A three-level coordinated load allocation and unit shutdown control method for pumped storage power stations
By employing a three-level coordinated load distribution and unit shutdown control method, the problems of frequency fluctuations, frequent governor adjustments, and poor shutdown control accuracy in pumped storage power stations have been solved, achieving grid frequency stability and efficient equipment operation, and extending equipment lifespan.
Patent Information
- Application Number
- CN202611555924.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-09
- Publication Date
- 2026-11-17
AI Technical Summary
Existing pumped storage power station group control technology has problems such as step-distribution leading to grid frequency fluctuations, frequent governor adjustments, units operating outside of their high-efficiency range, and poor shutdown control accuracy, which affect grid safety and stability and equipment lifespan.
A three-level coordinated load distribution and unit shutdown control method is adopted, including load slope decomposition at the power plant level, differentiated allocation at the group level, and shutdown slope control at the single unit level. This transforms the step-like distribution into a smooth, continuous slope distribution. By combining the coordinated switching of group slope and single unit slope, the lead time for shutdown commands is dynamically adjusted to achieve smooth load transfer and high-efficiency operation.
Eliminating the impact of step abrupt changes on grid frequency, reducing the frequency of governor adjustments, extending equipment life, improving power plant operating efficiency and accuracy, ensuring unit operation in the high-efficiency range, and enhancing grid security and stability.
Smart Images

Figure CN123121598A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of computer monitoring and automatic power generation control technology for pumped storage power stations, and in particular to a three-level coordinated load allocation and unit shutdown control method for pumped storage power stations. Background Technology
[0002] Pumped storage power stations, as crucial peak-shaving, frequency-regulating, and emergency backup power sources in the power system, directly impact the safety, stability, and economy of the power grid due to their operational flexibility. With the large-scale integration of new energy sources into the grid, the power grid places higher demands on the load tracking rate and regulation accuracy of pumped storage power stations. Load distribution control at these stations typically employs an Automatic Generation Control (AGC) system, which decomposes the planned active power output from the dispatch center to each unit, achieving rapid power response. Currently, pumped storage power stations utilize reversible units connected to the grid via transmission lines and operate in a group control mode, receiving daily load curves from the dispatch center at 96 points for automatic control. This group control employs a dual-line principle: one main line calculates the number of units to start and stop based on the individual unit load parameters in the dispatch order, while the other main line distributes the load commands from the daily load curve to each operating unit using an average distribution principle.
[0003] Existing group control technology has the following problems in actual operation:
[0004] 1. The existing group control software adopts a step-by-step distribution of load every 15 minutes, which is synchronized with the power generation plan. When the unit switches at each planned point, the active power output of the whole plant changes stepwise, causing grid frequency fluctuations, which is not conducive to the safe and stable operation of the grid. This step-by-step load distribution has a great impact on the grid.
[0005] 2. Frequent governor adjustments and increased mechanical wear, the step-type distribution means that the governor needs to make significant load adjustments at each planned point; after changing to slope distribution, if all units participate in load tracking, the frequency of governor adjustments will increase significantly.
[0006] 3. Inability to differentiate allocation, some units deviate from the high-efficiency range. The existing software adopts a uniform average allocation strategy for all participating units. The load of all units changes synchronously, causing some units to deviate from the high-efficiency operating range, reducing the overall operating efficiency of the power plant. Moreover, during the shutdown period, the units waiting to be shut down are still adjusted according to the average allocation with other units, resulting in unnecessary adjustment actions.
[0007] 4. The shutdown control uses a fixed delay, resulting in poor matching accuracy. The existing power generation shutdown command uses a fixed delay parameter, which cannot be dynamically adjusted according to the number of units to be shut down. If the advance amount for shutting down one unit is too large, it will cause unnecessary load transfer. If the advance amount for shutting down multiple units is insufficient, it will affect the shutdown accuracy. Summary of the Invention
[0008] To overcome the above problems, the purpose of this invention is to provide a three-level coordinated pumped storage power station load distribution and unit shutdown control method. This method transforms step load distribution into continuous slope smooth distribution, eliminating the impact of step changes on the grid frequency; through differentiated load distribution of grouped units and dynamic shutdown average distribution, unnecessary governor adjustment frequency is reduced, extending equipment life; high-priority units are kept in the full-load high-efficiency zone, improving the overall operating efficiency of the power station; and during shutdown periods, coordinated switching of group slope and single-unit slope is adopted to ensure smooth load transfer during shutdown, thereby improving the overall operating efficiency of the pumped storage power station and extending equipment life.
[0009] The technical solution adopted in this invention is:
[0010] A three-level coordinated load allocation and unit shutdown control method for pumped storage power stations includes the following steps:
[0011] S1: Power plant load slope decomposition, which decomposes the load change between two adjacent planned points on the daily load curve issued by the dispatcher during the dispatch cycle. The internal structure is continuously decomposed into the plant's active power setpoint per minute according to a linear slope. .
[0012] S2: Group-level differentiated load allocation calculation allocates the loads of the units participating in group control, including units participating in average allocation and units withdrawing from average allocation. The load setpoints of the units withdrawing from average allocation are locked. The units participating in average allocation are allocated their remaining power after deducting the locked load, ultimately obtaining the load setpoint for each unit participating in average allocation. .
[0013] S3: Automatic determination of exiting the average allocation function, including automatic input conditions, automatic recovery conditions, and forced recovery conditions.
[0014] S4: During downtime, the group tilt rate and the single machine tilt rate are controlled in a coordinated manner.
[0015] S5: Frequency anomaly protection lockout. During load adjustment, when the grid frequency experiences high-frequency or low-frequency over-limit anomalies, the current load setting value is locked, and further adjustment is prohibited. Slope control is restored after the frequency returns to normal.
[0016] S6: Emergency support overlay processing. The emergency support adjustable capacity calculation uses the planned value and does not perform slope decomposition. The emergency support additional value is added after the slope control and directly overlays the calculation of the number of units started and the average load power.
[0017] As a further description of the present invention, the specific process of S1 is as follows:
[0018] Within the planning interval of the k-th distribution cycle, the initial planning value is The next planned value is The interval duration is At any moment The plant-wide active power setting is:
[0019] .
[0020] As a further description of the present invention, the constraint condition of S2 is as follows:
[0021] When manually exiting, at least one unit should be retained to participate in the average allocation.
[0022] When automatically exiting, at least two units should be retained to participate in the average distribution.
[0023] The load setpoint for the unit that exits the average distribution mode is locked to the current value at the time of exit.
[0024] As a further description of the present invention, the automatic activation condition in S3 is automatic function activation, which occurs when the unit is in grid-connected operation under group control power generation mode and the unit load setpoint is greater than or equal to the set threshold. When the difference between the number of units required to operate under the current load plan and the group control priority of the unit is ≥2, the unit will exit the average allocation.
[0025] The automatic recovery condition is that when the automatic function is activated and the difference between the number of units required to operate in the current load plan and the priority is ≤1, the unit resumes participation in the average allocation.
[0026] The forced recovery condition is that when any one of the following conditions is met: the group exits the sloping rate function, the unit exits the group power generation mode, or the one-key recovery function is activated, the unit will be forced to resume participation in the average distribution.
[0027] As a further description of the present invention, the specific process of S4 is as follows:
[0028] S41: Before the group software issues a shutdown command, the load of the entire plant is evenly distributed according to the load slope decomposition method of S1.
[0029] S42: After the group software issues a shutdown command, it locks out the average load distribution of the unit and takes over by the single-unit layer.
[0030] S43: After receiving a group shutdown command, the single-unit layer sets the active power setpoint to the minimum steady-state operating load. The load setpoint received by the speed controller is distributed through the slope module, and the load reduction rate is... The calculation formula is:
[0031] .
[0032] in: This represents the current operating power of the unit. The minimum operating power of the generating unit is T, which is the time it takes for the power to drop from the current value to the minimum operating power of the generating unit, in seconds.
[0033] S44: When the active power of the unit is lower than the minimum power of the unit for generating operation, the power generation shutdown procedure is triggered.
[0034] As a further description of the present invention, the load setpoint of each participating unit in S2 is... A proportional correction is made based on the current operating conditions of the unit, with the correction factor being:
[0035] .
[0036] in: Basic allocation coefficient, Based on the current head of the unit The correction function, Based on the current active power output of the unit The correction function, the corrected single-machine setting value This keeps the total setpoint unchanged. To participate in the average allocation of the number of generating units. These are the corrected standalone settings.
[0037] As a further description of the present invention, S4 also includes a dynamic adjustment mechanism for shutdown delay:
[0038] The delay of the shutdown command for group power generation is dynamically adjusted according to the number of units to be shut down within the planned time. When one unit is to be shut down, the shutdown command is issued 5 minutes in advance; when two units are to be shut down, the shutdown command is issued 9 minutes in advance; and when three units are to be shut down, the shutdown command is issued 13 minutes in advance. Each advance parameter can be adjusted online.
[0039] When multiple generating units shut down simultaneously, shutdown commands for each unit are issued sequentially according to group control priority, from lowest to highest, with an interval between adjacent shutdown commands. Its value range is .
[0040] As a further description of the present invention, in S5, after the frequency abnormality protection is triggered, the frozen load setting value is held for no more than the preset maximum freezing time. If the power grid frequency does not return to normal after the time exceeds this limit, the system will automatically switch to manual adjustment mode and issue a frequency abnormality timeout alarm signal.
[0041] As a further description of the present invention, in S6, during the emergency support superposition process, the adjustable capacity of the emergency support is superimposed in segments according to the emergency support response time: during the emergency period after the emergency support is started, the additional power is superimposed with a fast response slope, and then switched to the normal slope superposition; the emergency time is set online by the operator, and the default value is 30 seconds.
[0042] As a further description of the present invention, in S2, the load setpoint of each unit participating in the average distribution is... After the calculation is completed, a dead zone is processed: when the calculated result... When the absolute value of the deviation from the current actual active power of the unit is less than the preset dead zone value, the current load setting value of the unit is maintained unchanged.
[0043] The beneficial effects of this invention are:
[0044] This invention discloses a three-level collaborative load allocation and unit shutdown control method for pumped storage power stations. This method employs a three-level collaborative architecture: power station-level slope decomposition, group-level differentiated allocation, and single-unit-level shutdown slope control. It transforms the group control system from a step-like dispatch to a continuous, smooth-slope dispatch, enabling the entire plant's active power to continuously and smoothly track the planned curve and eliminating the impact of step-like abrupt changes on the grid frequency. Combined with the group-level and single-unit slope collaborative mechanism during the S4 shutdown phase, seamless connection is achieved before and after the shutdown command is issued. Furthermore, the single-unit level smoothly reduces load according to the calculated slope, effectively preventing the planned curve from derailing or power drops, and significantly improving the tracking accuracy of the daily dispatch plan.
[0045] This invention discloses a three-level coordinated load allocation and unit shutdown control method for pumped-storage power stations. In method S3, the automatic judgment mechanism for exiting the average allocation function uses a dual-mode manual / automatic exit and priority difference judgment algorithm to ensure that high-priority units maintain full-load, high-efficiency operation without affecting the overall plant load tracking accuracy, thus reducing unnecessary governor adjustments. In method S4, the coordinated switching method between group tilt rate and individual unit tilt rate during shutdown periods avoids sudden changes in the overall plant load during shutdown.
[0046] This invention discloses a three-level coordinated load allocation and unit shutdown control method for pumped storage power stations. This method uses a dynamic adjustment of the shutdown command lead time based on the number of units scheduled to shut down within the planned time point, replacing the fixed delay parameter, so that the shutdown timing is precisely matched with the load slope decline curve, thereby improving the accuracy of shutdown operations. Attached Figure Description
[0047] Figure 1 This is a flowchart of a three-level coordinated pumped storage power station load allocation and unit shutdown control method proposed in this invention.
[0048] Figure 2This is a detailed flowchart of S2 of a three-level coordinated pumped storage power station load allocation and unit shutdown control method proposed in this invention.
[0049] Figure 3 This is a detailed flowchart of S3 for a three-level coordinated pumped storage power station load allocation and unit shutdown control method proposed in this invention. Detailed Implementation
[0050] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the protection scope of the present invention.
[0051] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and those skilled in the art can make similar extensions without departing from the spirit of the invention. Therefore, the invention is not limited to the specific embodiments disclosed below.
[0052] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that is mutually exclusive with other embodiments.
[0053] This invention is described in detail with reference to the schematic diagrams. When detailing the embodiments of this invention, for ease of explanation, the cross-sectional views illustrating the device structure may be partially enlarged, not adhering to the usual scale. Furthermore, the schematic diagrams are merely examples and should not be construed as limiting the scope of protection of this invention. In actual fabrication, the three-dimensional spatial dimensions of length, width, and depth should be included.
[0054] Furthermore, in the description of this invention, it should be noted that the terms "upper," "lower," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are used solely for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. In addition, the terms "first," "second," or "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0055] Unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" in this invention should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; similarly, they can refer to mechanical connections, electrical connections, or direct connections, or indirect connections through an intermediate medium, or internal connections between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0056] like Figures 1-3 As shown, it illustrates a specific embodiment of the present invention:
[0057] Example 1:
[0058] A three-level coordinated load allocation and unit shutdown control method for pumped storage power stations includes the following steps:
[0059] S1: Power plant load slope decomposition, which decomposes the load change between two adjacent planned points on the daily load curve issued by the dispatcher during the dispatch cycle. The internal structure is continuously decomposed into the plant's active power setpoint per minute according to a linear slope. .
[0060] The specific process of S1 is as follows:
[0061] Within the planning interval of the k-th distribution cycle, the initial planning value is The next planned value is The interval duration is At any moment The plant-wide active power setting is:
[0062] .
[0063] S2: Group-level differentiated load allocation calculation allocates the loads of the units participating in group control, including units participating in average allocation and units withdrawing from average allocation. The load setpoints of the units withdrawing from average allocation are locked. The units participating in average allocation are allocated their remaining power after deducting the locked load, ultimately obtaining the load setpoint for each unit participating in average allocation. .
[0064] In this embodiment, the total active power setting value for the entire plant is... Let A be the set of units participating in the average allocation, and L be the set of units exiting the average allocation (locked-in). The sum of their locked-in loads is: The load setpoint for each unit participating in the average distribution is... for:
[0065] .
[0066] in, Let A be the number of generating units in set A.
[0067] The constraint condition of S2 is:
[0068] When manually exiting, at least one unit should be retained to participate in the average allocation;
[0069] When automatically shutting down, at least two units should be retained to participate in the average allocation.
[0070] The load setpoint for the unit that exits the average distribution mode is locked to the current value at the time of exit.
[0071] The load setting value of each unit participating in the average distribution in S2 A proportional correction is made based on the current operating conditions of the unit, with the correction factor being:
[0072] ;
[0073] in: Basic allocation coefficient, Based on the current head of the unit The correction function, Based on the current active power output of the unit The correction function, the corrected single-machine setting value This keeps the total setpoint unchanged. To participate in the average allocation of the number of generating units. These are the corrected standalone settings.
[0074] In S2, the load setpoint for each unit participating in the average distribution is... After the calculation is completed, a dead zone is processed: when the calculated result... When the absolute value of the deviation from the current actual active power of the unit is less than the preset dead zone value, the current load setting value of the unit is maintained unchanged.
[0075] S3: Automatic determination of exiting the average allocation function, including automatic input conditions, automatic recovery conditions, and forced recovery conditions.
[0076] The automatic activation condition in S3 is automatic function activation, which occurs when the unit is operating in grid-connected mode under group control power generation conditions and the unit load setpoint is greater than or equal to the set threshold. And when the difference between the number of units required to operate in the current load plan and the group control priority of the unit is ≥2, the unit will be removed from the average allocation.
[0077] The automatic recovery condition is that when the automatic function is activated and the difference between the number of units required to operate in the current load plan and the priority is ≤1, the unit resumes participation in the average allocation.
[0078] The forced recovery condition is that when any one of the following conditions is met: the group exits the sloping rate function, the unit exits the group power generation mode, or the one-key recovery function is activated, the unit will be forced to resume participation in the average distribution.
[0079] In this embodiment, the group control priority of the unit is manually set by the operator before starting the unit each day.
[0080] S4: During downtime, the group tilt rate and the single-machine tilt rate are controlled in a coordinated manner.
[0081] The specific process of S4 is as follows:
[0082] S41: Before the group software issues a shutdown command, the load of the entire plant is evenly distributed according to the load slope decomposition method of S1.
[0083] S42: After the group software issues a shutdown command, the average load distribution of the unit is locked and taken over by the single unit layer;
[0084] S43: After receiving a group shutdown command, the single-unit layer sets the active power setpoint to the minimum steady-state operating load. The load setpoint received by the speed controller is distributed through the slope module, and the load reduction rate is... The calculation formula is:
[0085] ;
[0086] in: This represents the current operating power of the unit. The minimum operating power of the generating unit is T, which is the time it takes for the power to drop from the current value to the minimum operating power of the generating unit, in seconds.
[0087] S44: When the active power of the unit is lower than the minimum power of the unit for generating operation, the power generation shutdown procedure is triggered.
[0088] S4 also includes a dynamic adjustment mechanism for shutdown delay:
[0089] The delay of the shutdown command for group power generation is dynamically adjusted according to the number of units to be shut down within the planned time. When one unit is to be shut down, the shutdown command is issued 5 minutes in advance; when two units are to be shut down, the shutdown command is issued 9 minutes in advance; and when three units are to be shut down, the shutdown command is issued 13 minutes in advance. Each advance parameter can be adjusted online.
[0090] When multiple generating units shut down simultaneously, shutdown commands for each unit are issued sequentially according to group control priority, from lowest to highest, with an interval between adjacent shutdown commands. Its value range is .
[0091] S5: Frequency anomaly protection lockout. During load adjustment, when the grid frequency experiences high-frequency or low-frequency over-limit anomalies, the current load setting value is locked, and further adjustment is prohibited. The slope control is restored after the frequency returns to normal.
[0092] In this embodiment, the specific process of S5 is as follows:
[0093] Set high-frequency over-limit threshold and low-frequency over-limit threshold When the power grid frequency or Frequency anomaly protection is triggered, and the current active power setpoint for the entire plant is immediately frozen upon triggering. Simultaneously, all unit load setpoints are sent out with a frequency anomaly blocking signal; frequency restoration to normal means that the grid frequency is continuous. Seconds in Within the range, The default setting is 5 seconds. The default value for frequency hysteresis is 0.05Hz; after recovery, the slope control will catch up or delay according to the deviation between the current actual load value and the planned value, and the catching-up rate will not exceed 1.2 times the normal adjustment rate.
[0094] In S5, after the frequency anomaly protection is triggered, the frozen load setting value is held for no more than the preset maximum freezing time. If the grid frequency does not return to normal after this time, it will automatically switch to manual adjustment mode and issue a frequency anomaly timeout alarm signal.
[0095] S6: Emergency support overlay processing. The emergency support adjustable capacity calculation uses the planned value and does not perform slope decomposition. The emergency support additional value is added after the slope control and directly overlays the calculation of the number of units started and the average load power.
[0096] In S6, during the emergency support overlay processing, the adjustable capacity of emergency support is overlaid in segments according to the emergency support response time. During the emergency period after the emergency support is activated, the additional power is overlaid with a fast response slope, and then switched to the normal slope overlay. The emergency time is set online by the operator, and the default value is 30 seconds.
[0097] Example 2:
[0098] Based on the above embodiment 1, this embodiment 2 is based on the actual operation record of a pumped storage power station to realize the rapid peak-shaving response of the method in embodiment 1 under high-frequency disturbances of the power grid.
[0099] A pumped-storage power station with an installed capacity of 1200MW (4×300MW) participates in the provincial power grid's AGC (Automatic Generation Control) peak shaving. One afternoon, a sudden increase in photovoltaic output caused the grid frequency to rise to 50.12Hz (the high-frequency over-limit threshold is set at 50.10Hz). The dispatch center urgently issued a 15-minute planned curve, requiring the plant's active power to quickly decrease from 600MW to 300MW and stabilize near the target value within the following 10 minutes.
[0100] S1: Slope decomposition.
[0101] The scheduling and distribution plan points are as follows: , , The power station layer decomposes load changes into minute-by-minute setpoints using a linear slope:
[0102] , The unit is MW, and the unit t is minutes.
[0103] This continuous decomposition avoids the impact of traditional step-by-step regulation, the speed governor responds smoothly, and the measured water hammer pressure fluctuation is reduced by about 18% compared with the original method.
[0104] S2: Differentiated allocation and dead zone handling.
[0105] At that time, all four units were operating in group power generation mode. Unit #3, due to vibration zone limitations, was manually removed from the average power distribution and locked at 150MW by the operators. =150MW), the remaining 3 units will be allocated equally ( ).
[0106] The calculation shows that: ,when hour, .
[0107] At the same time, proportional adjustments are made based on the current head (H=520m) and output (85MW) of Unit #1. , , After correction, the setting value of unit #1 is 84.5MW, and the total setting value remains unchanged at 400MW.
[0108] Dead zone management (preset dead zone value 2MW) avoids frequent adjustments caused by small deviations (such as ±1.5MW), reducing the number of adjustments for Unit #2 by about 40 times per day.
[0109] S3: Automatically exit the discrimination process.
[0110] When the grid frequency exceeds the limit, the dispatching system requires a rapid reduction in output. The system determines that the automatic function is activated, and the difference between the number of units required for the current load plan (based on maximum single-unit output, 2 units) and the priority ranking (#4 has the lowest priority) is ≥2. Therefore, it automatically removes unit #4 from the average load distribution, locking its load at the current value (185MW), while the remaining units continue to handle the remaining load reduction. This ensures that high-priority units (#1, #2) do not operate frequently, extending their guide vane life.
[0111] S4: Shutdown Coordination Control.
[0112] When the plan requires a further reduction to below 300MW, the group software determines that Unit #4 needs to be shut down. Before the shutdown order is issued, the load distribution continues according to the S1 slope; after the order is issued, the average load distribution of #4 is blocked, and the single-unit layer takes over.
[0113] Current power Minimum steady-state operating power Set load reduction time The rate of decrease .
[0114] Meanwhile, the shutdown delay is dynamically adjusted—if one unit is scheduled to shut down in this project, the shutdown command will be issued 5 minutes in advance, so that the actual shutdown time matches the bottom of the grid load, avoiding insufficient reserve caused by premature shutdown.
[0115] After the frequency anomaly protection is triggered, the system immediately freezes all settings. After 5 seconds, the frequency recovers to 50.03Hz (within the hysteresis band), and then catches up with the planned value at 1.2 times the normal rate, finally reaching 300MW accurately within the planned window.
[0116] S5: Frequency anomaly lockout and timeout protection
[0117] This high-frequency over-limit event lasted approximately 8 seconds (less than the maximum freeze time of 30 seconds). During the protection operation, the load was not further reduced; adjustment continued only after the frequency recovered, thus avoiding the risk of low-frequency over-adjustment. Throughout the entire adjustment process, unit vibration, bearing temperature, and other indicators remained within acceptable limits.
[0118] In this embodiment, the pumped storage power station successfully completed a rapid downsizing of 300MW within 15 minutes, with an adjustment accuracy of ±2MW. The response time was shortened by 22% compared to the traditional method. At the same time, it avoided long-term operation of the unit in the vibration zone, significantly improving equipment safety and grid frequency support capabilities.
[0119] Example 3:
[0120] Based on the above embodiment 1, this embodiment 3 implements the low-load stable control of the method in embodiment 1 based on the situation of a pumped storage power station during its annual maintenance.
[0121] Scenario Description: Due to a major overhaul of Unit #2, a pumped storage power station has only three units (#1, #3, and #4) operational. Unit #3 is experiencing strong vibrations in the 80-110MW range due to tailrace pipe pressure pulsation, requiring avoidance. The power grid dispatch has issued a low-load nighttime plan: the plant's active power will gradually decrease from 450MW to 180MW between 23:00 and 04:00, then increase back to 300MW. The units are required to operate safely and stably during the low-load period.
[0122] In this embodiment, the power plant level decomposes the plant setpoints at 15-minute intervals. Operators pre-emptively "exclude" Unit #3 from average allocation and lock it at 120MW (to avoid the vibration zone), while the remaining Units #1 and #4 participate in the average allocation. ).
[0123] when At that time, after deducting the locked load of 120MW, the remaining 180MW will be equally distributed between #1 and #4. However, the current head of Unit #1 is relatively low (H=480m), and the correction factor is... The head of Unit #4 is 530m. After proportional adjustment, #1 is set to 87.4MW and #4 to 92.6MW, with the total remaining at 180MW. This differentiated allocation ensures that neither #1 nor #4 enters their respective vibration zones, and that the power output is uniform.
[0124] When the plant's overall plan is further reduced to 200MW, the system determines that the difference between the required number of units to be operated (based on the maximum adjustable range of a single unit) and the priority is ≥2. It automatically removes #4 (lowest priority) from the average allocation and locks it at 85MW. At this time, only #1 participates in the average allocation (still satisfying the constraint of "at least 1 unit is retained when manually withdrawing").
[0125] Once the planned capacity recovers to 300MW, and the difference is ≤1, the system will automatically restore #4 to participate in the average distribution without manual intervention, thus reducing the workload of operators.
[0126] During the lowest load period (180MW), the group software determined that Unit #1 (lowest priority) needed to be shut down. This plan requires the shutdown of two units (#1 and #4 in sequence). According to the dynamic adjustment rules, the first shutdown instruction is issued 9 minutes in advance, followed by the second instruction 60 seconds later.
[0127] After single-unit takeover, the units were smoothly reduced to different descent rates. This subsequently triggered a power generation shutdown. The staggered shutdown avoided the impact of simultaneous load reduction on the power grid, and the measured frequency fluctuation was only ±0.03Hz, which is far better than the neighboring station that did not adopt this strategy during the same period (±0.12Hz).
[0128] During low-load operation, a fault occurred on an adjacent line, and the power grid requested the power plant to urgently generate an additional 50MW of power. The system immediately activated the emergency support superposition: without slope decomposition, it directly calculated the adjustable capacity (currently #1 and #4 are both at 50MW, which can be increased to 300MW), and superimposed the additional power at a rapid slope (1.5MW / s) within the 30-second emergency time, after which it switched to the normal slope.
[0129] Meanwhile, the frequency anomaly protection mechanism blocked the risk of overfrequency transmission caused by sudden increases, allowing the system to resume operation according to the planned curve once the frequency stabilized. The entire support process had a response time of only 25 seconds, effectively supporting the restoration of the power grid frequency.
[0130] In this embodiment, during the stable load period (maintaining 250MW), the calculation deviation of each unit's set value is less than the dead zone value (2MW), and the system maintains the current setting unchanged, reducing the frequent operation of the governor. According to statistics, the number of times the guide vane opening of Unit #1 is adjusted is reduced by 65% compared with the traditional algorithm, effectively extending the service life of the servo valve.
[0131] In summary, this method transforms step-load distribution into continuous, smooth-slope distribution, eliminating the impact of step-load abrupt changes on the grid frequency. Through differentiated load allocation of grouped units and dynamic withdrawal from average allocation, it reduces unnecessary governor adjustments and extends equipment lifespan. It keeps high-priority units operating at full load and high efficiency, improving the overall operating efficiency of the power station. Simultaneously, during shutdown periods, it employs coordinated switching of group and individual unit ramp rates to ensure smooth load transfer during shutdown, thereby improving the overall operating efficiency of pumped-storage power stations and extending equipment lifespan. In practical application, even under complex constraints such as unit maintenance, low load, and vibration zone limitations, the solution still achieves safe, economical, and flexible plant-wide regulation through differentiated allocation, automatic withdrawal / recovery, coordinated shutdown delays, and emergency support. In particular, the "load locking + remaining averaging" strategy successfully avoids the vibration zone of the units while ensuring balanced load on remaining units, preventing energy losses due to single-unit overload or inefficient operation.
[0132] The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention.
[0133] Many other changes and modifications can be made without departing from the concept and scope of this invention. It should be understood that this invention is not limited to the specific embodiments, and the scope of this invention is defined by the appended claims.
Claims
1. A three-level coordinated load allocation and unit shutdown control method for pumped-storage power stations, characterized in that, Includes the following steps: S1: Power plant load slope decomposition, which decomposes the load change between two adjacent planned points on the daily load curve issued by the dispatcher during the dispatch cycle. The internal structure is continuously decomposed into the plant's active power setpoint per minute according to a linear slope. ; S2: Group-level differentiated load allocation calculation allocates the loads of the units participating in group control, including units participating in average allocation and units withdrawing from average allocation. The load setpoints of the units withdrawing from average allocation are locked. The units participating in average allocation are allocated their remaining power after deducting the locked load, ultimately obtaining the load setpoint for each unit participating in average allocation. ; S3: Automatic determination of exiting the average allocation function, including automatic input conditions, automatic recovery conditions, and forced recovery conditions; S4: During downtime, the group tilt rate and the single-machine tilt rate are controlled in a coordinated manner. S5: Frequency anomaly protection lockout. During load adjustment, when the grid frequency experiences high-frequency or low-frequency over-limit anomalies, the current load setting value is locked, and further adjustment is prohibited. The slope control is restored after the frequency returns to normal. S6: Emergency support overlay processing. The emergency support adjustable capacity calculation uses the planned value and does not perform slope decomposition. The emergency support additional value is added after the slope control and directly overlays the calculation of the number of units started and the average load power.
2. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, The specific process of S1 is as follows: Within the planning interval of the k-th distribution cycle, the initial planning value is The next planned value is The interval duration is At any moment The plant-wide active power setting is: 。 3. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, The constraint condition of S2 is: When manually exiting, at least one unit should be retained to participate in the average allocation; When automatically shutting down, at least two units should be retained to participate in the average allocation. The load setpoint for the unit that exits the average distribution mode is locked to the current value at the time of exit.
4. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, The automatic activation condition in S3 is automatic function activation, which occurs when the unit is operating in grid-connected mode under group control power generation conditions and the unit load setpoint is greater than or equal to the set threshold. And when the difference between the number of units required to operate in the current load plan and the group control priority of the unit is ≥2, the unit will be removed from the average allocation; The automatic recovery condition is that when the automatic function is activated and the difference between the number of units required to operate in the current load plan and the priority is ≤1, the unit resumes participation in the average allocation. The forced recovery condition is that when any one of the following conditions is met: the group exits the sloping rate function, the unit exits the group power generation mode, or the one-key recovery function is activated, the unit will be forced to resume participation in the average distribution.
5. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, The specific process of S4 is as follows: S41: Before the group software issues a shutdown command, the load of the entire plant is evenly distributed according to the load slope decomposition method of S1. S42: After the group software issues a shutdown command, the average load distribution of the unit is locked and taken over by the single unit layer; S43: After receiving a group shutdown command, the single-unit layer sets the active power setpoint to the minimum steady-state operating load. The load setpoint received by the speed controller is distributed through the slope module, and the load reduction rate is... The calculation formula is: ; in: This represents the current operating power of the unit. The minimum operating power of the generating unit is T, which is the time it takes for the power to drop from the current value to the minimum operating power of the generating unit, in seconds. S44: When the active power of the unit is lower than the minimum power of the unit for generating operation, the power generation shutdown procedure is triggered.
6. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, The load setting value of each unit participating in the average distribution in S2 A proportional correction is made based on the current operating conditions of the unit, with the correction factor being: ; in: Basic allocation coefficient, Based on the current head of the unit The correction function, Based on the current active power output of the unit The correction function, the corrected single-machine setting value This keeps the total setpoint unchanged. To participate in the average allocation of the number of generating units. These are the corrected standalone settings.
7. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, S4 also includes a dynamic adjustment mechanism for shutdown delay: The delay of the shutdown command for group power generation is dynamically adjusted according to the number of units to be shut down within the planned time. When one unit is to be shut down, the shutdown command is issued 5 minutes in advance; when two units are to be shut down, the shutdown command is issued 9 minutes in advance; and when three units are to be shut down, the shutdown command is issued 13 minutes in advance. Each advance parameter can be adjusted online. When multiple generating units shut down simultaneously, shutdown commands for each unit are issued sequentially according to group control priority, from lowest to highest, with an interval between adjacent shutdown commands. Its value range is .
8. The method for load allocation and unit shutdown control of a three-level coordinated pumped-storage power station according to claim 1, characterized in that, In S5, after the frequency anomaly protection is triggered, the frozen load setting value is held for no more than the preset maximum freezing time. If the grid frequency does not return to normal after this time, it will automatically switch to manual adjustment mode and issue a frequency anomaly timeout alarm signal.
9. The three-level coordinated pumped-storage power station load allocation and unit shutdown control method according to claim 1, characterized in that, In S6, during the emergency support superposition process, the adjustable capacity of emergency support is superimposed in segments according to the emergency support response time: during the emergency period after the emergency support is started, the additional power is superimposed with a fast response slope, and then switched to normal slope superposition. The emergency time is set online by the operators, with a default value of 30 seconds.
10. The three-level coordinated pumped-storage power station load allocation and unit shutdown control method according to claim 1, characterized in that, In S2, the load setpoint for each unit participating in the average distribution is... After the calculation is completed, a dead zone is processed: when the calculated result... When the absolute value of the deviation from the current actual active power of the unit is less than the preset dead zone value, the current load setting value of the unit is maintained unchanged.
