Novel pipe pile suitable for sand gravel layer and matched pile cap

By inserting water conduit pipes and supporting pile caps in prestressed pipe piles, the problem of sand and gravel is difficult to penetrate in prestressed pipe piles is solved, reducing construction costs and improving construction efficiency .

CN222008887UActive Publication Date: 2024-11-15POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420422750.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-15
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

In the construction of prestressed pipe piles, it is difficult for conventional pile driving equipment to penetrate the gravel layer, resulting in an increase in construction costs. Especially in photovoltaic projects, due to the short length of the bracket pipe piles, the hole lead operation has led to a significant increase in the foundation construction costs.

Method used

Design a new type of pipe pile with built-in water conduit pipe, use a high-pressure water supply system to cut the gravel layer, and discharge the gravel through the guide discharge channel, and use pile caps to ensure the accurate guidance and connection of high-pressure water, so as to realize the operation with the hole guide The same effect without adding construction processes or equipment.

Benefits of technology

Through high-pressure water flow cutting and discharge of gravel, construction costs are reduced, professional equipment needs for hole lead operations are avoided, and construction efficiency and economic benefits are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008887U_ABST
    Figure CN222008887U_ABST
Patent Text Reader

Abstract

The utility model provides a novel pipe pile suitable for a sand gravel layer, a water guide pipe is arranged in a pile body of the pipe pile, the water guide pipe is arranged in the same direction along the axial direction of the pipe pile, and the two ends of the water guide pipe are communicated with a pile head and a pile tail of the pipe pile; a guiding and discharging channel for discharging water flow and sand gravel is formed in a pipe pile inner cavity in the pipe pile. The water guide pipe is provided with a flaring section on the pile head side of the pipe pile. And a sealing ring is arranged on the inner side of the flaring section. The water guide pipe is provided with a connecting section on the pile tail side of the pipe pile, and the connecting section protrudes out of a pile end plate of the pipe pile so that the pipe pile can be connected with the water guide pipe of the front pipe pile end to end during pile splicing. A certain number of water guide pipes are implanted in the pipe pile, pressure water supplied by the pile cap is ejected from the pile tail to cut a sand gravel layer, and sand gravel is discharged through the inner cavity of the pipe pile by high-speed water flow, so that the same effect as hole guiding operation is achieved, construction procedures are not increased, additional professional equipment is not needed, and the construction cost is reduced. And the construction cost can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prestressed pipe pile foundations, in particular to a new type of pipe pile suitable for a sand and gravel layer and a matching pile cap. Background Art

[0002] Prestressed pipe piles are widely used in the foundation construction of new energy projects, such as wind turbine foundations and photovoltaic support foundations, due to their advantages such as fast construction speed and strong bearing capacity. During the construction of prestressed pipe piles, conventional piling equipment is used to drive into clay layers and some sand layers, but when there is a gravel layer, it is often difficult to drive the pipe piles. The conventional solution is to use a boring device to first conduct boring operations and then drive in prestressed pipe piles. The boring operation not only increases the construction process, but also requires professional boring equipment, which greatly increases the construction cost. Especially for photovoltaic projects, because the length of photovoltaic support pipe piles is relatively short, the boring operation will lead to a significant increase in the foundation construction cost and reduce the economic benefits of the project. Utility Model Content

[0003] The first purpose of the utility model is to provide a new type of pipe pile that can provide a cutting and discharge path for the gravel layer. To this end, the utility model adopts the following technical solutions:

[0004] A new type of pipe pile suitable for gravel layers, wherein a water guide pipe is arranged in the pile body of the pipe pile, the water guide pipe is arranged in the same direction along the axial direction of the pipe pile, and the two ends of the water guide pipe are connected to the pile head and the pile tail of the pipe pile, so as to form a coordinated working state with the pipe pile through a high-pressure water supply system; the inner cavity of the pipe pile inside the pipe pile forms a guiding discharge channel for discharging water and gravel.

[0005] Furthermore: the water guide pipe is provided with a flared section on the pile head side of the pipe pile.

[0006] Furthermore: a sealing ring is arranged inside the expansion section.

[0007] Furthermore, a connecting section is arranged on the tail side of the pipe pile, and the connecting section protrudes from the end plate of the pipe pile so that the pipe pile is connected end to end with the water conduit of the preceding pipe pile when the pipe pile is connected.

[0008] Furthermore: the water guide pipe is arranged inside the reinforcement mesh of the pipe pile body.

[0009] Furthermore, the pipe pile is provided with guide blocks on the pile circumference side of the pile head area.

[0010] The second purpose of the utility model is to provide a pile cap that can effectively connect with the pipe pile and guide the high-pressure water. To this end, the utility model adopts the following technical solutions:

[0011] A matching pile cap, wherein the pile cap is provided with a pile cap inner cavity connected to the pile head, the pile cap is also provided with a drain port which can be communicated with a guide discharge channel, and the water outlet of the drain port passes through the pile cap; the top of the pile cap is provided with a pressure water pipe which can be connected and cooperated with a water guide pipe.

[0012] Furthermore: a guide track groove and a limit groove are sequentially arranged in the wall body of the inner cavity of the pile cap from bottom to top, the bottom and top of the guide track groove are respectively provided with a flaring portion and a gathering portion, the limit groove is connected with the guide track groove through the gathering portion, and the guide track groove and the limit groove cooperate with the guide block of the pipe pile to accurately align the pressure water pipe with the water guide pipe.

[0013] Furthermore: a bell-mouth section is arranged at the bottom of the pile cap.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] The utility model implants a certain number of water guide pipes in the pipe pile, and the pressure water supplied by the pile cap is ejected from the pile tail to cut the gravel layer, and the gravel is discharged through the inner cavity of the pipe pile by the high-speed water flow, thereby playing the same role as the hole-guiding operation, but does not increase the construction process, and does not need to use additional professional equipment, which can greatly reduce the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the pipe pile and pile cap of the utility model;

[0017] Figure 2 It is an overall cross-sectional view of the pipe pile and pile cap of the utility model;

[0018] Figure 3 This is a schematic diagram of the structure of the practical water pipe;

[0019] Figure 4 This is a first-view structural diagram of the interior of the pile cap of the utility model;

[0020] Figure 5 This is a second perspective structural diagram of the interior of the pile cap of the utility model.

[0021] The marks in the attached drawings are: 1-pile cap; 101-pressure water pipe; 11-bell mouth section; 12-drainage outlet; 13-inner cavity of pile cap; 131-guide track groove; 132-limiting groove;

[0022] 2-pile; 21-inner cavity of the pile; 22-water guide pipe; 221-expansion section; 222-connection section; 23-guide block; 24-sealing ring. DETAILED DESCRIPTION

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0024] like Figure 1-5 As shown, a new type of pipe pile suitable for gravel layers, a water guide pipe 22 is arranged in the pile body of the pipe pile 2, the water guide pipe 22 is arranged in the same direction along the axial direction of the pipe pile 2, and the two ends of the water guide pipe 2 are connected to the pile head and the pile tail of the pipe pile 2, so as to form a coordinated working state with the pipe pile 2 through a high-pressure water supply system; the pipe pile inner cavity 21 inside the pipe pile 2 forms a guiding discharge channel for discharging water flow and gravel, so that the bottom gravel layer is cut by high-pressure water through the water guide pipe 2, and the gravel is brought out of the pile body through the guiding discharge channel by the high-speed water flow.

[0025] In this embodiment, there are four water pipes 22 in total, which are evenly distributed at equal angles in the pile body of the pipe pile 2; a trumpet-shaped expansion section 221 is provided on the top of the water pipe 22, which is not only convenient for connection with the pressure water pipe 101, but also convenient for connection with the water pipe 22 of the adjacent pipe pile 2 when the pipe pile as a whole needs to be connected; a conical connecting section 222 is provided at the bottom of the water pipe 22, and the connecting section 222 appropriately protrudes from the pile end plate of the pipe pile 2, and is connected end to end with the water pipe 22 of the previous pipe pile 2 when the pile is connected.

[0026] Furthermore, the water conduit 22 is arranged inside the reinforcement mesh of the pile body of the pipe pile 2 .

[0027] In this embodiment, a sealing ring 24 is provided inside the expanded section 221 of the pipe pile 2, which plays a sealing role when the pressure water pipe 101 or the connecting section 222 of the adjacent water pipe 22 is connected to the water pipe 22 to prevent the high-pressure water flow from overflowing.

[0028] Meanwhile, the pipe pile 2 is provided with guide blocks 23 on the pile side of the pile head area, two guide blocks 23 are symmetrically provided, and the guide blocks 23 are symmetrically welded to the top of the pile hoop of the pipe pile 2 or are produced in an integrated manner with the pile hoop.

[0029] Among them, the specifications, dimensions, internal reinforcement and other parameters of the pipe pile 2 are set according to national standards and meet relevant technical requirements.

[0030] This embodiment also provides a pile cap, which is connected and matched with the new pipe pile and used in conjunction with it. The size of the pile cap 1 matches the size of the pipe pile 2.

[0031] In this embodiment, the pile cap 1 is provided with a pile cap inner cavity 13 connected to the pile head of the pipe pile 2, and the pile cap 1 is also provided with a drain port 12 which can be communicated with the guide discharge channel, so that the water inlet hole of the drain port 12 is communicated with the top of the pile cap inner cavity 13, and the water outlet of the drain port 12 runs through the side surface of the pile cap 1; the top of the pile cap 1 is provided with a pressure water pipe 101 which can be connected and cooperated with the water guide pipe 22, and the pressure water pipe 101 is used to be connected to an external high-pressure water supply system.

[0032] In addition, a guide track groove 131 and a limit groove 132 are sequentially arranged in the wall of the pile cap inner cavity 13 from bottom to top, and a flaring portion and a gathering portion are respectively arranged at the bottom and the top of the guide track groove 131, and the limit groove 132 is connected with the guide track groove 131 through the gathering portion; when the pile cap 1 is fixed on the pipe pile 2, the guide track groove 131 and the limit groove 132 cooperate with the guide block 23 around the pipe pile 2 to guide the pile head of the pipe pile 2 to a specific position, so as to ensure that the water pipe 22 is accurately connected to the pressure water pipe 101.

[0033] In this embodiment, a bell-mouth section 11 is provided at the bottom of the pile cap 1, which serves to reduce the difficulty of pile feeding (ie, the process of fixing the pipe pile 2 on the pile cap 1 during the piling process) and improve the construction efficiency.

[0034] At the same time, the upper part of the pile cap 1 is connected to the piling equipment.

[0035] See also Figure 1-5 , when the new type of pipe pile is used for construction, the specific contents are as follows:

[0036] After the pipe pile 2 is connected to the pile cap 1, high-pressure water is injected into the water pipe 22 through the pressure water pipe 101; the pressure water pipe 101 is connected to the external high-pressure water supply system, and the pressure water pipe 101 and the water pipe 22 can be tightly connected by hydraulic systems or springs and other accessories (not marked in the figure).

[0037] When the high-pressure water flows through the pressure water pipe 101 and the water pipe 22 and then ejects from the pipe pile 2, the high-pressure water cuts the soil layer, and after the cutting is completed, the mud and sand carried are discharged through the inner cavity 21 of the pipe pile and the drain port 12. The drain port 12 is connected to the external drain pipe and leads to the sedimentation tank to avoid soil and water loss.

[0038] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.

Claims

1. A new type of pipe pile suitable for gravel layers, characterized by: A water guide pipe (22) is provided in the pile body of the pipe pile (2), the water guide pipe (22) being arranged in the same direction along the axial direction of the pipe pile (2), and the two ends of the water guide pipe (22) being connected to the pile head and the pile tail of the pipe pile (2); the pipe pile inner cavity (21) inside the pipe pile (2) forms a guide discharge channel for discharging water and gravel.

2. The novel pipe pile suitable for gravel layers according to claim 1 is characterized by: The water guide pipe (22) is provided with a flared section (221) on the pile head side of the pipe pile (2).

3. The novel tubular pile suitable for gravel layers according to claim 2, characterized in that: A sealing ring (24) is provided inside the flared section (221).

4. A new type of pipe pile suitable for gravel layers according to claim 1 or 2, characterized in that: The water guide pipe (22) is provided with a connecting section (222) at the pile tail side of the pipe pile (2), and the connecting section (222) protrudes from the pile end plate of the pipe pile (2), so that the pipe pile (2) is connected end to end with the water guide pipe (22) of the preceding pipe pile (2) when the pipe pile (2) is connected.

5. The novel tubular pile suitable for gravel layers according to claim 1 is characterized by: The water guide pipe (22) is arranged on the inner side of the reinforcement mesh of the pipe pile (2).

6. The novel tubular pile suitable for gravel layers according to claim 1 is characterized by: The pipe pile (2) is provided with a guide block (23) on the pile circumference side of the pile head area.

7. A matching pile cap, characterized by: The invention is installed on a new type of pipe pile suitable for a gravel layer as described in any one of claims 1 to 6, wherein a pile cap inner cavity (13) connected to the pile head of the pipe pile (2) is provided inside the pile cap (1), a drain port (12) which can be communicated with a guide discharge channel is further provided inside the pile cap (1), and a water outlet of the drain port (12) passes through the pile cap (1); and a pressure water pipe (101) which can be connected to a water guide pipe (22) is provided on the top of the pile cap (1).

8. The matching pile cap according to claim 7, characterized in that: A guide track groove (131) and a limit groove (132) are sequentially arranged in the wall of the pile cap inner cavity (13) from bottom to top. The bottom and top of the guide track groove (131) are respectively provided with a flaring portion and a convergence portion. The limit groove (132) is connected to the guide track groove (131) through the convergence portion. The guide track groove (131) and the limit groove (132) cooperate with the guide block (23) of the pipe pile (2) to ensure that the pressure water pipe (101) is accurately aligned with the water guide pipe (22).

9. The matching pile cap according to claim 7, characterized in that: The bottom of the pile cap (1) is provided with a bell-mouth section (11).

Citation Information

Cited By

  • Novel pipe pile suitable for sand gravel layer and matched pile cap

    CN118087509A