An optimized control method and system for a flue gas bypass evaporation system
By employing optimized control methods such as differential pressure interlocking, variable-rate segmented PID control, and stepped slow water spraying, the problem of droplet scaling on the flue gas bypass evaporation system under deep peak shaving and variable load conditions was solved, achieving efficient automated operation and safety of the system under different operating conditions.
Patent Information
- Application Number
- CN202611396721.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-09
- Publication Date
- 2026-11-17
AI Technical Summary
Existing flue gas bypass evaporation systems suffer from problems such as insufficient air preheater pressure differential leading to droplet scaling and incomplete evaporation under deep peak shaving and load variation conditions. Furthermore, traditional control schemes fail to effectively cope with rapid load changes, have low automation levels, and rely on manual operation.
An optimized control method using differential pressure interlocking, variable-rate segmented PID, and stepped slow water spraying is adopted. By collecting real-time parameters of the unit and preset load and differential pressure thresholds, the automatic water spraying function can be unlocked and interlocked. The control mode is switched under rapid load fluctuations and steady-state conditions to dynamically match the water spraying volume and avoid excessive water spraying and scaling of the evaporator.
This improves the system's operational reliability and automation level under different operating conditions, reduces manual intervention and modification costs, and ensures efficient evaporation of desulfurization wastewater and the safety of the evaporation tower.
Smart Images

Figure CN123113294A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to zero-discharge control technology for desulfurization wastewater from coal-fired power plants, and particularly to an optimized control method and system for a flue gas bypass evaporation system. Background Technology
[0002] Under the current new power system, wind and solar energy are being connected to the grid on a large scale, and thermal power units are undertaking deep peak-shaving tasks, with unit loads frequently fluctuating rapidly between 20% and 100%. The desulfurization wastewater bypass flue gas evaporation process is widely used due to its advantages of low investment, high waste heat utilization, and simple operation and maintenance; however, existing control schemes have significant shortcomings: 1. The existing control system only uses the unit's rated load as the commissioning threshold and does not couple the core constraint of the air preheater inlet and outlet pressure difference. At low loads, the air preheater pressure difference is insufficient, the amount of high-temperature flue gas extracted is sharply reduced, the flow velocity inside the tower is too low, the atomized wastewater cannot be completely enveloped by the flue gas, and the droplets accumulate on the wall to form scale, forcing a shutdown for cleaning; traditional control lacks pressure difference pre-locking, and automatic water spraying at low loads is very prone to causing caking.
[0003] 2. Conventional single-outlet flue gas temperature PID control lacks load change rate discrimination logic. When the unit rapidly increases or decreases the load, the flue gas heat supply lags behind the water flow regulation. The PID continuously and significantly increases or decreases the water spray volume, exceeding the evaporation limit in a short time, resulting in undried droplets. Existing patents only statically divide the load range, without distinguishing between "drastic load changes" and "steady-state operation" conditions, and lack a segmented flow limiting mechanism.
[0004] 3. Lack of standardized slow water spray logic. The existing automatic control valve adjustment range is unrestrained, and the water volume increases sharply during startup / load increase, causing the evaporator tower temperature rise rate and temperature drop rate to exceed the standard, exacerbating the flow field turbulence and scaling inside the tower; at the power plant site, manual micro-adjustment is the only option, resulting in extremely low automation and large human operation errors.
[0005] Therefore, an optimized control method integrating differential pressure interlocking, variable rate segmented PID, and stepped slow water spray is needed to solve the problem of evaporator caking under deep peak shaving and variable load. Summary of the Invention
[0006] The present invention aims to at least partially solve one of the technical problems in the related art.
[0007] Therefore, the first objective of this invention is to provide an optimized control method for a flue gas bypass evaporation system, comprising the following steps: Collect real-time operating parameters of the unit, preset minimum operating load threshold and air preheater differential pressure safety threshold. When the real-time load of the unit is not lower than the minimum operating load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold, unlock the automatic water spraying function of the spray system. The real-time load of the unit is acquired according to a fixed sampling period and the load change rate is calculated. The load change rate is compared with a preset rate judgment threshold. When the load change rate is greater than the rate judgment threshold, the load rapid fluctuation control mode is entered. When the load change rate is not greater than the rate judgment threshold, the steady-state closed-loop control mode is entered. In the rapid load fluctuation control mode, the rated load of the unit is divided into multiple continuous load intervals. Each load interval has a safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constant to match the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule. In the steady-state closed-loop control mode, the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator is used as the control input. The opening of the wastewater inlet regulating valve is controlled by the output adjustment signal of the closed-loop controller to dynamically match the spray flow rate. The output of the controller is set with a limit to ensure that the spray flow rate does not exceed the safe spray volume corresponding to the current load range. When switching between the load rapid fluctuation control mode and the steady-state closed-loop control mode, a seamless switching is performed. When the real-time load of the unit drops below the minimum operating load threshold or the average differential pressure on both sides of the air preheater drops below the differential pressure safety threshold, the spray water pump is interlocked to stop, the inlet water regulating valve is closed after a delay, and the atomizer is switched to low-frequency standby state after a delay.
[0008] In one embodiment of the present invention, the average pressure difference between the two sides of the air preheater is obtained as follows: The inlet and outlet pressures of the air preheater on side A of the boiler are collected in real time and the pressure difference ΔP1 of the air preheater on side A is calculated. The inlet and outlet pressures of the air preheater on side B of the boiler are collected in real time and the pressure difference ΔP2 of the air preheater on side B is calculated. The arithmetic mean of the pressure difference ΔP1 of the air preheater on side A and the pressure difference ΔP2 of the air preheater on side B is taken and the arithmetic mean is taken as the average pressure difference ΔP of the two sides of the air preheater. The calibration method for the air preheater differential pressure safety threshold is as follows: Structural parameters of the bypass flue, flue gas damper, and evaporator were collected, and the total resistance characteristic equation of the bypass system was obtained through fluid simulation or cold resistance test. ΔP_sys=K·Q_gas 2 Where K is the bypass system resistance coefficient, and Q_gas is the actual bypass flue gas flow rate; Based on the atomized particle size of the rotary atomizer, the diameter of the evaporator tower, and the height inside the tower, the minimum bypass flue gas flow rate Q_gas,min is determined by thermo-fluid coupling calculation to ensure that the atomized desulfurization wastewater droplets are completely suspended and evaporated without droplet settling and adhering to the wall. Substituting the minimum bypass flue gas flow rate Q_gas,min into the total resistance characteristic equation of the bypass system, the theoretical pressure difference safety threshold P_set=K·Q_gas,min is calculated. 2 ; Under the hot commissioning conditions of the unit, keep the bypass flue gas valve fully open, gradually reduce the unit load, monitor the flow field state and tower wall temperature in the evaporator, and record the measured value of the average pressure difference between the two sides of the air preheater when the first local temperature drop of the tower wall occurs. Compare the measured value with the theoretical pressure difference safety threshold and make on-site correction to the air preheater pressure difference safety threshold P_set.
[0009] In one embodiment of the present invention, the formula for calculating the load change rate is: dS / dt=(S S -1 ) / T Where S is the real-time load of the unit collected in the current sampling period, S -1 This represents the real-time load of the unit collected in the previous sampling period.
[0010] In one embodiment of the present invention, the calibration method for the rate determination threshold Vo is as follows: Using the unit load S as the input disturbance and the evaporator outlet flue gas temperature T_out as the output, the first-order inertial transfer function of the flue gas-evaporator was identified through unit load increase and decrease disturbance tests. G(s)=T_out(s) / S(s)=A / (1+τ·s) Where τ is the thermal inertia time constant of the flue gas-evaporator system, and A is the gain coefficient of the load disturbance on the outlet flue gas temperature; Set the maximum allowable dynamic deviation ΔT_limit for the outlet flue gas temperature, based on the maximum dynamic deviation under a step disturbance of a first-order inertial system. ΔT_limit=A·Vo·τ The rate determination threshold was calculated. Vo = ΔT_limit / (A·τ) The rate determination threshold Vo was calibrated on-site through multiple sets of lifting and lowering load disturbance tests.
[0011] In one embodiment of the present invention, the closed-loop controller is a PID controller, and the temperature deviation ΔT = T_set between the set value T_set and the real-time measured value T_real of the flue gas temperature at the outlet of the evaporator is used as the reference. T_real serves as the input to the PID controller, and the output signal of the PID controller linearly adjusts the opening degree of the wastewater inlet electric regulating valve.
[0012] In one embodiment of the present invention, the output of the PID controller is set with upper and lower limits, wherein the upper limit does not exceed the safe spray volume Q_safe corresponding to the current load range, and the lower limit is not lower than the minimum atomization flow rate of the system, to prevent over-spraying and spray interruption; During the operation of the steady-state closed-loop control mode, when a sudden increase in the load change rate is detected to exceed the rate judgment threshold Vo, the control system immediately switches from the steady-state closed-loop control mode to the load rapid fluctuation control mode, locks the safe water spray volume Q_safe corresponding to the load range to which the current load belongs, and achieves a seamless switching.
[0013] In one embodiment of the present invention, in the rapid load fluctuation control mode, the output opening of the water inlet regulating valve is constantly matched with the flow rate corresponding to the safe spray volume Q_safe of the current load range, and the PID controller is prohibited from making large-scale water volume adjustments to the water inlet regulating valve.
[0014] In one embodiment of the present invention, it further includes: During the entire water spraying adjustment process, the single increase in water spray volume shall not exceed the preset upper limit of the increase, the time interval between two adjacent water volume adjustments shall not be less than the preset time interval, and the rate of decrease of flue gas temperature at the outlet of the evaporator shall not exceed the preset temperature drop rate. When the load decreases, the inlet water regulating valve shall be closed first to quickly reduce the water spray volume.
[0015] To achieve the above objectives, a second aspect of the present invention provides an optimized control system for a flue gas bypass evaporation system, comprising: The commissioning unlocking module is used to collect real-time operating parameters of the unit, preset the minimum commissioning load threshold and the air preheater differential pressure safety threshold. When the real-time load of the unit is not lower than the minimum commissioning load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold, the automatic water spraying function of the spray system is unlocked. The load rate discrimination and mode switching module is used to acquire the real-time load of the unit at a fixed sampling period and calculate the load change rate. The load change rate is compared with a preset rate judgment threshold. When the load change rate is greater than the rate judgment threshold, the module enters the load rapid fluctuation control mode. When the load change rate is not greater than the rate judgment threshold, the module enters the steady-state closed-loop control mode. The load rapid fluctuation control module is used to divide the rated load of the unit into multiple continuous load intervals under the load rapid fluctuation control mode. Each load interval has a pre-stored safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constantly matched with the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule. The flue gas temperature steady-state closed-loop control module is used in the steady-state closed-loop control mode to control the opening degree of the wastewater inlet regulating valve by using the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator as the control input, and to dynamically match the spray flow rate by outputting an adjustment signal through the closed-loop controller. It also sets a limit on the output of the controller to ensure that the spray flow rate does not exceed the safe spray volume corresponding to the current load range. When switching between the load rapid fluctuation control mode and the steady-state closed-loop control mode, it performs a seamless switching. The interlocking shutdown protection module is used to interlock and shut down the spray water pump, delay the closing of the inlet water regulating valve, and delay the switching of the atomizer to low-frequency standby state when the real-time load of the unit drops below the minimum operating load threshold or the average differential pressure on both sides of the air preheater drops below the differential pressure safety threshold.
[0016] To achieve the above objectives, a third aspect of the present invention provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the method described in the first aspect.
[0017] The method, system, and storage medium of this invention effectively solve the problems of droplet scaling and incomplete evaporation caused by insufficient pressure difference under low load and drastic load changes in the flue gas bypass evaporation system under deep peak shaving and variable load conditions. This improves the system's operational reliability and automation level under different operating conditions, while reducing manual intervention and modification costs.
[0018] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0019] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein: Figure 1 This is a flowchart of an optimized control method for a flue gas bypass evaporation system according to an embodiment of the present invention; Figure 2 This is a flowchart illustrating the overall control logic of an embodiment of the present invention. Figure 3 Logic block diagram for determining the feedforward interlock of the air preheater differential pressure; Figure 4 Block diagram for load change rate discrimination and dual-mode switching control; Figure 5 The process for controlling the gradual, step-by-step water spraying during load increases; Figure 6 This is a structural diagram of an optimized control system for a flue gas bypass evaporation system according to an embodiment of the present invention. Detailed Implementation
[0020] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.
[0021] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0022] The following description, with reference to the accompanying drawings, describes an optimized control method and system for a flue gas bypass evaporation system according to an embodiment of the present invention.
[0023] Example 1 Figure 1 This is a flowchart of an optimized control method for a flue gas bypass evaporation system according to an embodiment of the present invention.
[0024] like Figure 1 As shown, the optimized control method for the flue gas bypass evaporation system includes the following steps: S1 collects the real-time load of the unit, the pressure difference between the inlet and outlet of the air preheater, the flue gas temperature at the outlet of the evaporator, and the operating parameters of the spray system. It presets the minimum operating load threshold and the air preheater pressure difference safety threshold that can be modified online. When the real-time load of the unit is not lower than the minimum operating load threshold and the average pressure difference between the two sides of the air preheater is not lower than the pressure difference safety threshold, the automatic water spraying function of the spray system is unlocked; otherwise, the water spraying operation of the spray system is locked and the atomizer is put into a low-frequency standby state.
[0025] This method involves determining the state and establishing a safety interlock mechanism before the flue gas bypass evaporation system is put into operation. The system collects in real-time load signals reflecting the unit's operating conditions, differential pressure signals between the inlet and outlet of the air preheater reflecting the flue gas flow capacity, outlet flue gas temperature signals reflecting the thermal state of the evaporator, and the operating parameters of the spray system itself. Simultaneously, the system presets two key thresholds: a minimum operating load threshold and an air preheater differential pressure safety threshold. Both thresholds can be modified online to adapt to changes in different unit characteristics and operating conditions. When determining whether to allow the spray system to automatically spray water, the system compares the real-time collected unit load with the minimum operating load threshold and the average differential pressure on both sides of the air preheater with the differential pressure safety threshold. The automatic spray function of the spray system is unlocked only when both conditions are met: the unit load is not lower than the minimum operating load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold. If either condition is not met, the spray system's spray operation is locked, and the atomizer is switched to a low-frequency standby state. This prevents the risk of insufficient evaporation of atomized wastewater and the accumulation of droplets on the walls due to insufficient flue gas volume or excessive channel resistance, thus avoiding scaling. This lockout decision logic uses both unit load and the actual flow capacity of the flue gas channel as prerequisites for operation, overcoming the limitation of using only load as the sole basis for operation.
[0026] As one implementation method, the air preheater differential pressure safety threshold can be obtained by coupling the bypass system resistance characteristic equation with the minimum bypass flue gas flow rate to ensure complete suspension and evaporation of atomized droplets, and then verified and corrected on-site by hot commissioning test. At the same time, a DCS online modification function is set to adapt to the change of air preheater resistance with operating time.
[0027] The aforementioned pre-lock judgment mechanism can effectively avoid the risk of scaling and blockage of the evaporator tower caused by blindly operating the spray system under low load or insufficient flue gas channel resistance, thus ensuring the safety of system operation from the source. At the same time, the online threshold modification function improves the adaptability of this method to different units and operating conditions.
[0028] S2, acquire the real-time load of the unit according to a fixed sampling period and calculate the load change rate, compare the load change rate with a preset rate judgment threshold, when the load change rate is greater than the rate judgment threshold, enter the load rapid fluctuation control mode, when the load change rate is not greater than the rate judgment threshold, enter the steady-state closed-loop control mode.
[0029] In this method, the system continuously collects real-time load signals from the unit at a fixed sampling period and calculates the load change rate based on the load values at the current and previous times. This rate characterizes the severity of unit output fluctuations. A preset rate judgment threshold is used as a criterion to distinguish different operating conditions. This threshold is related to the thermal inertia characteristics of the unit and the flue gas evaporation system, reflecting the boundary of the system's ability to maintain stable outlet flue gas temperature under load disturbances. The real-time calculated load change rate is compared with this threshold. When the load change rate exceeds the threshold, it indicates that the unit is in a rapid load fluctuation condition. At this time, the risk of dynamic imbalance between flue gas heat supply and wastewater evaporation demand increases significantly, and the system enters a rapid load fluctuation control mode to avoid the overshoot risk caused by thermal inertia lag in closed-loop regulation. When the load change rate does not exceed the threshold, it indicates that the unit is operating relatively smoothly, and the system enters a steady-state closed-loop control mode to optimize the water spray volume using the accuracy of closed-loop regulation. Through the above mode discrimination and switching mechanism, differentiated control strategies for different operating conditions are adapted.
[0030] As one implementation method, the real-time load of the unit is collected at a fixed sampling period. Compared with the previous cycle load ,according to Calculate the rate of load change, where Sampling period; Rate determination threshold The first-order inertial transfer function of the flue gas-evaporator tower was obtained through systematic identification. Combined with the maximum allowable dynamic deviation of smoke temperature According to the formula The solution was obtained by combining the results with calibration through load change disturbance tests, whereby... The time constant is the thermal inertia. This is the gain coefficient of load disturbance on the outlet flue gas temperature.
[0031] This step introduces a real-time load change rate discrimination mechanism, enabling the control system to adaptively switch control modes according to the dynamic characteristics of the unit's operating conditions. This effectively avoids overshoot and excessive water spraying caused by thermal inertia lag in closed-loop regulation when the load fluctuates rapidly. At the same time, it ensures the accuracy of closed-loop regulation under steady-state conditions and improves the system's adaptability and control quality under different operating conditions.
[0032] S3, in the load rapid fluctuation control mode, the rated load of the unit is divided into multiple continuous load intervals. Each load interval has a pre-stored safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constant to match the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule.
[0033] In the rapid load fluctuation control mode, to avoid the risks of incomplete evaporation and scaling inside the tower caused by the dynamic mismatch between flue gas heat supply and wastewater spray volume adjustment, this method pre-constructs multiple continuous load intervals based on the rated load range of the unit, and sets a corresponding safe spray volume for each load interval. This safe spray volume is obtained by calibrating the heat-carrying capacity and evaporation capacity of flue gas under different load levels through thermal tests, and can characterize the upper limit of wastewater spray flow that the system can safely accept within the corresponding load interval. When the unit is determined to be in a rapid load fluctuation condition, the control system no longer performs continuous closed-loop adjustment based on the outlet flue gas temperature deviation, but locks the safe spray volume corresponding to the load interval to which the current unit load belongs, and uses it as the upper limit of the spray flow. The output flow of the wastewater inlet regulating valve is controlled to be constantly matched with this safe spray volume, so that the spray flow remains stable during load disturbances, avoiding excessive spraying due to adjustment lag or overshoot. When the unit load crosses the load range boundary, the water spray flow rate does not undergo a sudden jump. Instead, it is adjusted gradually to the safe water spray flow rate corresponding to the target load range according to the step-by-step water spray rule with limited increments and adjustment intervals. This ensures a smooth transition of the evaporation system's thermal balance during continuous load changes.
[0034] In one implementation, the rated load of the unit can be divided into several continuous percentage intervals. Each interval is calibrated with a corresponding safe water spray volume and stored in the control system parameter library. When the load fluctuates rapidly, the safe water spray volume corresponding to the current interval is locked, and the opening of the inlet regulating valve is kept constant to match the flow rate. When the load crosses intervals, it is gradually adjusted to the safe water spray volume of the new interval according to the preset increment and interval.
[0035] This step effectively suppresses drastic changes in spray flow rate under rapid load fluctuation conditions by locking the safe spray volume in load intervals and using a stepped cross-interval adjustment mechanism. It avoids excessive spraying caused by overshooting of closed-loop regulation, ensures sufficient evaporation of wastewater droplets in flue gas, reduces the risk of scaling and clogging on the inner wall of the evaporation tower, and improves the operational reliability and safety of the system under deep peak shaving and variable load conditions.
[0036] S4. In the steady-state closed-loop control mode, the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator is used as the control input. The opening of the wastewater inlet regulating valve is controlled by the output regulating signal of the closed-loop controller to dynamically match the spray flow rate. The output of the controller is also set with a limit so that the spray flow rate does not exceed the safe spray volume corresponding to the current load range.
[0037] In the unit's steady-state closed-loop control mode, the deviation between the setpoint and measured value of the flue gas temperature at the evaporator outlet is used as the control input. The closed-loop controller outputs an adjustment signal, which affects the opening of the wastewater inlet regulating valve, thereby dynamically adjusting the spray flow rate of the desulfurization wastewater to maintain the flue gas temperature at the evaporator outlet stably near the setpoint. This control method utilizes the feedback effect of the temperature deviation to achieve continuous and automatic adjustment of the spray flow rate, matching the evaporation capacity available on the flue gas side under the unit's current operating conditions, ensuring sufficient evaporation conditions for wastewater droplets within the tower. To prevent excessive output from the controller due to disturbances or lag during adjustment, limit constraints are set on the controller's output signal, limiting the adjusted spray flow rate within the safe spray volume range corresponding to the current load range. This avoids excessive instantaneous spray volume exceeding the flue gas evaporation capacity, preventing droplets from adhering to the wall before complete drying.
[0038] In one implementation, the closed-loop controller employs a proportional-integral-derivative (PI-DE) control algorithm. Using the deviation between the setpoint and measured outlet flue gas temperature as input, the controller outputs a signal that linearly adjusts the opening of the wastewater inlet electric regulating valve. Simultaneously, the upper limit of the controller output is limited to the safe spray volume corresponding to the current load range, while the lower limit is not lower than the minimum flow rate required for stable atomization, preventing over-spraying or spray interruption. Furthermore, when the unit's operating state changes and the load change rate exceeds a preset threshold, the control system can instantly switch from this steady-state closed-loop control mode to a rapid load fluctuation control mode, with a smooth and undisturbed switching process, ensuring the continuity and stability of the spray regulation.
[0039] This step, through a combination of closed-loop feedback regulation and output limit constraints, achieves adaptive matching of spray flow rate to flue gas evaporation capacity under steady-state operation of the unit. This ensures the evaporation treatment efficiency of desulfurization wastewater while effectively preventing the risk of scaling and blockage in the evaporation tower caused by excessive water spraying, thus improving the system's operational reliability and automation level under variable load conditions.
[0040] Example 2 To more clearly illustrate the method proposed in this invention, the invention will be further described in detail below with reference to specific embodiments.
[0041] refer to Figure 2 The overall control logic flowchart of this invention can be broken down as follows: (1) Real-time data collection of unit load, air preheater double-sided pressure difference, evaporator inlet and outlet flue gas temperature, wastewater flow rate, and atomizer frequency; (2) Execute differential pressure + minimum load dual commissioning interlock judgment; (3) Interlocking not satisfied: Directly cut off the spray circuit and go into low-frequency standby mode; (4) The interlocking condition is satisfied by: calculating the load change rate dS / dt; (5) dS / dt > 1MW / min: Enter the fixed safe water volume control zone; (6) dS / dt≤1MW / min: Enter the PID closed-loop control of the outlet flue gas temperature; (7) The water volume regulation process shall be subject to the constraints of step-by-step slow water spraying and slow increase and fast decrease throughout the entire process; (8) When the load drops to the minimum limit, the spray system is interlocked and shut down.
[0042] Example 2 is a 300MW deep peak-shaving coal-fired unit (rated load 300MW, minimum stable operating load 90MW, i.e. 30% Pe).
[0043] The unit is equipped with a desulfurization wastewater bypass flue gas evaporator. The total resistance of the bypass flue and evaporator is approximately 500 Pa. It is equipped with differential pressure measuring points for dual-sided air preheaters, thermocouples at the inlet and outlet of the evaporator, electric valves for wastewater flow regulation, rotary atomizers, and ash conveying devices. The control logic of this invention is configured in the DCS system. The implementation steps are as follows: Specifically, the parameter configuration settings and adjustable parameters are entered into the DCS screen: minimum operating load S_min=90MW (30%Pe), differential pressure threshold P_set=500Pa, load rate threshold Vo=1MW / min, and outlet flue gas temperature set to 200℃; the test safe spray volume for each load range is written into the parameter module: 90~180MW (30%~60%): 0.5m³ / h; 180~210MW (60%~70%): 1.0m³ / h; 210~255MW (70%~85%): 1.8m³ / h; 255~300MW (85%~100%): 3.5m³ / h.
[0044] Further, refer to Figure 3 The logic block diagram for the air preheater differential pressure feedforward interlocking judgment process is as follows: The differential pressure feedforward interlocking process is determined in real time. The DCS collects ΔP1 on side A and ΔP2 on side B every 2 seconds and calculates the average value ΔP. Specifically, under operating condition 1, the unit load is 100MW (33% Pe), the single-side differential pressure is 460Pa, and the average ΔP = 470Pa < 500Pa. Automatic water spraying is locked, and only the atomizer is kept on standby at 20Hz. Under operating condition 2, the unit load is 190MW (63% Pe), the double-side differential pressure is 580Pa and 610Pa, and the average ΔP = 595Pa ≥ 500Pa. The commissioning conditions are met, and water spraying is allowed.
[0045] Further, refer to Figure 4This is a block diagram for load change rate detection and dual-mode switching control. When the load fluctuates rapidly, the operating condition control is as follows: if the unit increases from 190MW to 208MW within 10 minutes, and the load change rate is 1.8MW / min > 1MW / min, a rapid fluctuation is determined, and the safe water volume of 1.0m³ is locked in the 60%~70% range. 3 / h; the inlet valve opening is fixed to match this flow rate and is not significantly adjusted with the outlet flue gas temperature; when the load increases to 212MW in the inter-section, it is increased by +0.25m each time. 3 / h, 10min interval, step increase to 1.8m 3 / h. This step is particularly suitable for deep peak-shaving operations of coal-fired units. During low-load operation, the boiler flue gas volume is significantly reduced. Without zoned feedforward control, the heat and mass transfer efficiency within the evaporator tower will decrease, leading to problems such as incomplete wastewater evaporation, tower wall caking, and high moisture content in the ash. By implementing this step, the system can respond promptly to rapid load fluctuations, ensuring the match between flue gas flow and wastewater evaporation demand, thereby improving evaporation efficiency and preventing scaling and blockage inside the evaporator tower.
[0046] When the load is stable, the automatic control operation is as follows: When the unit stabilizes at 240MW and the load fluctuation is ≤0.5MW / min, the PID closed-loop control for outlet flue gas temperature is switched; if the measured outlet flue gas temperature is 186℃, lower than the set 200℃, the PID slightly opens the regulating valve to increase the spray volume; when the flue gas temperature rises to 203℃, the valve is closed to reduce the flow rate, ensuring that the total water volume does not exceed the upper limit of the interval by 1.8m³. 3 .
[0047] Further, refer to Figure 5 The load increase stepwise water spray control process is as follows: load increases from 95MW to 195MW, pressure differential reaches the target, evaporator preheats to 245℃, atomizer stabilizes at 50Hz; initial spray volume is 0.5m³ / h. 3 / h, increasing by 0.25m every 10 minutes. 3 After each adjustment, monitor the outlet temperature drop to be ≤2℃ / min until it matches the current safe value for the range, and avoid increasing the water volume all at once.
[0048] The technical advantage of the overall control logic of this invention lies in the dual interlocking of air preheater differential pressure feedforward: filling the gap in existing control that does not consider flue gas resistance constraints, and solving the problem of droplet scaling caused by insufficient differential pressure and insufficient flue gas volume at low loads from the source; the DCS online adjustable threshold adapts to the performance differences of air preheaters in different units, and has strong versatility.
[0049] Furthermore, the load rate features dual-mode segmented control: distinguishing between rapid fluctuations and steady-state conditions, it locks in a safe water volume during drastic load changes to prevent PID overshoot and excessive water spraying; during stable operation, it automatically optimizes output based on flue gas temperature closed-loop control, balancing safety and processing efficiency, significantly improving dynamic adaptability compared to the static range feedforward patent. Simultaneously, the standardized stepped slow water spraying logic strictly limits the magnitude and interval of water volume increases, controls the rate of flue gas temperature change, eliminates incomplete evaporation during startup and load ramp-up phases, reduces manual intervention, and achieves fully automated stable start-up and shutdown.
[0050] Specifically, the control logic of this invention is simple and can be configured using existing DCS systems without the need for additional hardware, resulting in low modification costs. It can be directly integrated with bypass evaporation processes. This ensures that desulfurization wastewater can achieve efficient evaporation under different operating conditions, thereby guaranteeing its reliability and stability.
[0051] Example 3 like Figure 6 As shown, the present invention proposes an optimized control system 10 for a flue gas bypass evaporation system, comprising: The commissioning unlocking module 100 is used to collect real-time operating parameters of the unit, preset the minimum commissioning load threshold and the air preheater differential pressure safety threshold. When the real-time load of the unit is not lower than the minimum commissioning load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold, the automatic water spraying function of the spray system is unlocked. The load rate discrimination and mode switching module 200 is used to acquire the real-time load of the unit at a fixed sampling period and calculate the load change rate. The load change rate is compared with a preset rate judgment threshold. When the load change rate is greater than the rate judgment threshold, the load rapid fluctuation control mode is entered. When the load change rate is not greater than the rate judgment threshold, the steady-state closed-loop control mode is entered. The load rapid fluctuation control module 300 is used to divide the rated load of the unit into multiple continuous load intervals under the load rapid fluctuation control mode. Each load interval has a pre-stored safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constantly matched with the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule. The flue gas temperature steady-state closed-loop control module 400 is used in the steady-state closed-loop control mode to control the opening degree of the wastewater inlet regulating valve by using the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator as the control input, and to dynamically match the spray flow rate by outputting an adjustment signal through the closed-loop controller. It also sets a limit on the output of the controller to ensure that the spray flow rate does not exceed the safe spray volume corresponding to the current load range. When switching between the load rapid fluctuation control mode and the steady-state closed-loop control mode, it performs a seamless switching. The interlock shutdown protection module 500 is used to interlock and shut down the spray water pump, delay the closing of the inlet water regulating valve, and delay the switching of the atomizer to low-frequency standby state when the real-time load of the unit drops below the minimum operating load threshold or the average differential pressure on both sides of the air preheater drops below the differential pressure safety threshold.
[0052] The present invention also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the above-described method for optimizing control of the flue gas bypass evaporation system.
[0053] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0054] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.
Claims
1. An optimized control method for a flue gas bypass evaporation system, characterized in that, Includes the following steps: Collect real-time operating parameters of the unit, preset minimum operating load threshold and air preheater differential pressure safety threshold. When the real-time load of the unit is not lower than the minimum operating load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold, unlock the automatic water spraying function of the spray system. The real-time load of the unit is acquired according to a fixed sampling period and the load change rate is calculated. The load change rate is compared with a preset rate judgment threshold. When the load change rate is greater than the rate judgment threshold, the load rapid fluctuation control mode is entered. When the load change rate is not greater than the rate judgment threshold, the steady-state closed-loop control mode is entered. In the rapid load fluctuation control mode, the rated load of the unit is divided into multiple continuous load intervals. Each load interval has a safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constant to match the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule. In the steady-state closed-loop control mode, the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator is used as the control input. The opening of the wastewater inlet regulating valve is controlled by the output adjustment signal of the closed-loop controller to dynamically match the spray flow rate. The output of the controller is set with a limit to ensure that the spray flow rate does not exceed the safe spray volume corresponding to the current load range. When switching between the load rapid fluctuation control mode and the steady-state closed-loop control mode, a seamless switching is performed. When the real-time load of the unit drops below the minimum operating load threshold or the average differential pressure on both sides of the air preheater drops below the differential pressure safety threshold, the spray water pump is interlocked to stop, the inlet water regulating valve is closed after a delay, and the atomizer is switched to low-frequency standby state after a delay.
2. The method as described in claim 1, characterized in that, The method for obtaining the average pressure difference between the two sides of the air preheater is as follows: The inlet and outlet pressures of the air preheater on side A of the boiler are collected in real time and the pressure difference ΔP1 of the air preheater on side A is calculated. The inlet and outlet pressures of the air preheater on side B of the boiler are collected in real time and the pressure difference ΔP2 of the air preheater on side B is calculated. The arithmetic mean of the pressure difference ΔP1 of the air preheater on side A and the pressure difference ΔP2 of the air preheater on side B is taken and the arithmetic mean is taken as the average pressure difference ΔP of the two sides of the air preheater. The calibration method for the air preheater differential pressure safety threshold is as follows: Structural parameters of the bypass flue, flue gas damper, and evaporator were collected, and the total resistance characteristic equation of the bypass system was obtained through fluid simulation or cold resistance test. ΔP_sys=K·Q_gas 2 Where K is the bypass system resistance coefficient, and Q_gas is the actual bypass flue gas flow rate; Based on the atomized particle size of the rotary atomizer, the diameter of the evaporator tower, and the height inside the tower, the minimum bypass flue gas flow rate Q_gas,min is determined by thermo-fluid coupling calculation to ensure that the atomized desulfurization wastewater droplets are completely suspended and evaporated without droplet settling and adhering to the wall. Substituting the minimum bypass flue gas flow rate Q_gas,min into the total resistance characteristic equation of the bypass system, the theoretical pressure difference safety threshold P_set=K·Q_gas,min is calculated. 2 ; Under the hot commissioning conditions of the unit, keep the bypass flue gas valve fully open, gradually reduce the unit load, monitor the flow field state and tower wall temperature in the evaporator, and record the measured value of the average pressure difference between the two sides of the air preheater when the first local temperature drop of the tower wall occurs. Compare the measured value with the theoretical pressure difference safety threshold and make on-site correction to the air preheater pressure difference safety threshold P_set.
3. The method as described in claim 1, characterized in that, The formula for calculating the load change rate is: dS / dt=(S S -1 ) / T Where S is the real-time load of the unit collected in the current sampling period, S -1 This represents the real-time load of the unit collected in the previous sampling period.
4. The method as described in claim 1, characterized in that, The calibration method for the rate determination threshold Vo is as follows: Using the unit load S as the input disturbance and the evaporator outlet flue gas temperature T_out as the output, the first-order inertial transfer function of the flue gas-evaporator was identified through unit load increase and decrease disturbance tests. G(s)=T_out(s) / S(s)=A / (1+τ·s) Where τ is the thermal inertia time constant of the flue gas-evaporator system, and A is the gain coefficient of the load disturbance on the outlet flue gas temperature; Set the maximum allowable dynamic deviation ΔT_limit for the outlet flue gas temperature, based on the maximum dynamic deviation under a step disturbance of a first-order inertial system. ΔT_limit=A·Vo·τ The rate determination threshold was calculated. Vo = ΔT_limit / (A·τ) The rate determination threshold Vo was calibrated on-site through multiple sets of lifting and lowering load disturbance tests.
5. The method as described in claim 1, characterized in that, The closed-loop controller is a PID controller, defined as the temperature deviation ΔT = T_set between the setpoint T_set and the real-time measured value T_real of the flue gas temperature at the evaporator outlet. T_real serves as the input to the PID controller, and the output signal of the PID controller linearly adjusts the opening degree of the wastewater inlet electric regulating valve.
6. The method as described in claim 5, characterized in that, The output of the PID controller is set with upper and lower limits. The upper limit does not exceed the safe spray volume Q_safe corresponding to the current load range, and the lower limit is not lower than the minimum atomization flow rate of the system to prevent over-spraying and spray interruption. During the operation of the steady-state closed-loop control mode, when a sudden increase in the load change rate is detected to exceed the rate judgment threshold Vo, the control system immediately switches from the steady-state closed-loop control mode to the load rapid fluctuation control mode, locks the safe water spray volume Q_safe corresponding to the load range to which the current load belongs, and achieves a seamless switching.
7. The method as described in claim 5, characterized in that, In the rapid load fluctuation control mode, the output opening of the inlet regulating valve is constantly matched with the flow rate corresponding to the safe spray volume Q_safe of the current load range, and the PID controller is prohibited from making large-scale water volume adjustments to the inlet regulating valve.
8. The method as described in claim 1, characterized in that, Also includes: During the entire water spraying adjustment process, the single increase in water spray volume shall not exceed the preset upper limit of the increase, the time interval between two adjacent water volume adjustments shall not be less than the preset time interval, and the rate of decrease of flue gas temperature at the outlet of the evaporator shall not exceed the preset temperature drop rate. When the load decreases, the inlet water regulating valve shall be closed first to quickly reduce the water spray volume.
9. An optimized control system for a flue gas bypass evaporation system, characterized in that, include: The commissioning unlocking module is used to collect real-time operating parameters of the unit, preset the minimum commissioning load threshold and the air preheater differential pressure safety threshold. When the real-time load of the unit is not lower than the minimum commissioning load threshold and the average differential pressure on both sides of the air preheater is not lower than the differential pressure safety threshold, the automatic water spraying function of the spray system is unlocked. The load rate discrimination and mode switching module is used to acquire the real-time load of the unit at a fixed sampling period and calculate the load change rate. The load change rate is compared with a preset rate judgment threshold. When the load change rate is greater than the rate judgment threshold, the module enters the load rapid fluctuation control mode. When the load change rate is not greater than the rate judgment threshold, the module enters the steady-state closed-loop control mode. The load rapid fluctuation control module is used to divide the rated load of the unit into multiple continuous load intervals under the load rapid fluctuation control mode. Each load interval has a pre-stored safe water spray volume calibrated by thermal test. The safe water spray volume corresponding to the current load interval is locked as the upper limit of the water spray flow. The output flow of the water inlet regulating valve is controlled to be constantly matched with the safe water spray volume. When the load changes across intervals, the water spray volume is gradually adjusted to the safe water spray volume of the target load interval according to the step-by-step slow water spray rule. The flue gas temperature steady-state closed-loop control module is used in the steady-state closed-loop control mode to control the opening degree of the wastewater inlet regulating valve by using the deviation between the set value and the measured value of the flue gas temperature at the outlet of the evaporator as the control input, and to dynamically match the spray flow rate by outputting an adjustment signal through the closed-loop controller. It also sets a limit on the output of the controller to ensure that the spray flow rate does not exceed the safe spray volume corresponding to the current load range. When switching between the load rapid fluctuation control mode and the steady-state closed-loop control mode, it performs a seamless switching. The interlocking shutdown protection module is used to interlock and shut down the spray water pump, delay the closing of the inlet water regulating valve, and delay the switching of the atomizer to low-frequency standby state when the real-time load of the unit drops below the minimum operating load threshold or the average differential pressure on both sides of the air preheater drops below the differential pressure safety threshold.
10. A computer-readable storage medium storing a computer program that, when executed by a processor, implements the method as claimed in any one of claims 1-8.