A construction method and grouting device for tunnel grouting reinforcement

By using grouting inserts to form a canopy-shaped reinforcement channel during shield tunnel construction, the problems of grout diffusion path and range control were solved, achieving uniform reinforcement of the strata and effective support of the outer arc surface of the tunnel segments, thus enhancing the reinforcement effect of the tunnel.

CN123109722APending Publication Date: 2026-11-17SHANGHAI MECHANIZED CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611588908.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In shield tunnel construction, existing technologies are unable to effectively control the diffusion path and reinforcement range of grout in the stratum soil, resulting in uneven stratum reinforcement, affecting stratum settlement and the support reaction force of the outer arc surface of the tunnel segment.

Method used

A grouting insert is inserted into the soil through a pre-reserved grouting hole to form a reinforcement channel. Grout is injected through grouting equipment, and multiple reinforcement channels distributed in a canopy shape are formed by rotating the grouting insert, thereby controlling the reinforcement range and path of the grout.

Benefits of technology

The grout reinforcement range was increased, the reinforcement effect of the stratum and the supporting reaction force of the outer arc surface of the tunnel segment were improved, the uniform reinforcement of the stratum was ensured, and uneven settlement was avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109722A_ABST
    Figure CN123109722A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of tunnel construction technology, and discloses a construction method and grouting device for tunnel grouting reinforcement. First, a grouting insert is inserted into the soil to a first preset position. The grouting insert is then connected to a grouting device. The grouting insert is partially pulled out until it moves to a second preset position, and grout is injected into the formed reinforcement channel. The above operation is repeated by rotating the grouting insert, making the grouting insert and the reinforcement channel form any angle. The grouting insert is then rotated and grout is injected repeatedly, thereby forming multiple reinforcement channels distributed in a canopy shape. After the grouting insert is pulled out, the reserved grouting holes are sealed. Using this construction method for tunnel grouting reinforcement can increase the reinforcement range of the grout, enhance the reinforcement effect on the stratum, and effectively control the reinforcement range of the grout, ensuring uniform reinforcement of the stratum and avoiding uneven settlement of the stratum.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel construction technology, and in particular to a construction method and grouting device for tunnel grouting reinforcement. Background Technology

[0002] During shield tunnel construction, as the tunnel continues to advance, the shield machine simultaneously injects grout into the annular gap between the lining segments and the soil, which is called synchronous grouting. This is used to initially fill the shield tail gap, control ground settlement, and constrain segment displacement. In actual engineering applications, due to the influence of multiple factors such as ground conditions, tunneling parameters, and grout characteristics, the shield tail gap is difficult to be completely filled and compacted by synchronous grouting. Therefore, secondary grouting reinforcement is required for the gaps on the outside of the segments.

[0003] In existing technologies, high-pressure water or drilling rigs are typically used to clear the grouting holes pre-drilled in the tunnel lining segments. Then, grouting connectors are installed inside the grouting holes, connected to grouting pipelines and pumps. The pump injects grout into the gaps on the outside of the segments through the pipelines. The grouting pressure is adjusted to allow the grout to seep into the soil and diffuse until uniform grout flow is observed from adjacent grouting holes, at which point grouting stops. Clearly, if this method is used to reinforce the gaps on the outside of the tunnel lining segments, relying solely on controlling the grouting pressure to allow the grout to seep into the soil results in two problems: firstly, the grout has poor diffusion within the soil, limiting the reinforcement range and thus affecting the reinforcement effect; secondly, the diffusion path of the grout within the soil cannot be effectively controlled, making it difficult to control the reinforcement range of secondary grouting. This can easily lead to reinforcement blind spots in the gaps on the outside of the segments, causing uneven soil reinforcement and ultimately resulting in uneven ground settlement. In addition, due to the limited reinforcement range, the reinforcement effect of the secondary grouting on the segments is poor, thus failing to provide sufficient support reaction force to the outer arc surface of the segments. Summary of the Invention

[0004] The purpose of this invention is to provide a construction method and grouting device for tunnel grouting reinforcement, which can increase the reinforcement range of the grout, enhance the reinforcement effect on the stratum, improve the support reaction force on the outer arc surface of the tunnel segment, effectively control the reinforcement range of the grout, ensure uniform reinforcement of the stratum, and avoid uneven settlement of the stratum.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: Firstly, a construction method for tunnel grouting reinforcement is provided, comprising the following steps: S1. Clean the reserved grouting holes of the tunnel segments; S2. Insert the grouting end of the grouting plug through the reserved grouting hole and into the soil until the grouting end is inserted to the first preset position. The connecting end of the grouting plug is located inside the segment. The grouting plug is provided with a first grouting channel and a grouting port. The grouting port is located at the grouting end. The first grouting channel extends along the axial direction of the grouting plug. S3. Connect the connecting end to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe; S4. Pull the grouting insert along the direction close to the inside of the pipe segment to form a reinforcement channel in the soil, and control the grouting equipment to inject grout into the reinforcement channel through the first grouting pipe, the first grouting channel and the grouting port until the grouting end of the grouting insert is moved to the second preset position, the second preset position being located on the side of the first preset position close to the pipe segment; S5. Using the formed reinforcement channel as a reference, rotate the grouting plug in any direction along the circumference of the reinforcement channel so that the grouting plug and the reinforcement channel form an arbitrary angle. S6. Repeat steps S2 to S4 to form the reinforcement channel again, and inject grout into the reinforcement channel. S7. Repeat steps S5 and S6 until the grouting insert abuts against the wall of the reserved grouting hole to form multiple reinforcement channels, which are distributed in a canopy shape. S8. Pull out the grouting insert and seal the reserved grouting hole.

[0006] Optionally, the side of the grouting end facing the soil is provided with an insertion bevel so that the grouting end body forms a bevel plug, and the bevel plug is provided with the grouting port.

[0007] Optionally, a sealing element is provided on the insertion inclined surface, which can partially block the grouting port.

[0008] Optionally, the grouting insert is provided with a diameter expander, which is located on the side near the grouting end. The diameter expander can expand or contract radially to expand the reinforced channel radially.

[0009] Optionally, the expanding component includes an expanding airbag, the grouting insert is provided with an inflation channel and multiple through holes, the inflation channel extends along the axial direction of the grouting insert, the connecting end is configured to be connected to an inflation device so that the inflation chamber of the inflation device is in communication with the inflation channel, the side of the grouting insert near the grouting end is provided with multiple rings of inflation structure at intervals along its axial direction, each ring of the inflation structure includes multiple through holes at intervals along the circumference of the grouting insert, any one of the through holes is in communication with the inflation channel, the expanding airbag is sleeved on the grouting insert, and the inner cavity of the expanding airbag is in communication with the inflation channel through the through holes.

[0010] Optionally, after step S3 is executed and before step S4 is executed, step S40 is executed, which specifically includes the following steps: Connect the inflation device to the connection end and control the inflation device to inflate gas into the expanding airbag through the inflation channel and the through hole, so that the expanding airbag expands radially.

[0011] Optionally, the grouting insert is provided with a second grouting channel and a plurality of grouting holes. The second grouting channel extends along the axial direction of the grouting insert. The grouting cavity of the grouting device can be connected to the second grouting channel through a second grouting pipe. The side of the grouting insert near the grouting end is provided with multiple rings of grouting structures spaced apart along its axial direction. Each ring of the grouting structure includes a plurality of grouting holes spaced apart along the circumference of the grouting insert. Each grouting hole is connected to the second grouting channel.

[0012] Optionally, after step S4 is executed and before step S5 is executed, step S50 is executed, which specifically includes the following steps: The second grouting pipe is connected to the second grouting channel, and the grouting equipment is controlled to inject grout into the reinforcement channel through the second grouting pipe, the second grouting channel and the grouting hole at a preset grouting pressure, so that the grout is split into the soil.

[0013] Optionally, the preset grouting pressure is 1MPa to 3MPa.

[0014] Secondly, a grouting device for tunnel grouting reinforcement is provided, applicable to the tunnel grouting reinforcement construction method described above. The grouting device for tunnel grouting reinforcement includes: The grouting insert is provided with a grouting end, a connecting end, a grouting port, and a first grouting channel. The grouting port is located at the grouting end, and the grouting end can penetrate the reserved grouting hole and be inserted into the soil. The first grouting channel extends along the axial direction of the grouting insert and communicates with the grouting port. The connecting end is configured to be connected to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through a first grouting pipe.

[0015] The beneficial effects of this invention are: This invention provides a construction method and grouting device for tunnel grouting reinforcement. During tunnel grouting reinforcement, the pre-reserved grouting holes of the tunnel segments are cleaned, a grouting insert is inserted through the pre-reserved grouting holes into the soil, and the connecting end is connected to the grouting equipment. This allows the grouting chamber of the grouting equipment to connect with the first grouting channel through a first grouting pipe. Then, the grouting insert is partially pulled out, forming a reinforcement channel. During the pulling out of the grouting insert, the grouting equipment injects grout into the reinforcement channel through the first grouting pipe, the first grouting channel, and the grouting port. Grout is injected into the tunnel to reinforce it. Thus, the grout used for reinforcement is located within the reinforcement channel. Then, the grouting plug is rotated to form an arbitrary angle with the formed reinforcement channel. The above-mentioned method of inserting, removing and injecting grout is used to reinforce the tunnel again. Then, the above-mentioned operation of rotating and injecting grout is repeated until the grouting plug abuts against the wall of the reserved grouting hole, thereby forming multiple reinforcement channels distributed in a canopy shape. Finally, the grouting plug is removed and the reserved grouting hole is sealed.

[0016] By first inserting the grouting end of the grouting plug into the first preset position in the soil, and then pulling out part of the grouting plug so that the grouting end retracts to the second preset position, a reinforcement channel is formed. During the pulling-out process, grout is continuously injected into the reinforcement channel. On the one hand, this ensures that the reinforcement channel is completely filled with grout along its length, thereby increasing the grout reinforcement range and enhancing the reinforcement effect on the stratum. At the same time, the increased reinforcement range of the grout can improve the bearing capacity of the tunnel segments. Furthermore, the secondary grouting can improve the supporting reaction force on the outer arc surface of the tunnel segments. On the other hand, the grout used for grouting reinforcement can be injected into the reinforcement channel in the stratum according to the preset reinforcement path and reinforcement range, which can effectively control the reinforcement range of the grout. By rotating the grouting plug multiple times, multiple reinforcement channels are formed in a canopy-like distribution, and each reinforcement channel is injected with grout, which can ensure uniform reinforcement of the stratum and avoid uneven settlement of the stratum. Attached Figure Description

[0017] Figure 1 This is a flowchart of the tunnel grouting reinforcement construction method provided in the embodiments of the present invention; Figure 2 This is a schematic diagram of the grouting plug provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the grouting insert provided in the embodiment of the present invention when it penetrates the reserved grouting hole; Figure 4 This is a schematic diagram of the structure of the grouting plug provided in this embodiment of the invention when it is inserted into the first preset position; Figure 5 This is a schematic diagram of the structure of the grouting plug-in when it moves to the second preset position according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the structure when two reinforced channels are arranged at an angle, as provided in an embodiment of the present invention; Figure 7 This is a first view of the multiple reinforced channels provided in the embodiments of the present invention when they are distributed in a canopy-like pattern; Figure 8 This is a second view of the multiple reinforced channels provided in the embodiments of the present invention when they are distributed in a canopy-like pattern; Figure 9 This is a schematic diagram of the structure of the expanding member provided in the embodiment of the present invention when it expands radially.

[0018] In the picture: 100. Segment; 1001. Reserved grouting hole; 1. Grouting insert; 11. Grouting end; 111. Grouting port; 12. Connecting end; 13. Grouting hole; 2. Sealing components; 3. Expanded diameter parts. Detailed Implementation

[0019] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.

[0020] In the description of this invention, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0021] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0022] In the description of this embodiment, the terms "upper," "lower," "left," and "right," etc., refer to the orientation or positional relationship shown in the accompanying drawings. They are used only for ease of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention. In addition, the terms "first" and "second" are used only for distinction in description and have no special meaning.

[0023] Example 1 This embodiment provides a construction method for tunnel grouting reinforcement, such as... Figures 1 to 9 As shown, using this construction method for tunnel grouting reinforcement can not only increase the reinforcement range of the grout, enhance the reinforcement effect on the stratum, and improve the support reaction force on the outer arc surface of the segment, but also effectively control the reinforcement range of the grout, ensure uniform reinforcement of the stratum, and avoid uneven settlement of the stratum.

[0024] The construction method for tunnel grouting reinforcement includes the following steps: S1, see also Figure 1 As shown, the reserved grouting hole 1001 of the cleaning segment 100; S2, see also Figures 1 to 4 As shown, the grouting end 11 of the grouting plug 1 is inserted through the reserved grouting hole 1001 and inserted into the soil until the grouting end 11 is inserted to the first preset position. The connecting end 12 of the grouting plug 1 is located inside the segment 100. The grouting plug 1 is provided with a first grouting channel and a grouting port 111. The grouting port 111 is located at the grouting end 11. The first grouting channel extends along the axial direction of the grouting plug 1. S3, see also Figure 1 As shown, the connecting end 12 is connected to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe; S4, see also Figure 1 and Figure 5As shown, the grouting plug 1 is pulled out along the direction close to the inside of the segment 100 to form a reinforcement channel in the soil, and the grouting equipment is controlled to inject grout into the reinforcement channel through the first grouting pipe, the first grouting channel and the grouting port 111 until the grouting end 11 of the grouting plug 1 is moved to the second preset position, which is located on the side of the first preset position close to the segment 100. S5, see also Figure 1 As shown, with the existing reinforcement channel as a reference, the grouting plug 1 is rotated in any direction along the circumference of the reinforcement channel so that the grouting plug 1 and the reinforcement channel form an arbitrary angle. S6, see also Figure 1 and Figure 6 As shown, steps S2 to S4 are repeated to form a reinforced channel again, and grout is injected into the reinforced channel. S7, see also Figure 1 , Figure 7 and Figure 8 As shown, repeat steps S5 and S6 until the grouting plug 1 abuts against the wall of the reserved grouting hole 1001 to form multiple reinforcement channels, which are distributed in a canopy shape. S8, see also Figure 1 As shown, pull out the grouting insert 1 and seal the reserved grouting hole 1001.

[0025] During tunnel grouting reinforcement, construction is carried out according to steps S1 to S8 as described above. The reserved grouting holes 1001 of the segment 100 are cleaned, the grouting insert 1 is inserted through the reserved grouting hole 1001 and into the soil, and the connecting end 12 is connected to the grouting equipment. This allows the grouting chamber of the grouting equipment to connect with the first grouting channel through the first grouting pipe. Then, the grouting insert 1 is partially pulled out, forming a reinforcement channel. During the pulling out of the grouting insert 1, the grouting equipment injects grout into the reinforcement channel through the first grouting pipe, the first grouting channel, and the grouting port 111. Grout is injected into the channel to reinforce the tunnel. Thus, the grout used for reinforcement is located within the reinforcement channel. Then, the grouting plug 1 is rotated to form an arbitrary angle with the formed reinforcement channel. The above-mentioned method of inserting the grouting plug 1, pulling out the grouting plug 1 and injecting grout is used to perform grouting reinforcement again. Then, the above-mentioned operation of rotating the grouting plug 1 and injecting grout is repeated until the grouting plug 1 abuts against the wall of the reserved grouting hole 1001, thereby forming multiple reinforcement channels distributed in a canopy shape. Finally, the grouting plug 1 is pulled out and the reserved grouting hole 1001 is sealed.

[0026] By first inserting the grouting end 11 of the grouting plug 1 into the first preset position in the soil, and then partially pulling out the grouting plug 1, the grouting end 11 is retracted to the second preset position, thus forming a reinforcement channel. During the pulling-out process, grout is continuously injected into the reinforcement channel. On the one hand, this ensures that the reinforcement channel is completely filled with grout, thereby increasing the reinforcement range of the grout and enhancing the reinforcement effect on the stratum. At the same time, due to the increased reinforcement range of the grout, the bearing capacity of the segment 100 can be improved. In addition, the secondary grouting can improve the supporting reaction force on the outer arc surface of the segment 100. On the other hand, the grout used for grouting reinforcement can be injected into the reinforcement channel in the stratum according to the preset reinforcement path and reinforcement range, which can effectively control the reinforcement range of the grout. By rotating the grouting plug 1 multiple times, multiple reinforcement channels are formed in a canopy-like distribution, and each reinforcement channel is injected with grout, which can ensure uniform reinforcement of the stratum and avoid uneven settlement of the stratum.

[0027] It should be noted that when injecting grout into the reinforcement channel, the grouting pressure needs to be controlled. It is only necessary to inject the grout into the reinforcement channel, and there is no need to split the grout into the surrounding soil. The injected grout includes plain concrete or cement grout, etc. The reserved grouting hole 1001 is sealed using the existing radial grouting three-stage sealing method, which will not be described in detail here. The first and second preset positions are determined according to the reinforcement range required by the project during actual construction.

[0028] Optionally, the side of the grouting end 11 facing the soil is provided with an insertion bevel, so that the body of the grouting end 11 forms an angled plug, and the angled plug is provided with a grouting port 111. By providing an insertion bevel, an angled plug is formed at the grouting end 11. When the grouting end 11 is inserted into the soil, the penetration resistance of the soil can be reduced, allowing the grouting end 11 to be inserted smoothly. This helps to ensure the smooth progress of the grouting reinforcement operation and effectively control the reinforcement range of the grout.

[0029] Furthermore, the angle between the inclined plane and the horizontal plane is set to 30° to 60°, that is, the angle of the inclined plug is 30° to 60°.

[0030] Optionally, such as Figure 2 As shown, a sealing element 2 is provided on the inclined surface, which can partially block the grouting port 111. By setting the sealing element 2 to partially block the grouting port 111, during the process of inserting the grouting end 11 into the soil, the sealing element 2 can prevent a large amount of soil from flowing into the first grouting channel from the grouting port 111, thus avoiding affecting the subsequent injection of grout into the reinforcement channel through the first grouting channel.

[0031] Optionally, such as Figure 2As shown, the grouting insert 1 is equipped with an expanding member 3. The expanding member 3 is located on the side near the grouting end 11. The expanding member 3 can expand or contract radially to expand the reinforcement channel radially. After the grouting insert 1 is inserted into the first preset position in the soil, the expanding member 3 is controlled to expand radially. Then, the grouting insert 1 is partially pulled out of the soil, thereby forming a reinforcement channel. As the grouting insert 1 is partially pulled out, grout is injected into the reinforcement channel. By setting the expanding member 3, the reinforcement channel can be expanded radially, increasing the cross-sectional area of ​​the reinforcement channel, thereby increasing the total amount of grout injected into the reinforcement channel, which is beneficial to improving the reinforcement effect on the stratum.

[0032] In this embodiment, the expanding component 3 includes an expanding airbag. The grouting insert 1 is provided with an inflation channel and multiple through holes, the inflation channel extending axially along the grouting insert 1. The connecting end 12 is configured to connect to an inflation device so that the inflation chamber of the inflation device is in communication with the inflation channel. Multiple rings of inflation structures are spaced axially along the side of the grouting insert 1 near the grouting end 11, each ring including multiple through holes spaced circumferentially along the grouting insert 1, each through hole communicating with the inflation channel. The expanding airbag is sleeved on the grouting insert 1, and the inner cavity of the expanding airbag is in communication with the inflation channel through the through holes.

[0033] Therefore, after the grouting plug 1 is inserted into the first preset position, the inflation device can be connected to the connecting end 12, so that the inflation chamber of the inflation device is connected to the inflation channel. Then, the inflation device is controlled to inject gas into the inner cavity of the expansion airbag through the inflation channel and through hole, so that the expansion airbag expands radially to expand the cross-sectional area of ​​the reinforcement channel.

[0034] Correspondingly, after step S3 is executed and before step S4 is executed, step S40 is executed. Step S40 specifically includes the following steps: Connect the inflation device to the connecting end 12 and control the inflation device to inflate the expanded diameter airbag through the inflation channel and through hole so that the expanded diameter airbag expands radially.

[0035] It should be noted that after the grouting end 11 of the grouting plug 1 moves to the second preset position, the inflation device is controlled to draw gas from the expansion airbag, thereby causing the expansion airbag to contract. Then, the grouting plug 1 is rotated to form an arbitrary angle with the reinforcement channel, and then the grouting plug 1 is inserted into the soil again.

[0036] Optionally, such as Figure 2As shown, the grouting insert 1 is provided with a second grouting channel and multiple grouting holes 13. The second grouting channel extends axially along the grouting insert 1, and the grouting chamber of the grouting equipment can be connected to the second grouting channel through a second grouting pipe. On the side of the grouting insert 1 near the grouting end 11, multiple rings of grouting structures are arranged at intervals along its axial direction. Each ring of grouting structure includes multiple grouting holes 13 arranged at intervals along the circumference of the grouting insert 1, and any grouting hole 13 is connected to the second grouting channel.

[0037] Correspondingly, after step S4 is executed and before step S5 is executed, step S50 is executed, which specifically includes the following steps: Connect the second grouting pipe to the second grouting channel, and control the grouting equipment to inject grout into the reinforcement channel through the second grouting pipe, the second grouting channel and the grouting hole 13 at a preset grouting pressure, so that the grout is split into the soil.

[0038] By setting a second grouting channel and grouting hole 13, grout can be injected into the reinforcement channel simultaneously through grouting hole 13 and grouting port 111 at a position close to the segment 100. The grouting hole 13 is distributed circumferentially on the grouting insert 1, so that the grout can be split into the soil along the circumferential direction at a preset grouting pressure, further expanding the reinforcement range radially. This forms a composite reinforcement structure with the grout in the reinforcement channel as the main reinforcement and circumferential jet grout as the reinforcement auxiliary, thereby enhancing the reinforcement effect of tunnel grouting reinforcement and improving the bearing capacity of the reinforcement structure.

[0039] For example, the preset grouting pressure is 1MPa to 3MPa.

[0040] Example 2 This embodiment provides a grouting device for tunnel reinforcement, applicable to the tunnel grouting reinforcement construction method in Embodiment 1. The tunnel reinforcement grouting device includes a grouting insert 1, such as... Figure 2 and Figure 3 As shown, the grouting plug 1 is provided with a grouting end 11, a connecting end 12, a grouting port 111 and a first grouting channel. The grouting port 111 is located at the grouting end 11. The grouting end 11 can penetrate the reserved grouting hole 1001 and be inserted into the soil. The first grouting channel extends along the axial direction of the grouting plug 1 and communicates with the grouting port 111. The connecting end 12 is configured to be connected to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe.

[0041] During tunnel grouting reinforcement, the reserved grouting holes 1001 of the segment 100 are cleaned, the grouting insert 1 is inserted through the reserved grouting hole 1001 and into the soil, and the connecting end 12 is connected to the grouting equipment, so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe. Then, the grouting insert 1 is partially pulled out, thus forming a reinforcement channel. During the process of pulling out the grouting insert 1, the grouting equipment injects grout into the reinforcement channel through the first grouting pipe, the first grouting channel and the grouting port 111 to achieve the desired effect. The tunnel is now being reinforced by grouting. As can be seen, the grout used for reinforcement is located within the reinforcement channel. Then, the grouting plug 1 is rotated to form an arbitrary angle with the formed reinforcement channel. The above-mentioned method of inserting the grouting plug 1, pulling out the grouting plug 1 and grouting is used to perform grouting reinforcement again. Then, the above-mentioned operation of rotating the grouting plug 1 and grouting is repeated until the grouting plug 1 abuts against the wall of the reserved grouting hole 1001, thereby forming multiple reinforcement channels distributed in a canopy shape. Finally, the grouting plug 1 is pulled out and the reserved grouting hole 1001 is sealed.

[0042] By first inserting the grouting end 11 of the grouting plug 1 into the first preset position in the soil, and then partially pulling out the grouting plug 1, the grouting end 11 is retracted to the second preset position, thereby forming a reinforcement channel. During the pulling-out process, grout is continuously injected into the reinforcement channel. On the one hand, the length of the reinforcement channel is filled with grout, thereby increasing the grout reinforcement range and enhancing the reinforcement effect on the stratum. On the other hand, the grout used for grouting reinforcement can be injected into the reinforcement channel in the stratum according to the preset reinforcement path and reinforcement range, which can effectively control the reinforcement range of the grout. By rotating the grouting plug 1 multiple times, multiple reinforcement channels are formed in a canopy-like distribution, and each reinforcement channel is injected with grout, which can ensure uniform reinforcement of the stratum and avoid uneven settlement of the stratum.

[0043] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation of the present invention. Those skilled in the art will be able to make various obvious changes, readjustments, and substitutions without departing from the scope of protection of the present invention. It is neither necessary nor possible to exhaustively describe all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.

Claims

1. A construction method for tunnel grouting reinforcement, characterized in that, Includes the following steps: S1. Clean the reserved grouting holes (1001) of the segment (100). S2. Insert the grouting end (11) of the grouting plug (1) through the reserved grouting hole (1001) and insert it into the soil until the grouting end (11) is inserted to the first preset position. The connecting end (12) of the grouting plug (1) is located inside the segment (100). The grouting plug (1) is provided with a first grouting channel and a grouting port (111) that are connected. The grouting port (111) is located at the grouting end (11). The first grouting channel extends along the axial direction of the grouting plug (1). S3. Connect the connecting end (12) to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe; S4. Pull the grouting plug (1) along the direction close to the inside of the pipe segment (100) to form a reinforcement channel in the soil, and control the grouting equipment to inject grout into the reinforcement channel through the first grouting pipe, the first grouting channel and the grouting port (111) until the grouting end (11) of the grouting plug (1) is moved to the second preset position, the second preset position is located on the side of the first preset position close to the pipe segment (100); S5. Using the already formed reinforcement channel as a reference, rotate the grouting plug (1) in any direction along the circumference of the reinforcement channel so that the grouting plug (1) and the reinforcement channel form an arbitrary angle. S6. Repeat steps S2 to S4 to form the reinforcement channel again, and inject grout into the reinforcement channel. S7. Repeat steps S5 and S6 until the grouting insert (1) abuts against the wall of the reserved grouting hole (1001) to form a plurality of the reinforcement channels, which are distributed in a canopy shape. S8. Pull out the grouting insert (1) and seal the reserved grouting hole (1001).

2. The construction method for tunnel grouting reinforcement according to claim 1, characterized in that, The grouting end (11) has an insertion bevel on the side facing the soil so that the grouting end (11) body forms a bevel plug, and the bevel plug is provided with the grouting port (111).

3. The construction method for tunnel grouting reinforcement according to claim 2, characterized in that, A sealing element (2) is provided on the insertion inclined surface, and the sealing element (2) can partially block the grouting port (111).

4. The construction method for tunnel grouting reinforcement according to claim 1, characterized in that, The grouting insert (1) is provided with an expansion member (3), which is located on the side close to the grouting end (11). The expansion member (3) can expand or contract radially to expand the reinforced channel radially.

5. The construction method for tunnel grouting reinforcement according to claim 4, characterized in that, The expanding component (3) includes an expanding airbag. The grouting insert (1) is provided with an inflation channel and multiple through holes. The inflation channel extends along the axial direction of the grouting insert (1). The connecting end (12) is configured to be connected to an inflation device so that the inflation chamber of the inflation device is connected to the inflation channel. The grouting insert (1) has multiple rings of inflation structure spaced along its axial direction on the side near the grouting end (11). Each ring of inflation structure includes multiple through holes spaced along the circumference of the grouting insert (1). Any one of the through holes is connected to the inflation channel. The expanding airbag is sleeved on the grouting insert (1). The inner cavity of the expanding airbag is connected to the inflation channel through the through hole.

6. The construction method for tunnel grouting reinforcement according to claim 5, characterized in that, After step S3 is executed and before step S4 is executed, step S40 is executed, which specifically includes the following steps: Connect the inflation device to the connection end (12) and control the inflation device to inflate gas into the expansion airbag through the inflation channel and the through hole so that the expansion airbag expands radially.

7. The construction method for tunnel grouting reinforcement according to any one of claims 1-6, characterized in that, The grouting insert (1) is provided with a second grouting channel and a plurality of grouting holes (13). The second grouting channel extends along the axial direction of the grouting insert (1). The grouting cavity of the grouting device can be connected to the second grouting channel through a second grouting pipe. The grouting insert (1) is provided with multiple rings of grouting structure at intervals along its axial direction on the side near the grouting end (11). Each ring of the grouting structure includes a plurality of grouting holes (13) arranged at intervals along the circumference of the grouting insert (1). Any of the grouting holes (13) is connected to the second grouting channel.

8. The construction method for tunnel grouting reinforcement according to claim 7, characterized in that, After step S4 is executed and before step S5 is executed, step S50 is executed, which specifically includes the following steps: The second grouting pipe is connected to the second grouting channel, and the grouting equipment is controlled to inject grout into the reinforced channel through the second grouting pipe, the second grouting channel and the grouting hole (13) at a preset grouting pressure, so that the grout is split into the soil.

9. The construction method for tunnel grouting reinforcement according to claim 8, characterized in that, The preset grouting pressure is 1MPa to 3MPa.

10. A grouting device for tunnel grouting reinforcement, characterized in that, The tunnel grouting reinforcement construction method applicable to any one of claims 1-9, wherein the tunnel grouting reinforcement grouting device comprises: The grouting plug (1) is provided with a grouting end (11), a connecting end (12), a grouting port (111) and a first grouting channel. The grouting port (111) is located at the grouting end (11). The grouting end (11) can penetrate the reserved grouting hole (1001) and be inserted into the soil. The first grouting channel extends along the axial direction of the grouting plug (1) and communicates with the grouting port (111). The connecting end (12) is configured to be connected to the grouting equipment so that the grouting chamber of the grouting equipment is connected to the first grouting channel through the first grouting pipe.