A step-moving model for ore backfilling and mining in underground collapse zones
By using a step-by-step moving model for ore backfilling and mining in underground collapse zones, the problems of large amount of backfill material, high cost, low recovery rate and poor safety in mining collapse zone mining have been solved, achieving efficient and safe ore recovery and backfilling quality control.
Patent Information
- Application Number
- CN202611535023.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-30
- Publication Date
- 2026-11-17
AI Technical Summary
In mining, the recovery of collapsed areas faces problems such as large amount of backfill material, high cost, low recovery rate, ore dilution and poor safety. Especially under complex collapse conditions, traditional backfilling technology is difficult to effectively control the stability of overburden and reduce the risk of mining disturbance.
The step-moving formwork for backfilling and mining ore in the collapsed area underground includes a guide rail assembly and a formwork body. Through sliding fit and airbag sealing, it realizes the gradual backfilling and mining of the collapsed area, avoiding blasting and tunneling, and using the whole tailings slurry to form the formwork roadway, reducing the amount of backfill material and cementing material used, and improving mining efficiency and safety.
It saves on the amount of filling material and cementitious material used, shortens the mining cycle, increases the recovery rate, reduces costs, avoids ore dilution, enhances mining safety, reduces solid waste generation, improves equipment utilization, and ensures filling quality and operational continuity.
Smart Images

Figure CN123109769A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mining and relates to an auxiliary backfilling device for backfilling and mining crushed ore in underground collapse areas of mines, specifically a stepping moving model for backfilling and mining ore in underground collapse areas. Background Technology
[0002] Collapse zones generated during mining operations generally suffer from problems such as fractured surrounding rock, disordered stress distribution, and accumulation of loose debris. These problems not only result in the retention of a large amount of residual ore resources but also pose safety hazards such as roof collapse, rock bursts, and surface subsidence. The recovery of residual ore in collapse zones has become the primary goal of mine resource tapping and disaster management [Feng Guorui et al. Current Status and Research Progress of Residual Coal Mining in China [J]. Journal of Coal Science and Technology, 2020, 45(01): 151-159]. The recovery of collapse zones requires a balance between resource recovery rate and stope safety, which places high demands on overburden structure detection, surrounding rock stability control, and mining technology selection [Chen Qingfa. New Ideas and Application Practices for Disaster Prevention and Control in Cooperative Mining Processes [J]. Mineral Resources Protection and Utilization, 2025, 45(08): 1-9].
[0003] The core difficulty in mining the collapse zone lies in controlling the stability of the fractured surrounding rock. The overlying rock inside the collapse zone has already broken and collapsed. Mining disturbance will induce secondary instability of the overlying rock, which is prone to disasters such as roof falls and shock waves [Cao Jianli et al. Research on treatment technology of goaf in a certain iron mine [J]. China Mining, 2019, 28(06):112-117].
[0004] Currently, most mining technologies for collapsed areas focus on the spatial morphology and rock mass conditions of the collapsed area. They employ multi-source detection methods such as geophysical exploration, three-dimensional laser scanning, and underground camera detection to determine the extent of the collapsed area, the thickness of the collapsed material, and the degree of fracturing of the surrounding rock, providing basic data for the design of mining schemes [Shen Shuang et al. Subsidence analysis of collapse areas in deep metal mines [J]. Metal Mines, 2021(12):143-148].
[0005] In terms of backfilling technology, the mainstream approach is to construct artificial load-bearing structures using paste backfilling and high-water-content materials to reinforce fractured surrounding rock and form a stable artificial roof, thereby controlling ground pressure while recovering residual ore [Zhang Dongjie et al. Research on the Optimization of Goaf Treatment Methods Based on AHP-FUZZY [J]. Metal Mines, 2021(05):1-7]. Artificial false roofs are constructed using full tailings paste backfilling to reduce the risk of collapse caused by mining disturbances [Wu Aixiang et al. Current Status and Trends of Paste Technology Development in China [J]. Journal of Engineering Science, 2018, 40(05):517-525]. During the mining process, the movement of overlying rock is simultaneously controlled, and the compaction effect of the collapsed loose material is used to form a load-bearing system, achieving simultaneous disaster prevention and resource recovery [Gu Xinjian et al. Mining Technology and Safety Management Measures for Residual Ore in Old Workings [J]. China Safety Science Journal, 2008, 18(01):150-153]. For the ore body below the collapse zone, segmented caving and open-field modification techniques can be adopted, and blasting parameters should be strictly controlled to avoid inducing large-scale collapses [Zhang Hailei et al. Research on the practice of residual ore recovery in ancient mining areas where the roof and floor are not stable [J]. China Mining, 2022, 31(S1):245-249].
[0006] In terms of filling slurry preparation and filling process, full tailings cemented paste filling slurry is mostly used. Multi-stage stirring system is relied upon to ensure the homogeneity of the slurry and improve the slurry's penetration and cementing ability to loose collapse voids [Yang Xiaobing et al. Homogenization model of high-concentration full tailings filling slurry for waste rock [J]. Journal of Engineering Science, 2023, 45(08): 1316-1323]. Some mines adopt a segmented grouting-paste filling combined process. First, the loose rock mass in the collapse area is pre-grouted and consolidated, and then large-volume tailings paste filling is implemented to cement the broken loose material into a filling structure with load-bearing capacity [Wang Xinyan. Research on key technologies for grouting and filling re-mining in small kiln damaged areas [J]. Mining Research and Development, 2023, 43(06): 45-50].
[0007] In terms of application in mining engineering, a complete approach of "collapse area treatment - tailings backfilling - residual ore recovery" has been formed in China. For collapse areas with relatively simple conditions, the upward layered backfilling method is used to recover residual ore after the backfilling and maintenance meet the standards. For large-scale collapse areas with high degree of fragmentation, the isolation and division of the panel is adopted, and the backfilling and mining are carried out in separate zones to control the damage of mining disturbance to the backfilled areas [Liu Lang, Fang Zhiyu, Zhang Bo. Evolution and basic categories of mine backfilling technology [J]. Metal Mines, 2021(03):1-10]. However, there are still many problems that need to be solved in this process: The long curing cycle of backfilling restricts the efficiency of mine production; the parameter matching system for backfilling-reminding under complex collapse conditions still needs to be improved [Deng Hongwei et al. Study on the stability of tailings backfilling-reminding under seepage-stress coupling [J]. Gold Science and Technology, 2025, 33(04): 547-556.].
[0008] The high cost of backfill materials restricts their promotion in small and medium-sized mines; the dynamic disaster early warning system during the mining process is not yet sound, making it difficult to predict the risk of overburden instability in real time [Feng Guorui et al. Research on strata control theory and key technologies for mining residual coal under complex conditions [J]. Coal Science and Technology, 2020, 48(01):144-149].
[0009] The large amount of filling cementitious material used leads to the dilution of the recovered ore, resulting in a low recovery rate and high recovery costs. More seriously, when mining the crushed ore in the collapsed area, drilling and blasting are still required. The blasting vibrations further impact and loosen the surrounding area, posing a severe challenge to the safety of mining and the ecological environment of the entire collapsed area. Summary of the Invention
[0010] The purpose of this invention is to solve the above-mentioned technical problems and provide a stepping moving model for underground ore filling and mining in collapse areas that is safe, reliable, effectively saves the amount of filling material and cementing material, significantly reduces mining costs, shortens the mining cycle, improves the mining rate, and avoids ore dilution.
[0011] The present invention relates to a step-type moving mold for ore backfilling and mining in underground collapse areas, comprising a guide rail assembly and a mold body, wherein the lower end of the mold body is slidably engaged with the guide rail assembly, and the mold body is composed of at least one mold unit and a mold tail connected in a detachable manner in sequence. The first segment of the module unit has a baffle at its front end, an external airbag on the outside of the baffle, multiple fins on both sides of the top surface of the module unit, and a semi-circular airbag on the outside of the tail of the module.
[0012] The guide rail assembly includes two parallel U-shaped rails and multiple rolling balls located within the rails. The lower ends of both sides of the mold body are in contact with the rolling balls within the corresponding U-shaped rails.
[0013] The two parallel U-shaped tracks are detachably connected by multiple parallel fixed beams, the length of which is adjustable.
[0014] The cross-section of the mold unit and the mold tail is arched, and it is assembled from the top plate of the mold and the mold side plates on both sides, or directly from the mold side plates on both sides.
[0015] The lower sections of the mold side plates on both sides are detachably connected by a bottom beam, and the bottom beam is detachably connected to the upper sections of the mold side plates on both sides by a support column.
[0016] A columnar airbag can be installed on the outer side of the mold side plate.
[0017] The outer edges of the outer airbags all extend beyond the outer edges of the baffles, and the inflation tubes of the outer airbags extend through the baffles to the tail of the mold.
[0018] The lower edge of the external airbag extends to the front end of the cover rail assembly.
[0019] The gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower end of the baffle, and its inflation tube extends to the mold tail.
[0020] The outer wall of the module unit is smooth, and at least two pairs of fins are symmetrically arranged on both sides of the top surface along the axial direction of the module body. The cross section of the fins is a triangle with the tip pointing upwards. At least two layers of semi-annular airbags are arranged circumferentially on the outer side of the module tail, and their inflation tubes extend into the module tail.
[0021] Geotextile is laid on the outside of the guide rail assembly, covering the entire outer surface of the stepping moving mold, including an outer airbag pad and a semi-circular airbag, with the lower end extending to the ground and covering the guide rail assembly.
[0022] Furthermore, the process of using the mobile formwork for backfilling crushed ore in collapsed areas during mining is as follows: ① Install at least one set of goaf filling pipes at the top of the goaf area above the moving formwork. Each set has two pipes, and the two filling pipes are connected to two sets of filling sand bins with opposite electrical properties, respectively, to transport filling materials with opposite electrical properties. The outlets of the two goaf filling pipes are spaced 4-5 meters apart.
[0023] ② Lay U-shaped guide rail components from inside the roadway to the collapsed crushed ore area to be mined, with the end of the guide rail components reaching the collapsed crushed ore area to be mined; ③ On the U-shaped guide rail assembly in the tunnel, the first section of the mold unit is assembled to form the mold head. The mold head and the U-shaped guide rail assembly are in contact through rolling elements, and the mold body moves along the U-shaped guide rail by the rolling of the rolling elements. ④ Advance the first module unit along the U-shaped guide rail assembly to the collapsed crushed ore area to be mined, and then connect the next module unit in sequence until the baffle of the first module unit reaches the collapsed crushed ore to be mined. Then connect the module tail to the end module unit to complete the on-site assembly of the moving module. The entire module tail is located in the roadway. ⑤ Build a partition wall on the side of the semi-annular airbag at the tail of the mold near the roadway to seal the gap between the tail of the mold and the roadway wall; reserve fixing holes in the partition wall for the insertion of the filling pipe at the top of the mold into the goaf. ⑥ Install the top filling pipe, extending through the top plate to the side of the collapsed crushed ore to be mined on the outer airbag; slowly inject the full tailings slurry to fill the space between the outer airbag and the collapsed crushed ore; when the level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe, injecting full tailings slurry while pulling, the injection volume of full tailings slurry is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe reaches the junction of the mold tail and the mold body, stop dragging, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe, and seal the fixing hole; ⑦ After the fixing holes are sealed tightly, inflate the outer airbag to fill the gaps between the baffle and the ore wall, and between the baffle and the ground; inflate the bottom airbag strip to fill the gap between the lower edge of the outer airbag and the front end of the guide rail assembly; inflate the semi-circular airbag at the tail of the mold to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall. ⑧ The tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipeline to form a filling layer until the entire goaf area is filled. ⑨ After the filling material in the goaf area has reached the design strength, remove the partition wall on the outside of the mold tail, drag the moving mold into the roadway, remove the moving mold to form the mold roadway, and use the ore extraction equipment to mine the collapsed crushed ore near the mold roadway entrance with the help of the isolation support of the mold roadway. ⑩ Repeat steps ①-⑨ above for step-by-step mining until all collapsed ore fragments are recovered.
[0024] Step 9, the process of mining collapsed and crushed ore, is as follows: ① Clear the entire tailings layer in the model roadway, check the bonding between the backfill and the surrounding rock around the model roadway, and determine whether it is necessary to add anchor bolts to strengthen the support based on the surrounding rock conditions. If the surrounding rock conditions are uncertain, add anchor bolts to strengthen the support. ② The tailings layer and collapsed crushed ore near the entrance of the tunnel are shoveled and transported to the screening unit using shovel and transport equipment; ③ The transported ore is screened through a screening unit to separate the tailings and ore.
[0025] Furthermore, based on the relative position of the ore pile in the collapsed area and the roadway entrance, the amount of ore pile, and the surrounding environment of the goaf after some ore has been mined, mobile modules with different cross-sectional dimensions can be flexibly assembled.
[0026] For small collapsed ore piles more than 10 meters from the tunnel entrance, a movable formwork assembled from side panels is used. This reduces the arched cross-sectional size of the movable formwork, improving the flexibility and safety of its assembly, movement, and subsequent dismantling. Because the ore pile is far from the tunnel entrance, the formwork tunnel formed by a single filling is relatively long, and the amount of tailings slurry injected during filling is large. Using a movable formwork with a larger cross-sectional size would create a large formwork tunnel, reducing safety. Furthermore, a longer movable formwork increases the dragging force required to pull it into the tunnel. Reducing the formwork cross-sectional size reduces the required dragging force and improves operational stability.
[0027] Furthermore, due to the uncertainty of the collapse, there are local and scattered fragments of ore in the collapse area. If each of these fragments is filled with a moving mold, although the mining efficiency is higher and the mining cost is lower than that of traditional filling, it will reduce the overall mining efficiency.
[0028] For collapse zones containing both main collapsed ore piles and scattered small ore piles, the ends of the laid U-shaped guide rail assemblies reach the main collapsed ore piles. Based on the distribution of scattered small collapsed ore piles near the U-shaped guide rail assemblies, mold side plates with pipe installation holes are selected for assembling the moving mold.
[0029] The side panel of the formwork has 2-3 rows of pipe installation holes, arranged in a pattern where the number of pipe installation holes gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each group of holes corresponds to a cylindrical airbag, with an inflation tube and a water inlet tube at one end. The cylindrical airbag pierces the geotextile through the inflation tube and the water inlet tube, passes through the two holes arranged at the top and bottom, and extends into the inside of the side panel of the formwork for fixed installation. The cylindrical airbag is 1-2 meters long and 0.3-0.5 meters in diameter.
[0030] Based on the distance between the scattered ore piles and the U-shaped guide rail assembly, columnar airbags of different diameters and lengths are selected and installed on the outside of the mold side plate. The inflated columnar airbags and the tailings slurry trapped between the columnar airbags form a channel connecting the scattered ore piles after filling.
[0031] At the start of filling, water is first injected into the columnar airbags, with the water volume being 5-15% of the volume of the columnar airbags. Then, the airbags are inflated until the air pressure is 80% of the air pressure of the outer airbag cushion. After inflation, the end of the columnar airbags reaches or approaches the scattered collapsed ore piles. After the tailings slurry covers all the columnar airbags, the columnar airbags are inflated a second time until their air pressure is the same as that of the outer airbag cushion.
[0032] While the columnar airbag is being inflated a second time, tailings filling material containing cementitious material is injected into the collapse area until the entire collapse area is filled.
[0033] After the tailings filling material containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe and water inlet pipe are removed from the moving formwork to drain the water accumulated in the columnar airbags. The moving formwork is then pulled out and dismantled, forming a formwork tunnel. The entire tailings layer in the formwork tunnel is cleaned, the columnar airbags are pulled out, and the entire tailings layer in the area of the columnar airbags is cleaned, forming a channel connecting the formwork tunnel to the scattered fragmented ore piles for the mining of scattered fragmented ore.
[0034] Compared with the prior art, the present invention has the following beneficial effects: 1. Saves on filling material and cementing material usage, reducing filling costs: Traditional mining of collapsed crushed ore involves filling the entire collapsed area. During mining, a roadway must be excavated within the filling body to enter the collapsed crushed ore area. This invention uses a moving mold to assist filling. The moving mold occupies the space of the roadway before filling, and the filling material is only injected into the goaf area above the moving mold. After the moving mold is removed, the mold roadway is formed directly, eliminating the need to excavate a separate roadway within the filling body. This saves on the amount of filling material used in the mold roadway area, correspondingly reducing the amount of cementing material used and lowering the cost of filling and mining.
[0035] 2. Eliminates the need for re-excavation of tunnels, reducing solid waste. Traditional methods require excavating tunnels again within the filling body to enter the collapsed ore area, generating a large amount of waste material that becomes underground solid waste. This invention can directly form a tunnel after removing the movable formwork, eliminating the need for re-excavation, thus saving construction costs and time associated with tunnel excavation, while also reducing the amount of waste rock and solid waste generated during excavation.
[0036] 3. Shorten the mining cycle in the collapse area and improve mining safety. After the backfill material has cured to the design strength, the moving formwork is removed. After the moving formwork is removed, the formwork roadway is directly formed, eliminating the need to excavate a new roadway within the backfill material, thus saving time. At the same time, it avoids damage to the backfill material caused by excavation and disturbance to the junction between the backfill material and the surrounding rock caused by excavation vibration, which helps to ensure the safety of mining operations.
[0037] 4. Improve recovery rate and suppress ore dilution. Based on the distribution of crushed ore in the collapse zone, this invention gradually extends the moving formwork to the crushed ore area, enabling the complete recovery of crushed ore in the collapse zone. The formwork roadway formed after the moving formwork is dismantled directly reaches the crushed ore in the collapse zone. The recovered ore, after screening and separation of tailings, does not contain backfill material and will not lead to ore dilution.
[0038] 5. The mobile mold is reusable. The mobile mold is composed of mold units and a detachable mold tail. After the filling material reaches the design strength, it can be removed and continuously used for the mining of crushed ore in other collapse areas, thereby improving equipment utilization and reducing the manufacturing cost of the mobile mold.
[0039] 6. Facilitates the collection and discharge of oozing water. Gaps are left between the side plates of the moving formwork and the U-shaped track, between the U-shaped track and the ground, and between the spheres, forming oozing water discharge channels. The oozing water collects on the ground inside the moving formwork and is then discharged directly through connected tunnels. The large area of the oozing water discharge channels and the fast drainage speed reduce or even avoid the erosion of the surrounding rock by oozing water, which helps maintain the stability of the filling body and the surrounding rock.
[0040] 7. Reliable sealing and plugging to prevent slurry leakage. The semi-circular airbags arranged circumferentially on the outer side of the mold tail, after inflation, seal the gaps between the mold tail and the surrounding rock at the tunnel entrance, as well as the partition wall, forming a reliable seal together with the partition wall; the outer edge of the outer airbag pad extends beyond the outer edge of the baffle and the lower edge extends to cover the front end of the guide rail assembly, and together with the bottom airbag strip, fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly. After inflation, it can fill the gaps between the baffle and the ore wall, and between the baffle and the ground, preventing the filling slurry from leaking into the mold tunnel, guide rail assembly, and tunnel area, avoiding the filling material from solidifying into the guide rail assembly and affecting the pulling out of the moving mold, ensuring filling quality and continuous and reliable step-by-step operation; even if the airbag is damaged when pulling out the moving mold, the mold body will not be damaged, and the airbag can be easily replaced or repaired, with low maintenance costs.
[0041] 8. Complete tailings layer isolation and protection ensures smooth removal of the mobile formwork. During filling, complete tailings slurry is first injected into the area above the mobile formwork to form a complete tailings layer. Then, complete tailings slurry containing cementitious materials is injected to form a filling material layer. The complete tailings layer contains no cementitious materials, forming a non-cementing isolation layer on the formwork surface, preventing the filling material layer containing cementitious materials from adhering to the formwork, ensuring easy removal of the mobile formwork. Fins are installed on both sides of the top surface of the formwork unit to intercept the complete tailings slurry. The stable adhesion of the complete tailings layer to the formwork surface increases the thickness of the complete tailings layer and expands the cross-sectional size of the formwork tunnel, facilitating the subsequent easy removal of the mobile formwork into the tunnel and improving the safety of the mining operation. After the mobile formwork is removed, the complete tailings layer is located within the tunnel and can be stripped and transported out during ore extraction operations.
[0042] 9. Rolling guide rails and seepage prevention ensure smooth advancement and withdrawal of the mobile formwork. The formwork contacts the U-shaped track via rolling elements. The rolling of these elements enables the mobile formwork to be advanced and withdrawn along the guide rails. The rolling friction resistance is low, allowing for flexible movement. The entire outer perimeter of the formwork is covered with geotextile, with the lower end extending to the ground and covering the guide rail assembly. This prevents filling slurry and debris from entering the track area, avoiding obstruction of the spherical rolling and ensuring stable sliding and step-by-step advancement of the mobile formwork along the guide rails.
[0043] 10. The arched, detachable structure boasts excellent load-bearing capacity and facilitates easy assembly and disassembly. Both the formwork unit and its tail section are arched, assembled from the top plate and side plates. The arched structure is advantageous for bearing the loads of the upper filling layer and loose rock mass, resulting in good structural stability. The lower sections of the side plates are connected by bottom beams, and the bottom beams are connected to the upper sections of the side plates by support columns. All components are detachable, facilitating on-site assembly, disassembly, and transportation of the mobile formwork underground. The arched cross-sectional dimensions of the mobile formwork can be adjusted according to the amount, shape, and location of the crushed ore accumulation in the collapse zone. For crushed ore piles far from the tunnel entrance and with minimal collapse, a mobile formwork with a small arched cross-section can be selected, i.e., assembled from side plates on both sides, allowing for flexible setup and convenient assembly and disassembly.
[0044] 11. Install columnar airbags on the outside of the mold side plates to shorten the mining cycle and improve the recovery rate. Based on the stockpiling of collapsed crushed ore in the collapse zone and the position of the mold body relative to the goaf, consider selecting the number of mold side plates with pipe installation holes. Before the mold body advances into the goaf, install columnar airbags on the outside of the mold body to achieve the recovery of localized, scattered collapsed crushed ore.
[0045] In summary, using mobile formwork-assisted filling for the recovery of crushed ore in underground collapse areas eliminates the need for blasting to open roadways for the filling material, thus preventing blasting vibrations from impacting and damaging the junction between the filling material and the surrounding rock, as well as the surrounding rock strata. This improves the safety of mining in other areas, avoids causing larger-scale collapses, and enhances the overall ecological safety of the mining area. Attached Figure Description
[0046] Figure 1 This is a schematic diagram of the underground mining layout.
[0047] In the diagram, A1 represents the goaf area, A2 represents the collapse area, and the lines of different colors and shapes in the diagram represent the following: Figure 2 A schematic diagram showing the status of the mobile module entering the mining area after installation.
[0048] Figure 3 A schematic diagram showing the filling status of the goaf area above the moving formwork.
[0049] Figure 4 This is a schematic diagram of the mold tunnel formed after the moving mold is pulled out.
[0050] Figures 2-4In the diagram, T1-2 is the ore body outside the collapse zone; T2 is the roadway; T3-2 is the edge of the collapse void; T6-5 is the filling pipe; T4-3 is the goaf area; T5-1 is the collapsed crushed ore; T6-5 is the goaf filling pipe; T6-6 is the top filling pipe; T7-2 is the filling body of the collapse area; T7-3 is the filling body of the goaf area; T7-4 is the entire tailings layer; T8 is the moving mold; T9 is the partition wall; and T10 is the mold roadway.
[0051] Figure 5 for Figure 3 Enlarged view of section A3 in the image.
[0052] Figure 6 for Figure 5 DD sectional view.
[0053] Figure 7 An axial cross-sectional view of the moving mold (also) Figure 8 (MM cross-section without geotextile).
[0054] Figure 8 for Figure 7 NN cross-sectional view of the movable mold assembled from the side templates and the top template.
[0055] Figure 9 for Figure 7 A cross-sectional view of the moving mold assembled only from the two side templates, excluding the mold top plate (excluding the mold top plate).
[0056] Figure 10 for Figure 7 Cross-sectional view of the moving mold NN with columnar airbags set on both sides of the side template.
[0057] Figure 11 A schematic diagram of a large collapse zone (section) where collapsed ore blocks a roadway.
[0058] Figure 12 A schematic diagram of the collapse zone (section) of the collapsed ore pile far from the roadway.
[0059] Figures 5 to 10 In the middle, M1 is the side plate of the mold; M2 is the top plate of the mold; M4 is the parallel fixed beam; M5 is the bottom beam; M6 is the support column; M7 is the sphere; M8 is the wing strip; M9 is the geotextile; M10 is the U-shaped track; M11 is the outer airbag cushion; M12 is the baffle; M13 is the semi-circular airbag; M14 is the inflation tube; M15 is the bottom airbag strip; M16 is the columnar airbag; and M17 is the water inlet pipe. Detailed Implementation
[0060] The specific embodiments of the present invention will be further described below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only for explaining the present invention and are not intended to limit the scope of protection of the present invention.
[0061] Example 1: A movable mold is adopted, which is assembled from two side mold plates and a top mold plate (see...). Figure 6 and Figure 7 ).
[0062] Combination Figure 1 This embodiment provides a step-by-step moving formwork for backfilling in underground collapse zones. Before mining, the collapse cavity of collapse zone A2 is filled with tailings slurry containing cementing material to form collapse zone backfill body T7-2. The tailings slurry containing cementing material not only fills the collapse cavity but also fills the gaps between the crushed ore and cements the crushed ore. In this embodiment, the collapsed crushed ore T5-1 near the entrance of roadway T2 is mined first using ore extraction equipment. For the collapsed crushed ore T5-1 farther from the entrance of roadway T2, a step-by-step mining method with moving formwork is used for assisted backfilling.
[0063] Combination Figures 5 to 8 The movable mold T8 includes a guide rail assembly and a mold body, with the lower end of the mold body slidingly engaged with the guide rail assembly. The guide rail assembly includes two parallel U-shaped rails M10 and multiple spheres M7 located within the rails. The lower ends of both sides of the mold body contact the corresponding spheres M7 within the U-shaped rails M10. The two U-shaped rails M10 are detachably connected by multiple parallel fixed beams M4. The mold body is composed of at least one mold unit and a mold tail, which are sequentially and detachably connected. Both the mold unit and the mold tail have arched cross-sections and are assembled from a top mold plate M2 and two side mold plates M1. The lower sections of the side mold plates M1 are detachably connected by a bottom beam M5, and the bottom beam M5 is detachably connected to the upper sections of the side mold plates M1 by support columns M6. Gaps are left between the spheres M7, allowing the exudate from the filling material to flow into the ground inside the movable mold T8 through these gaps and be discharged through connected channels.
[0064] The front end of the first mold unit is equipped with a baffle M12, and an outer airbag cushion M11 is provided on the outer side of the baffle M12. The outer edge of the outer airbag cushion M11 extends beyond the outer edge of the baffle M12, and the lower edge of the outer airbag cushion M11 extends to cover the front end of the guide rail assembly. The inflation tube M14 of the outer airbag cushion M11 passes through the baffle M12 and extends into the first mold unit. The gap between the lower edge of the outer airbag cushion M11 and the front end of the guide rail assembly is filled with a bottom airbag strip M15. One end of the bottom airbag strip M15 is fixed to the lower outer side of the baffle M12, and its inflation tube M14 extends to the mold tail. Multiple fins M8 are provided on both sides of the top surface of the mold unit. The cross-section of the fins M8 is a triangle with the tip pointing upwards. A semi-annular airbag M13 is provided circumferentially on the outer side of the mold tail. At least two layers of semi-annular airbags M13 are arranged circumferentially, and their inflation tubes M14 extend into the mold tail. The outer perimeter of the mold is entirely covered with M9 geotextile, and the lower end of the M9 geotextile extends to the ground and covers the guide rail assembly.
[0065] The mobile mold-assisted filling step-by-step mining is carried out according to the following steps: Step ①: Combining Figure 11 The third filling pipe T6-5 is installed by opening a hole at the top of the T4-3 goaf. Two T6-5 pipes are set in each group and connected to the filling sand bin. The discharge port extends into the opening at the top of the T4-3 goaf, and the discharge ports are spaced 4-5 meters apart. Step ②: Lay a guide rail assembly consisting of M10 U-shaped rails from inside roadway T2 back to goaf T4-3; Step 3: On the guide rail assembly in tunnel T2, complete the assembly of the first section of the mold unit to form the mold head. The mold head and the guide rail assembly are in contact through the ball M7, and the mold body moves along the guide rail assembly by the rolling of the ball M7. Step 4: Advance the first module unit along the guide rail assembly towards the goaf T4-3, then connect the next module unit in sequence until the baffle M12 of the first module unit abuts against the surface of the crushed ore pile T5-1, which is far from the roadway entrance. Then connect the tail of the module to the end module unit to complete the on-site assembly of the moving module T8. The entire tail of the module is located in roadway T2. The state of the moving module installed in the goaf is as follows. Figure 10 As shown; Step 5: Seal the gap between the mold tail and the roadway wall by building a partition wall T9 on the side of the semi-annular airbag M13 near the roadway; leave a fixed hole for the mold top filling pipe T6-6 to be inserted into the goaf area in the partition wall T9; Step 6: Install the top filling pipe T6-6, extending from the top of the top plate M2 to the side of the collapsed crushed ore to be mined on the outer airbag cushion M11; slowly inject the full tailings slurry to fill the space between the outer airbag cushion M11 and the collapsed crushed ore; when the level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe T6-6, injecting full tailings slurry while pulling, the injection volume of full tailings slurry is 3-5 cubic meters per meter of moving mold T8, until the end of the top filling pipe T6-6 reaches the junction of the mold tail and the mold body, stop pulling, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe T6-6, and seal the fixing hole; Step 7: After the fixing holes are sealed tightly, inflate the outer airbag M11 to fill the gaps between the baffle M12 and the ore wall, and between the baffle M12 and the ground; inflate the bottom airbag strip M15 to fill the gap between the lower edge of the outer airbag M11 and the front end of the guide rail assembly; inflate the semi-circular airbag M13 at the tail of the mold to seal the gaps between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall T9. Step 8: Combining Figure 11 The tailings slurry is injected into the collapsed ore pile through the third filling pipe T6-5 until it completely covers the collapsed ore. Then, the filling material containing cementitious material is injected until the entire goaf T4-3 is filled, forming the goaf filling body T7-3. The filling state is as follows: Figure 11 As shown, section A3 is magnified as follows: Figure 12 As shown; Step 9: After the filling material in the goaf T4-3 has reached the design strength, remove the partition wall T9 on the tail side of the formwork, drag the movable formwork T8 into the roadway T2, remove the movable formwork T8 to form the formwork roadway T10, and use the ore extraction equipment to mine the crushed ore pile T5-1 near the entrance of the formwork roadway T10 to form a new goaf T4-3. The full tailings layer T7-4 in the goaf of the formwork roadway T10 does not contain cementing material and has no cementing effect, and can be stripped and transported out along with the ore extraction operation; Step 10: Repeat steps 1-9 above to carry out step-by-step mining until the entire collapsed area of the crushed ore pile T5-1 is mined.
[0066] Due to the uncertainty of collapses, there are situations where the collapse area is large (the length and width of the collapse area are greater than 10 meters) and the collapsed ore pile blocks the tunnel, such as... Figure 11 As shown; there are cases where collapsed ore piles are far from the tunnel entrance, such as... Figure 12 As shown, there are also localized and sporadic small collapsed ore piles near the main collapsed ore pile.
[0067] For T5-1 mining of collapsed ore piles that are far from the roadway entrance and whose length and width dimensions are less than 10 meters, see [reference needed]. Figures 2-6 Following steps ①-⑨, the entire collapsed area of the crushed ore pile T5-1 is mined in one step.
[0068] Because the filling material injected through the goaf filling pipe T6-5 contains cementitious tailings slurry, it has less water content and a higher density than regular tailings slurry. The outlets of the two goaf filling pipes T6-5 are spaced 4-5 meters apart. The injected filling material falls on both sides of the moving formwork T8. The filling material pushes the previously injected tailings slurry towards the periphery of the moving formwork T8, increasing the space in the formwork tunnel T10 and facilitating the later installation of the moving formwork T8. During the mining process, the transported ore is screened by a screening unit, and the separated tailings can be reused to prepare regular tailings slurry, achieving recycling.
[0069] Example 2: A movable mold is assembled using only the side plates on both sides (see...). Figure 6 and Figure 8 ).
[0070] Combination Figure 1This embodiment provides a step-by-step moving formwork for backfilling in underground collapse zones. Before mining, the collapse cavity of collapse zone A2 is filled with tailings slurry containing cementing material to form collapse zone backfill body T7-2. The tailings slurry containing cementing material not only fills the collapse cavity but also fills the gaps between the crushed ore and cements the crushed ore. In this embodiment, the collapsed crushed ore T5-1 near the entrance of roadway T2 is mined first using ore extraction equipment. For the collapsed crushed ore T5-1 farther from the entrance of roadway T2, a step-by-step mining method with moving formwork is used for assisted backfilling.
[0071] Combination Figures 5 to 8 The movable mold T8 includes a guide rail assembly and a mold body, with the lower end of the mold body slidingly engaged with the guide rail assembly. The guide rail assembly includes two parallel U-shaped rails M10 and multiple spheres M7 located within the rails. The lower ends of both sides of the mold body contact the corresponding spheres M7 within the U-shaped rails M10. The two U-shaped rails M10 are detachably connected by multiple parallel fixed beams M4. The mold body is composed of at least one mold unit and a mold tail, which are sequentially and detachably connected. Both the mold unit and the mold tail have arched cross-sections and are assembled from two mold side plates M1. The lower sections of the two mold side plates M1 are detachably connected by a bottom beam M5, and the bottom beam M5 is detachably connected to the upper sections of the two mold side plates M1 by support columns M6. Gaps are left between the spheres M7, allowing the exudate from the filling material to flow into the ground inside the movable mold T8 through these gaps and be discharged through connected tunnels.
[0072] The remaining implementation methods are the same as in Example 1.
[0073] Example 3: Combination Figure 9 The filling is assisted by columnar airbags. Due to the uncertainty of the collapse, there are local and scattered small collapsed ore piles near the larger main collapsed ore pile. If each of these scattered ore piles is filled with moving T8 molds, the overall mining efficiency will be significantly reduced.
[0074] For collapse zones containing both main collapsed ore piles and scattered small ore piles, the ends of U-shaped guide rail M10 components are laid to reach the main collapsed ore pile. Based on the distribution of scattered small collapsed ore piles near the U-shaped guide rail M10 components, the side plate M1 with pipe installation holes is selected for assembling the moving mold T8.
[0075] The side panel M1 of the formwork has 2-3 rows of pipe installation holes, arranged in a pattern where the number of pipe installation holes gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each group of holes corresponds to a columnar airbag M16. One end of the columnar airbag M16 is equipped with an inflation tube and a water inlet tube. The columnar airbag M16 pierces the geotextile M9 through the inflation tube M14 and the water inlet tube M17, and extends into the inside of the side panel M1 of the formwork for fixed installation through the two holes arranged at the top and bottom. The columnar airbag M16 is 1-2 meters long and 0.3-0.5 meters in diameter.
[0076] Based on the distance between the scattered ore pile and the U-shaped guide rail M10 assembly, columnar airbags M16 of different diameters and lengths are selected and installed outside the mold side plate M1. The inflated columnar airbags M16 and the tailings slurry trapped between the columnar airbags M16 form a channel connecting the scattered ore pile after filling.
[0077] At the start of filling, water is first injected into the columnar airbag M16 through the water inlet pipe M17. When the water volume reaches 5-15% of the volume of the columnar airbag M16, the inflation pipe M14 is switched to inflate it once. When the air pressure is 80% of the air pressure of the outer airbag pad M11, the inflation is stopped. After inflation, the end of the columnar airbag M16 reaches or approaches the scattered collapsed ore pile.
[0078] The tailings slurry is filled into the surface of the moving mold T8 and the columnar airbag M16 through the filling pipe T6-6 at the top of the mold. After the tailings slurry covers the surface of the mold and all columnar airbags M16, the columnar airbags M16 are inflated again until their air pressure is the same as that of the outer airbag pad M11.
[0079] While the columnar airbag is being inflated a second time, full tailings slurry is injected into the collapsed ore pile until the full tailings slurry completely covers the collapsed ore. Then, full tailings slurry containing cementitious material is injected until all voids are filled.
[0080] After the injected tailings slurry containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe M14 and water inlet pipe M17 are removed from the moving formwork T8 to drain the water accumulated in the airbags. The moving formwork T8 is then pulled out and dismantled, forming formwork tunnel T10. The entire tailings layer within formwork tunnel T10 is cleaned, the columnar airbag M16 is pulled out, and the entire tailings layer in the area of columnar airbag M16 is cleaned, forming a channel in formwork tunnel T10 connecting to the scattered fragmented ore piles for the mining of scattered fragmented ore.
[0081] The remaining implementation methods are the same as in Example 1.
Claims
1. A stepwise mobile module for stoping of ore filling in a caved zone of a mine, characterized in that, It includes a guide rail assembly and a mold body, the lower end of the mold body is slidably engaged with the guide rail assembly, and the mold body is composed of at least one mold unit and a mold tail connected in a detachable manner in sequence; The first segment of the module unit has a baffle at its front end, an external airbag on the outside of the baffle, multiple fins on both sides of the top surface of the module unit, and a semi-circular airbag on the outside of the tail of the module.
2. The step-by-step mobile mill for underground caving zone ore filling stoping as claimed in claim 1, characterized in that, The guide rail assembly includes two parallel U-shaped rails and multiple rolling balls located within the rails. The lower ends of both sides of the mold body are in contact with the rolling balls within the corresponding U-shaped rails.
3. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 2, characterized in that, The two parallel U-shaped tracks are detachably connected by multiple parallel fixed beams.
4. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 1, characterized in that, Both the mold unit and the mold tail have arched cross sections, and are assembled from the top plate and the mold side plates on both sides, or directly from the mold side plates on both sides.
5. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 4, characterized in that, The lower sections of the mold side plates on both sides are detachably connected by a bottom beam, and the bottom beam is detachably connected to the upper sections of the mold side plates on both sides by a support column; a columnar airbag can be installed on the outer side of the mold side plate.
6. The stepping moving model for ore backfilling and mining in underground collapsed areas as described in any one of claims 1-5, characterized in that, The outer edges of the outer airbags all extend beyond the outer edges of the baffles, and the inflation tubes of the outer airbags extend through the baffles to the tail of the mold.
7. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 6, characterized in that, The lower edge of the external airbag extends to the front end of the cover rail assembly.
8. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 7, characterized in that, The gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower end of the baffle, and its inflation tube extends to the mold tail.
9. The step-moving model for ore backfilling and mining in underground collapsed areas as described in claim 1, characterized in that, The outer wall of the module unit is smooth, and at least two pairs of fins are symmetrically arranged on both sides of the top surface along the axial direction of the module body. The cross section of the fins is a triangle with the tip pointing upwards. At least two layers of semi-annular airbags are arranged circumferentially on the outer side of the module tail, and their inflation tubes extend into the module tail.
10. The stepping moving model for ore backfilling and mining in underground collapsed areas as described in claim 1, characterized in that, Geotextile is laid on the outside of the guide rail assembly, covering the entire outer surface of the stepping moving mold, including an outer airbag pad and a semi-circular airbag, with the lower end extending to the ground and covering the guide rail assembly.