A method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm quadrilateral drilling
By combining a swing-angle double-arm drilling machine with a mining wire saw, a quadrilateral through hole is formed and continuously cut, solving the problems of large construction vibration, low safety, and independent equipment in traditional underground coal mine roof cutting and coal seam cutting, and achieving efficient and precise cutting results.
Patent Information
- Application Number
- CN202611279364.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-21
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional underground roof cutting and coal seam cutting operations in coal mines suffer from problems such as large construction vibrations, low safety, irregular cuts, independent equipment, and low efficiency, and drilling cannot form a through-hole.
The method combines a swing-angle double-arm drilling machine with a mining wire saw. The double arms form a quadrilateral double-angle drilling hole to form a through hole, and the wire saw is used for continuous cutting.
It achieves continuous, low-disturbance cutting of the roof and coal seam, improves the equipment's versatility and construction efficiency, reduces the risk of vibration and gas outburst, and ensures precise and controllable cutting surfaces for easy subsequent support.
Smart Images

Figure CN123109688A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine underground mining equipment and mining technology, and in particular to a method for cutting the roof and horizontally cutting coal in underground coal mine roadways based on double-arm quadrilateral drilling. Background Technology
[0002] Traditional roof cutting operations use blasting methods, which have drawbacks such as large construction vibrations, easy disturbance and damage to the surrounding rock, low safety, irregular cuts, and difficulty in subsequent support.
[0003] Coal seam cutting operations rely heavily on coal mining machines, which present problems such as low cutting accuracy, high dust generation, high risk of instantaneous gas surge, and difficulty in achieving controllable cutting and slow depressurization.
[0004] Roof cutting and coal seam cutting operations often require drilling first. Traditional drilling methods involve drilling forward simultaneously, producing two parallel, independent, and unconnected straight holes, without forming a through-hole.
[0005] Moreover, the existing drilling, roof cutting, coal cutting, and pressure relief equipment are independent of each other, making it impossible to complete roof cutting and horizontal coal cutting operations simultaneously on a single set of equipment. This results in poor equipment versatility, large underground space occupation, cumbersome operation procedures, and low overall construction efficiency. Summary of the Invention
[0006] To address the problems existing in the prior art, this invention combines a swing-angle double-arm drilling machine with a mining wire saw. The double arms form a quadrilateral double-angle drilling hole to create a through hole, and then the wire saw is inserted into the through hole to achieve continuous and low-disturbance cutting of the roof strata or coal seam.
[0007] To achieve the above objectives, the present invention provides a method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm quadrilateral drilling, characterized in that it includes:
[0008] (1) Cutting the roof of the tunnel.
[0009] Determine the location of the cutting surface of the tunnel roof, and starting from the end face of the tunnel roof, excavate a rope-threading tunnel forward in the rock strata above the tunnel to the cutting surface of the tunnel roof.
[0010] The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, and the drilling arms are arranged vertically to the left and right.
[0011] Determine the positions of the drill holes at both ends based on the cut-off area;
[0012] The left and right drill arms were adjusted to a vertical quadrilateral layout.
[0013] The left and right drilling arms drill holes from the top of the tunnel upwards until the holes connect the tunnel and the rope passage, forming a quadrilateral through hole.
[0014] The wire saw machine feeds the diamond wire saw through the left end hole, passes it through the rope passage, and then leads it out through the right end hole, forming a closed-loop cutting circuit.
[0015] Start the wire saw machine and pull the diamond wire saw to continuously cut along the quadrilateral through hole, cutting off the roof strata of the tunnel.
[0016] (2) Horizontal coal cutting.
[0017] Excavate rope-threading tunnels in the coal seam between the transport roadway and the return airway until the rope-threading tunnels connect the transport roadway and the return airway.
[0018] The tilting double-arm drilling machine can be moved to the working position in front of the coal face and leveled and fixed.
[0019] The wire saw machine draws the diamond wire saw from the transport tunnel through the rope hole and out of the return air tunnel, forming a closed-loop cutting circuit.
[0020] Start the wire saw machine and pull the diamond wire saw to cut the coal seam.
[0021] Optionally, the quadrilateral through hole is vertical or comb-shaped.
[0022] By adopting the above technical solution, the present invention has at least the following beneficial effects:
[0023] 1. Multi-purpose machine: It can simultaneously cut the roof and cut coal, reducing equipment investment and underground space occupation.
[0024] 2. Significantly improved efficiency: Simultaneous drilling with dual arms, forming a through hole in one go, increasing drilling efficiency by more than 50%, and continuous and efficient cutting.
[0025] 3. Significantly improved safety: Mechanical cutting replaces blasting, eliminating vibration and shock waves, reducing the risk of surrounding rock damage and gas outbursts.
[0026] 4. Precise and controllable cutting: The cut is regular and the cut surface is flat, which facilitates subsequent support and pressure relief.
[0027] 5. Low disturbance and high adaptability: It causes little damage to coal and rock masses and is suitable for complex conditions such as high gas levels and fractured roofs. Attached Figure Description
[0028] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0029] Figure 1This is a schematic diagram of the drilling process using the tiltable double-arm drilling machine in Embodiment 1 of the present invention;
[0030] Figure 2 This is a schematic diagram of the wire saw cutting the top in Embodiment 1 of the present invention;
[0031] Figure 3 This is a schematic diagram of horizontal coal cutting using a wire saw in Embodiment 2 of the present invention.
[0032] Attached reference numerals: 1. Cutting eye; 2. Main roof; 3. Direct roof; 4. False roof; 5. Rope passage; 7. Integrated device for swing-angle double-arm drilling and wire saw cutting; 8. Left drill arm; 9. Right drill arm; 10. Left end borehole; 11. Right end borehole; 12. Coal seam; 13. Transport roadway; 14. Return airway. Detailed Implementation
[0033] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0034] This invention employs an integrated device combining a swing-angle double-arm drilling machine and a mining wire saw, used for roof cutting and depressurization in underground coal mines, horizontal coal cutting, and coal seam gas depressurization and permeability enhancement.
[0035] (1) Angle-swinging double-arm drilling machine
[0036] Main components: hydraulic station, control panel, frame.
[0037] Both the left and right drill arms are equipped with pitch and horizontal tilt functions.
[0038] Drive mechanism: hydraulic motor, rotary head, feed cylinder, angle adjustment cylinder, to realize independent or linked angle control of the drill arm.
[0039] Positioning mechanism: support legs, leveling device.
[0040] (2) Mining wire saw
[0041] Power unit: Explosion-proof hydraulic and electric drive main unit.
[0042] Actuating mechanisms: diamond beaded rope, guide wheel, tensioning mechanism, traction mechanism.
[0043] Threading mechanism: It can feed the rope in from one end of the through hole and lead it out from the other end to achieve closed-loop threading.
[0044] Example 1
[0045] Based on the above-mentioned integrated device of a swing-angle double-arm drilling machine and a mining wire saw, Embodiment 1 of the present invention discloses a method for cutting the roof of underground coal mine roadways based on double-arm quadrilateral drilling, including drilling and roof cutting.
[0046] like Figure 1 As shown, the drilling process is as follows:
[0047] Determine the location of the cutting surface of the tunnel roof, and starting from the end face of the tunnel roof, excavate a rope-threading tunnel forward in the rock strata above the tunnel to the cutting surface of the tunnel roof.
[0048] The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, with the drilling arms arranged vertically to the left and right.
[0049] The positions of the drill holes at the left and right ends are determined based on the cutting range.
[0050] The left and right drill arms are adjusted to a vertical quadrilateral layout, forming a vertical parallelogram or rectangle.
[0051] The left and right drill arms drill upwards from the top of the tunnel until the drill hole connects the tunnel and the rope passage, forming a quadrilateral through hole. The quadrilateral through hole is vertical or comb-shaped.
[0052] like Figure 2 As shown, the top-cutting process is as follows:
[0053] The wire saw machine feeds the diamond wire saw through the left end hole, passes it through the rope passage, and then leads it out through the right end hole, forming a closed-loop cutting circuit.
[0054] Start the wire saw machine and pull the diamond wire saw to continuously cut along the quadrilateral through hole, cutting off the roof strata of the tunnel.
[0055] Example 2
[0056] Based on the aforementioned integrated device of a swing-angle double-arm drilling machine and a mining wire saw, Embodiment 2 of this invention discloses a method for horizontal coal cutting in underground mines based on double-arm quadrilateral drilling, such as... Figure 3 As shown, it includes:
[0057] Excavate rope-threading tunnels in the coal seam between the transport roadway and the return airway until the rope-threading tunnels connect the transport roadway and the return airway.
[0058] The tilting double-arm drilling machine can be moved to the working position in front of the coal face and leveled and fixed.
[0059] The wire saw machine draws the diamond wire saw from the transport tunnel through the rope hole and out of the return air tunnel, forming a closed-loop cutting circuit.
[0060] Start the wire saw machine and pull the diamond wire saw to cut the coal seam.
[0061] The present invention has been described above with reference to the preferred embodiments shown in the accompanying drawings. However, it will be readily understood by those skilled in the art that the scope of protection of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will all fall within the scope of protection of the present invention.
Claims
1. A method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm quadrilateral drilling, characterized in that, include: (1) Cutting the roof of the tunnel; Determine the location of the cutting surface of the tunnel roof, and starting from the end face of the tunnel roof, excavate a rope-threading tunnel forward in the rock strata above the tunnel to the cutting surface of the tunnel roof. The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, and the drilling arms are arranged vertically to the left and right. Determine the positions of the drill holes at both ends based on the cut-off area; The left and right drill arms were adjusted to a vertical quadrilateral layout. The left and right drilling arms drill holes from the top of the tunnel upwards until the holes connect the tunnel and the rope passage, forming a quadrilateral through hole. The wire saw machine feeds the diamond wire saw through the left end hole, passes it through the rope passage, and then leads it out through the right end hole, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to continuously cut along the quadrilateral through hole, cutting off the roof rock layer of the tunnel; (2) Horizontal coal cutting; Excavate rope-threading tunnels in the coal seam between the transport roadway and the return airway until the rope-threading tunnels connect the transport roadway and the return airway. The tilting double-arm drilling machine can be moved to the working position in front of the coal face and leveled and fixed. The wire saw machine draws the diamond wire saw from the transport tunnel through the rope hole and out of the return air tunnel, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to cut the coal seam.
2. The method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm quadrilateral drilling as described in claim 1, characterized in that, The quadrilateral through-hole is vertical or comb-shaped.