Dynamic assessment method and model for the safety of bored pile construction adjacent to subway lines in karst areas
By constructing a safety dynamic assessment model for karst strata adjacent to subway shield tunnels, the safety status is monitored in real time and dynamically output, solving the safety assessment problem of bored pile construction in karst areas, realizing the feasibility and safety of all-day construction, and improving construction efficiency.
Patent Information
- Application Number
- CN202611211088.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-11
- Publication Date
- 2026-11-10
AI Technical Summary
In the construction of bored piles in karst areas adjacent to subways, existing technologies cannot effectively assess the feasibility of full-day construction, lack quantitative methods, and lack a safety assessment model that systematically compares construction vibration with train operation vibration. As a result, construction safety relies on engineering experience and cannot fully guarantee the operational safety of subway structures.
A dynamic safety assessment model for the construction of bored piles in karst strata adjacent to subway shield tunnels was constructed. The model includes a vibration intensity determination unit, a vibration frequency determination unit, a tunnel deformation determination unit, and a comprehensive determination unit. The model monitors the safety status in real time and outputs it dynamically through an automated monitoring system, forming a dynamic closed-loop control throughout the entire process.
This has upgraded construction safety from experience-based judgment to quantitative verification, ensuring that construction vibration does not exceed the daily operating load range of the tunnel structure, avoiding resonance risks, significantly improving construction efficiency and safety, and extending the effective construction time to the operating period.
Smart Images

Figure CN123069656A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of pile foundation construction technology and underground engineering safety monitoring technology. Specifically, it relates to a method and model for dynamic safety assessment of bored pile construction adjacent to subway lines in karst areas. Background Technology
[0002] In the process of urban renewal and construction, it is becoming increasingly common for elevated expressway pile foundations to be located close to existing operating subway structures; especially when large-diameter bored piles are constructed in water-rich karst strata, the risk of drilling vibration and hole collapse poses a serious threat to the safety of subway structures.
[0003] In existing technologies, the construction of cast-in-place piles adjacent to subway lines can typically only be carried out during the subway's non-operational nighttime maintenance windows. This results in short effective working hours per day, extremely low overall construction efficiency, and long construction periods in the rail-related sections, severely hindering project progress. While existing technologies involve full-casing cast-in-place pile construction processes or vibration monitoring methods, they have not solved the technical problem of quantitatively demonstrating the feasibility of full-day construction. They also lack safety assessment models that systematically compare construction vibration with train operation vibration, making construction safety judgments highly dependent on engineering experience and lacking clear, data-driven criteria.
[0004] In addition, existing safety assessments mostly focus on a single vibration amplitude index, lacking frequency domain analysis, which cannot effectively avoid the risk of harmful resonance between construction vibration and tunnel structure, and makes it difficult to fully guarantee the operational safety of subway structures. Summary of the Invention
[0005] The purpose of this invention is to solve the problems mentioned in the background art, and to propose a dynamic assessment method and model for the safety of bored pile construction in karst areas adjacent to subway lines.
[0006] The technical solution adopted by this invention to solve its technical problem is: A dynamic assessment model for the safety of bored pile construction in karst strata adjacent to subway shield tunnels includes a vibration intensity determination unit, a vibration frequency determination unit, a tunnel deformation determination unit, and a comprehensive determination unit. The vibration intensity determination unit has a built-in vibration intensity criterion: the effective value and instantaneous peak value of the tunnel vibration acceleration caused by construction V1≤α·V0, where V0 is the reference value of the effective value and instantaneous peak value of the tunnel vibration acceleration caused by normal operation of the subway train, α is the safety redundancy coefficient, and the value of α is determined in the range of 0.6 to 0.8 according to the tunnel structural condition. 0.8 is taken for tunnels without defects, and 0.6 is taken for tunnels with structural defects. The vibration frequency determination unit has a built-in vibration frequency criterion: the main frequency of construction vibration avoids the 4-8Hz building resonance range and the ±2Hz range of the subway structure's natural frequency. The tunnel deformation determination unit has a built-in deformation criterion: the displacement amplitude of the tunnel caused by construction is D1≤D0, where D0 is the reference value of the tunnel displacement amplitude caused by the normal operation of the subway train. The integrated judgment unit receives the output results of the three judgment units. When all three criteria are met, it outputs a judgment signal indicating that construction safety is controllable. When any criterion is not met, it outputs a warning signal indicating that construction risk exceeds the limit. During the construction process, the integrated judgment unit continuously receives the real-time output of the three judgment units and dynamically outputs the safety status judgment result.
[0007] This application also proposes a dynamic safety assessment method for bored pile construction in karst strata adjacent to subway shield tunnels, including the following steps: S1. Condition Determination and Model Activation: Determine the spatial relationship between the pile hole and the subway tunnel lining and the site hydrogeological conditions. Activate the dynamic risk assessment model when the triggering conditions are met. S2. Operational baseline data collection: During normal subway operation, an automated monitoring system deployed on the tunnel lining wall continuously collects the effective value and instantaneous peak value of tunnel vibration acceleration caused by train operation, the baseline value of vibration main frequency, and the baseline value of tunnel displacement amplitude. S3. Test hole formation and actual measurement data collection: During non-operational periods of the subway, test hole formation operations are carried out using a full-casing drilling rig, and the effective value and instantaneous peak value of tunnel vibration acceleration, the measured value of vibration main frequency and the measured value of tunnel displacement amplitude caused by construction are collected simultaneously. S4. Three-dimensional safety assessment: The three parameters measured during the trial drilling are compared with the corresponding benchmark values. The construction safety is deemed controllable when all three of the following criteria are met: The effective value and instantaneous peak value of the construction vibration acceleration V1≤α·V0, where α is the safety redundancy coefficient; The main frequency of construction vibration, F1, should avoid the 4-8Hz building resonance range and the ±2Hz range of the subway structure's natural frequency. Construction caused tunnel displacement amplitude D1≤D0; S5. Full-process dynamic closed-loop management: After determining that safety is controllable, the pile foundation construction will be extended to continuous operation during subway operation hours; during construction, the three parameters will be continuously monitored in real time through an automated monitoring system, and the comprehensive judgment unit will dynamically output the safety status judgment result based on the real-time monitoring data; when any monitoring indicator exceeds the corresponding criterion threshold, the system will automatically trigger an alarm and stop construction operations; after the cause of the abnormality is investigated and dealt with, construction can only resume after the comprehensive judgment unit re-determines that all three criteria are met.
[0008] Furthermore, in the trial drilling operation of step S3, the follow-up depth of the full casing shall not be less than 3m below the end of the rotary drilling rig's casing.
[0009] Furthermore, in step S3, the trial drilling operation adopts drilling parameters with low speed and low torque, and the drilling rig construction parameters are adjusted and optimized based on real-time monitoring data and formation conditions to determine the optimal combination of construction parameters.
[0010] Furthermore, in the trial drilling operation of step S3, the mud specific gravity is controlled at 1.1 to 1.2, the viscosity is 19 to 22s, and the sand content is <4%.
[0011] Furthermore, in the trial drilling operation of step S3, C30 underwater concrete is used, with a slump of 200-220mm and an initial setting time of ≥5h.
[0012] Furthermore, in step S5, the entire construction process is continuously monitored in real time by an automated monitoring system for three indicators: tunnel vibration acceleration, vibration frequency, and displacement amplitude. If any monitoring indicator exceeds the corresponding threshold, drilling operations must be stopped immediately, and measures must be taken to prevent the borehole from collapsing. Construction can only resume after the cause of the abnormality has been investigated and dealt with.
[0013] Furthermore, the triggering condition in step S1 is: the horizontal net distance between the pile foundation and the tunnel lining structure is ≤10.0m, and the pile foundation passes through karst-developed strata.
[0014] Furthermore, in step S2, the automated monitoring system continuously collects multiple sets of train operation data and then determines the range of values for the three benchmark values.
[0015] Furthermore, in the trial drilling operation of step S3, when the measured construction vibration time-domain waveform shows a slowly rising and falling bun shape without discrete spike pulses, it helps to determine that the construction vibration state is stable.
[0016] Furthermore, the input data for the vibration intensity determination unit, vibration frequency determination unit, and tunnel deformation determination unit all come from the automated monitoring system deployed on the tunnel lining wall.
[0017] Compared with the prior art, the beneficial effects of the present invention are: 1. This invention uses the structural vibrations caused by the normal operation of subway trains as a benchmark, elevating the construction safety assessment from experience-based judgment to quantitative verification, ensuring that the construction vibrations do not exceed the daily operating load range of the tunnel structure, and providing clear data basis for the feasibility of construction throughout the day.
[0018] 2. This invention introduces a frequency domain analysis dimension, which avoids the building resonance zone and the tunnel structure natural vibration zone by controlling the main frequency of construction vibration, thereby preventing harmful resonance between construction vibration and tunnel structure, overcoming the shortcomings of single amplitude evaluation, and improving the comprehensiveness and reliability of safety assessment.
[0019] 3. This invention constructs a dynamic closed-loop control system covering the entire process of "monitoring-evaluation-decision-execution". Through a comprehensive judgment unit, it continuously receives real-time monitoring data from three judgment units throughout the construction process and dynamically outputs the safety status judgment results. This realizes the upgrade of construction safety from "one-time verification" to "real-time judgment throughout the entire process", which can dynamically respond to risk changes during the construction process and ensure the safety of the entire construction process.
[0020] 4. Under the premise of ensuring the safety of the subway structure, this invention can extend the effective construction time from the nighttime window to continuous operation during the operating hours, which greatly improves the construction efficiency of the track-related pile foundation, significantly shortens the total construction period of the track-related section, and solves the technical problem of low construction efficiency of pile foundations adjacent to the subway. Attached Figure Description
[0021] Figure 1 A schematic diagram of the cross-section layout for an automated tunnel monitoring system; Figure 2 A time history comparison of vibration acceleration across the entire tunnel during pile driving construction and train operation. Figure 3 The time history curve of dynamic strain in a tunnel at a typical location under pile driving excitation; Figure 4 The time history curve of dynamic strain in a tunnel at a typical location under train operation induction; Figure 5 This is a time-history curve of long-term monitoring of tunnel arch settlement; Figure 6 A time-history curve of long-term monitoring of tunnel cross-section convergence; Figure 7 Time history curve of tunnel dynamic strain under excavation excavation excitation of the pier cap; Figure 8 This is a curve showing the convergence variation of multiple longitudinal sections of the tunnel. Figure 9 This is a graph showing the change in elevation difference along the track. Figure 10 This is a time history curve of background vibration of the tunnel under undisturbed conditions; Figure 11 This is a superimposed comparison of the vibration spectrum of the tunnel lining wall during pile testing and the vibration spectrum of the tunnel lining wall during normal subway operation. Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0023] The present invention discloses a dynamic safety assessment system for the construction of bored piles in shield tunnels adjacent to subway operations in karst strata. It consists of two parts: a dynamic assessment model and supporting assessment methods. The core technical solution is to use the structural response caused by the normal operation of existing subway trains as the safety benchmark, and to construct a three-dimensional quantitative criterion of vibration intensity, vibration frequency, and tunnel deformation. After verification by trial drilling and actual measurement during the non-operation period, the construction is extended to continuous operation during the operation period, and a dynamic safety closed loop is formed through real-time monitoring.
[0024] 1. Construction Safety Dynamic Assessment Model This evaluation model is an embedded judgment device integrated into the tunnel automated monitoring system. It includes a processor, a memory, and an executable program stored in the memory. When the program is run by the processor, it is divided into a vibration intensity judgment unit, a vibration frequency judgment unit, a tunnel deformation judgment unit, and a comprehensive judgment unit. The input data of each unit comes from the automated monitoring system deployed on the tunnel lining wall.
[0025] The core feature that distinguishes this model from existing technologies is that each judgment unit does not only make a judgment once before construction starts, but continuously receives real-time monitoring data and continuously outputs judgment results throughout the entire construction process. Based on this, the comprehensive judgment unit dynamically outputs safety status signals, realizing a true full-process dynamic assessment.
[0026] 1.1 Vibration Intensity Determination Unit The system incorporates a built-in vibration intensity quantification criterion, receiving measured vibration acceleration data from construction and benchmark vibration data from train operation. It then executes the following judgment logic: the effective value and instantaneous peak value of the tunnel vibration acceleration caused by construction, V1 ≤ α·V0; where V0 is the benchmark value of the effective value and instantaneous peak value of the tunnel vibration acceleration caused by normal subway train operation, and α is a safety redundancy coefficient, which is graded according to the tunnel structural condition: 0.8 for tunnels without defects and 0.6 for tunnels with structural defects.
[0027] 1.2 Vibration Frequency Determination Unit The built-in vibration frequency avoidance criterion receives construction vibration spectrum data and tunnel structure natural frequency parameters, and executes the judgment logic: the main frequency of construction vibration avoids the 4-8Hz building resonance range and the ±2Hz range of the subway structure natural frequency, so as to avoid causing harmful structural resonance.
[0028] 1.3 Tunnel Deformation Judgment Unit The built-in displacement amplitude criterion receives measured data of tunnel displacement caused by construction and benchmark data of train operation displacement, and executes the judgment logic: the displacement amplitude of the tunnel caused by construction is D1≤D0; where D0 is the benchmark value of tunnel displacement amplitude caused by normal operation of subway trains.
[0029] 1.4 Comprehensive Judgment Unit The unit receives the outputs from the three judgment units. When all three criteria are met simultaneously, it outputs a judgment signal indicating that construction safety is controllable; if any criterion is not met, it outputs a warning signal indicating that construction risk exceeds limits. During construction, the unit continuously receives the real-time outputs from the three judgment units and dynamically outputs the safety status judgment results, thus upgrading the assessment from "one-time verification" to "real-time judgment throughout the entire process."
[0030] 2. Dynamic assessment method for construction safety Based on the above evaluation model, this method is implemented according to the following steps: 2.1 Condition Determination and Model Activation Before on-site construction, the spatial relationship between the pile holes and the subway tunnel lining is determined, and the hydrogeological conditions of the site are investigated. When the two triggering conditions of horizontal net distance between the pile foundation and the tunnel lining structure ≤10.0m and the pile foundation passing through karst strata are met at the same time, the dynamic risk assessment model is activated and the subsequent assessment process is initiated.
[0031] 2.2 Operational baseline data collection During normal subway operation, an automated vibration and displacement monitoring system is installed on the tunnel lining wall. The monitoring system can adopt a deployment scheme that combines distributed fiber optic vibration sensors, point-type accelerometers and laser displacement sensors. Continuous monitoring optical cables are laid along the longitudinal direction of the tunnel, and point-type sensors are laid on key sections to realize continuous real-time acquisition of vibration and deformation throughout the tunnel. The structural response caused by train operation is continuously monitored, and after collecting multiple sets of effective data, the range of three sets of reference values is determined: (1) Vibration intensity reference value V0: includes the effective value and instantaneous peak value of tunnel structure vibration acceleration; (2) Vibration frequency reference value F0: extracts the main frequency distribution range of the monitoring signal; (3) Tunnel deformation reference value D0: extracts the displacement amplitude range of the subway structure.
[0032] 2.3 Trial Hole Drilling and Measured Data Acquisition During non-operating hours of the subway (nighttime maintenance window), trial drilling operations are carried out using a full-casing drilling rig, and the following control requirements are followed during the construction process: Casing advance control: The advance depth of the entire casing shall not be less than 3m below the end of the rotary drilling rig casing, to isolate the upper loose strata and karst fissure water, and reduce the risk of borehole collapse and vibration transmission; Drilling parameter control: Low-speed, low-torque drilling parameters are adopted. Preferably, in soil layers, the rotary drilling rig speed is controlled at around 1200 r / min and the feed rate is controlled at around 2-3 m / h; in rock layers, the engine speed is controlled at around 1300-1500 r / min, the feed rate is controlled at 0.6-0.8 m / h for fractured and moderately fractured weathered rock, and at 0.15-0.3 m / h for relatively intact moderately weathered rock. During the initial construction phase, the speed is reduced, and after all monitoring parameters stabilize, the speed is gradually transitioned to normal parameters. Simultaneously, the drilling rig speed, torque, feed rate, and other parameters are adjusted and optimized based on real-time monitoring data and geological conditions to determine the optimal combination of construction parameters. When the distributed fiber optic vibration monitoring data shows a significant increase in the vibration response in the 4-8 Hz frequency band, immediately reduce the rotation speed to 1200-1300 r / min for emergency vibration control, simultaneously reduce the drilling pressure and slow down the advance. After the vibration index returns to a stable level, reassess and restore normal drilling parameters.
[0033] Synchronous data acquisition: Throughout the entire trial drilling process, the automated monitoring system inside the tunnel synchronously acquires the effective value and instantaneous peak value of tunnel vibration acceleration, the measured value of the main vibration frequency, and the measured value of tunnel displacement amplitude caused by construction.
[0034] During construction, the vibration state can be determined by time-domain waveforms: when the measured construction vibration time-domain waveform is a slowly rising and falling bun shape (i.e., a sinusoidal envelope shape with slow rise and fall) and there are no discrete spike pulses, it can be determined that the construction vibration state is stable and there is no impact or harmful vibration.
[0035] 2.4 Three-Dimensional Security Assessment The three parameters measured by the trial hole are compared with the corresponding benchmark values. If the following three criteria are met, the construction safety is considered controllable: (1) Vibration intensity criterion: the effective value and instantaneous peak value of the construction vibration acceleration V1≤α·V0, where α is the safety redundancy coefficient; (2) Vibration frequency criterion: the main frequency F1 of the construction vibration avoids the 4~8Hz building resonance range and the ±2Hz range of the subway structure natural frequency; (3) Tunnel deformation criterion: the tunnel displacement amplitude D1 ≤ D0 caused by construction.
[0036] 2.5 Dynamic Closed-Loop Construction Management After determining that construction safety was controllable, relevant approval procedures were completed, and pile foundation construction was extended to continuous operation during subway operating hours. Throughout the construction process, an automated monitoring system continuously monitored three indicators in real time: tunnel vibration acceleration, vibration frequency, and displacement amplitude. During construction, the vibration intensity judgment unit, vibration frequency judgment unit and tunnel deformation judgment unit continuously receive real-time monitoring data and output judgment results. The comprehensive judgment unit dynamically outputs safety status signals based on the real-time outputs of the three judgment units, realizing real-time monitoring of the safety status throughout the process. When any monitoring indicator exceeds the corresponding threshold, the system immediately triggers an audible and visual alarm and stops drilling operations, ensuring the existing borehole is protected against collapse. After on-site technicians investigate and address the cause of the anomaly, construction can only resume after the comprehensive judgment unit reassesses all three criteria based on the latest monitoring data. Through this mechanism, a dynamic closed-loop management system is formed, encompassing the entire process of "monitoring-assessment-decision-execution".
[0037] 3. Specific Project Example 1: Pile Foundation Project of Elevated Expressway for Metro Line 3 in a Certain City 3.1 Project Overview The city's Metro Line 3 is already operational. A newly constructed elevated expressway is located above a section of the existing tunnel. The elevated expressway's pile foundations have diameters of 1.2m, 1.5m, 1.8m, 2.0m, and 2.2m, using a pile group system and filled with C30 underwater concrete. The closest distance between the pile foundations and the existing metro structure is less than 2m, with pile lengths ranging from 40 to 60m. The shield tunnel traverses primarily 10-1 silty clay, 14-1 silty clay, 15-3 silty clay containing gravel, 19-1 completely weathered diorite, 19-2 strongly weathered diorite, and 19-3 moderately weathered diorite, with a local section crossing 21-2 moderately weathered limestone (karst strata). The foundation slab of the section structure is buried at a depth of approximately 17.64–31.20m, and the arch overburden is approximately 11.24–24.8m.
[0038] 3.2 Model Activation and Baseline Data Acquisition The horizontal clearance between the pile foundation and the tunnel lining wall in this project is less than 2m, meeting the triggering condition of ≤10.0m. Furthermore, the pile foundation passes through karst-developed strata, thus activating the dynamic risk assessment model. During normal subway operation, an automated vibration monitoring system was deployed on the tunnel lining wall to continuously monitor tunnel vibration data during subway train operation. Multiple sets of data were continuously collected, and the benchmark values for subway train operation vibration were determined as follows: Effective value of tunnel wall vibration acceleration: 0.10~0.40m / s² Instantaneous peak value of tunnel wall vibration acceleration: 0.15~0.50m / s² Tunnel wall displacement amplitude: 5~25μm The dominant vibration frequency range is 50–75 Hz. 3.3 Trial Hole Drilling and Measured Data During the subway's non-operational periods, a full-casing drilling rig was used for trial drilling, employing low-speed, low-torque parameters. The casing depth was no less than 3 meters from the end of the rotary drilling rig casing. Simultaneously, an automated monitoring system within the tunnel collected real-time vibration data, and the drilling parameters were optimized based on the geological conditions to determine the optimal parameters. The measured data from the trial drilling are as follows: Effective value of construction vibration acceleration: 0.08~0.12m / s² Instantaneous peak value of construction vibration acceleration: 0.10~0.18m / s² Construction vibration main frequency: 12~18Hz Tunnel wall displacement amplitude: 3-8μm. During construction, the vibration waveform is a slowly rising and falling bun shape, without discrete spike pulses, and the vibration state is stable.
[0039] 3.4 Three-Dimensional Security Assessment The comparison of the three criteria and the judgment results are shown in the table below: Criterion Dimensions Train operation benchmark value Measured values of test hole drilling Judgment Result RMS acceleration 0.10~0.40m / s² 0.08~0.12m / s² Much smaller than the benchmark value, meeting the strength criterion. main frequency 50~75Hz 12~18Hz Avoiding the resonance region and the natural resonant region, satisfying the frequency criterion. Displacement amplitude 5~25μm 3~8μm Less than the reference value, satisfying the deformation criterion.
[0040] The tunnel in this project has no structural defects, and the safety redundancy coefficient α is taken as 0.8. After conversion, the effective value safety threshold of vibration acceleration is 0.08~0.32m / s², and the instantaneous peak value safety threshold is 0.12~0.40m / s². The measured construction vibration values all fall within the threshold range. At the same time, through on-site pulsation testing, the natural frequency of the shield tunnel structure in this section is about 30~40Hz. The main frequency of construction vibration is 12~18Hz, which avoids the 4~8Hz building resonance zone and also falls outside the range of ±2Hz of the tunnel structure's natural frequency. All three criteria are met, and the construction is deemed safe and controllable, verifying the reliability of the full-casing drilling rig.
[0041] 3.5 Overall Construction Results Based on the assessment results, and after completing the relevant approval procedures, the pile foundation drilling operation was expanded from being limited to nighttime maintenance windows to cover all subway operating hours, achieving continuous 24-hour operation. After deducting time for process connections and equipment maintenance, the effective daily working time is approximately 20 hours. Vibration and displacement data were continuously monitored in real time during construction, and the comprehensive assessment unit dynamically output safety status signals. All monitoring indicators remained within the safety threshold range throughout the process. No abnormalities were observed in tunnel vibration monitoring values during drilling, and the pile foundation drilling, hole cleaning, rebar cage hoisting, and concrete pouring processes were completed normally according to the construction plan. In this embodiment, the dominant frequency of construction vibration did not overlap with the dominant frequency of train operation vibration, and the amplitude was lower, proving that the construction vibration did not exceed the daily operating load range of the tunnel structure. Simultaneously, the effective construction time was significantly extended, significantly improving construction efficiency.
[0042] 3.6 Monitoring Output Data Types The data types output by the monitoring system of this project are shown in the table below: Serial Number Data types Specific values / forms How to obtain 1 Construction vibration time-domain waveform diagram Measured acceleration time history curve, horizontal axis time / s, vertical axis acceleration / (m / s²) The monitoring system outputs directly during trial drilling. 2 Vibration spectrum superimposed comparison diagram The horizontal axis represents frequency (Hz), and the vertical axis represents amplitude; the two curves are overlaid for comparison. The measured data is output after FFT transformation. 3 Specific vibration values <![CDATA[V1=0.08~0.12m / s²]]> Monitoring system actual measurement
[0043] 4 Engineering Verification Case: Construction of Track-Related Pile Foundations for the Southern Extension Project of the Fenghuang Yellow River Bridge 4.1 Overview of Rail-Related Projects The Phoenix Yellow River Bridge South Extension Project crosses multiple operating and under-construction subway lines. The section parallel to Subway Line 6 is approximately 6.5km long, with 516 pile foundations and 154 abutments within a 10-meter radius of the track. The section intersecting with Subway Line 3 Phase I has 110 pile foundations and 38 abutments within a 10-meter radius of the track. The minimum clearance between the pile foundations and the subway structure is approximately 2m. The site generally traverses moderately weathered limestone karst strata, which is a typical application scenario for this invention. The project employs three structural forms: large-span steel beams crossing station sections, straddle-type abutments crossing shield tunnel sections, and strip abutments + portal piers crossing shield tunnel sections. The pile foundations are large-diameter bored cast-in-place piles, constructed using a full-casing follow-up construction technique.
[0044] 4.2 Construction parameters of the first test pile The first test pile foundation was constructed in the FC189-FC191# pier area. The shield tunneling depth in this section is approximately 11.9m, traversing moderately weathered limestone karst strata. The main parameters of the first pile are as follows: Table 1 Main parameters of the first pile Serial Number Pier No. Station number relative lines Pile length (m) Clear distance from the tunnel ( ) Casing follow-up depth (m) 1 FC189 FC189-4 Left line 13 9.29 3 2 FC189 FC189-3 Left line 13 7.94 3.2 3 FC190 FC190-4 Left line 26 2.99 3
[0045] Construction proceeded gradually from the farthest point to the subway, with the casing advancing to the first layer of moderately weathered rock, meeting the control requirement that the casing advances at least 3 meters ahead of the drill pipe end.
[0046] 4.3 Construction Control Parameters The core control parameters used in the first construction are as follows: Drilling speed control: In soil, the rotary drilling rig speed is about 1200 r / min, with a drilling depth of 2 m / h; in rock, the engine speed is about 1200-1300 r / min, with a drilling depth of 0.6-0.8 m / h for fractured moderately weathered rock and 0.15-0.3 m / h for relatively intact moderately weathered rock; reduce the drilling speed in the initial stage, and resume normal operation after the parameters stabilize.
[0047] Mud parameters: During drilling, the mud specific gravity is 1.1-1.2, viscosity is 19-22s, and sand content is <4%.
[0048] Concrete properties: C30 underwater concrete is used, with a slump of 200-220mm and an initial setting time of ≥5h.
[0049] 4.4 Multidimensional Monitoring Results During construction, comprehensive monitoring of displacement, vibration, and strain was conducted to verify the comprehensiveness and reliability of this assessment method. (1) Displacement monitoring results: By the end of the monitoring period, the cumulative changes in all displacement indicators of the subway structure were far less than the control values. The specific parameters of the multidimensional monitoring are as follows: Table 2 Parameters of Multidimensional Monitoring Results Monitoring Projects Points Cumulative change (mm) Control value (mm) Horizontal displacement Z12-GY-Y 0.29 ±8 Vertical displacement Z8-DC-Z 0.18 ±8 Relative convergence Z7 0.13 ±8 Lateral elevation difference of the track Z12 0.2 ±4 Track elevation difference Z6 0.19 ±4
[0050] (2) Vibration monitoring results: Taking the 190-4# pile foundation 2.99m away from the left line as an example, the peak value of pure construction vibration was 0.093cm / s, and the peak value of train operation vibration was 0.099cm / s. The amplitude of construction vibration was basically the same as that of train operation vibration and slightly lower. There was no superposition and amplification of construction vibration and train operation vibration, which met the strength criteria. The main frequency of construction vibration was significantly different from that of train operation vibration, and there was no risk of resonance.
[0051] (3) Fiber optic strain monitoring results: A distributed fiber optic sensing system was deployed along both tunnel lines, totaling 1000m (5000 measuring points), to achieve continuous monitoring of the strain field across the entire tunnel. During the pile foundation construction, all measuring points remained within ±20uε. The dynamic strain field of the tunnel structure did not change abnormally with the construction of the co-located bridge, and the construction did not cause problems such as segment misalignment or settlement.
[0052] (4) Monitoring results of tunnel crown settlement and cross-section convergence: Wireless laser displacement gauges were installed on key cross-sections. The settlement deformation and convergence deformation of the tunnel crown were both within the range of 0.2 mm, which is much smaller than the control value.
[0053] (5) Crack monitoring results: Crack scans were performed before and after the test pile construction, and no new cracks were found in the subway structure, which verified that the construction did not damage the tunnel structure.
[0054] 4.5 Improvement of construction efficiency After verifying safety using this assessment method, pile foundations within a distance of twice the pile diameter from the track can be expanded from "construction only during nighttime track openings" to continuous operation throughout the day, significantly improving construction efficiency. Construction only during nighttime skylights (4 hours of effective work per day): The efficiency of single pile construction is approximately 16 days / pile; Construction during daytime operating hours only (16 hours of effective work per day): The efficiency of single pile construction is approximately 4 days / pile; Continuous operation throughout the day (covering operating hours and maintenance windows, with an effective working time of approximately 20 hours per day): The efficiency of single pile construction is approximately 3 days / pile.
[0055] Compared to working only at night, continuous operation throughout the day increases construction efficiency by about 5 times and can significantly shorten the total construction period of the track-related sections.
[0056] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.
Claims
1. A dynamic safety assessment model for bored pile construction in karst strata adjacent to subway shield tunnels, characterized in that, It includes a vibration intensity determination unit, a vibration frequency determination unit, a tunnel deformation determination unit, and a comprehensive determination unit; The vibration intensity determination unit incorporates a vibration intensity criterion: the effective value and instantaneous peak value of the vibration acceleration V1 induced in the tunnel due to construction ≤ α. V0, where V0 is the effective value and instantaneous peak value of tunnel vibration acceleration caused by normal operation of subway trains, and α is the safety redundancy coefficient. The value of α is determined in the range of 0.6 to 0.8 according to the tunnel structure condition. 0.8 is taken for tunnels without defects, and 0.6 is taken for tunnels with structural defects. The vibration frequency determination unit has a built-in vibration frequency criterion: the main frequency of construction vibration avoids the 4-8Hz building resonance range and the ±2Hz range of the subway structure's natural frequency. The tunnel deformation determination unit has a built-in deformation criterion: the displacement amplitude of the tunnel caused by construction is D1≤D0, where D0 is the reference value of the tunnel displacement amplitude caused by the normal operation of the subway train. The comprehensive judgment unit receives the output results of the three judgment units. When all three criteria are met, it outputs a judgment signal indicating that construction safety is controllable. When any criterion is not met, it outputs a warning signal indicating that construction risk exceeds the limit. The integrated judgment unit continuously receives real-time outputs from the three judgment units during the construction process and dynamically outputs the safety status judgment results.
2. A method for dynamic safety assessment of bored pile construction in karst strata adjacent to subway shield tunnels, characterized in that, Includes the following steps: S1. Condition Determination and Model Activation: Determine the spatial relationship between the pile hole and the subway tunnel lining and the site hydrogeological conditions. Activate the dynamic risk assessment model when the triggering conditions are met. S2. Operational baseline data collection: During normal subway operation, an automated monitoring system deployed on the tunnel lining wall continuously collects the effective value and instantaneous peak value of tunnel vibration acceleration caused by train operation, the baseline value of vibration main frequency, and the baseline value of tunnel displacement amplitude. S3. Test hole formation and actual measurement data collection: During non-operational periods of the subway, test hole formation operations are carried out using a full-casing drilling rig, and the effective value and instantaneous peak value of tunnel vibration acceleration, the measured value of vibration main frequency and the measured value of tunnel displacement amplitude caused by construction are collected simultaneously. S4. Three-dimensional safety assessment: The three parameters measured during the trial drilling are compared with the corresponding benchmark values. The construction safety is deemed controllable when all three of the following criteria are met: Effective value and instantaneous peak value of construction vibration acceleration V1≤α V0, α is the safety redundancy coefficient; The main frequency of construction vibration, F1, should avoid the 4-8Hz building resonance range and the ±2Hz range of the subway structure's natural frequency. Construction caused tunnel displacement amplitude D1≤D0; S5. Full-process dynamic closed-loop management: After determining that safety is controllable, the pile foundation construction period is extended to the subway operation period for continuous operation; during the construction process, the three parameters are continuously monitored in real time through an automated monitoring system, and the comprehensive judgment unit dynamically outputs the safety status judgment result based on the real-time monitoring data; when any monitoring indicator exceeds the corresponding criterion threshold, the system automatically triggers an alarm and stops the construction operation; after the cause of the abnormality is investigated and dealt with, the construction can only be resumed after the comprehensive judgment unit re-determines that all three criteria are met.
3. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In the trial drilling operation of step S3, the follow-up depth of the full casing shall not be less than 3m below the end of the rotary drilling rig casing.
4. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In the trial drilling operation of step S3, low speed and low torque drilling parameters are used, and the drilling rig construction parameters are adjusted and optimized according to real-time monitoring data and formation conditions to determine the optimal combination of construction parameters.
5. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In the trial drilling operation of step S3, when the measured construction vibration time-domain waveform shows a slowly rising and falling bun shape without discrete spike pulses, it helps to determine that the construction vibration state is stable.
6. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, The triggering condition in step S1 is: the horizontal net distance between the pile foundation and the tunnel lining structure is ≤10.0m, and the pile foundation passes through karst strata.
7. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In step S2, the automated monitoring system continuously collects multiple sets of train operation data and then determines the range of values for the three benchmark values.
8. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In the trial drilling operation of step S3, the mud specific gravity is controlled at 1.1 to 1.2, the viscosity is 19 to 22s, and the sand content is <4%.
9. The method for dynamic safety assessment of bored pile construction adjacent to subway shield tunnels in karst strata according to claim 2, characterized in that, In the trial drilling operation of step S3, C30 underwater concrete is used with a slump of 200-220mm and an initial setting time of ≥5h.
10. The dynamic safety assessment model for bored pile construction adjacent to subway shield tunnels in karst strata as described in claim 1, characterized in that, The input data for the vibration intensity determination unit, vibration frequency determination unit, and tunnel deformation determination unit all come from the automated monitoring system installed on the tunnel lining wall.