A micropile for shallow foundation reinforcement and its construction process

By using micro steel pipe piles and cast-in-place pile caps to form a composite foundation system in shallow foundations, the problems of limited construction space and inconsistent reinforcement effects are solved, achieving efficient and low-cost reinforcement.

CN123109135APending Publication Date: 2026-11-17GANSU ARCHITECTURE DESIGN ACAD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611465539.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for shallow foundation reinforcement of existing buildings suffer from problems such as limited construction space, inability to bring large equipment to the site, high cost of conventional micropiles, complex procedures, and inconsistent reinforcement effects.

Method used

Miniature steel pipe piles are driven directly into the stratum and, after grouting, are not pulled out to serve as load-bearing piles. Combined with cast-in-place pile caps, a composite foundation system is formed. High-pressure grouting forms grout veins to reinforce the soil, and the piles and soil share the load.

Benefits of technology

It achieves efficient reinforcement in confined spaces, with controllable quality, reduced engineering costs, adaptability to different geological conditions, and the formation of a reliable composite stress system, avoiding inconsistent reinforcement effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109135A_ABST
    Figure CN123109135A_ABST
Patent Text Reader

Abstract

This invention discloses a micropile and its construction process for shallow foundation reinforcement, belonging to the field of geotechnical engineering foundation treatment technology. The micropile structure includes a perforated grouting micro-steel pipe pile, a pile tip, a pile cap, and a grout vein reinforcement body. The micro-steel pipe pile is segmented and extended, with grouting holes opened in the pile body and pile tip. It is directly driven into the ground using a pneumatic impactor. After grouting, the steel pipe is retained as a load-bearing component. The pile head is cut below the ground level, and a cavity is excavated to cast a high-strength pile cap. The pile cap simultaneously fills the perforated ground level, achieving a rigid connection between the micropile and the existing ground level, forming a composite foundation where the micropile, grouting-modified soil, and existing foundation work together to bear loads. This invention can be used for the reinforcement of existing factories and buildings in confined spaces without interrupting production. This invention solves the problems of bulky traditional micropile equipment and inconsistent quality in pure grouting reinforcement. The process is simple, the cost is low, and it has good adaptability to backfill soil, collapsible loess, and silty sand shallow foundations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of geotechnical engineering foundation treatment technology, and particularly relates to a micropile for shallow foundation reinforcement and its construction process. Background Technology

[0002] Existing technologies for reinforcing shallow foundations of existing buildings mainly include micropiles (diameter 100mm~400mm, with 150mm~300mm being the most common in engineering applications) and ordinary grouting methods.

[0003] 1. Micropile reinforcement is mainly used for foundation soil reinforcement. Due to its relatively large pile diameter, construction requires heavy machinery, making it unsuitable for large-area soil reinforcement of building cores. There are no rigorous theoretical calculation methods in the design phase; most calculations rely on empirical judgment and approximate calculations. Micropiles are generally divided into two types: cast-in-place piles and precast piles; (1) General steps of cast-in-place pile construction: pile foundation hole formation, earthwork transportation, steel cage fabrication, steel cage placement in the hole, concrete pouring. The process is complex, requires a large construction space, diverse equipment, and high project cost.

[0004] (2) General steps for using precast piles: construction preparation and positioning, placement of pile driver or static pressure pile driver, hoisting of precast pile body, pile driving, pile splicing, and termination of pile driving. Precast piles have a significant impact on the environment, poor geological adaptability, many potential quality problems, large equipment size, and high cost.

[0005] 2. Conventional grouting is a mature technology that uses pressure to inject solidifiable grout into the pores or fissures of the foundation to improve the physical and mechanical properties of the soil.

[0006] Its main methods and steps are: construction preparation and positioning, equipment drilling, hole cleaning and grouting pipe installation, grout injection, pipe removal and hole sealing; Its main drawbacks are: simple grouting is easily affected by the inherent characteristics of the geological body. The site's soil and rock masses exhibit strong spatial variability in key parameters such as strength, compressibility, and permeability, easily leading to uneven grout distribution and uncertain diffusion range. Due to the uncertainty of geological conditions, the disturbance of the construction process, and the complexity of the grout-soil interaction mechanism, grouting reinforcement is essentially a probabilistic technical process. The resulting reinforced body has inherent variability in spatial distribution, strength improvement, and uniformity. Therefore, even under strict construction quality control, deviations from the design expectations in localized areas are an objective phenomenon that is difficult to completely avoid with this technology. Summary of the Invention

[0007] The purpose of this invention is to provide a micropile and its construction process for shallow foundation reinforcement, solving the technical problems of shallow and weak soil foundation reinforcement in existing buildings and factory cores, such as limited construction space, inability to bring in large equipment, single stress distribution and inconsistent reinforcement effects of pure grouting reinforcement, and high cost and complex procedures of conventional micropile. This invention achieves direct driving of micro steel pipes into the stratum, with the steel pipes not being pulled out after grouting and serving as the load-bearing pile body. The cast-in-place pile cap achieves a rigid connection between the pile body and the existing ground / foundation, constructing a composite foundation system in which micropile-grouting soil-existing foundation share the load. This method has a small construction space, controllable quality, and low cost, making it suitable for reinforcing shallow indoor foundations of existing buildings without interrupting production.

[0008] To achieve the above objectives, the present invention provides the following technical solution: A micropile for shallow foundation reinforcement includes a grouted microsteel pipe pile, a pile tip, a pile cap, and a grout vein reinforcement body; The grouting micro steel pipe pile is a seamless carbon steel pipe. The steel pipe is set in sections, and each section of the steel pipe is connected to each other. Grouting holes are opened in the pile body along the axial direction at a set interval. A conical pile tip is fixedly welded to the bottom end of the grouting micro steel pipe pile, and a pile tip grouting hole is set around the pile tip. The existing ground or foundation has a pile location opening. The grouting micro steel pipe pile is driven directly through the pile location opening into the soil layer to be reinforced. The lower end of the pile enters the stable bearing layer. The total length of the grouting micro steel pipe pile is ≤5.0m. High-pressure grout is injected into the inner cavity of the grouting micro steel pipe pile and diffuses outward through the grouting holes in the pile body and the grouting holes at the pile tip, forming a grout vein solidified body in the soil around the pile and in the gap between the ground and the soil. The pile head of the grouting micro steel pipe pile is cut off to at least 100mm below the bottom of the ground. A cavity is formed by excavating around the pile head. The cavity and the pile cap are integrally cast into the pile position opening. The pile cap wraps around the pile head and is rigidly connected to the existing ground or foundation.

[0009] As a preferred embodiment of the present invention, the grouting micro steel pipe pile has an outer diameter of 48mm, a wall thickness of 3.5mm, and a single section of steel pipe with a length of 1.0m, 1.5m, or 2.0m. The grouting holes in the pile body have a diameter of 10mm and are arranged alternately at 300mm intervals along the axial direction of the pile body. Grouting holes are also arranged within 250mm of the pile tip.

[0010] As a preferred embodiment of the present invention, the grouting micro steel pipe piles are arranged in a rectangular or equilateral triangle pattern, with a pile spacing of 1.0m-2.0m, a single micro pile construction plane occupies 0.8m×1.0m space, and a minimum working height of 2.5m.

[0011] As a preferred embodiment of the present invention, the pile cap is made of high-performance cement-based grouting material or high-strength concrete with a compressive strength of not less than 50MPa.

[0012] As a preferred embodiment of the present invention, the upper load is jointly borne by the perforated grouting micro steel pipe piles and the soil improved by the grouting vein, forming a composite force system in which the micro piles, grouting soil, and existing foundation work together.

[0013] This invention also provides a construction process for micropiles used for shallow foundation reinforcement, for constructing the micropile structure, comprising the following steps: S1. Site and component prefabrication preparation: Clean and level the site; process the pre-drilled grouting micro steel pipe piles, cut the steel pipes into sections, open staggered grouting holes in the pile body, and weld a conical pile tip with a pile tip grouting hole to the bottom of the steel pipe. S2. Pile location layout and positioning: Mark the pile locations according to the design, and arrange the pile locations in equilateral triangles or rectangles; use a concrete core drilling machine to drill pile location openings in the existing ground or foundation. S3. Driving micro steel pipe piles: Using a pneumatic impactor, the pre-drilled grouting micro steel pipe piles are driven vertically through the pre-drilled hole at the pile location into the stratum; the steel pipes are extended in sections until the pile tip penetrates the soil layer to be reinforced and enters the stable bearing layer, and the total pile length is controlled to be ≤5.0m. S4. Pressure grouting construction: Connect the grouting pipeline to the pile head, prepare the grouting slurry, match the grouting pressure according to the stratum conditions, and carry out high-pressure grouting. The slurry diffuses outward through the grouting holes in the pile body and the grouting holes at the pile tip to form a grout vein solidification. The grouting adopts a dual-control termination condition of grouting pressure and grouting volume. S5. Pile head treatment: After the grout has initially solidified, cut the pile head at least 100mm below the bottom of the ground and excavate the soil around the pile head to form a pouring cavity. S6. Casting pile cap: Pour grout with a compressive strength of ≥50MPa or high-strength concrete into the cavity and the opening of the pile position, and cast the pile cap in one piece. The pile cap wraps the pile head to realize the rigid connection between the micropile head and the existing ground. S7. Maintenance and Settlement Monitoring: After the pile cap has reached the design strength, settlement monitoring points are set up for settlement monitoring. If abnormal settlement occurs, grouting is carried out as a remedy.

[0014] As a preferred embodiment of the present invention, when driving the micro steel pipe pile in step S3, the verticality deviation of the pile body is controlled to be ≤1%.

[0015] As a preferred embodiment of the present invention, during the grouting construction in step S4, an intermittent skipping grouting sequence is adopted to reduce the risk of grout cross-contamination between adjacent pile holes.

[0016] As a preferred embodiment of the present invention, when grouting collapsible soil layers, 2%-5% water glass by weight of cement is added to the cement grout, and the water-cement ratio is controlled at 0.6-0.8:1.

[0017] In a preferred embodiment of the present invention, the diameter of the hole at the pile location in step S2 is 110-150 mm; the pile spacing is set to 1.0-2.0 m.

[0018] In summary, the beneficial technical effects of the present invention are as follows: 1. Suitable for confined spaces, no need for large drilling equipment; a single pile only requires a 0.8m×1.0m plane space, and can be constructed with a net height of ≥2.5m; it relies on a pneumatic impactor to directly drive the steel pipe, without the need for a large drilling rig, and is suitable for indoor factory buildings and the condition of non-stop reinforcement of the soil in the core of existing buildings, greatly reducing the restrictions on equipment entry.

[0019] 2. Grouting steel pipes are retained, and the pile and soil work together to bear the load, ensuring controllable quality. Unlike traditional grouting processes where the grouting pipe must be pulled out, this micro-steel pipe pile is permanently retained after grouting, serving as a rigid load-bearing component and no longer relying solely on the improved soil for bearing. The grout forms veins around the pile to improve the soil. Then, a cast-in-place high-strength pile cap is used to rigidly connect the steel pipe pile to the original ground / foundation, constructing a composite load-bearing system of "micro-pile + grouting soil + existing foundation". The load is borne jointly by the pile and the reinforced soil, overcoming the defect of discrete reinforcement effects in pure grouting. The reinforcement quality is detectable and controllable.

[0020] 3. Simplified process and low project cost. It eliminates the need for steel cage fabrication, concrete pile drilling, and earthwork transportation; the steel pipes are spliced ​​in sections, simplifying on-site construction procedures and reducing material consumption. Compared to conventional micropiles, the cost is significantly lower for the same reinforcement area.

[0021] 4. Strong adaptability to different soil types. Differentiated grouting pressures are set for ordinary backfill soil, collapsible soil, silty sand, and compacted fill. Water glass grout can be added for collapsible loess conditions to achieve both penetration and fracturing grouting effects. Pile length is controlled within 5m, specifically targeting shallow foundation defects and avoiding ineffective depth construction. Attached Figure Description

[0022] The accompanying drawings are provided to further illustrate the invention and form part of the specification, but do not constitute a limitation thereof. In the drawings: Figure 1 This is a cross-sectional schematic diagram of a micropile used for shallow foundation reinforcement in this embodiment.

[0023] In the diagram: 1. Grouting micro steel pipe pile; 2. Grouting hole in the pile body; 3. Pile tip; 4. Grouting hole at the pile tip; 5. Pile head; 6. Existing structural foundation or concrete floor; 7. Grouting vein reinforcement body; 8. Upper load; 9. Existing foundation / floor pile location opening; 10. Pile cap. Detailed Implementation

[0024] The present invention will be further described in detail below with reference to the accompanying drawings.

[0025] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] This invention provides a technical solution: a micropile for shallow foundation reinforcement and its construction process, wherein the micropile includes a perforated grouting microsteel pipe pile 1, a pile tip 3, a pile cap 10, and a grout vein reinforcement body 7; the perforated grouting microsteel pipe pile 1 adopts a segmented seamless carbon steel pipe, with each segment welded or extended by sleeve; grouting holes are evenly distributed on the pile body and the conical pile tip 3; the microsteel pipe pile is driven vertically into the stratum through the existing ground opening, with the pile tip entering the stable bearing layer, and the total pile length not exceeding 5.0m; high-pressure grout is injected from inside the steel pipe. The grout is injected and diffuses outward through the grouting hole to form a grout vein solidified body 7, which improves the soil around the pile and fills the gap between the ground and the soil layer. After grouting, the pile head 5 is cut to a depth of not less than 100mm below the bottom of the ground. A cavity is excavated on the outside of the pile head 5, and a high-strength pile cap 10 is integrally cast at the cavity and the opening position of the ground. The pile cap 10 wraps the pile head 5 and is rigidly connected to the existing ground. The upper load 8 is borne by the micro steel pipe pile and the grout-improved soil, forming a composite force system in which the micro pile, grout soil and existing foundation work together.

[0027] The construction process is carried out according to the following steps: site preparation → pile location layout → ground drilling → driving micro steel pipe piles → high-pressure grouting → cutting and excavating the cavity at the pile head 5 → pouring the pile cap 10 → curing and settlement observation. The single pile construction occupies a plane space of 0.8m × 1.0m, with a minimum working height of 2.5m. The grouting adopts dual control of pressure and grouting volume. Corresponding grouting parameters are matched for different strata. Water glass is added to the grout for collapsible loess to shorten the gelation time.

[0028] Example 1: Reinforcement of shallow collapsible loess foundation in the interior soil of an existing factory building An industrial plant in Northwest China, with a building area of ​​2400㎡ and dense indoor equipment, has a 120mm thick concrete floor with multiple through cracks, the largest crack being 8mm wide. Geological surveys show that the 0-3.8m layer below the floor is collapsible loess with a compression modulus of 4.2MPa and a collapsibility grade of II; below 3.8m is dense silty clay, which can serve as a stable bearing layer. The plant cannot cease production, and large drilling rigs cannot access the equipment areas, so only small equipment can be used for construction. The original plan was to use a pure pressure grouting solution, but pure grouting reinforcement has inconsistent reinforcement effects and still carries the risk of uneven settlement later. Therefore, the technical solution of this invention is adopted for reinforcement. The specific implementation steps are as follows: S1. Preparation: Prefabricate 48mm outer diameter and 3.5mm wall thickness Q235 seamless steel pipes, 1.5m in length; grouting holes are staggered by 10mm in length every 300mm in length; weld a tapered pile tip with grouting holes to the bottom end.

[0029] S2. Laying out: The pile positions are arranged in an equilateral triangle with a pile spacing of 1.5m; the core drilling hole diameter in the ground is 130mm.

[0030] S3. Driven steel pipe piles: driven in by a pneumatic impactor, with two sections of steel pipe joined together, the total pile length is 4.0m, and the pile end enters the dense silty clay bearing layer.

[0031] S4. Grouting: Cement P.O42.5, water-cement ratio 0.7:1, with 3% water glass added by the cement mass; grouting pressure 0.15MPa; grouting pressure and grouting volume are controlled by dual control to stop grouting.

[0032] S5. Pile head treatment: After grouting is completed, cut the pile head to 120mm below the bottom of the ground and excavate the cavity around it.

[0033] S6. Casting pile cap: The pile cap is cast using 55MPa high-performance cement-based grouting material, which simultaneously fills the ground opening, so that the pile cap wraps around the pile head and integrates with the ground as a whole.

[0034] S7. Maintenance and monitoring: Settlement monitoring will be conducted after maintenance is completed.

[0035] After reinforcement, the ground settlement tends to stabilize and no new cracks are added; after grouting, core drilling and testing show continuous cement grout veins in the loess within a range of 0.7-0.9m around the pile, the soil compression modulus increases to 8.6-10.2MPa, and the soil collapsibility is eliminated; cement grout penetrates and consolidates the bearing layer at the pile tip, improving the pile tip bearing capacity.

[0036] Meanwhile, the micro-steel pipe piles are retained as rigid components, rigidly connected to the concrete floor through high-strength pile caps. Part of the floor load is transferred to the micro-steel pipe piles, and part is borne by the grouted and improved soil between the piles, forming a composite foundation. After 12 months of continuous settlement monitoring, the maximum floor settlement was 2.1 mm, the settlement rate approached zero, and no new cracks appeared in the floor, fully meeting the settlement control requirements for factory production. If the traditional pure grouting process were used, without rigid piles to share the load, relying solely on the improved loess to bear the load would pose a risk of uneven settlement recurring later.

[0037] Example 2: Reinforcement of shallow backfilled soil foundation in outdoor drainage area of ​​building The existing residential building's outdoor drainage system has settled and cracked. The lower 2.5m is loose backfill soil, and the underlying layer is dense old soil. This process is adopted: the pile spacing is 1.2m, rectangular arrangement, and the total pile length is 2.8m; the grouting slurry is ordinary cement slurry with a water-cement ratio of 0.65:1 and a grouting pressure of 0.2MPa; the pile cap is made of C50 concrete.

[0038] Construction utilizes only small pneumatic impact equipment, avoiding damage to surrounding greenery and underground pipelines. Grouting and core sampling revealed a network of grout veins within the backfill soil, effectively increasing its compaction and raising the soil compression modulus from 5.1 MPa to 9.1 MPa. The pile caps effectively connect the drainage surface layer to the micropiles, with the upper load shared by the micropiles and the improved backfill soil. After eight months of observation, the drainage settlement remained stable, with no further subsidence or cracking observed. Compared to traditional large-diameter micropiles, this solution shortens the construction period, reduces material usage, and lowers project costs. Compared to pure grouting reinforcement, the addition of rigid load-bearing components to the micropiles significantly enhances their resistance to later compression deformation of the backfill soil.

[0039] Example 3: Shallow compacted soil reinforcement for low-load roads in the factory area The non-motorized vehicle roads within the factory area have a roadbed made of compacted backfill soil. However, the compaction quality is insufficient in some areas, resulting in road surface subsidence and cracking. The underlying layer is a dense old soil layer at a depth of 3.5m.

[0040] Construction parameters selected: pile positions are arranged in an equilateral triangle, with a pile spacing of 1.8m; total pile length is 3.5m; grouting pressure is 1.2MPa, suitable for compacted backfill; water-cement ratio is 0.75:1; no water glass is added; the pile cap is cast with 50MPa grouting material.

[0041] High-pressure grouting forms a split grout vein network in the compacted fill, and the micropile-soil composite foundation improves the overall stiffness of the subgrade; pavement settlement is controlled.

[0042] Comparative Example 1 The traditional pure pressure grouting process was adopted: under the same geological conditions of the factory in Example 1, only grouting was performed, the grouting pipe was pulled out, no steel pipe piles were left, and no pile cap structure was used; after the reinforcement was completed, the soil compression modulus was also improved to a certain extent, but there was a lack of rigid piles to share the load; after 6 months of observation, new settlement appeared in some areas, with a maximum settlement of 11.7 mm, indicating that the reinforcement effect was inconsistent.

[0043] Comparative Example 2 Traditional micropiles, with a diameter of 220mm, require large drilling rigs, steel cages, and concrete pouring. The factory building cannot accommodate large equipment and does not meet the construction requirements, making the cost 2.1 times that of the solution proposed in this invention.

[0044] As can be seen from the comparison of Examples 1-3 and Comparative Examples 1-2, the present invention uses grouting micro steel pipe piles as load-bearing components, combined with the hollowing out of the pile head cavity and the cast-in-place high-strength pile cap to form a pile-soil-ground composite load-bearing system. This system is suitable for construction in confined spaces, overcomes the defects of discrete reinforcement effects of pure grouting, and significantly reduces the project cost.

[0045] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0046] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A micropile for shallow foundation reinforcement, characterized in that, It includes grouting micro steel pipe piles, pile tips (3), pile caps (10), and grout vein reinforcement bodies (7); The grouting micro steel pipe pile is a seamless carbon steel pipe. The steel pipe is set in sections, and each section of the steel pipe is connected to each other. The pile body is staggered with grouting holes (2) at a set interval along the axial direction. A conical pile tip (3) is fixedly welded to the bottom end of the grouting micro steel pipe pile. Grouting holes of the pile tip (3) are set around the pile tip (3). The existing ground or foundation has a pile location opening. The grouting micro steel pipe pile is driven directly through the pile location opening into the soil layer to be reinforced. The lower end of the pile enters the stable bearing layer. The total length of the grouting micro steel pipe pile is ≤5.0m. High-pressure grout is injected into the inner cavity of the grouting micro steel pipe pile and diffuses outward through the grouting hole (2) in the pile body and the grouting hole (3) at the pile tip, forming a grout vein solidified body (7) in the soil around the pile and in the gap between the ground and the soil. The pile head (5) of the grouting micro steel pipe pile is cut off to at least 100mm below the bottom surface of the ground. A cavity is formed by excavating around the pile head (5). The cavity and the pile cap (10) are integrally cast into the pile position opening. The pile cap (10) wraps around the pile head (5) and is rigidly connected to the existing ground or foundation.

2. The micropile for shallow foundation reinforcement according to claim 1, characterized in that, The grouting micro steel pipe pile has an outer diameter of 48mm and a wall thickness of 3.5mm. The length of a single steel pipe section is 1.0m, 1.5m or 2.0m. The diameter of the grouting hole (2) in the pile body is 10mm. The grouting holes (2) in the pile body are arranged alternately at 300mm intervals along the axial direction of the pile body. The grouting holes (2) in the pile body are also arranged within 250mm of the pile tip (3).

3. The micropiles for shallow foundation reinforcement according to claim 2, characterized in that, The grouting micro steel pipe piles are arranged in a rectangular or equilateral triangle pattern, with a pile spacing of 1.0m-2.0m. The construction plane space occupied by a single micro pile is 0.8m×1.0m, and the minimum working height is 2.5m.

4. The micropile for shallow foundation reinforcement according to claim 1, characterized in that, The pile cap (10) is made of high-performance cement-based grouting material or high-strength concrete with a compressive strength of not less than 50MPa.

5. The micropiles for shallow foundation reinforcement according to claim 1, characterized in that, The upper load (8) is jointly borne by the grouted micro steel pipe pile (1) and the soil improved by the grout vein reinforcement (7), forming a composite force system in which the micro pile, grout soil and existing foundation work together.

6. A construction process for micropiles used for shallow foundation reinforcement, characterized in that, The method for constructing the micropile structure according to claim 1 is characterized by comprising the following steps: S1. Site and component prefabrication preparation: Clean and level the site; process the pre-drilled grouting micro steel pipe piles, cut the steel pipes into sections, open staggered grouting holes in the pile body, and weld a conical pile tip with a pile tip grouting hole to the bottom of the steel pipe. S2. Pile location layout and positioning: Mark the pile locations according to the design, and arrange the pile locations in equilateral triangles or rectangles; use a concrete core drilling machine to drill pile location openings in the existing ground or foundation. S3. Driving micro steel pipe piles: Using a pneumatic impactor, the pre-drilled grouting micro steel pipe piles are driven vertically through the pre-drilled hole at the pile location into the stratum; the steel pipes are extended in sections until the pile tip penetrates the soil layer to be reinforced and enters the stable bearing layer, and the total pile length is controlled to be ≤5.0m. S4. Pressure grouting construction: Connect the grouting pipeline to the pile head, prepare the grouting slurry, match the grouting pressure according to the stratum conditions, and carry out high-pressure grouting. The slurry diffuses outward through the grouting holes in the pile body and the grouting holes at the pile tip to form a grout vein solidification. The grouting adopts a dual-control termination condition of grouting pressure and grouting volume. S5. Pile head treatment: After the grout has initially solidified, cut the pile head at least 100mm below the bottom of the ground and excavate the soil around the pile head to form a pouring cavity. S6. Casting pile cap: Pour grout with a compressive strength of ≥50MPa or high-strength concrete into the cavity and the opening of the pile position, and cast the pile cap in one piece. The pile cap wraps the pile head to realize the rigid connection between the micropile head and the existing ground. S7. Maintenance and Settlement Monitoring: After the pile cap has reached the design strength, settlement monitoring points are set up for settlement monitoring. If abnormal settlement occurs, grouting is carried out as a remedy.

7. The construction process for micropiles used for shallow foundation reinforcement according to claim 6, characterized in that, When driving the micro steel pipe pile in step S3, the verticality deviation of the pile body should be controlled to be ≤1%.

8. The construction process for micropiles used for shallow foundation reinforcement according to claim 6, characterized in that, During the grouting construction in step S4, an intermittent skipping grouting sequence is adopted to reduce the risk of grout leakage between adjacent pile holes.

9. The construction process for micropiles used for shallow foundation reinforcement according to claim 6, characterized in that, When grouting collapsible soil layers, add 2%-5% water glass by weight of cement to the cement grout, and control the water-cement ratio to 0.6-0.8:

1.

10. The construction process for micropiles used for shallow foundation reinforcement according to claim 6, characterized in that, In step S2, the diameter of the hole at the pile location is 110-150mm; the pile spacing is set to 1.0-2.0m.