A method for multi-energy coordinated optimization and scheduling in zero-carbon industrial parks
By dividing the energy storage capacity into low-carbon, medium-carbon, and high-carbon ranges according to carbon emission attributes, and prioritizing the use of low-carbon energy for power supply, the problem of carbon emission control and critical load power supply during periods of sudden drop in photovoltaic power supply has been solved, thus achieving the reliability and continuity of power supply in the park.
Patent Information
- Application Number
- CN202611568803.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-12
- Publication Date
- 2026-11-10
AI Technical Summary
When photovoltaic power supply drops sharply, the energy storage device fails to distinguish carbon emission attributes during scheduling, resulting in the mixed use of low-carbon and high-carbon electricity, which affects the reliability of carbon emission control and critical load power supply.
The energy storage capacity is divided into three categories based on carbon emission attributes: low-carbon, medium-carbon, and high-carbon. The energy is released to key loads in order of priority according to carbon emission attributes, ensuring that low-carbon energy is given priority in energy supply, and high-carbon energy is supplemented by the grid when necessary.
Effectively control carbon emissions in the industrial park, ensure the reliability and continuity of power supply for critical loads during periods of photovoltaic power shortage, reduce disorderly dispatch of high-carbon electricity, and improve the reliability and continuity of energy supply scheduling in the industrial park.
Smart Images

Figure CN123073992A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of multi-energy system scheduling technology, specifically to a method for multi-energy collaborative optimization and scheduling in zero-carbon industrial parks. Background Technology
[0002] Zero-carbon industrial parks are typically equipped with photovoltaic power generation systems, energy storage devices, and various electrical loads. Under normal operating conditions, the park's energy management system coordinates photovoltaic output, energy storage charging and discharging, and various load electricity consumption according to a preset dispatch strategy, in order to reduce the park's carbon emissions and improve the level of renewable energy consumption.
[0003] However, photovoltaic (PV) power output is significantly affected by weather conditions and can experience a sharp drop in power within a short period, known as a sudden PV power reduction event. When PV power drops sharply, a power shortage occurs within the industrial park, requiring energy storage devices to respond quickly to support the continuous operation of critical loads. Currently, energy storage devices are typically treated as homogeneous energy during dispatch, focusing only on the total stored energy and total power constraints without distinguishing the carbon emission attributes of the stored energy at the time of charging. This approach can easily lead to the mixed use of low-carbon and high-carbon energy in emergency situations, rendering carbon emission control targets ineffective during PV power reductions and hindering the priority use of low-carbon energy storage to ensure power supply to critical loads.
[0004] Therefore, there is a need for a multi-energy collaborative optimization and scheduling method that can differentiate and sequentially call up energy storage power according to carbon emission attributes during periods of sudden drop in photovoltaic power supply. Summary of the Invention
[0005] In view of this, the purpose of this application is to provide a multi-energy collaborative optimization and scheduling method for zero-carbon parks, which can divide the energy storage power into multiple intervals according to the carbon emission attributes after detecting a sudden drop in photovoltaic power supply, and release the power of each interval to the critical load in order of priority from low to high carbon emission attributes, so as to achieve a balance between continuous power supply to critical loads and controllable carbon emissions.
[0006] According to a first aspect of this application, a method for multi-energy coordinated optimization and scheduling in zero-carbon industrial parks is provided, comprising: S100: In response to the detection of a sudden drop in photovoltaic power supply in the zero-carbon park, obtain the power to be met for critical loads; S200: Divide the electricity in the energy storage devices in the zero-carbon park into at least two carbon attribute electricity ranges according to carbon emission attributes, where the lower the carbon emission attribute, the higher the priority of the corresponding carbon attribute electricity range. S300: In order of priority from high to low, starting with the carbon attribute power range with the highest priority, the carbon attribute power ranges are called in sequence to release power to the critical load. Only one carbon attribute power range releases power to the critical load at any given time. S400: For each call, the actual released power of the call is deducted from the remaining power of the corresponding carbon attribute power range, the remaining power of the corresponding carbon attribute power range is updated, and the power released to the critical load in the call is deducted from the unmet power of the critical load, the unmet power of the critical load is updated. S500: After each call to a carbon attribute power range is completed, determine whether the power to be satisfied by the critical load has been reduced to zero. S600: If the power to be satisfied by the critical load is still greater than zero, and there are carbon attribute power ranges that have not yet been called, then the next priority carbon attribute power range will be called to continue releasing power to the critical load; if the power to be satisfied by the critical load has been reduced to zero, or all types of carbon attribute power ranges in the energy storage device have been called, then the calling of carbon attribute power ranges will be stopped.
[0007] In some embodiments, the types of carbon-attribute electricity ranges include: low-carbon range, medium-carbon range, and high-carbon range. The electricity generated by energy storage devices within a zero-carbon park is divided into at least two carbon-attribute ranges based on carbon emission attributes, including: The electricity in the energy storage device is divided into multiple electricity units, and the carbon emission factor of the corresponding source when each electricity unit is charged into the energy storage device is obtained. Electricity units with carbon emission factors not exceeding the first threshold are classified into the low-carbon attribute range. Electricity units with carbon emission factors higher than the first threshold but not higher than the second threshold are classified into the medium carbon attribute range. Electricity units with carbon emission factors exceeding the second threshold are classified into the high-carbon attribute range. The energy of each energy unit in the low-carbon attribute range, medium-carbon attribute range, and high-carbon attribute range is accumulated separately to obtain the energy storage capacity in the low-carbon attribute range, the energy storage capacity in the medium-carbon attribute range, and the energy storage capacity in the high-carbon attribute range.
[0008] In some embodiments, the first threshold is less than the second threshold, and the energy storage power in the low-carbon attribute range comes from the energy stored by photovoltaic power generation whose carbon emission factor is not higher than the first threshold. The energy storage capacity in the medium-carbon attribute range and the energy storage capacity in the high-carbon attribute range come from the amount of electricity charged into the energy storage devices by the power grid during different carbon emission factor periods.
[0009] In some embodiments, following a priority order from highest to lowest, starting with the highest priority carbon attribute electrical energy range, the carbon attribute electrical energy ranges are sequentially invoked to release electrical energy to critical loads, including: Prioritize the use of low-carbon energy storage capacity to release to critical loads; after the use of low-carbon energy storage capacity is completed, if the unmet power of critical loads is still greater than zero, then use medium-carbon energy storage capacity to release to critical loads. After the energy storage capacity in the medium carbon attribute range is used up, if the power demand of the critical load is still greater than zero, it is determined whether to allow the use of energy storage capacity in the high carbon attribute range. When a request to activate a high-carbon attribute zone is received, the release of energy stored in the high-carbon attribute zone to critical loads is permitted only when the power grid is unavailable or the carbon emission factor of the power grid at the time of the request reaches the preset high-carbon activation conditions. If the power grid is available and the power grid's carbon emission factor at the time of the call request does not meet the preset high-carbon activation conditions, the power grid will supplement the critical load with the power to be satisfied by the critical load.
[0010] In some embodiments, for the carbon attribute power range to be called, the upper limit of the releaseable power of that type of carbon attribute power range in the current scheduling period is obtained; Compare the upper limit of releaseable power with the power to be met for critical loads; If the upper limit of the releaseable power is less than the power to be satisfied by the critical load, then the upper limit of the releaseable power is used as the actual power released to the critical load in this carbon attribute power range, and the power to be satisfied by the critical load is deducted from the actual power. The power to be satisfied by the critical load after deduction is used as the power to be satisfied by the critical load when the next priority carbon attribute power range is called. If the upper limit of the releaseable power is not less than the power to be satisfied by the critical load, then the power to be satisfied by the critical load shall be used as the actual power released to the critical load by the carbon attribute power range, and the carbon attribute power range shall be stopped.
[0011] In some embodiments, obtaining the upper limit of the releaseable power of the carbon attribute power range to be invoked during the current scheduling period includes: The remaining power in the carbon attribute power range to be called is multiplied by the energy storage discharge efficiency and then divided by the duration of the current scheduling period to obtain the first candidate power. The maximum allowable discharge power of the energy storage device is used as the second candidate power. The first candidate power is compared with the second candidate power, and the smaller of the two is taken as the upper limit of the release power of the carbon attribute power range to be invoked.
[0012] In some embodiments, obtaining the power to be satisfied for critical loads specifically includes: forming the minimum power consumption of each type of critical load in the current scheduling period based on the minimum power consumption required for each type of critical load in the critical load set to maintain operation during the current scheduling period; The minimum power consumption corresponding to each type of critical load is added together to obtain the total minimum power demand of critical loads during the current dispatch period; the power already supplied to critical loads is subtracted from the total minimum power demand of critical loads to obtain the power to be satisfied by critical loads during the current dispatch period.
[0013] In some embodiments, the critical load set includes data centers, cold chain warehouses, and electric vehicles that are about to leave the site; The minimum power consumption of a data center is determined by adding the basic operating power of the servers to the minimum cooling power required to maintain the normal operating temperature of the data center. The minimum power consumption of a cold chain warehouse is determined by the minimum refrigeration requirements of the cold chain warehouse and the current coefficient of performance of the electric refrigeration unit. The minimum power consumption of electric vehicles about to leave the site is determined by the amount of electricity each vehicle needs to replenish before leaving, the duration of the current dispatch period, and the charging efficiency.
[0014] In some embodiments, upon detecting a sudden drop in photovoltaic power supply in a zero-carbon park, a non-critical load reduction command is generated, and a cold storage device release command is generated. The non-critical load reduction command is used to reduce the power consumption of non-critical loads, and the cold storage device release command is used to control the cold storage device to release cold to replace part of the power demand of the electric refrigeration unit. The reduction in non-critical loads and the amount of cold storage and release are determined together based on the energy gap caused by the sudden drop in photovoltaic power and the cooling load demand. The energy gap is the difference between the predicted photovoltaic power and the actual photovoltaic power, and the cooling load demand is the cooling power required for critical loads with cooling needs to maintain normal operation.
[0015] In some embodiments, non-critical loads include hydrogen electrolysis loads, ordinary vehicle charging loads, office air conditioning loads, and deferred production loads. Non-critical load reduction commands control the suspension of operation of electrolytic hydrogen production load, suspension of operation of ordinary vehicle charging load, reduction of office air conditioning load from original power to first set power, and reduction of deferred production load from original power to second set power. The execution process of the cold storage device's cold release command includes: determining the release power based on the current cold storage capacity, cold release efficiency, and the current scheduling period duration; The available cooling power is compared with the cooling load demand, and the smaller of the two is taken as the actual cooling power. After the cooling is released, the remaining cooling capacity of the cold storage device is updated according to the actual cooling power, the duration of the current scheduling period, and the cooling efficiency.
[0016] One embodiment of the above application has the following advantages or beneficial effects: Upon detecting a sudden drop in photovoltaic power output, this application divides the electricity in the energy storage device into at least two carbon-emission ranges. The electricity from each range is then sequentially allocated to critical loads in order of increasing priority based on the carbon emission level. Since the carbon-emission range with the lowest carbon emission level is allocated first, the energy supply to critical loads during a sudden drop in photovoltaic power output is preferentially undertaken by the energy storage with the lowest carbon emission level. This reduces the possibility of disorderly allocation of energy storage with high carbon emission levels during emergency situations, effectively controlling carbon emissions in the industrial park during a sudden drop in photovoltaic power output.
[0017] Meanwhile, after each call to a carbon-attribute power range, the actual released power is deducted from the remaining power in the corresponding range, and the remaining power in the corresponding carbon-attribute power range is updated. In this way, the remaining power of different carbon emission attributes in the energy storage device remains accurate during the scheduling process, providing a reliable data basis for continuing to call energy storage power according to carbon attribute priority in subsequent scheduling periods, and avoiding scheduling deviations caused by unclear carbon attribute power accounting.
[0018] After each carbon attribute power range is called, it is determined whether the unmet power of the critical load has decreased to zero. The calling of carbon attribute power ranges is stopped when the unmet power of the critical load has decreased to zero or all carbon attribute power ranges have been called. In this way, the energy storage power is released only when there is an actual power supply gap in the critical load, avoiding over-discharge. This helps to maintain the power margin of the energy storage device during the photovoltaic power drop and improves the reliability and continuity of the park's power supply scheduling.
[0019] Other effects of the above-mentioned alternative methods will be described below in conjunction with specific embodiments. Attached Figure Description
[0020] The accompanying drawings are provided for a better understanding of this solution and do not constitute a limitation of this application. Wherein: Figure 1 This is a flowchart illustrating a method for multi-energy collaborative optimization and scheduling in a zero-carbon industrial park, as provided in an embodiment of this application. Figure 2 This is a schematic diagram comparing the photovoltaic power before and after a sudden drop, provided in an embodiment of this application. Figure 3 This is a schematic diagram illustrating the division of the carbon-attribute electrical energy range of the energy storage device provided in the embodiments of this application; Figure 4 This is a schematic diagram showing the comparison of non-critical load power reduction before and after the implementation of this application. Detailed Implementation
[0021] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.
[0022] See Figure 1 This is a flowchart illustrating a multi-energy collaborative optimization and scheduling method for zero-carbon industrial parks provided in an embodiment of this application. Figure 1 The execution subject of the method shown can be a combination of software and / or hardware, specifically, it can be one or more of various types of terminals, hardware systems, cloud computing, etc.
[0023] Figure 1 The zero-carbon industrial park multi-energy coordinated optimization and scheduling method shown includes steps S100 to S600. This method is executed by the park's energy management system to ensure continuous power supply to critical loads and control carbon emissions in the park during periods of sudden drop in photovoltaic power generation. Specifically, as follows: S100: In response to the detection of a sudden drop in photovoltaic power supply in the zero-carbon park, obtain the power to be met for critical loads.
[0024] The specific method for detecting sudden drops in photovoltaic power supply is as follows: The park's energy management system acquires the predicted and actual photovoltaic power during each scheduling period. The predicted photovoltaic power is generated by the photovoltaic power prediction system in the previous scheduling period, while the actual photovoltaic power is collected in real time by the power metering unit of the photovoltaic inverter during the current scheduling period. The unit for both is MW. The photovoltaic prediction deviation rate is calculated using the following formula:
[0025] In the formula, This represents the photovoltaic prediction deviation rate corresponding to the current scheduling period t. The photovoltaic power forecast corresponds to the current scheduling period t, in MW; This represents the actual photovoltaic power output corresponding to the current scheduling period t, in MW.
[0026] It should be noted that this calculation formula uses the photovoltaic (PV) predicted power as a unified benchmark to measure the relative degree of deviation between the actual power and the predicted power. This ensures that the deviation rate is not affected by the scale of PV installations, facilitating the use of a unified PV sag detection threshold across PV power plants of different sizes, and improving the universality and sensitivity of sag detection. The above detection is performed during periods when the PV predicted power is greater than zero; sag detection is not performed during periods when the PV predicted power is zero or lower than zero.
[0027] A photovoltaic power supply power drop event is determined to have occurred when the photovoltaic prediction deviation rate exceeds the pre-set photovoltaic power drop threshold and the actual photovoltaic power is lower than the photovoltaic prediction power. The energy management system performs the above detection once at each scheduling time; once a drop event is determined to have occurred, the original regular energy supply plan is immediately stopped, and the scheduling is switched to priority scheduling for carbon attribute power range. At the same time, non-critical load reduction instructions and cold storage device release instructions are triggered to complete the scheduling response within the current scheduling period when the drop occurs, so as to avoid the critical loads from losing power in subsequent periods due to response lag.
[0028] The introduction of a threshold for determining photovoltaic power drop is intended to distinguish a significant decrease in photovoltaic output from regular prediction errors, avoid frequent switching of dispatch strategies due to small prediction deviations, and promptly detect power drop that is sufficient to affect the energy supply balance of the park.
[0029] The specific method for determining the photovoltaic (PV) power drop threshold is as follows: Predicted and actual power outputs of PV power plants in the zero-carbon industrial park are collected for each scheduling period over at least one quarter. After removing abnormal samples caused by non-meteorological factors such as equipment failure and curtailment, the distribution of PV prediction deviation rates for each period is statistically analyzed. The 95th quantile of this distribution, which significantly deviates from the normal prediction error range, is taken as the PV power drop threshold. In this embodiment, the PV power drop threshold is preset to 20%. This value is outside the normal prediction deviation distribution and close to the deviation range caused by strong weather disturbances, enabling it to capture PV power output drops caused by rapid cloud cover with high sensitivity. A smaller threshold is more sensitive to power drops but increases the probability of false triggering; a larger threshold may result in missed detections. The threshold can be adjusted based on the industrial park's requirements for power supply reliability, using the values set in this embodiment. Please refer to [link to specific details]. Figure 2 , Figure 2 The figure shows the power comparison before and after the photovoltaic power drop; the photovoltaic predicted power was 2.40MW, while the actual photovoltaic power dropped sharply to 1.30MW, and the photovoltaic prediction deviation rate reached 45.83%, which significantly exceeded the preset photovoltaic power drop judgment threshold of 20%. The figure intuitively reflects the technical effect of the photovoltaic power drop detection mechanism in this application.
[0030] The unmet power for critical loads refers to the portion of the critical load's minimum energy demand during the current scheduling period that has not yet been met by existing supply sources. Specifically, it is obtained as follows: First, at each scheduling time, the set of critical loads is determined, forming the total minimum energy demand for critical loads. Then, the power currently supplied to critical loads by the photovoltaic inverters and the metering devices at the park's grid connection points is read. The total minimum energy demand for critical loads is then subtracted from the already supplied power to critical loads to obtain the unmet power for critical loads. The detailed process will be explained later. The unmet power obtained in this way directly reflects the power required for critical loads to maintain operation during the current period, providing a basis for the subsequent power allocation for each carbon-related energy range.
[0031] S200: Divide the electricity in the energy storage devices in the zero-carbon park into at least two carbon attribute electricity ranges according to the carbon emission attributes, where the lower the carbon emission attribute, the higher the priority of the corresponding carbon attribute electricity range.
[0032] In this embodiment, the energy storage device is a lithium battery energy storage system with a rated capacity of 10MWh, a maximum charging power of 3MW, a maximum discharging power of 3MW, and a charging efficiency of 0.95. Among these parameters, the rated capacity, maximum charging power, and maximum discharging power are given by the energy storage device's nameplate parameters, while the charging efficiency and discharging efficiency are obtained through factory testing and calibration of the battery system. The calibration method involves conducting full-charge-discharge cycle tests under standard operating conditions, determining the charging efficiency by the ratio of energy charged to energy discharged at the battery end, and determining the discharging efficiency by the ratio of energy discharged on the AC side to energy discharged at the battery end. As the battery ages, these efficiency parameters can be retested and corrected on a quarterly basis. The park dispatch period is 15 minutes, or 0.25 hours. This duration matches the fluctuation timescale of the park's photovoltaic output and the power adjustment response time of energy storage and loads, ensuring timely dispatch decisions after changes in photovoltaic output while avoiding frequent fluctuations in adjustment commands due to excessively short dispatch cycles.
[0033] The types of carbon-attribute electricity ranges include: low-carbon, medium-carbon, and high-carbon ranges. The electricity generated by energy storage devices within zero-carbon parks will be divided into at least two carbon-attribute ranges based on its carbon emission attributes, including: The electricity in the energy storage device is divided into multiple electricity units, and the carbon emission factor of the corresponding source when each electricity unit is charged into the energy storage device is obtained. Electricity units with carbon emission factors not exceeding the first threshold are classified into the low-carbon attribute range. Electricity units with carbon emission factors higher than the first threshold but not higher than the second threshold are classified into the medium carbon attribute range. Electricity units with carbon emission factors exceeding the second threshold are classified into the high-carbon attribute range. The energy of each energy unit in the low-carbon attribute range, medium-carbon attribute range, and high-carbon attribute range is accumulated separately to obtain the energy storage capacity in the low-carbon attribute range, the energy storage capacity in the medium-carbon attribute range, and the energy storage capacity in the high-carbon attribute range.
[0034] If the first threshold is less than the second threshold, the energy storage power in the low-carbon attribute range comes from the energy of photovoltaic power generation that is charged into the energy storage device when the carbon emission factor is not higher than the first threshold. The energy storage capacity in the medium-carbon attribute range and the energy storage capacity in the high-carbon attribute range come from the amount of electricity charged into the energy storage devices by the power grid during different carbon emission factor periods.
[0035] During each charging process, the energy management system records the amount of electricity charged into the energy storage device based on charging events or batches, and records the carbon emission factor of the corresponding charging source for each electricity unit. Electricity units can be divided according to a complete charging event or according to the charging amount within a preset time granularity. The carbon emission factor is obtained through methods corresponding to the charging source: for electricity charged from photovoltaic power generation, the carbon emission factor during the operating phase of the charging source is recorded as 0 kgCO2 / kWh, or it can be calculated based on the carbon emissions over the life cycle of the photovoltaic power generation system; for electricity charged from the grid, the carbon emission factor of the charging source is taken from the real-time marginal carbon emission factor of the grid at the time of charging, which can be obtained from data published by the grid dispatching agency or the power trading platform.
[0036] After the electricity units are divided, electricity units with carbon emission factors not higher than the first threshold are classified into the low-carbon attribute range; electricity units with carbon emission factors higher than the first threshold but not higher than the second threshold are classified into the medium-carbon attribute range; and electricity units with carbon emission factors higher than the second threshold are classified into the high-carbon attribute range. In this embodiment, the first threshold is preset to 0.05 kgCO2 / kWh, and the second threshold is preset to 0.35 kgCO2 / kWh. The calibration methods for the two thresholds are as follows: First, the carbon emission factor samples corresponding to each power unit in the energy storage device charging records of the park are statistically analyzed. The carbon factor of the photovoltaic charging samples during the operation phase is concentrated near 0, while the carbon factor of the grid charging samples is usually significantly higher than 0.05 kgCO2 / kWh, with a clear gap between the two. The first threshold is set at 0.05 kgCO2 / kWh, which is close to the upper edge of the photovoltaic charging sample within this gap, thus stably distinguishing the power charged by photovoltaic power generation from the power charged by the grid. Second, the hourly real-time marginal carbon emission factor distribution of the power grid where the park is located over the past year is statistically analyzed. The second threshold is set at the median quantile of this distribution, 0.35 kgCO2 / kWh, so that the power charged by the grid during normal carbon factor periods is classified into the medium carbon attribute range, and the power charged by the grid during high carbon factor periods is classified into the high carbon attribute range. The power in the two ranges is relatively balanced, avoiding both an excessively large high carbon attribute range that is used during normal periods and an excessively small high carbon attribute range that loses its buffer function as emergency backup power. The first and second thresholds are configurable parameters that can be recalibrated statistically as the grid carbon factor level changes annually.
[0037] The energy storage capacity of each unit within the low-carbon, medium-carbon, and high-carbon attribute ranges is summed separately to obtain the energy storage capacity in the low-carbon, medium-carbon, and high-carbon attribute ranges, respectively. The total energy storage capacity of the energy storage device is expressed as:
[0038] In the formula, Start of the current scheduling period The total amount of electricity stored in the energy storage device at any given time; Start of the current scheduling period Energy storage capacity within a specific timeframe, reflecting low-carbon properties. Start of the current scheduling period Energy storage capacity within the medium carbon attribute range at any given time; Start of the current scheduling period Energy storage capacity in the high-carbon attribute range at any given time, all in MWh. Indicates the start time of the current scheduling period; It should be noted that this calculation formula means that the sum of the energy storage capacity in the three carbon attribute energy ranges is always equal to the total energy capacity of the energy storage device, so that the energy storage capacity is neither missed nor double-counted in the tiered calculation, and the remaining energy capacity in each range is always consistent with the actual energy storage capacity of the energy storage device.
[0039] At the scheduling time of 17:45 in this embodiment, the energy storage capacity in the low-carbon attribute range was 1.80 MWh, the energy storage capacity in the medium-carbon attribute range was 2.40 MWh, and the energy storage capacity in the high-carbon attribute range was 1.60 MWh, for a total energy storage capacity of 5.80 MWh, as read from the carbon attribute ledger. Please refer to [link / reference]. Figure 3 , Figure 3 The pie chart shows the division of carbon-attribute energy ranges in the energy storage device at the 17:45 dispatch time. The total energy storage capacity is 5.80 MWh, which is divided into three ranges according to carbon emission factors: the low-carbon range is 1.80 MWh, accounting for 31.03%, which comes from photovoltaic power generation; the medium-carbon range is 2.40 MWh, accounting for 41.38%, which comes from the grid during the regular carbon factor period; and the high-carbon range is 1.60 MWh, accounting for 27.59%, which comes from the grid during the high carbon factor period.
[0040] The labeling of carbon emission attributes is not limited to the carbon emission factor of the charging source. It can also be based on the green certificates, green electricity trading certificates or the proportion of renewable energy electricity corresponding to the charging electricity.
[0041] S300: In descending order of priority, starting with the highest priority carbon attribute power range, the carbon attribute power ranges are called sequentially to release power to the critical load. Only one carbon attribute power range releases power to the critical load at any given time.
[0042] In descending order of priority, starting with the highest priority carbon attribute electricity range, electricity is released to critical loads sequentially from the carbon attribute electricity range, including: Prioritize the use of low-carbon energy storage capacity to release to critical loads; after the use of low-carbon energy storage capacity is completed, if the unmet power of critical loads is still greater than zero, then use medium-carbon energy storage capacity to release to critical loads. After the energy storage capacity in the medium carbon attribute range is used up, if the power demand of the critical load is still greater than zero, it is determined whether to allow the use of energy storage capacity in the high carbon attribute range. When a request to activate a high-carbon attribute zone is received, the release of energy stored in the high-carbon attribute zone to critical loads is permitted only when the power grid is unavailable or the carbon emission factor of the power grid at the time of the request reaches the preset high-carbon activation conditions. If the power grid is available and the power grid's carbon emission factor at the time of the call request does not meet the preset high-carbon activation conditions, the power grid will supplement the critical load with the power to be satisfied by the critical load.
[0043] Following the order of priority from high to low, starting with the highest priority carbon attribute power range, the process of releasing power from the carbon attribute power range to the critical load is as follows: first, the energy storage power from the low carbon attribute range is called up and released to the critical load.
[0044] Before the call, the energy management system calculates the maximum release power limit for the low-carbon attribute zone during the current scheduling period. The maximum release power limit is constrained by both the remaining electricity in the low-carbon attribute zone and the maximum allowable discharge power of the energy storage device.
[0045] To facilitate understanding of the control logic for the call sequence, the call conditions for the medium-carbon and high-carbon attribute ranges are explained below. If the energy storage capacity in the low-carbon attribute range is used up, and the unmet power of the critical load is still greater than zero, then the energy storage capacity in the medium-carbon attribute range is used to release energy to the critical load. If the energy storage capacity in the medium-carbon attribute range is used up, and the unmet power of the critical load is still greater than zero, then it is determined whether to allow the use of energy storage capacity in the high-carbon attribute range.
[0046] Only when the power grid is unavailable or the current carbon emission factor of the power grid reaches the preset high-carbon activation condition will the energy stored in the high-carbon attribute range be allowed to be released to critical loads. If the power grid is available and the current carbon emission factor of the power grid does not reach the preset high-carbon activation condition, the power grid will supplement the critical loads with the power to be met. Among them, power grid unavailability refers to a fault on the power grid side or the park actively being in an off-grid operation state, which can be determined by a combination of the status of the interconnection switch at the park's grid connection point and the monitoring results of voltage and frequency exceeding limits. The current carbon emission factor of the power grid can be obtained from real-time data released by the power grid dispatching agency or the power trading platform.
[0047] The calibration method and reasons for setting the preset high-carbon activation conditions are as follows. The energy storage capacity in the high-carbon attribute range is supplied by the grid power during periods when the carbon factor is high. Its carbon intensity is equivalent to the grid power with a carbon factor higher than 0.70 kgCO2 / kWh. Therefore, in this embodiment, the preset high-carbon activation conditions are pre-set to the current carbon emission factor of the grid being higher than 0.70 kgCO2 / kWh. This 0.70 kgCO2 / kWh is calibrated by taking the 90th quantile of the hourly real-time marginal carbon emission factor distribution of the grid where the park is located over the past year.
[0048] When the power grid is available and the current carbon emission factor has not reached that level, the carbon intensity of drawing power from the power grid to supplement critical loads is lower than the amount of energy stored in the high-carbon attribute zone. In this case, calling energy stored in the high-carbon attribute zone is detrimental to the park's carbon emission control target. The remaining energy in the high-carbon attribute zone should be reserved for use during periods when the power grid is unavailable or the power grid carbon factor is higher and the carbon intensity of the power grid exceeds the carbon intensity of the high-carbon attribute energy itself. When the power grid is unavailable or the power grid carbon factor reaches the preset high-carbon activation conditions, calling energy stored in the high-carbon attribute zone becomes a necessary means to ensure continuous power supply to critical loads. In this case, calling will not increase the park's carbon emissions.
[0049] Through the above-mentioned conditional control, the order of power allocation spatially prioritizes low-carbon power and temporally postpones high-carbon power, balancing the reliability of power supply to critical loads with carbon emission control. The preset high-carbon activation condition is a configurable parameter. In this embodiment, the power grid is available, and the current carbon emission factor of the power grid is 0.52 kgCO2 / kWh, which does not meet the preset high-carbon activation condition. Furthermore, the unmet power requirement for critical loads has been reduced to zero. Therefore, neither the medium-carbon nor the high-carbon attribute ranges are activated, and no grid replenishment occurs.
[0050] Only one carbon-emission power range can release electricity to critical loads at any given time. This ensures that low-carbon and high-carbon power are released sequentially rather than mixed. This guarantees that electricity with lower carbon emissions will prioritize power supply to critical loads, and that each released power range has a unique corresponding range in the carbon attribute ledger, maintaining clarity in carbon attribute accounting. The process starts with the highest-priority carbon-emission power range, completes the allocation of one range, and then moves on to the next highest-priority range.
[0051] The actual power of the current call interval is used as the discharge power setpoint and sent to the energy storage converter. The energy storage converter releases electricity to the park's AC bus according to the discharge power setpoint during the dispatch period. At any given time, only one carbon attribute power interval releases electricity to the critical load. This is achieved by deducting only the corresponding ledger account of the current call interval during the time period. That is, only the carbon attribute power interval in the call state has its remaining power deducted during a dispatch period, while the remaining power of the other carbon attribute power intervals remains unchanged. This avoids the mixed release of low-carbon and high-carbon attribute power from the accounting mechanism.
[0052] S400: For each call, the actual released power of the call is deducted from the remaining power of the corresponding carbon attribute power range, the remaining power of the corresponding carbon attribute power range is updated, and the power released to the critical load in this call is deducted from the unmet power of the critical load, the unmet power of the critical load is updated.
[0053] For the carbon attribute power range to be called up, obtain the upper limit of the releaseable power of this type of carbon attribute power range in the current scheduling period; Compare the upper limit of releaseable power with the power to be met for critical loads; If the upper limit of the releaseable power is less than the power to be satisfied by the critical load, then the upper limit of the releaseable power is used as the actual power released to the critical load in this carbon attribute power range, and the power to be satisfied by the critical load is deducted from the actual power. The power to be satisfied by the critical load after deduction is used as the power to be satisfied by the critical load when the next priority carbon attribute power range is called. If the upper limit of the releaseable power is not less than the power to be satisfied by the critical load, then the power to be satisfied by the critical load shall be used as the actual power released to the critical load by the carbon attribute power range, and the carbon attribute power range shall be stopped.
[0054] Retrieve the maximum releaseable power of the carbon attribute power range to be invoked during the current scheduling period, including: The remaining power in the carbon attribute power range to be called is multiplied by the energy storage discharge efficiency and then divided by the duration of the current scheduling period to obtain the first candidate power. The maximum allowable discharge power of the energy storage device is used as the second candidate power. The first candidate power is compared with the second candidate power, and the smaller of the two is taken as the upper limit of the release power of the carbon attribute power range to be invoked.
[0055] Retrieve the maximum releaseable power of the carbon attribute power range to be invoked during the current scheduling period, including: The remaining energy in the carbon-attribute energy range to be called up is multiplied by the energy storage discharge efficiency, and then divided by the current scheduling period duration to obtain the first candidate power. Multiplying by the energy storage discharge efficiency converts the energy extractable from the battery into AC-side releaseable energy, and dividing by the current scheduling period duration represents the power level corresponding to the uniform release of the remaining energy in this range within the current scheduling period. The maximum allowable discharge power of the energy storage device is obtained as the second candidate power. The second candidate power is determined by the smaller of the rated power of the energy storage converter and the discharge current limiting setting value of the battery management system, corresponding to the two discharge capacity boundaries of the power conversion stage and the battery itself, respectively. The first candidate power and the second candidate power are compared, and the smaller of the two is taken as the upper limit of the releaseable power for the carbon-attribute energy range to be called up. The reason for choosing the smaller of the two is that the first candidate power ensures that the remaining power in the interval is sufficient to support the continuous release of the entire scheduling period without premature depletion, while the second candidate power ensures that the discharge power does not exceed the capacity of the energy storage converter and battery system. Only the power that meets both constraints can be used as the actual release power. The technical effect is to avoid the interruption of critical load power supply caused by the depletion of the interval power in the middle of the period, and to avoid damage to the energy storage equipment or triggering protection shutdown due to over-power discharge.
[0056] The formula used to calculate the upper limit of releaseable power for the carbon-attribute power range to be mobilized during the current scheduling period is as follows:
[0057] In the formula, This represents the upper limit of releaseable power for the low-carbon attribute range during the current scheduling period t. The maximum allowable discharge power of the energy storage device is expressed in MW. The remaining electricity in the low-carbon attribute range during the current scheduling period t is expressed in MWh. For energy storage discharge efficiency; The duration of the current scheduling period is in hours (h); where t represents the index of the current scheduling period; the technical methods for the upper limit of releaseable power corresponding to the remaining two types of carbon attribute electricity ranges are similar and will not be elaborated here. The upper limit of the releaseable power is compared with the power to be satisfied by the critical load. If the upper limit of the releaseable power is less than the power to be satisfied by the critical load, the upper limit of the releaseable power is used as the actual power released to the critical load in this carbon attribute power range, and the power to be satisfied by the critical load is reduced by the actual power. The power to be satisfied by the critical load after deduction is used as the power to be satisfied by the critical load when calling the next priority carbon attribute power range. If the upper limit of the releaseable power is greater than or equal to the power to be satisfied by the critical load, the power to be satisfied by the critical load is used as the actual power released to the critical load in this carbon attribute power range, and the calling of the carbon attribute power range is stopped.
[0058] The smaller of the two values is used as the actual power to avoid both over-discharge caused by releasing power exceeding the actual load demand and exceeding the sustainable power level of the interval within the time period. In this embodiment, the actual power is determined according to the following formula:
[0059] In the formula, This represents the actual power released to critical loads within the low-carbon attribute range during the current scheduling period t. The power to be met for critical loads is in MW.
[0060] After the release is completed, the energy management system deducts the actual released electricity from the remaining electricity in the low-carbon attribute range and updates the remaining electricity in the low-carbon attribute range. The actual released electricity is divided by the energy storage discharge efficiency to restore the released electricity on the AC side to the energy taken from the battery. The remaining electricity is updated according to the following formula:
[0061] In the formula, The remaining electricity in the low-carbon attribute range during the (t+1)th scheduling period is expressed in MWh. The (t+1)th scheduling period is the next scheduling period after the current one. This update method restores the energy taken out from the battery terminal according to the energy storage discharge efficiency when deducting the actual released electricity, so that the updated remaining electricity accurately reflects the energy that can still be released from the battery terminal, ensuring that the sustainable release capacity of the interval will not be overestimated when calculating the first candidate power based on the remaining electricity in the next scheduling period.
[0062] After each call, deduction and update are performed to ensure that the remaining electricity in each carbon attribute electricity range is consistent with the actual ledger, providing accurate remaining electricity data for subsequent scheduling periods to continue calling according to carbon attribute priority.
[0063] After each call, the energy management system multiplies the actual power of the call by the duration of the current scheduling period to obtain the actual released electricity. The energy extracted from the battery corresponding to the actual released electricity is deducted from the remaining electricity in the current call interval, and the deducted result is written into the carbon attribute ledger as the remaining electricity for that interval in the next scheduling period. Simultaneously, the power released to the critical load in this call is deducted from the critical load's unmet power, updating the critical load's unmet power. This ensures that the unmet power used in subsequent S500 judgments accurately reflects the unmet energy supply gap. Through these two parallel update steps, the remaining electricity in each interval in the carbon attribute ledger remains consistent with the actual state of the energy storage device, and the unmet power of the critical load remains consistent with the actual gap. This ensures that accurate interval electricity can be read when the next scheduling period is divided or called again, and also ensures that the judgment to continue or stop calling is accurate.
[0064] S500: After each call to a carbon attribute power range is completed, determine whether the power to be satisfied by the critical load has been reduced to zero.
[0065] S600: If the power to be satisfied by the critical load is still greater than zero, and there are carbon attribute power ranges that have not yet been called, then the next priority carbon attribute power range will be called to continue releasing power to the critical load; if the power to be satisfied by the critical load has been reduced to zero, or all types of carbon attribute power ranges in the energy storage device have been called, then the calling of carbon attribute power ranges will be stopped.
[0066] Once the unmet power of critical loads has been reduced to zero, the subsequent interval calls will be stopped to prevent the energy storage capacity from continuing to be released when the demand has been met; similarly, if all carbon attribute energy intervals have been called but the unmet power is still greater than zero, the calls will also be stopped to avoid idling when there are no intervals available for adjustment.
[0067] This embodiment also simultaneously generates non-critical load reduction instructions and cold storage device release instructions. By reducing the electricity consumption of non-critical loads and replacing the power consumption of electric chiller units with cold storage release, together with the energy storage carbon attribute power range call, the power supply gap caused by the sudden drop is made up. The specific execution method will be explained in detail later.
[0068] Based on the minimum power consumption required for each type of critical load in the critical load set to maintain operation during the current scheduling period, the minimum power consumption corresponding to each type of critical load during the current scheduling period is formed. The minimum power consumption corresponding to each type of critical load is added together to obtain the total minimum power demand of critical loads during the current dispatch period; the power already supplied to critical loads is subtracted from the total minimum power demand of critical loads to obtain the power to be satisfied by critical loads during the current dispatch period.
[0069] The critical load set includes data centers, cold chain warehouses, and electric vehicles that are about to leave the site; The minimum power consumption of a data center is determined by adding the basic operating power of the servers to the minimum cooling power required to maintain the normal operating temperature of the data center. The minimum power consumption of a cold chain warehouse is determined by the minimum refrigeration requirements of the cold chain warehouse and the current coefficient of performance of the electric refrigeration unit. The minimum power consumption of electric vehicles about to leave the site is determined by the amount of electricity each vehicle needs to replenish before leaving, the duration of the current dispatch period, and the charging efficiency.
[0070] In this embodiment, the critical load set is a pre-determined load list, including three categories: data centers, cold chain warehouses, and electric vehicles about to leave the site. Using a pre-determined list allows for the identification of power supply targets immediately upon a power outage without waiting for a confirmation process. In other embodiments, critical loads can also be dynamically determined. For example, during scheduling, loads whose power outage losses exceed a preset loss threshold, loads with a preset safety level, or loads whose operational status does not allow for interruption are identified as critical loads in real time. The preset loss threshold and preset level can be determined according to the park's operation and management requirements.
[0071] Before allocating power to critical loads within the carbon-attribute power range, the energy management system determines the minimum power consumption for each type of critical load within the critical load set, based on the minimum power required to maintain operation during the current scheduling period. Specifically, the minimum power consumption for the data center is determined using the following formula:
[0072] In the formula, This represents the minimum power consumption of the data center during the current scheduling period t. This represents the basic operating power of the servers in the data center during the current scheduling period t. The minimum cooling power required to maintain the normal operating temperature of the data center during the current scheduling period t, in MW.
[0073] The basic operating power of the servers is obtained by the power monitoring unit of the computer room collecting the power of all servers in real time according to the scheduling cycle. The minimum cooling power consumption is calculated by combining the supply and return air temperatures measured by the computer room temperature sensors with the power and energy efficiency parameters on the nameplate of the cooling equipment. Alternatively, it can be determined through calibration tests during the commissioning phase of the cooling system. The calibration method is to measure the minimum power consumption of the cooling equipment required to maintain the upper limit of the computer room temperature under different heat load levels, and form a comparison relationship between heat load and power consumption for scheduling purposes.
[0074] The reason for using an additive form in this calculation is that the server's basic operating power and minimum cooling power consumption correspond to two essential types of consumption: computing equipment and cooling equipment. Both are indispensable: if only server power is considered without cooling power, the computing equipment will still be forced to reduce its frequency or shut down if the data center temperature exceeds the limit; if only cooling power is considered without server power, computing tasks cannot continue to run. A power outage in a data center will cause data loss or equipment damage; therefore, both the server's basic operating power and the minimum cooling power consumption must be included in the minimum power consumption.
[0075] The minimum power consumption of a cold chain warehouse is determined by the following formula:
[0076] In the formula, This represents the minimum power consumption of the cold chain warehouse during the current scheduling period t, i.e., the minimum refrigeration power consumption of the cold chain warehouse, in MW. The minimum cooling demand of the cold chain warehouse during the current scheduling period t is expressed in MW. It is determined by combining the warehouse temperature measured by multiple temperature sensors with the temperature requirements of the goods inside the warehouse, and by calculating the cooling load required to maintain the warehouse temperature through the warehouse heat transfer model. The temperature detection module is calibrated according to the verification cycle to ensure the accuracy of the warehouse temperature measurement. The current performance coefficient of the electric chiller unit within the current scheduling period t is obtained from the performance curve of the electric chiller unit under the current evaporation and condensation temperature conditions. The performance curve is obtained from the unit's factory test or on-site calibration test and is affected by the ambient temperature and the unit's load rate.
[0077] It should be noted that the reason for using division in this calculation formula is that the power consumption of the electric refrigeration unit is equal to the refrigeration demand it undertakes divided by the coefficient of performance. The higher the coefficient of performance, the lower the power consumption per unit of cooling capacity. Therefore, dividing the minimum refrigeration demand by the current coefficient of performance of the electric refrigeration unit yields the minimum power consumption required to maintain the temperature of the storage room. This formula takes into account the refrigeration demand while deducting the influence of the unit's energy efficiency, so that the obtained power value corresponds exactly to the actual power consumption of the unit.
[0078] The minimum power consumption of electric vehicles about to leave the site is determined by the following formula:
[0079] In the formula, The minimum power consumption of the electric vehicle about to leave the site during the current dispatch period t, in MW; This is the set of vehicles that have been connected to charging during the current scheduling period t but have not yet met the power requirements for departure, determined based on the vehicle connection status and departure plan; The amount of electricity required to replenish the electric vehicle v before it leaves the site is allocated to the current scheduling period t. The unit is MWh. The total amount of electricity required before leaving the site is obtained by comparing the current power status reported by the vehicle battery management system with the target power before leaving the site. The total amount of electricity required before leaving the site is then evenly distributed to each scheduling period from the current scheduling period to the time before leaving the site. Charging efficiency is obtained through charging equipment efficiency testing and calibration. The calibration method involves measuring the ratio of the output power of the charging equipment to the power absorbed by the vehicle battery under standard operating conditions, and then retesting and correcting it annually. The duration of the current scheduling period is in hours (h); v represents the variable for electric vehicles that are about to leave the site. This is the collection of electric vehicles that are about to leave the site during the current scheduling period; The calculation formula uses the form of summing the numerator and dividing by the product of charging efficiency and scheduling period duration. Its meaning is as follows: sum the supplementary power of each vehicle in the set allocated to the current scheduling period, and after correcting for charging efficiency, divide by the current scheduling period duration to obtain the average charging power required for each vehicle to be recharged according to plan within the current scheduling period. Dividing by charging efficiency restores the amount of power to be recharged at the battery end to the input power required by the charging equipment. Dividing by the current scheduling period duration converts the amount of power to be charged within the current scheduling period into the average power corresponding to that period, thereby ensuring that the vehicle can reach the target power before leaving the site by recharging at the minimum average power in each period.
[0080] Adding the minimum power consumption corresponding to the above three types of critical loads, we obtain the minimum total energy demand for the critical loads:
[0081] In the formula, This represents the minimum total energy demand for critical loads during the current scheduling period t, expressed in MW.
[0082] The calculation uses a direct addition form because the electricity demands of three critical loads—data centers, cold chain warehouses, and electric vehicles about to leave the site—exist concurrently and independently during periods of rapid decline, and must be guaranteed simultaneously. The total demand equals the sum of the minimum power demands of each type. This total demand serves as a common benchmark for subsequently determining the power to be met for critical loads, controlling the power allocation for each carbon-attribute power range, and determining the reduction amount for non-critical loads and the amount of cold storage and release. Power allocation in each stage is based on this benchmark to ensure that the sum of the scheduling results precisely meets the minimum power supply requirements for critical loads.
[0083] The execution method of direct photovoltaic power supply is as follows: the energy management system issues power allocation settings to the photovoltaic inverter according to the importance level of key loads. The photovoltaic inverter prioritizes sending the actual output to the data center feeder and sends the remaining output to the cold chain warehouse feeder according to the settings. The actual power supplied is recorded by the grid connection point metering device.
[0084] The minimum total energy demand for critical loads is reduced by the power already supplied to critical loads, where the power already supplied to critical loads is the power that photovoltaics have actually supplied to critical loads after the sharp drop. The effect of supplying all actual photovoltaic output to critical loads first is that the carbon emission factor is 0 during the photovoltaic power generation operation phase. Prioritizing the use of photovoltaic power will not increase the carbon emissions of the park, and can also minimize the amount of energy storage power to be called up, while reserving energy storage power in the low-carbon range to cope with the further decline in photovoltaic output in the later period.
[0085] When a sudden drop in photovoltaic power supply is detected in the zero-carbon park, a non-critical load reduction command is generated, and a cold storage device release command is also generated. The non-critical load reduction command is used to reduce the power consumption of non-critical loads, and the cold storage device release command is used to control the cold storage device to release cold to replace part of the power demand of the electric refrigeration unit. The reduction in non-critical loads and the amount of cold storage and release are determined together based on the energy gap caused by the sudden drop in photovoltaic power and the cooling load demand. The energy gap is the difference between the predicted photovoltaic power and the actual photovoltaic power, and the cooling load demand is the cooling power required for critical loads with cooling needs to maintain normal operation.
[0086] Due to the sudden drop in power, the actual photovoltaic output was lower than the predicted output, resulting in a power shortage in the park. Non-critical load reduction, cold storage and release, and the use of carbon-attribute energy storage were carried out in parallel to maintain the energy supply and demand balance in the park.
[0087] In this embodiment, non-critical loads include hydrogen electrolysis production loads, ordinary vehicle charging loads, office air conditioning loads, and production loads that can be delayed. Non-critical load reduction commands control the suspension of operation of electrolytic hydrogen production load, suspension of operation of ordinary vehicle charging load, reduction of office air conditioning load from original power to first set power, and reduction of production load that can be delayed from original power to second set power.
[0088] The reduction instructions are executed in the following order: first, interrupt loads that can be stopped instantly, and then reduce loads that can be adjusted. First, stop operation instructions are issued to the electrolysis hydrogen production load and the ordinary vehicle charging load. Then, load reduction operation instructions are issued to the office air conditioning load and the production load that can be delayed. Both types of instructions are executed within the same scheduling period when the sudden drop event is detected, and the reduced power is released immediately.
[0089] The power output of the electrolytic hydrogen production system before load reduction was 0.60MW, measured and collected from the electrolyzer inlet. The hydrogen production process is interruptible, and the hydrogen production buffer tank can absorb production fluctuations caused by shutdowns, ensuring that shutdowns do not affect key production in the park. The power output of the ordinary vehicle charging system before load reduction was 0.30MW, measured and collected from the charging pile cluster. Ordinary vehicles are not involved in the imminent departure of vehicles, and charging can be postponed. The power output of the office air conditioning system before load reduction was 0.40MW, with the initial set power pre-set at 0.25MW. Its calibration method involved on-site testing of the air conditioning system's power output at different operating levels in the office area. Temperature response: The lowest power setting required to meet the upper limit of office area temperature is taken as the first set power. Even after the office air conditioner operates at reduced power, it can still maintain the basic environmental requirements of the office area, ensuring heat dissipation for office equipment and basic comfort for personnel. The power before production load reduction is 0.50MW, and the second set power is preset to 0.20MW. Its calibration method is to measure the minimum power required to maintain the operation of auxiliary systems such as monitoring, lubrication, and lighting when the production line is in standby mode. Retaining this standby power allows for rapid resumption of production after a sudden drop, avoiding the time and cost losses caused by shutdown and restart. The total power reduction for non-critical loads is calculated according to the following formula:
[0090] In the formula, The formula represents the total power reduction for non-critical loads within the current scheduling period t, expressed in MW. The four terms in the formula are, in order, the power reduction from the suspension of electrolytic hydrogen production loads, the power reduction from the suspension of ordinary vehicle charging loads, the power reduction from office air conditioning loads, and the power reduction from production loads that can be delayed. This calculation method accumulates the difference between the power before and after the reduction for each load. Loads that are suspended are counted at their full pre-reduction power, while loads operating at reduced loads are counted at the difference, thus accurately reflecting the actual power released by the reduction action. Substituting the data, the total power reduction is... MW. For the 1.10MW power supply gap caused by the sudden drop in photovoltaic power, the 0.80MW of critical load power to be met will be supplemented by electricity released from energy storage, while the non-critical load portion will be offset by reducing the released power. This ensures that the park does not need to draw power from the grid (where the carbon factor is higher than 0.35 kgCO2 / kWh) to drive non-critical loads during the drop. The portion of the reduction exceeding the 0.25MW power supply gap forms a dispatch margin, which can absorb further fluctuations in photovoltaic output during the dispatch period and prevent the power supply gap from widening and causing a decline in the critical load guarantee capability. Please refer to [link / reference] for details. Figure 4 , Figure 4 The power comparison before and after the non-critical load reduction is shown. After detecting a photovoltaic power drop event, the energy management system generates non-critical load reduction instructions: the electrolysis hydrogen production load is suspended from 0.60MW, the ordinary vehicle charging load is suspended from 0.30MW, the office air conditioning load is reduced from 0.40MW to 0.25MW, and the deferred production load is reduced from 0.50MW to 0.20MW. The total power reduction of non-critical loads is 1.35MW, which exceeds the power supply gap of 1.10MW, forming a dispatch margin of 0.25MW.
[0091] The execution process of the cold storage device's cold release command includes: determining the release power based on the current cold storage capacity, cold release efficiency, and the current scheduling period duration; The available cooling power is compared with the cooling load demand, and the smaller of the two is taken as the actual cooling power. After the cooling is released, the remaining cooling capacity of the cold storage device is updated according to the actual cooling power, the duration of the current scheduling period, and the cooling efficiency. The execution process of the cold storage device's cold release command specifically includes: the energy management system calculates the current cold storage capacity by combining the measured values of the cold storage medium temperature and liquid level through the ice storage capacity detection module of the cold storage device; multiplies the current cold storage capacity by the cold release efficiency and then divides it by the duration of the current scheduling period to form the releaseable cold power. Multiplying by the cold release efficiency converts the cold storage capacity stored in the cold storage device into the actual releaseable cold power, and dividing by the duration of the current scheduling period represents the power level corresponding to the uniform release of cold power within the current scheduling period.
[0092] In the formula, The cold storage device's release capacity during the current scheduling period t is expressed in units of... ; The cold storage capacity of the cold storage device during the current scheduling period t is expressed in units of t. ; The cold release efficiency of the cold storage device.
[0093] The cold release efficiency is obtained by factory testing or on-site calibration test of the cold storage device. The calibration method is to conduct a cold storage-cold release cycle test on the cold storage device under standard operating conditions, measure the ratio of the actual released cold amount to the stored cold amount in one cycle, and retest and correct annually.
[0094] The calculation formula, multiplied by the cold release efficiency and divided by the current scheduling period duration, represents the power level corresponding to the uniform release of the current cold storage capacity within the current scheduling period after deducting cold release losses. This power level provides the upper limit for the cold storage device to continuously release power within this period without prematurely depleting its reserves, thus providing an upper limit boundary for subsequently determining the actual cold release power. In this embodiment, the cold storage device is an ice storage device with a capacity of 8... The cold storage efficiency and cold release efficiency are both 0.90, and the current cold storage capacity is 3.20. .
[0095] Compare the release capacity with the cooling load demand, and take the smaller of the two as the actual release capacity:
[0096] In the formula, This represents the actual cooling power released by the cold storage device during the current scheduling period t. This represents the releasable cooling power of the cold storage device during the current scheduling period t. The cooling load demand for the current scheduling period t is the cooling power required to maintain normal operation of the critical loads with cooling needs, expressed in units of t. .
[0097] It should be noted that the reason for taking the smaller of the two in this calculation formula is that the release capacity is constrained by the cold storage capacity, and the cooling load demand is constrained by the actual load demand. The actual release capacity should not exceed both at the same time: exceeding the release capacity will cause the cold storage capacity to be exhausted before the end of the whole period, and exceeding the cooling load demand will cause the cold capacity to be wasted and the cold storage capacity to be over-consumed.
[0098] In this embodiment, the critical loads with cooling requirements are the data center and the cold chain warehouse. The current coefficient of performance (COP) of the electric chillers in both the data center and the cold chain warehouse is 4.0, and the minimum cooling power consumption of the data center is 0.25MW, corresponding to a COP of 1.00. For cooling capacity requirements, the minimum refrigeration power consumption for a cold chain warehouse is 0.50MW, corresponding to 2.00MW. The total cooling capacity requirement is 3.00. That is, the cooling load requirement is 3.00. The radiant cooling power is 11.52. With a cooling load demand of 3.00 The smaller one has an actual cooling power of 3.00. The cold release process is as follows: the cold storage device controller adjusts the refrigerant circulation flow rate or the opening of the cold release valve in the cold release circuit, and delivers cold capacity to the cooling network according to the actual cold release power; as the cold release gradually replaces the cold load, the electric refrigeration units of the data center and cold chain warehouse automatically reduce their load or shut down according to the remaining cold load they bear.
[0099] During the cooling release period, the park's electrical load decreases accordingly. The electricity consumption of the electric chillers replaced by the cooling release no longer occupies the park's limited photovoltaic and energy storage resources, allowing the stored electricity to be concentrated on ensuring the other electricity needs of critical loads.
[0100] After the cooling release is completed, the remaining cold storage capacity of the cold storage device is updated based on the actual cooling release power, the duration of the current scheduling period, and the cooling release efficiency. The actual cooling release power is multiplied by the duration of the current scheduling period to obtain the actual cooling capacity released during this period, which is then divided by the cooling release efficiency to restore the reduction in the cooling medium within the cold storage device. The remaining cold storage capacity is updated according to the following formula:
[0101] In the formula, The remaining cold storage capacity of the cold storage device in the (t+1)th scheduling period is expressed in units of... .
[0102] This update method restores the reduction in cold medium based on the cold release efficiency, so that the updated remaining cold storage capacity truly reflects the amount of cold storage available for release in subsequent periods, avoiding overestimation of the remaining cold capacity and causing subsequent cold release plans to exceed the actual capacity.
[0103] The threshold for photovoltaic power drop, the first threshold, the second threshold, the preset high-carbon activation conditions, the first set power, the second set power, the current scheduling period duration, and various efficiency parameters can all be adjusted according to the actual configuration of the park. The energy storage device is not limited to lithium battery energy storage systems, but can also be other electrochemical energy storage such as flow batteries and sodium-ion batteries, or compressed air energy storage. The cold storage device is not limited to ice cold storage devices, but can also be water cold storage devices or phase change cold storage devices. The key load set can be pre-listed or dynamically determined. Photovoltaic power generation can be replaced by other renewable energy power generation, and photovoltaic power supply power drop events can also be replaced by power output drop events of other external power sources.
[0104] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented in software, the above embodiments can be implemented, in whole or in part, as a computer program product. Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution.
[0105] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment, depending on actual needs.
[0106] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.
Claims
1. A method for multi-energy coordinated optimization and scheduling in a zero-carbon industrial park, characterized in that, include: S100: In response to the detection of a sudden drop in photovoltaic power supply in the zero-carbon park, obtain the power to be met for critical loads; S200: Divide the electricity in the energy storage devices in the zero-carbon park into at least two carbon attribute electricity ranges according to carbon emission attributes, where the lower the carbon emission attribute, the higher the priority of the corresponding carbon attribute electricity range. S300: In order of priority from high to low, starting with the carbon attribute power range with the highest priority, the carbon attribute power ranges are called in sequence to release power to the critical load. Only one carbon attribute power range releases power to the critical load at any given time. S400: For each call, the actual released power of the call is deducted from the remaining power of the corresponding carbon attribute power range, the remaining power of the corresponding carbon attribute power range is updated, and the power released to the critical load in the call is deducted from the unmet power of the critical load, the unmet power of the critical load is updated. S500: After each call to a carbon attribute power range is completed, determine whether the power to be satisfied by the critical load has been reduced to zero. S600: If the power to be satisfied by the critical load is still greater than zero, and there are carbon attribute power ranges that have not yet been called, then the next priority carbon attribute power range will be called to continue releasing power to the critical load; if the power to be satisfied by the critical load has been reduced to zero, or all types of carbon attribute power ranges in the energy storage device have been called, then the calling of carbon attribute power ranges will be stopped.
2. The method according to claim 1, characterized in that, The types of carbon-attribute electricity ranges include: low-carbon, medium-carbon, and high-carbon ranges. The electricity generated by energy storage devices within zero-carbon parks will be divided into at least two carbon-attribute ranges based on its carbon emission attributes, including: The electricity in the energy storage device is divided into multiple electricity units, and the carbon emission factor of the corresponding source when each electricity unit is charged into the energy storage device is obtained. Electricity units with carbon emission factors not exceeding the first threshold are classified into the low-carbon attribute range. Electricity units with carbon emission factors higher than the first threshold but not higher than the second threshold are classified into the medium carbon attribute range. Electricity units with carbon emission factors exceeding the second threshold are classified into the high-carbon attribute range. The energy of each energy unit in the low-carbon attribute range, medium-carbon attribute range, and high-carbon attribute range is accumulated separately to obtain the energy storage capacity in the low-carbon attribute range, the energy storage capacity in the medium-carbon attribute range, and the energy storage capacity in the high-carbon attribute range.
3. The method according to claim 2, characterized in that, If the first threshold is less than the second threshold, the energy storage power in the low-carbon attribute range comes from the energy of photovoltaic power generation that is charged into the energy storage device when the carbon emission factor is not higher than the first threshold. The energy storage capacity in the medium-carbon attribute range and the energy storage capacity in the high-carbon attribute range come from the amount of electricity charged into the energy storage devices by the power grid during different carbon emission factor periods.
4. The method according to claim 2, characterized in that, In descending order of priority, starting with the highest priority carbon attribute electricity range, electricity is released to critical loads sequentially from the carbon attribute electricity range, including: Prioritize the use of low-carbon energy storage capacity to release to critical loads; after the use of low-carbon energy storage capacity is completed, if the unmet power of critical loads is still greater than zero, then use medium-carbon energy storage capacity to release to critical loads. After the energy storage capacity in the medium carbon attribute range is used up, if the power demand of the critical load is still greater than zero, it is determined whether to allow the use of energy storage capacity in the high carbon attribute range. When a request to activate a high-carbon attribute zone is received, the release of energy stored in the high-carbon attribute zone to critical loads is permitted only when the power grid is unavailable or the carbon emission factor of the power grid at the time of the request reaches the preset high-carbon activation conditions. If the power grid is available and the power grid's carbon emission factor at the time of the call request does not meet the preset high-carbon activation conditions, the power grid will supplement the critical load with the power that the critical load needs to meet.
5. The method according to claim 4, characterized in that, For the carbon attribute power range to be called up, obtain the upper limit of the releaseable power of this type of carbon attribute power range in the current scheduling period; Compare the upper limit of releaseable power with the power to be met for critical loads; If the upper limit of the releaseable power is less than the power to be satisfied by the critical load, then the upper limit of the releaseable power is used as the actual power released to the critical load in this carbon attribute power range, and the power to be satisfied by the critical load is deducted from the actual power. The power to be satisfied by the critical load after deduction is used as the power to be satisfied by the critical load when the next priority carbon attribute power range is called. If the upper limit of the releaseable power is not less than the power to be satisfied by the critical load, then the power to be satisfied by the critical load shall be used as the actual power released to the critical load by the carbon attribute power range, and the carbon attribute power range shall be stopped.
6. The method according to claim 5, characterized in that, Retrieve the maximum releaseable power of the carbon attribute power range to be invoked during the current scheduling period, including: The remaining power in the carbon attribute power range to be called is multiplied by the energy storage discharge efficiency and then divided by the duration of the current scheduling period to obtain the first candidate power. The maximum allowable discharge power of the energy storage device is used as the second candidate power. The first candidate power is compared with the second candidate power, and the smaller of the two is taken as the upper limit of the release power of the carbon attribute power range to be invoked.
7. The method according to claim 4, characterized in that, Obtaining the power to be met for critical loads specifically includes: forming the minimum power consumption of each type of critical load in the current scheduling period based on the minimum power consumption required to maintain operation of each type of critical load in the current scheduling period; The minimum power consumption corresponding to each type of critical load is added together to obtain the total minimum power demand of critical loads during the current dispatch period; the power already supplied to critical loads is subtracted from the total minimum power demand of critical loads to obtain the power to be satisfied by critical loads during the current dispatch period.
8. The method according to claim 7, characterized in that, The critical load set includes data centers, cold chain warehouses, and electric vehicles that are about to leave the site; The minimum power consumption of a data center is determined by adding the basic operating power of the servers to the minimum cooling power required to maintain the normal operating temperature of the data center. The minimum power consumption of a cold chain warehouse is determined by the minimum refrigeration requirements of the cold chain warehouse and the current coefficient of performance of the electric refrigeration unit. The minimum power consumption of electric vehicles about to leave the site is determined by the amount of electricity each vehicle needs to replenish before leaving, the duration of the current dispatch period, and the charging efficiency.
9. The method according to claim 8, characterized in that, When a sudden drop in photovoltaic power supply is detected in the zero-carbon park, a non-critical load reduction command is generated, and a cold storage device release command is also generated. The non-critical load reduction command is used to reduce the power consumption of non-critical loads, and the cold storage device release command is used to control the cold storage device to release cold to replace part of the power demand of the electric refrigeration unit. The reduction in non-critical loads and the amount of cold storage and release are determined together based on the energy gap caused by the sudden drop in photovoltaic power and the cooling load demand. The energy gap is the difference between the predicted photovoltaic power and the actual photovoltaic power, and the cooling load demand is the cooling power required for critical loads with cooling needs to maintain normal operation.
10. The method according to claim 9, characterized in that, Non-critical loads include hydrogen electrolysis production loads, ordinary vehicle charging loads, office air conditioning loads, and production loads that can be delayed; Non-critical load reduction commands control the suspension of operation of electrolytic hydrogen production load, suspension of operation of ordinary vehicle charging load, reduction of office air conditioning load from original power to first set power, and reduction of deferred production load from original power to second set power. The execution process of the cold storage device's cold release command includes: determining the release power based on the current cold storage capacity, cold release efficiency, and the current scheduling period duration; The available cooling power is compared with the cooling load demand, and the smaller of the two is taken as the actual cooling power. After the cooling is released, the remaining cooling capacity of the cold storage device is updated according to the actual cooling power, the duration of the current scheduling period, and the cooling efficiency.