integrity of the configuration file and sends the current sampling mode and batch start information to each acquisition terminal. This data management ensures the traceability of measurement results without altering the aforementioned current sampling and vector synthesis principles.
[0078] The background monitoring system does not receive unfiltered single current values, but rather structured records including branch identifiers, measurement group identifiers, warning levels, occurrence times, synchronization status, and calculation results. When background communication is interrupted, the main acquisition terminal can continue sampling and saving records locally; after communication is restored, data is retransmitted according to batch number, avoiding the impact of background communication interruptions on field measurements.
[0079] Example 9: Application of dual AC power supply with common neutral line in station service The station service AC system of a certain 110 kV substation is a 380 V dual-power common neutral topology, and there are two [locations / locations]. Repeated grounding points. The traditional approach of installing a single residual current transformer at the main busbar inlet is affected by the common zero point and repeated grounding current shunting, resulting in a deviation of over 35% between the measured values and the on-site verification results. According to this invention, a main acquisition terminal is installed at the main AC busbar inlet, and acquisition terminals are installed at the outgoing ends of the 12 feeder branches, each equipped with a 0.2S class switchable current transformer.
[0080] The main acquisition terminal is based on a single wiring and Establish measurement topology by connecting lines: The branch with independent return current is treated as an independent branch, with dual power supply. The line and branches related to repeated grounding points are assigned to the same measurement group; in the shared Line convergence location settings Line measurement points. Shielded twisted-pair cables are used to transmit RS-485 data between the main acquisition terminal and the acquisition terminals, and IRIG-B time codes and 1PPS pulses are transmitted via independent differential lines.
[0081] During operation, the main acquisition terminal first initiates a confirmation-based time synchronization. After the acquisition terminal returns a successful synchronization, it then synchronizes with the bus. A phase marker is generated when the phase voltage crosses zero. During field testing, the sampling trigger time deviation between each acquisition terminal was 0.7 microseconds. Subsequently, the main acquisition terminal generates a sampling batch number, and the acquisition terminals sample under the same zero-crossing phase. , , and Line current. The main acquisition terminal reads data from each device one by one, but only accepts data packets with the same batch number, phase marker number, and synchronization status.
[0082] The main acquisition terminal extracts 50 Hz power frequency complex phasors for each channel. Independent branches directly perform four-wire vector synthesis; the common neutral line measurement group first calculates the initial residual current of each branch, then uses the total... Linear phasors and branches The difference in the directed phasors of the lines forms the uncovered compensation amount. The compensated measurement group phasors are used to determine whether the measurement group is abnormal, and the change vectors of each branch are used to calculate directional consistency and amplitude contribution.
[0083] When one branch simulates insulation degradation, the change vector of that branch is in the same direction as the change vector of the measurement group correction and contributes the most. After two consecutive valid batches point to the same branch, the main acquisition terminal outputs the branch number. This application illustrates the working process of the present invention in scenarios with both common neutral and repeated grounding. The indicators such as the 5 mA identification limit and the synthesis error within 1% described in the disclosure are test results under the corresponding hardware and field conditions, and are not considered as limitations that must be met in all implementation scenarios.
[0084] Example 10: Sampling Mode, Parameter Settings, and Operating Boundaries This invention allows for the setting of a trend monitoring mode and a power frequency phasor calculation mode. The trend monitoring mode is used to continuously observe changes in residual current, and can use 1 kHz or 8 kHz sampling; for light loads and when observing minor leakage, the sampling frequency can be increased to 8 kHz. The power frequency phasor calculation mode is used to perform a full-cycle FFT; for a 50 Hz system with 256 points per cycle, 12.8 kHz is used, and for 512 points per cycle, 25.6 kHz is used. Terminals participating in the same measurement combination must use the same mode and number of sampling points.
[0085] Synchronization Deviation Baseline batch number Number of consecutive verification batches The directional consistency threshold, amplitude contribution threshold, and early warning threshold can be set according to the transformer accuracy, line characteristics, and protection coordination requirements. Parameter changes do not alter the basic sequence of this invention: first, confirm the measurement boundaries; then confirm the time, phase, and batch; subsequently, extract the power frequency complex phasor; directly synthesize for independent branches; and first compensate for uncovered areas in the common neutral line measurement group. Line; finally, the branch change vector and the measurement group are used to correct the change vector positioning.
[0086] In a 60 Hz system, the power frequency can be... Set the frequency to 60 Hz and adjust the sampling frequency and number of points per cycle accordingly. In single-phase or other low-voltage AC systems, the number of channels can be adjusted according to the actual number of charged conductors and neutral wires, but the measurement boundary of the normal return path must still be intact. Regardless of the terminal model used, channels participating in the same vector synthesis should be sampled synchronously under a unified phase reference.
[0087] When there is no common neutral line on site, When a line is connected across a branch or repeatedly grounded, only the individual branch can be combined; the measurement group total can be disabled. Line compensation; when the above-mentioned complex topology exists on site, a total line compensation should be configured. Line measurement points. Total measurement points are missing. When measuring points along the line, the system can still display the initial residual current of each branch, but this result cannot be used to claim that the common current has been eliminated. The measurement group correction results of the line shunt error.
[0088] The above implementation methods address the main system, synchronization algorithm, sampled data, power frequency phasors, and Line compensation, tributary location, anomaly handling, and equipment implementation have been described. Those skilled in the art can make appropriate adjustments to the number of terminals, communication frame format, processor model, and parameter range without altering the above technical relationships; all such adjustments are limitations within the scope of this application.
Claims
1. A method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network, characterized in that, Includes the following steps: S1. Establish the measurement topology between the main busbar incoming line, feeder branches and neutral return path. Set up the main acquisition terminal on the busbar side and the acquisition terminal on each feeder branch. Divide the feeder branches with independent neutral return into independent branches and divide the feeder branches that share a neutral line, have neutral line cross-branch connections or repeated grounding into measurement groups. S2. The main acquisition terminal performs acknowledgment-based time synchronization with the acquisition terminals, providing a time reference and second pulse to the successfully synchronized acquisition terminals, and transmitting this information via the bus. A uniform phase marker is generated for the phase voltage zero-crossing event; S3. Data is collected synchronously by the acquisition terminal according to the same sampling batch and unified phase marker. Mutually, Mutually, Related For line current, the main acquisition terminal only receives sampled data that meets the requirements of synchronization status, sampling batch, phase marking and data integrity, and extracts the power frequency complex phasor of each conductor; S4. For independent branches, synthesize their four-wire current phasors. For the measurement group, based on the total of the measurement group... Linear phasors and intra-group branches The directed difference between the linear phasors forms the compensation for the uncovered neutral line, and the measurement group corrected residual current phasor is obtained accordingly. S5. Determine the insulation abnormal branch based on the directional consistency and amplitude contribution between the residual current change vector of each branch and the corrected residual current change vector of the measurement group to which it belongs, and output the location and graded early warning information.
2. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 1, characterized in that, When establishing the measurement topology, record the branch identifier, acquisition terminal address, corresponding conductors for each current channel, current transformer installation direction, measurement group, and whether it has an independent... Line return current and measurement group total Line test point; when the primary wiring relationship or When the line connection relationship changes, update the topology configuration version and make subsequent sampling data carry the version identifier corresponding to the current topology configuration.
3. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 1, characterized in that, The confirmed time synchronization includes: the master acquisition terminal sending a time synchronization command via a differential communication bus; the acquisition terminal recording the received time, entering the time synchronization state, and returning confirmation information; the master acquisition terminal outputting an IRIG-B time code and a 1PPS second pulse after receiving the confirmation information; the acquisition terminal correcting its local clock and returning a synchronization success or synchronization failure status; the master acquisition terminal re-initiating time synchronization for acquisition terminals that failed to synchronize, and sending the unified phase flag only to acquisition terminals that successfully synchronized.
4. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 3, characterized in that, The main acquisition terminal generates a sampling batch number and a phase marker number for each synchronous sampling. The data packet generated by the acquisition terminal includes at least the terminal identifier, topology configuration version, sampling batch number, phase marker number, synchronization status, sampling start time, number of valid sampling points, channel sampling data, acquisition completion status, and verification field. If any required field is inconsistent, verification fails, or the sampling start time deviation exceeds the preset synchronization deviation, the data packet will not participate in this vector synthesis, and the corresponding acquisition terminal or the corresponding measurement group will be resampled.
5. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 1, characterized in that, Mutually, Mutually, Harmony Each line is equipped with a current transformer and is synchronously sampled by at least four analog-to-digital converters. The sampled data is accessed by direct memory and written to random access memory. The main acquisition terminal performs DC-DC removal processing and fast Fourier transform on the sampling sequences of each channel within the same power frequency cycle, extracts the real and imaginary parts of the 50 Hz power frequency component, and forms a power frequency complex phasor based on the channel calibration coefficient and the installation direction of the current transformer.
6. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 5, characterized in that, For independent branches, Mutually, Mutually, Related The power frequency complex phasors of the line are vector-summed to obtain the branch residual current phasors; for the measurement group, in the shared... The measurement group is set at the line confluence location or at a location that can define the return boundary of the measurement group. Line measurement points, the total measurement group Line frequency complex phasor minus each branch in the group The result of summing the line power frequency complex phasors according to the installation direction is used to obtain the uncovered neutral line compensation phasor. The uncovered neutral line compensation phasor is then added to the sum of the residual current phasors of the branches within the group to obtain the measurement group corrected residual current phasor.
7. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 6, characterized in that, Reference phasors are established using the branch residual current phasors from multiple consecutive valid sampling batches during normal operation and the measurement group calibrated residual current phasors. Calculate the branch change vector and measurement group correction change vector of the current sampling batch relative to the corresponding reference phasor. Determine the same-direction contribution based on the consistency of their complex directions. Calculate the amplitude contribution by combining the magnitude of the branch change vector. Select the branch whose amplitude contribution reaches the positioning threshold and ranks high within the measurement group as the candidate branch for insulation anomaly.
8. The method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 7, characterized in that, For candidate branches with insulation abnormalities, at least two valid sampling batches are continuously verified; when the candidate branch identifiers are consistent, the location result is output; when the candidate branch changes with the sampling batch or the residual current of the measurement group recovers within a short time, it is judged as transient interference; when the amplitude contribution of multiple candidate branches is close, the candidate branch set is output and the sampling resolution is increased for resampling; When the effective value of the residual current corresponding to the positioning result exceeds 30 mA, 100 mA or 500 mA, a first-level warning, a second-level warning or a third-level alarm will be output respectively.
9. A method for distributed synchronous sampling, vector synthesis, and insulation fault location of residual current in a low-voltage AC distribution network according to claim 1, characterized in that, The data acquisition terminal uses a 0.2S class open-loop or closed-loop current transformer and has an overload capacity of at least 10 times the rated current; the data acquisition terminal is a seven-channel synchronous acquisition terminal, of which four channels are used for... Mutually, Mutually, Related Line sampling, the remaining channels are used for additional sampling. Line measurement points or backup channels; 1 kHz or 8 kHz sampling is used in trend monitoring mode, and synchronous sampling of 256 or 512 points per cycle is used in power frequency phasor calculation mode.
Citation Information
Patent Citations
Method for calculating residual current by collecting three-phase and zero-sequence currents under three-phase four-wire system
CN111610358A
Low-voltage power distribution network multi-point differential earth leakage protection method based on power distribution internet of things
CN113178850A
A network-based leakage current protection system and method with early warning
CN115833034B
