A method, device and medium for controlling dual converters in a semi-direct drive wind turbine.

By distributing and compensating torque values ​​in the semi-direct drive wind turbine, the problem of torque distribution and coordinated control of dual converters was solved, the coordinated control of dual converters was realized, and the operational stability and reliability of the unit were improved.

CN123073995APending Publication Date: 2026-11-10WINDEY ENERGY TECHNOLOGY GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611585769.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing semi-direct drive wind turbines lack torque distribution and coordination control mechanisms suitable for dual-converter architectures, making it difficult to achieve reasonable distribution of torque commands and coordinated control of operating status between the two converters.

Method used

By acquiring the target power and real-time operating status parameters, the total torque value is determined and allocated as a first torque value and a second torque value, which are then sent to the first converter and the second converter respectively. The actual torque and power feedback of each converter are obtained, and compensation, adjustment and correction are performed to form a closed-loop control, thereby achieving coordinated control of the two converters.

Benefits of technology

This improves the coordination of dual converter operation and the stability of unit power control, thereby enhancing the reliability and safety of the unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123073995A_ABST
    Figure CN123073995A_ABST
Patent Text Reader

Abstract

This invention discloses a dual-converter control method, device, and medium for a semi-direct-drive wind turbine, relating to the field of wind power generation technology. The method determines the total torque value of the turbine based on the target power and real-time operating parameters, and allocates it as a first torque value and a second torque value, which are then sent to the first and second converters respectively. This allows the two converters to share the torque demand of the turbine, achieving coordinated control of the dual converters based on total torque allocation. During operation, the actual torque and actual power fed back from the first and second converters are acquired respectively, thereby achieving torque compensation adjustment based on the actual operating state of the two converters. Simultaneously, the sum of the actual power of the two converters forms the total output power feedback of the turbine, performing closed-loop correction of the total torque, improving the coordination of dual-converter operation and the stability of turbine power control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wind power generation technology, and in particular to a method, device and medium for controlling dual converters in a semi-direct drive wind turbine. Background Technology

[0002] With the rapid development of offshore wind power, the capacity of individual wind turbine units is constantly increasing, while higher requirements are being placed on reliability and maintainability. Semi-direct-drive wind turbine units, employing a transmission chain structure of a single-stage gearbox, a medium-speed permanent magnet synchronous generator, and a full-power converter, balance size, reliability, and efficiency, and have become one of the mainstream technologies for large-scale units. Existing semi-direct-drive wind turbine units still use a single converter torque control method in the converter stage, with a single converter handling all power conversion and torque regulation of the unit. As the rated capacity of the units continues to rise, the power of a single converter is no longer sufficient to meet the capacity requirements of large-scale units.

[0003] However, semi-direct-drive wind turbines employing dual converters require both converters to share the generator's power output. Therefore, it's essential to rationally allocate the unit's torque demand between the two converters and implement coordinated control based on their actual operating states. Existing torque control schemes for single converters typically only calculate and adjust torque commands for a single converter, lacking a torque distribution and coordinated control mechanism suitable for dual-converter architectures. This makes it difficult to achieve rational allocation of torque commands and coordinated control of operating states between the two converters. Summary of the Invention

[0004] The purpose of this invention is to provide a dual-converter control method, device, and medium for semi-direct-drive wind turbine generators, which solves the problem that existing semi-direct-drive wind turbine generators lack torque distribution and coordination control mechanisms suitable for dual-converter architectures.

[0005] To solve the above-mentioned technical problems, the present invention provides a dual-converter control method for semi-direct drive wind turbine generators, comprising: Obtain the target power and collect real-time operating status parameters of the wind turbine; The total torque value is determined based on the target power and the real-time operating status parameters; The total torque value is allocated into a first torque value and a second torque value, and then sent to the first converter and the second converter respectively. The first actual torque value and the first actual power fed back by the first converter, and the second actual torque value and the second actual power fed back by the second converter are obtained respectively. Based on the deviation between the first actual torque value and the first torque value, and the deviation between the second actual torque value and the second torque value, the first torque value and / or the second torque value are compensated and adjusted. The first actual power and the second actual power are summed to determine the total output power of the unit, and the total torque value is corrected according to the deviation between the total output power and the target power.

[0006] Optionally, compensation adjustment is performed on the first torque value and / or the second torque value, including: Determine whether the deviation between the first actual torque value and the first torque value, and whether the deviation between the second actual torque value and the second torque value exceeds the preset torque control dead zone; When the deviation between the first actual torque value and the first torque value and / or the deviation between the second actual torque value and the second torque value exceeds the torque control dead zone, dynamic compensation is performed based on the deviation component that exceeds the torque control dead zone.

[0007] Optional, also includes: When an abnormal operating state of any converter is detected, the distribution ratio of the first torque value and the second torque value is adjusted to increase the distribution ratio of the torque value corresponding to the converter with normal operating state. When any converter is detected to be out of service, the power borne by the converter in normal operation is adjusted according to the relationship between the current target power and the rated power of the converter in normal operation. When the target power is greater than the rated power, the power borne by the converter in normal operation is adjusted to the rated power. When the target power is less than or equal to the rated power, the power borne by the converter in normal operation is adjusted to the target power.

[0008] Optionally, before the step of determining the total torque value, the method further includes: Obtain the real-time wind speed and direction of the wind turbine. When the real-time wind speed is between the preset cut-in wind speed and the preset cut-out wind speed and the real-time wind direction meets the preset wind direction condition, a pitch start command is sent to the pitch system and the real-time speed of the generator is obtained. When the real-time speed reaches the preset grid-connected speed threshold, the grid-connected control of the first converter and the second converter is executed.

[0009] Optionally, grid-connected control of the first converter and the second converter is performed, including: Send grid connection commands to the first converter and the second converter respectively, and obtain grid connection feedback from the first converter and the second converter respectively; When both the first converter and the second converter report successful grid connection, the dual converter torque distribution control is initiated. When only one converter is successfully connected to the grid, record the fault status of the converter that failed to connect to the grid and execute grid disconnection control; When both the first converter and the second converter report grid connection failure, a grid connection failure alarm is output and a shutdown control is executed.

[0010] Optionally, after the step of determining the total torque value, the method further includes: When the total torque value exceeds the torque safety threshold of the wind turbine, the total torque value is automatically limited and an early warning signal is generated. After the step of allocating the total torque value to a first torque value and a second torque value, the method further includes: When the first torque value exceeds the torque safety threshold of the first converter, the first torque value is automatically limited and a warning signal is generated. When the second torque value exceeds the torque safety threshold of the second converter, the second torque value is automatically limited and a warning signal is generated.

[0011] Optional, also includes: When the compensation amount of the first torque value and / or the second torque value reaches the preset maximum compensation amount, and the deviation between the first torque value and / or the second torque value and the corresponding actual torque value still exceeds the torque control dead zone and continues for a preset duration, fault protection is triggered and shutdown control is executed.

[0012] Optionally, after the step of collecting the real-time operating status parameters of the wind turbine, the method further includes: The real-time operating status parameters are compared with preset operating parameter ranges respectively; Real-time operating status parameters that exceed the range of the operating parameters are identified as abnormal and distorted data and removed.

[0013] To address the aforementioned technical problems, the present invention also provides a dual-converter control device for a semi-direct-drive wind turbine generator set, comprising: Memory, used to store computer programs; A processor is used to execute the computer program to implement the steps of the above-described semi-direct drive wind turbine dual converter control method.

[0014] To address the aforementioned technical problems, the present invention also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps of the aforementioned semi-direct drive wind turbine dual converter control method.

[0015] This invention provides a dual-converter control method for semi-direct-drive wind turbine units. By acquiring the target power and real-time operating parameters of the wind turbine unit, the total torque value of the unit is determined based on these parameters. This total torque value is then allocated into a first torque value and a second torque value, which are sent to the first and second converters respectively, allowing both converters to share the torque demand of the unit. During operation, the actual torque and actual power fed back from the first and second converters are acquired. The actual torque of each converter is compared with its corresponding torque value. When a deviation exists, the corresponding torque value is compensated and adjusted, thereby achieving torque compensation control based on the actual operating state of the two converters. Simultaneously, the actual power fed back from the two converters is summed to obtain the total output power of the unit. This total output power is compared with the target power, and the total torque value is corrected based on the deviation between the two. This allows the total torque to be dynamically adjusted according to changes in the actual output power of the unit, forming a closed-loop control with the total output power of the unit as feedback. Therefore, this invention utilizes the distribution of the total torque of the unit between the first and second converters, and combines the actual torque feedback of the two converters to compensate and adjust the corresponding torque values, thereby realizing coordinated control of the dual converters based on the total torque distribution; at the same time, the total output power of the unit is fed back by the sum of the actual power of the two converters, and the total torque is corrected in a closed loop, thereby improving the coordination of the dual converter operation and the stability of the unit power control.

[0016] Furthermore, the dual converter control device for semi-direct drive wind turbine generators and the computer-readable storage medium provided by this invention have the same effect as above. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the prior art and embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 A schematic diagram of a dual-converter control system for a semi-direct-drive wind turbine provided by the present invention; Figure 2 A schematic diagram of a dual-converter control method for a semi-direct-drive wind turbine provided by the present invention; Figure 3 A schematic diagram of another semi-direct drive wind turbine dual converter control method provided by the present invention; Figure 4 A schematic diagram of a dual-converter control device for a semi-direct drive wind turbine generator provided by the present invention; Figure 5 This is a schematic diagram of a computer-readable storage medium provided by the present invention. Detailed Implementation

[0019] The core of this invention is to provide a method, device, and medium for controlling dual converters in a semi-direct drive wind turbine.

[0020] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Semi-direct-drive wind turbines employing dual converters require both converters to share the generator's power output. Therefore, it's essential to rationally allocate the unit's torque demand between the two converters and implement coordinated control based on their actual operating states. Existing torque control schemes for single converters typically only calculate and adjust torque commands for a single converter, lacking a torque distribution and coordinated control mechanism suitable for dual-converter architectures. This makes it difficult to achieve rational allocation of torque commands and coordinated control of operating states between the two converters.

[0022] To address the aforementioned technical problems, this invention provides a dual-converter control method for semi-direct-drive wind turbine generators.

[0023] Please see Figure 1 , Figure 1 This is a schematic diagram of a dual-converter control system for a semi-direct-drive wind turbine provided by the present invention.

[0024] like Figure 1As shown, the wind farm is used for farm-level power dispatching of wind turbines and sends target power to the wind turbine main control system. The main control system is the main execution entity of the dual-converter control method in this embodiment. The main control system receives the target power sent by the wind farm and, combined with the current operating status of the wind turbine, determines the total torque required by the unit. It then distributes the total torque to form torque commands corresponding to the first and second converters, respectively. Simultaneously, it receives the operating status feedback from the two converters and adjusts the torque commands based on the feedback results. The first and second converters respectively receive the torque commands sent by the main control system and control the electromagnetic torque of the generator according to the corresponding torque commands. At the same time, the two converters respectively feed back their own operating status to the main control system, such as actual torque and actual power, enabling the main control system to obtain the actual operating conditions of the two converters. The pitch system is used to execute the blade angle or speed-related control commands sent by the main control system and return feedback information such as blade position to the main control system. The main control system can coordinate the start-up and operation of the wind turbine based on operating conditions such as wind speed, wind direction, generator speed, and blade angle.

[0025] For details, please see Figure 2 , Figure 2 This is a schematic diagram of a dual-converter control method for a semi-direct-drive wind turbine provided by the present invention.

[0026] like Figure 2 As shown, the method includes: S11: Obtain the target power and collect the real-time operating status parameters of the wind turbine; Specifically, the target power refers to the expected power output of the wind turbine to the grid, which is issued by the energy management platform to the main control system of the wind turbine based on the power dispatch requirements of the wind farm. Real-time operating status parameters are used to reflect the current operating conditions of the wind turbine, including relevant parameters that reflect the operating status of the turbine during operation, such as real-time wind speed, turbine speed, and blade angle.

[0027] Specifically, the real-time operating status parameters collected by the main control system come from the unit's supporting detection and execution components, including the permanent magnet generator, dual converters, speed encoder, anemometer, and pitch system. Among them, the anemometer collects real-time wind speed and direction data of the wind field environment, the speed encoder obtains the real-time operating speed of the generator, and the pitch system collects the deflection angle of the wind turbine blades in real time.

[0028] S12: Determine the total torque value based on the target power and real-time operating status parameters; S13: Allocate the total torque value into a first torque value and a second torque value, and send them to the first converter and the second converter respectively; Specifically, the total torque value refers to the unit torque control requirement determined by the main control system to enable the wind turbine to reach the target power. It characterizes the torque control quantity that the dual converters as a whole need to undertake under the current operating conditions. The first torque value and the second torque value are the torque control commands allocated to the first and second converters, respectively. The first and second converters are respectively connected to the electrical side of the generator and are used to control the electromagnetic torque of the generator according to the torque commands issued by the main control system, thereby participating in the active power output of the unit.

[0029] Specifically, the total torque value is determined through a preset power-torque closed-loop calculation model. The main control system determines the aerodynamic power that the impeller can currently capture, as well as the torque corresponding to the low-speed shaft of the impeller, based on the collected real-time wind speed. This low-speed shaft torque is converted by a semi-direct drive gearbox to obtain the input mechanical torque that matches the medium-speed permanent magnet synchronous generator. Subsequently, the electromagnetic torque corresponding to the medium-speed permanent magnet synchronous generator is determined based on the input mechanical torque, and the corresponding electromagnetic power is also determined. After subtracting the power losses of the generator body and the full-power converter, the active power output of the unit connected to the grid is finally obtained, thus establishing a power-torque conversion model. Based on this, the main control system calculates the total torque value according to the received target power. The total torque value is then allocated into a first torque value and a second torque value. Under the condition of normal parallel operation of the dual converters, since the two converters share the unit power and are connected to the same generator at the same speed, the main control system equally distributes the total torque value into the first torque value and the second torque value, that is, the first torque value and the second torque value are equal, each being 50% of the total torque value. When any converter fails, the distribution ratio of the first torque value and the second torque value can be dynamically adjusted.

[0030] S14: Obtain the first actual torque value and the first actual power fed back by the first converter, and the second actual torque value and the second actual power fed back by the second converter, respectively; Specifically, the actual torque value refers to the torque control quantity actually executed and fed back by the strain gauge, reflecting the torque currently actually borne by the strain gauge. The actual power refers to the active power currently actually output by the strain gauge, reflecting the power output actually borne by the strain gauge. Obtaining the first and second actual torque values ​​is mainly used for closed-loop feedback control of the converter torque output to ensure that both converters operate according to the first and second torque values. Obtaining the first and second actual power is mainly used for subsequent determination of the unit's total output power and for total torque closed-loop correction.

[0031] S15: Based on the deviation between the first actual torque value and the second actual torque value, and the deviation between the second actual torque value and the second torque value, compensate and adjust the first torque value and / or the second torque value. Specifically, the main control system determines whether the actual torque borne by the two converters matches their respective torque distribution requirements based on the first torque deviation and the second torque deviation. When any torque deviation meets the preset compensation condition, the corresponding torque value is compensated and adjusted. For example, a torque control dead zone can be preset. When the deviation between the actual torque and the corresponding torque value does not exceed the torque control dead zone, no compensation adjustment is performed; when the deviation exceeds the torque control dead zone, dynamic compensation is performed on the deviation component that exceeds the torque control dead zone.

[0032] S16: Sum the first actual power and the second actual power to determine the total output power of the unit, and correct the total torque value based on the deviation between the total output power and the target power.

[0033] Specifically, the main control system compares the calculated total output power with the target power to obtain the power deviation between the actual output power and the target power. When the total output power is less than the target power, it indicates that the actual output power of the current unit is insufficient, and the main control system can increase the total torque value accordingly. When the total output power is greater than the target power, it indicates that the actual output power of the current unit exceeds the target power, and the main control system can decrease the total torque value accordingly. The corrected total torque value is then redistributed to the first and second converters.

[0034] Specifically, during startup, the target power and real-time operating status parameters of the wind turbine are first acquired. Based on these parameters, the total torque value of the unit is determined and allocated as a first torque value and a second torque value, which are then sent to the first and second converters respectively, allowing both converters to share the unit's torque requirements. During operation, the actual torque and power fed back from the first and second converters are acquired. The actual torque of each converter is compared with its corresponding torque value. When a deviation exists, the corresponding torque value is compensated and adjusted, thereby achieving torque coordination based on the actual operating status of the two converters. Simultaneously, the actual power fed back from the two converters is summed to obtain the total output power of the unit. This total output power is compared with the target power, and the total torque value is corrected based on the deviation. This allows the total torque to be dynamically adjusted according to changes in the actual output power of the unit, forming a closed-loop control system with the total output power of the unit as feedback.

[0035] As can be seen, this embodiment utilizes the distribution of the total torque of the unit between the first and second converters, and combines the actual torque feedback of the two converters to compensate and adjust the corresponding torque values, thereby realizing coordinated control of the dual converters based on the total torque distribution; at the same time, the total output power of the unit is fed back by the sum of the actual power of the two converters, and the total torque is corrected in a closed loop, thereby improving the coordination of the dual converter operation and the stability of the unit power control.

[0036] Based on the above embodiments: As an optional embodiment, compensating for the first torque value and / or the second torque value includes: Determine whether the deviation between the first actual torque value and the second actual torque value, and whether the deviation between the second actual torque value and the second torque value exceeds the preset torque control dead zone; When the deviation between the first actual torque value and the second actual torque value exceeds the torque control dead zone, dynamic compensation is performed based on the deviation component that exceeds the torque control dead zone.

[0037] Specifically, to avoid frequent adjustments in the actual torque of the first and second converters due to measurement errors or normal fluctuations during operation, a torque control dead zone is pre-set. The torque control dead zone characterizes the allowable torque deviation range between the actual torque of the converter and its corresponding torque value. When the deviation between the actual torque and the corresponding torque value does not exceed the torque control dead zone, the main control system does not compensate for the corresponding torque value. When the deviation exceeds the torque control dead zone, it is considered that there is a torque deviation between the actual torque of the converter and its torque control requirements, requiring adjustment. The torque control dead zone can be pre-set according to the operating characteristics of the wind turbine and the converter; for example, it can be set to 5% of the rated torque. When any deviation exceeds the torque control dead zone, the main control system determines the portion of the deviation exceeding the torque control dead zone as the deviation component and dynamically compensates for the corresponding torque value based on the deviation component.

[0038] Furthermore, to avoid sudden changes in unit torque and power caused by excessive single compensation, the torque compensation amount within each control cycle is limited. The maximum allowable adjustment value within a single cycle is 0.5% of the rated torque, while the maximum compensation deviation is limited to no more than 5% of the rated torque. The main control system gradually adjusts the corresponding torque value based on the deviation component detected in each control cycle, so that the actual torque of the converter gradually approaches the corresponding torque control value.

[0039] As can be seen, this embodiment ensures stable system operation while adjusting the torque value of the input converter by setting a torque control dead zone.

[0040] As an optional embodiment, it also includes: When an abnormal operating state of any converter is detected, the distribution ratio of the first torque value and the second torque value is adjusted to increase the distribution ratio of the torque value corresponding to the converter with normal operating state. When any converter is detected to be out of service, the power borne by the converter in normal operation is adjusted according to the relationship between the current target power and the rated power of the converter in normal operation. When the target power is greater than the rated power, the power borne by the converter in normal operation is adjusted to the rated power. When the target power is less than or equal to the rated power, the power borne by the converter in normal operation is adjusted to the target power.

[0041] Specifically, this embodiment introduces a fault-tolerance mechanism during dual-converter operation to enhance the unit's continuous operation capability when a single converter malfunctions. When an abnormal operating status of any converter is detected, but it can still maintain operation, it indicates that the converter no longer has the ability to normally bear torque according to the original allocation ratio, such as high temperature, current deviation, or performance degradation of local components. At this time, the main control system adjusts the allocation ratio of the first torque value and the second torque value, increasing the torque value allocation ratio corresponding to the converter with normal operating status and correspondingly reducing the torque value allocation ratio of the abnormal converter, so that the actual output power of the unit is maintained as close as possible to the target power, while preventing further deterioration of the abnormal converter.

[0042] Specifically, when any converter is detected to have stopped operating, it means that it has completely withdrawn from power conversion. At this time, another converter in normal operation will solely bear the power output of the unit. When the target power is greater than the rated power of the normal converter, it means that the target power has exceeded the upper limit of the single converter's capacity. In this case, the power borne by the normal converter will be adjusted to the rated power to protect the converter from overload while maintaining the maximum available output as much as possible. When the target power is less than or equal to the rated power of the normal converter, the power borne by the normal converter will be directly adjusted to the target power, so that the unit can continue to generate electricity at the target power without disconnecting from the grid and shutting down.

[0043] As can be seen, this embodiment achieves dynamic torque distribution when a single converter fails by setting the control flow, thereby significantly improving the operational reliability of the semi-direct drive unit.

[0044] Please see Figure 3 , Figure 3 A schematic diagram of another semi-direct drive wind turbine dual converter control method provided by the present invention.

[0045] like Figure 3 As shown, as an optional embodiment, before the step of determining the total torque value, the method further includes: Obtain the real-time wind speed and direction of the wind turbine. When the real-time wind speed is between the preset cut-in wind speed and the preset cut-out wind speed and the real-time wind direction meets the preset wind direction condition, a pitch control command is sent to the pitch control system and the real-time speed of the generator is obtained. When the real-time speed reaches the preset grid-connected speed threshold, the grid-connected control of the first and second converters is executed.

[0046] Specifically, this embodiment focuses on generator start-up and grid connection control, used to complete propeller opening and increase generator speed to a grid-connectable range under safe operating conditions. The cut-in wind speed is the minimum wind speed at which the generator begins generating electricity; below this speed, wind energy is insufficient and the generator will not start. The cut-out wind speed is the maximum wind speed at which the generator must be shut down for protection; above this speed, wind load is excessive, posing a risk of equipment damage. Wind direction conditions refer to the nacelle's deviation from the wind direction being within the allowable tolerance range, meaning the generator has roughly aligned the nacelle with the incoming wind direction through the yaw system to ensure wind energy capture efficiency.

[0047] Specifically, when the energy management platform issues a command to prepare for startup, the main control system acquires the real-time wind speed and direction of the wind turbine. When the real-time wind speed is between the cut-in and cut-out wind speeds, and the real-time wind direction meets the preset wind direction conditions, it indicates that the current wind conditions are suitable for turbine operation, and the main control system sends a pitch control command to the pitch control system. The pitch control system controls the blades to rotate from the standby angle to the starting operating angle, enabling the wind turbine to rotate under wind drive. During this process, the main control system obtains real-time generator speed feedback through the encoder to confirm that the blade movement and speed increase trend are normal. When the generator's real-time speed reaches the preset grid-connected speed threshold, it indicates that the generator speed has risen to the frequency range where the full-power converter can synchronize with the grid, and the main control system executes grid-connected control of the first and second converters. This grid-connected control enables the two converters to complete self-checks, grid synchronization, and grid-connected contactor closure successively, thus establishing the operating prerequisites for subsequent dual-converter torque distribution and power regulation. After grid connection control is completed and both converters are successfully connected to the grid, the main control system then proceeds to determine the total torque value and allocate the total torque value as the first torque value and the second torque value.

[0048] In addition, after the main control system receives the shutdown command from the energy management platform, it simultaneously sends the pitch control command to the pitch control system. Once the generator speed reaches the grid disconnection speed, the grid disconnection control request is synchronously sent to the dual converters. The dual converters execute the grid disconnection command at the same time and feed it back to the main control system. After receiving the grid disconnection command, the main control system feeds it back to the energy management platform, forming a closed-loop control.

[0049] As can be seen, this embodiment controls the timing of propeller start-up and grid connection by using wind speed, wind direction and rotational speed as pre-judgment criteria, ensuring that the dual converters are put into operation only under safe wind conditions and rotational speeds, thereby improving the safety of the unit startup process and the stability of grid connection.

[0050] As an optional embodiment, grid-connected control of the first and second converters is performed, including: Send grid connection commands to the first converter and the second converter respectively, and obtain grid connection feedback from the first converter and the second converter respectively; When both the first and second converters have successfully fed back feedback that they are connected to the grid, the dual converter torque distribution control is initiated. When only one converter is successfully connected to the grid, record the fault status of the converter that failed to connect to the grid and execute grid disconnection control; When both the first and second converters report grid connection failure, a grid connection failure alarm is output and a shutdown control is executed.

[0051] Specifically, this embodiment classifies the grid connection results of two converters to ensure that the grid connection process is controllable. The grid connection command is the command issued by the main control system to each converter to start the grid connection operation. After receiving the command, the converter completes its internal self-test in sequence. The grid connection feedback is the grid connection result reported by the converter to the main control system after completing the above actions, including the success or failure status.

[0052] Specifically, the main control system handles the feedback from the two converters in three scenarios: When both the first and second converters report successful grid connection, it indicates that both converters are synchronously connected to the grid. In this case, the main control system enters the dual-converter torque distribution control phase, which involves determining the total torque value and distributing it as the first and second torque values, thus enabling the unit to enter normal dual-unit coordinated power generation. When only one converter reports successful grid connection while the other fails, it indicates a single-unit grid connection anomaly. The main control system records the fault status of the failed converter and performs grid disconnection control on it. When both the first and second converters report grid connection failure, it indicates that neither converter meets the grid connection requirements. The main control system outputs a grid connection failure alarm and executes shutdown control.

[0053] As can be seen, this embodiment improves the safety and controllability of the grid connection process by classifying and processing the grid connection results.

[0054] As an optional embodiment, the step of determining the total torque value further includes: When the total torque value exceeds the wind turbine's torque safety threshold, the total torque value is automatically limited, and a warning signal is generated. After the step of allocating the total torque value to a first torque value and a second torque value, the following is also included: When the first torque value exceeds the torque safety threshold of the first converter, the first torque value is automatically limited and a warning signal is generated. When the second torque value exceeds the torque safety threshold of the second converter, the second torque value is automatically limited and a warning signal is generated.

[0055] Specifically, this invention introduces a torque safety threshold constraint in the generation and distribution of torque commands to prevent damage to the generator or converter caused by torque commands exceeding the safe range. The torque safety threshold is the upper limit of electromagnetic torque that the equipment or component can safely withstand; exceeding this limit may cause generator overheating, converter overcurrent, or mechanical structure over-limit. After determining the total torque value, the main control system judges whether the total torque value exceeds the wind turbine's torque safety threshold. Since the total torque value corresponds to the total electromagnetic torque that the generator needs to output, its safe upper limit is determined by the generator's rated torque and mechanical bearing capacity; therefore, this threshold can be understood as the generator-side torque safety threshold. When the total torque value exceeds this threshold, the main control system automatically limits the total torque value, restricting it within the safe threshold, and generates a corresponding warning signal to report, preventing the generator from being subjected to excessive torque.

[0056] After the main control system allocates the total torque value into a first torque value and a second torque value, it further determines whether the first torque value and the second torque value exceed their limits. The first torque value is the torque share that the first converter needs to execute, and its safe upper limit is determined by the rated torque of the first converter; the second torque value corresponds to the second converter, and its safe upper limit is determined by the rated torque of the second converter. When the first torque value exceeds the torque safety threshold of the first converter, the first torque value is automatically limited and a warning signal is generated; when the second torque value exceeds the torque safety threshold of the second converter, the second torque value is automatically limited and a warning signal is generated.

[0057] As can be seen, this embodiment limits the total torque value, the first torque value, and the second torque value, thus constraining the generator and the two converters within their respective safe torque ranges. This not only prevents equipment from being damaged by overload but also generates timely warnings, thereby improving the operational safety of the unit.

[0058] As an optional embodiment, it also includes: When the compensation amount of the first torque value and / or the second torque value reaches the preset maximum compensation amount, and the deviation between the first torque value and / or the second torque value and the corresponding actual torque value still exceeds the torque control dead zone and continues for a preset duration, fault protection is triggered and shutdown control is executed.

[0059] Specifically, this embodiment further includes a fault protection mechanism after compensation saturation to prevent the converter from being unable to track torque commands for an extended period, which could damage the equipment or threaten the power grid. The compensation amount refers to the dynamic correction made by the main control system to the first torque value and / or the second torque value to eliminate the deviation between the actual torque and the commanded torque. Its magnitude is limited by a preset maximum compensation amount. If, after the compensation value has reached its upper limit, the deviation between the first actual torque value and the second actual torque value, or the deviation between the second actual torque value and the second torque value, still exceeds the preset dead zone, and this abnormal state persists for a preset duration, the unit will trigger fault protection and perform a shutdown operation.

[0060] As can be seen, this embodiment promptly triggers a protection shutdown when the converter loses its torque tracking capability, thus improving operational reliability.

[0061] As an optional embodiment, after the step of collecting the real-time operating status parameters of the wind turbine, the method further includes: The real-time operating status parameters are compared with the preset operating parameter ranges. Real-time operating status parameters that are outside the range of operating parameters are identified as abnormal and distorted data and removed.

[0062] Specifically, after collecting real-time operating status parameters and before determining the total torque value, this invention also includes a parameter rationality verification step to eliminate distorted data caused by sensor malfunctions or communication interference. The operating parameter range is a preset reasonable value interval for each type of operating status parameter collected by the main control system. For example, the generator speed should be within the range defined by zero to the mechanical speed limit, the blade angle should be within its mechanical travel range (0° to 90°), and the normal wind speed control range is 0 to 50 m / s. This operating parameter range reflects the physical feasible boundaries of the unit for each parameter. When the value of a parameter falls outside its preset range, it indicates that the reading deviates from the unit's possible true operating condition, most likely due to abnormal distortion caused by sensor failure, signal interference, or communication packet loss, rather than the actual operating state of the unit. The main control system identifies parameters exceeding the operating parameter range as abnormal distorted data and removes them from the subsequent total torque value calculation.

[0063] It is evident that by verifying the reasonable range of the collected parameters and eliminating abnormal and distorted data before torque calculation, the reliability of control commands and the safety of the unit can be improved, preventing abnormal distortion from leading to the calculation of incorrect torque commands.

[0064] To address the aforementioned technical problems, this invention also provides a dual-converter control device for semi-direct-drive wind turbine generators. Please refer to [link / reference]. Figure 4 , Figure 4 This is a schematic diagram of a dual converter control device for a semi-direct drive wind turbine provided by the present invention.

[0065] like Figure 4 As shown, the device includes: Memory 21 is used to store computer programs; The processor 22 is used to execute a computer program to implement the steps of the semi-direct drive wind turbine dual converter control method as described in any of the embodiments above.

[0066] The device also includes: Input interface 23, connected to processor 22 via communication bus 26, is used to acquire externally imported computer programs, parameters, and instructions, and save them to memory 21 under the control of processor 22. Input interface 23 can be connected to an input device to receive parameters or instructions manually entered by the user. This input device can be a touch layer covering the display screen, or buttons, a trackball, or a touchpad mounted on the terminal casing.

[0067] The display unit 24 is connected to the processor 22 via the communication bus 26 and is used to display data sent by the processor 22. The display unit 24 can be a liquid crystal display screen or an electronic ink display screen, etc.

[0068] Network port 25 is connected to processor 22 via communication bus 26, and is used for communication with external terminal devices. The communication technology used for this connection can be wired or wireless, such as mobile high-definition link technology, universal serial bus, high-definition multimedia interface, wireless fidelity technology, Bluetooth communication technology, Bluetooth low-power communication technology, or IEEE 802.11s-based communication technology. For a description of the semi-direct drive wind turbine dual converter control device provided by this invention, please refer to the embodiments of the semi-direct drive wind turbine dual converter control method described above; further details will not be repeated here.

[0069] To address the aforementioned technical problems, the present invention also provides a computer-readable storage medium. Please see below. Figure 5 , Figure 5 This is a schematic diagram of a computer-readable storage medium provided by the present invention.

[0070] like Figure 5 As shown, a computer program 31 is stored on a computer-readable storage medium. When the computer program 31 is executed by a processor, it implements the steps of the above-described semi-direct drive wind turbine dual converter control method.

[0071] The aforementioned computer-readable storage medium 30 may include, but is not limited to, various media capable of storing computer programs, such as USB flash drives, read-only memory (ROM), random access memory (RAM), portable hard drives, magnetic disks, or optical disks.

[0072] For a description of the computer-readable storage medium provided by this invention, please refer to the embodiments of the above-described semi-direct drive wind turbine dual converter control method; the present invention will not be repeated here.

[0073] The various embodiments described in this specification are presented in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. It should also be noted that in this specification, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

Claims

1. A dual-converter control method for a semi-direct-drive wind turbine generator set, characterized in that, include: Obtain the target power and collect real-time operating status parameters of the wind turbine; The total torque value is determined based on the target power and the real-time operating status parameters; The total torque value is allocated into a first torque value and a second torque value, and then sent to the first converter and the second converter respectively. The first actual torque value and the first actual power fed back by the first converter, and the second actual torque value and the second actual power fed back by the second converter are obtained respectively. Based on the deviation between the first actual torque value and the first torque value, and the deviation between the second actual torque value and the second torque value, the first torque value and / or the second torque value are compensated and adjusted. The first actual power and the second actual power are summed to determine the total output power of the unit, and the total torque value is corrected according to the deviation between the total output power and the target power.

2. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 1, characterized in that, Compensation adjustment of the first torque value and / or the second torque value includes: Determine whether the deviation between the first actual torque value and the first torque value, and the deviation between the second actual torque value and the second torque value, exceed the preset torque control dead zone; When the deviation between the first actual torque value and the first torque value and / or the deviation between the second actual torque value and the second torque value exceeds the torque control dead zone, dynamic compensation is performed based on the deviation component that exceeds the torque control dead zone.

3. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 1, characterized in that, Also includes: When an abnormal operating state of any converter is detected, the distribution ratio of the first torque value and the second torque value is adjusted to increase the distribution ratio of the torque value corresponding to the converter with normal operating state. When any converter is detected to be out of service, the power borne by the converter in normal operation is adjusted according to the relationship between the current target power and the rated power of the converter in normal operation. When the target power is greater than the rated power, the power borne by the converter in normal operation is adjusted to the rated power. When the target power is less than or equal to the rated power, the power borne by the converter in normal operation is adjusted to the target power.

4. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 1, characterized in that, Prior to the step of determining the total torque value, the method further includes: Obtain the real-time wind speed and direction of the wind turbine. When the real-time wind speed is between the preset cut-in wind speed and the preset cut-out wind speed and the real-time wind direction meets the preset wind direction condition, a pitch start command is sent to the pitch system and the real-time speed of the generator is obtained. When the real-time speed reaches the preset grid-connected speed threshold, the grid-connected control of the first converter and the second converter is executed.

5. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 4, characterized in that, Performing grid-connection control of the first converter and the second converter includes: Send grid connection commands to the first converter and the second converter respectively, and obtain grid connection feedback from the first converter and the second converter respectively; When both the first converter and the second converter report successful grid connection, the dual converter torque distribution control is initiated. When only one converter is successfully connected to the grid, record the fault status of the converter that failed to connect to the grid and execute grid disconnection control; When both the first converter and the second converter report grid connection failure, a grid connection failure alarm is output and a shutdown control is executed.

6. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 1, characterized in that, Following the step of determining the total torque value, the method further includes: When the total torque value exceeds the torque safety threshold of the wind turbine, the total torque value is automatically limited and an early warning signal is generated. After the step of allocating the total torque value to a first torque value and a second torque value, the method further includes: When the first torque value exceeds the torque safety threshold of the first converter, the first torque value is automatically limited and a warning signal is generated. When the second torque value exceeds the torque safety threshold of the second converter, the second torque value is automatically limited and a warning signal is generated.

7. The dual-converter control method for semi-direct drive wind turbine generators as described in claim 2, characterized in that, Also includes: When the compensation amount of the first torque value and / or the second torque value reaches the preset maximum compensation amount, and the deviation between the first torque value and / or the second torque value and the corresponding actual torque value still exceeds the torque control dead zone and continues for a preset duration, fault protection is triggered and shutdown control is executed.

8. The semi-direct drive wind turbine dual-converter control method as described in any one of claims 1 to 7, characterized in that, Following the step of collecting real-time operating status parameters of the wind turbine, the method further includes: The real-time operating status parameters are compared with preset operating parameter ranges respectively; Real-time operating status parameters that exceed the range of the operating parameters are identified as abnormal and distorted data and removed.

9. A dual-converter control device for a semi-direct-drive wind turbine generator set, characterized in that, include: Memory, used to store computer programs; A processor, configured to execute the computer program to implement the steps of the semi-direct drive wind turbine dual converter control method as described in any one of claims 1 to 8.

10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, implements the steps of the semi-direct drive wind turbine dual converter control method as described in any one of claims 1 to 8.