A method and system for calculating the revenue of independent energy storage under a capacity compensation mechanism.
By constructing a three-layer capacity compensation calculation model and a multi-constraint optimization model, and combining an improved particle swarm optimization algorithm, multiple problems in the revenue calculation of independent energy storage power stations are solved, achieving accurate quantification of capacity compensation revenue and maximization of comprehensive revenue, and providing precise investment and operation management support.
Patent Information
- Application Number
- CN202611304462.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-17
AI Technical Summary
Under the capacity compensation mechanism, the existing technology for calculating the revenue of independent energy storage power stations suffers from problems such as incomplete revenue sources, crude calculation of capacity compensation revenue, and a disconnect between the capacity compensation mechanism and the optimization of operation strategies, resulting in low and inaccurate revenue calculation results.
A three-layer capacity compensation calculation model is constructed, which includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient. Combined with a multi-constraint optimization model and an improved particle swarm optimization algorithm, the capacity compensation benefits are comprehensively evaluated, and the charging and discharging strategies are optimized.
It significantly improves the calculation accuracy of capacity compensation revenue and the overall revenue accuracy, ensures compliance, and provides precise support for investment decisions and operational management.
Smart Images

Figure CN123121653A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of power system energy storage technology, and in particular to a method and system for calculating the revenue of independent energy storage under a capacity compensation mechanism. Background Technology
[0002] With the advancement of "dual-carbon" targets and the construction of new power systems, the proportion of new energy power generation such as wind and solar power is rapidly increasing. However, the volatility and uncertainty of their output pose serious challenges to the safe and stable operation of the power grid. Independent energy storage power stations, as an important flexible regulation resource, can provide various services such as energy time-shifting, frequency regulation, peak shaving, and backup, playing an increasingly important role in smoothing out fluctuations in new energy output, improving grid security and stability, and optimizing power dispatch. However, the construction investment in independent energy storage power stations is substantial, and their economic viability directly affects the healthy development of the energy storage industry and investors' confidence. Therefore, accurately calculating the returns of independent energy storage is of great significance for project investment evaluation, operational strategy formulation, and policy effect analysis.
[0003] Despite some progress in calculating energy storage revenue using existing technologies, the following technical challenges remain under the context of capacity compensation mechanisms:
[0004] First, the sources of revenue are not fully considered. Existing methods typically only consider a single source of revenue, such as focusing solely on electricity arbitrage (utilizing peak-valley electricity price differences) or only on ancillary service revenue such as frequency regulation and peak shaving, while failing to incorporate capacity compensation revenue into the comprehensive revenue calculation system. This fragmented calculation method leads to underestimation of revenue, failing to fully reflect the true economic value of energy storage power stations and providing investors with accurate investment return forecasts.
[0005] Second, the calculation of capacity compensation benefits is crude. Existing methods often use a simple product of "rated capacity × compensation unit price" to calculate capacity compensation benefits, failing to fully consider the impact of the actual operating status of the energy storage power station on compensation. Specifically, existing methods lack dynamic assessment of the effective usable capacity of the energy storage power station, ignoring the influence of factors such as battery state of health (SOH), depth of discharge retention boundary, and state of charge (SOC) on the actual usable capacity. Furthermore, existing methods fail to dynamically adjust the compensation coefficient based on the actual performance of the energy storage power station (such as the number of calls, response time, and completion rate). This crude calculation method results in insufficient accuracy in measuring capacity compensation benefits, making it difficult to accurately reflect the true contribution and value of the energy storage power station.
[0006] Third, the capacity compensation mechanism is disconnected from operational strategy optimization. Existing technologies rarely combine capacity compensation mechanisms with energy storage operational strategy optimization. Capacity compensation policies typically include constraints such as available capacity assessment thresholds and performance-based rewards and penalties. These constraints directly affect the charging and discharging behavior of energy storage power stations, thereby altering the revenue potential from energy arbitrage and ancillary services. However, most existing revenue calculation methods treat capacity compensation as an external input independent of the operational strategy, failing to incorporate capacity compensation assessment requirements into the operational optimization model. This results in the calculated optimal charging and discharging strategy potentially violating capacity compensation assessment conditions in actual implementation, ultimately preventing the full realization of capacity compensation revenue.
[0007] In conclusion, there is an urgent need for a revenue calculation method for independent energy storage under a capacity compensation mechanism to address the problems existing in current technologies and provide technical support for the healthy development of the energy storage industry. Summary of the Invention
[0008] In view of this, this application provides a method and system for calculating the revenue of independent energy storage under a capacity compensation mechanism, which significantly improves the accuracy of revenue calculation and the practicality of strategy optimization, and provides comprehensive, accurate and executable technical support for investment decision-making and operation management of independent energy storage power stations under a capacity compensation mechanism.
[0009] To achieve the above objectives, the first aspect of this application provides a method for calculating the revenue of independent energy storage under a capacity compensation mechanism, including:
[0010] The system collects operating parameters, electricity market price data, and capacity compensation policy parameters of independent energy storage power stations, and performs outlier detection, missing value filling, and normalization on the collected raw data.
[0011] Based on the aforementioned capacity compensation policy parameters, a capacity compensation calculation model is constructed that includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient. The capacity compensation benefit is then calculated using this capacity compensation calculation model.
[0012] The total revenue of independent energy storage is decomposed into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue. The revenue of each sub-item is calculated separately and then summed to obtain the comprehensive revenue.
[0013] A multi-constraint optimization model is constructed with the goal of maximizing comprehensive benefits. An improved particle swarm optimization algorithm is used to solve the optimal charging and discharging strategy of an independent energy storage power station, and the optimal operation scheme and contribution analysis of each source of benefits are output.
[0014] As one possible implementation of the first aspect, the operating parameters of the independent energy storage power station include rated capacity, rated power, charging efficiency, discharging efficiency, real-time state of charge, and maximum number of battery cycles.
[0015] The electricity market price data includes time-of-use pricing, frequency regulation market clearing prices, and peak-shaving service market prices.
[0016] The capacity compensation policy parameters include the capacity compensation unit price, compensation period, available capacity assessment standards, and compensation coefficient adjustment rules.
[0017] As one possible implementation of the first aspect, the calculation formula of the capacity compensation calculation model is as follows:
[0018] ;
[0019] in, For capacity compensation revenue, This refers to the rated capacity of the energy storage power station. The unit price is for capacity compensation. For the compensation period, The effective usable capacity factor. This is the dynamic capacity compensation coefficient.
[0020] As one possible implementation of the first aspect, the effective available capacity coefficient The calculation method is as follows:
[0021] ;
[0022] in, For the width of the sliding window, This represents the actual usable capacity. The health status of the energy storage battery;
[0023] The actual available capacity according to calculate, In a charged state, Preserve boundaries for discharge depth;
[0024] The health status Based on cyclic aging model calculate, To accumulate the number of loops, The maximum number of loops. This is the aging index.
[0025] As one possible implementation of the first aspect, the dynamic capacity compensation coefficient The calculation formula is as follows: The adjustment is dynamically made based on the actual usage of the energy storage power station, response time, and completion rate indicators.
[0026] ;
[0027] in, As the benchmark compensation coefficient, In order to invoke the incentive factor, To call the frequency function, In response to the penalty factor, In response to the timeout function, As a quality incentive factor, To call the quality scoring function.
[0028] As one possible implementation of the first aspect, the revenue from electrical energy arbitrage, frequency regulation ancillary services, and peak shaving ancillary services are calculated according to the following formulas:
[0029] Electricity arbitrage profits: ,in, For discharge power, For the price of electricity, For charging power, For the price of electricity, For time step;
[0030] FM ancillary service revenue: ,in, Quoting for frequency modulation capacity, To clear out prices in the FM market This is the frequency modulation performance rating coefficient;
[0031] Peak shaving ancillary service revenue: ,in, To regulate peak power, For peak shaving service market prices;
[0032] The formula for calculating the comprehensive income is as follows:
[0033] ;
[0034] in, For capacity compensation revenue.
[0035] As one possible implementation of the first aspect, the calculation formula for the multi-constraint optimization model is as follows:
[0036] ;
[0037] in, For capacity compensation revenue, For arbitrage profits in electrical energy, For revenue from FM ancillary services, For revenue from peak shaving ancillary services;
[0038] The constraints of this multi-constraint optimization model include:
[0039] State of charge constraints: ;
[0040] Power constraints: ,in, For charging and discharging power, This refers to the rated power of the energy storage power station;
[0041] Charge and discharge mutual exclusion constraint: charging and discharging cannot occur simultaneously at the same time;
[0042] Daily cycle constraint: ,in, The state of charge at the start of a single-day operating cycle. This represents the maximum permissible decrease in state of charge per day. The state of charge at the end of a single day's operating cycle;
[0043] Capacity compensation assessment constraints: ,in, This represents the actual usable capacity. The minimum available capacity threshold for capacity compensation assessment.
[0044] As one possible implementation of the first aspect, the improvements to the improved particle swarm optimization algorithm include:
[0045] The position and velocity of the particles are encoded in a hybrid manner, and each particle corresponds to a complete 24-hour energy storage charging and discharging strategy.
[0046] An adaptive inertia weight factor is introduced to dynamically balance global search and local optimization capabilities based on the iteration process;
[0047] A multimodal mutation strategy based on crowding is adopted to divide the particle swarm into multiple subgroups for parallel search;
[0048] A constraint handling mechanism is set up to correct the parameters of particles that violate the constraints, rather than directly eliminating them.
[0049] As one possible implementation of the first aspect, the contribution analysis of each revenue source includes the amount, proportion, and trend analysis of each revenue source.
[0050] The second aspect of this application provides a revenue calculation system for independent energy storage under a capacity compensation mechanism, including:
[0051] The data acquisition module is used to collect operating parameters, electricity market price data, and capacity compensation policy parameters of independent energy storage power stations, and to perform outlier detection, missing value filling, and normalization on the collected raw data.
[0052] The capacity compensation calculation module is used to construct a capacity compensation calculation model based on the capacity compensation policy parameters, which includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, and to calculate the capacity compensation benefits through the capacity compensation calculation model.
[0053] The multi-source revenue calculation module is used to decompose the total revenue of independent energy storage into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue and peak shaving ancillary service revenue, and calculate each sub-item revenue separately and then sum them to obtain the comprehensive revenue.
[0054] The strategy optimization module is used to construct a multi-constraint optimization model with the goal of maximizing comprehensive benefits, and to solve the optimal charging and discharging strategy of independent energy storage power stations using an improved particle swarm optimization algorithm.
[0055] The results output module is used to output the optimal operating plan and the contribution analysis of each source of revenue.
[0056] Compared with the prior art, this application has the following beneficial effects:
[0057] This application provides a method and system for calculating the revenue of independent energy storage under a capacity compensation mechanism. By constructing a three-layer capacity compensation calculation model that includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, it is the first to incorporate battery health status, discharge depth retention boundary, and actual call performance (call frequency, response time, and completion rate) into the capacity compensation revenue calculation, significantly improving the accuracy of capacity compensation revenue calculation. Simultaneously, it establishes a multi-source revenue comprehensive calculation system covering capacity compensation revenue, energy arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue, overcoming the limitations of existing methods that only consider a single revenue source, and enabling a comprehensive assessment of the true economic benefits of independent energy storage power stations. Furthermore, it incorporates capacity compensation assessment constraints and energy storage operation physical constraints into a multi-constraint optimization model, and uses an improved particle swarm optimization algorithm (adaptive inertia weight, multimodal mutation, and constraint correction mechanism) to solve for the optimal charging and discharging strategy, achieving deep coupling between the capacity compensation mechanism and the operation strategy. This avoids losing capacity compensation eligibility due to pursuing arbitrage, ultimately maximizing comprehensive revenue while ensuring compliance, providing accurate and reliable technical support for investment decisions and operation management of energy storage power stations. Attached Figure Description
[0058] Figure 1 This is a flowchart illustrating a method for calculating the revenue of independent energy storage under a capacity compensation mechanism, as provided in an embodiment of this application.
[0059] Figure 2 This is a structural diagram of a revenue calculation system for independent energy storage under a capacity compensation mechanism, provided in an embodiment of this application.
[0060] Figure 3This is a structural diagram of a computing device provided in an embodiment of this application.
[0061] It should be understood that the dimensions and shapes of the block diagrams in the above structural diagrams are for reference only and should not constitute an exclusive interpretation of the embodiments of this application. The relative positions and inclusion relationships between the block diagrams presented in the structural diagrams are only schematic representations of the structural relationships between the block diagrams, and are not intended to limit the physical connection methods of the embodiments of this application. Detailed Implementation
[0062] To make this application easier to understand, specific embodiments are described below to further illustrate this application. The technical solutions provided by this application are further explained below with reference to the accompanying drawings and examples. It should be understood that the system architecture and business scenarios provided in the embodiments of this application are mainly for illustrating possible implementations of the technical solutions of this application and should not be construed as the sole limitation on the technical solutions of this application. Those skilled in the art will recognize that, with the evolution of system architecture and the emergence of new business scenarios, the technical solutions provided by this application are equally applicable to similar technical problems.
[0063] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. In case of any inconsistency, the meaning set forth in this specification or derived from the content described herein shall prevail. Furthermore, the terminology used herein is for the purpose of describing embodiments of this application only and is not intended to limit the scope of this application.
[0064] The solutions provided in this application will now be described in detail with reference to the accompanying drawings and embodiments.
[0065] This application proposes a method for calculating the revenue of independent energy storage under a capacity compensation mechanism. This method can be applied to independent energy storage systems. By constructing a three-layer capacity compensation calculation model that includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, and establishing a multi-source revenue comprehensive calculation system covering capacity compensation revenue, energy arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue, it can comprehensively evaluate the true economic benefits of independent energy storage power stations. In addition, by incorporating capacity compensation assessment constraints and energy storage operation physical constraints into a multi-constraint optimization model, and using an improved particle swarm optimization algorithm to solve the optimal charging and discharging strategy, the method achieves deep coupling between the capacity compensation mechanism and the operation strategy, avoiding the loss of capacity compensation eligibility due to the pursuit of arbitrage, and ultimately maximizing comprehensive revenue while ensuring compliance. This provides accurate and reliable technical support for investment decisions and operation management of energy storage power stations.
[0066] like Figure 1 As shown in the embodiment of this application, a method for calculating the revenue of independent energy storage under a capacity compensation mechanism includes the following steps:
[0067] S110: Collect operating parameters, electricity market price data, and capacity compensation policy parameters of independent energy storage power stations, and perform outlier detection, missing value filling, and normalization on the collected raw data.
[0068] In this embodiment, the following three types of data can be collected from channels such as energy storage management systems (EMS), regional power trading platforms, and policy documents from local energy authorities:
[0069] Operating parameters of a standalone energy storage power station: obtained through the API interface of the energy storage management system (EMS), including rated capacity. Rated power Charging efficiency Discharge efficiency Real-time state of charge Maximum battery cycle count ;
[0070] Electricity market price data: obtained through the data service interface of the electricity trading platform, including time-of-use pricing (electricity purchase price). and electricity sales price ), FM market clearing price Peak shaving service market prices ;
[0071] Capacity compensation policy parameters: These were retrieved and digitized from policy documents issued by provincial energy authorities, including the capacity compensation unit price. Compensation cycle (Usually 1 year), available capacity assessment standards (e.g., requiring that the daily available capacity of the energy storage power station is not less than 60% of the rated capacity), and compensation coefficient adjustment rules.
[0072] Based on the collected data, this step also employs outlier detection, missing value imputation, and normalization for preprocessing, specifically including:
[0073] Outlier detection: using Criterion. Calculate the mean for each data series. and standard deviation If a certain data point satisfy If an outlier is found, it is marked as an anomaly. Isolated outliers are removed directly; for consecutive outlier segments, linear interpolation of the preceding and following normal values is used for replacement.
[0074] Missing value imputation: Linear interpolation is used. For missing data caused by short-term network outages or data acquisition failures, the two consecutive valid data points are used. and ,calculate If the boundary is missing, nearest neighbor filling is used.
[0075] Normalization: Mapping data of different dimensions (such as SOC, electricity price, power) to the [0,1] interval, using the following formula: This facilitates distance calculation and convergence in subsequent optimization algorithms.
[0076] S120: Based on the capacity compensation policy parameters, construct a capacity compensation calculation model that includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, and calculate the capacity compensation benefits through this capacity compensation calculation model.
[0077] This step employs a three-tiered model—basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient—to construct a capacity compensation calculation model and calculate the capacity compensation benefits. The specific construction process is as follows:
[0078] The basic capacity compensation cost is calculated based on the rated capacity and capacity compensation unit price of the energy storage power station. The calculation formula is:
[0079]
[0080] in, This refers to the rated capacity of the energy storage power station. The unit price is for capacity compensation. For the compensation period.
[0081] Based on this basic capacity compensation The calculation formula for the capacity compensation calculation model is as follows:
[0082]
[0083] Right now
[0084]
[0085] in, The effective usable capacity factor. This is the dynamic capacity compensation coefficient.
[0086] The effective available capacity assessment uses a sliding window method to statistically analyze historical operating data and incorporates battery health status. Make corrections. This effectiveness can be achieved using the capacity factor. The calculation method is as follows:
[0087]
[0088] in, For the width of the sliding window, This represents the actual usable capacity. The health status of the energy storage battery;
[0089] The actual available capacity The calculation formula is:
[0090]
[0091] in, In a charged state, Preserve boundaries for discharge depth;
[0092] The health status of the energy storage battery Based on the cycle aging model, and taking into account the effects of temperature, depth of charge / discharge, and number of cycles on battery life, the calculation formula is as follows:
[0093]
[0094] in, To accumulate the number of loops, The maximum number of loops. This is the aging index.
[0095] The dynamic capacity compensation coefficient The dynamic capacity compensation coefficient is dynamically adjusted based on the actual usage, response time, and completion rate of the energy storage power station. In this embodiment, the dynamic capacity compensation coefficient... The compensation coefficient is positively correlated with the number of calls and negatively correlated with the response timeout rate. When the energy storage power station's call performance exceeds the assessment standard, the compensation coefficient increases; when the call performance falls below the assessment standard, the compensation coefficient decreases. The calculation formula is:
[0096]
[0097] in, As the benchmark compensation coefficient, In order to invoke the incentive factor, To call the frequency function, In response to the penalty factor, In response to the timeout function, As a quality incentive factor, To call the quality scoring function.
[0098] S130: Decompose the total revenue of independent energy storage into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue, and sum the revenue of each sub-item after calculating them separately to obtain the comprehensive revenue.
[0099] In this step, the total revenue from independent energy storage can be broken down into four revenue sources: capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue. Among these, capacity compensation revenue is... The revenue from electrical energy arbitrage, frequency regulation ancillary services, and peak shaving ancillary services are calculated using the following formulas:
[0100] The electricity arbitrage profit is calculated using a time-of-use electricity price peak-valley difference arbitrage model, and the formula is as follows:
[0101]
[0102] in, For discharge power, For the price of electricity, For charging power, For the price of electricity, For time step.
[0103] The revenue from frequency regulation ancillary services is calculated based on the power grid frequency regulation settlement rules, using the following formula:
[0104]
[0105] in, Quoting for frequency modulation capacity, To clear out prices in the FM market This is the frequency modulation performance rating coefficient, with a value range of 0-1.5.
[0106] The formula for calculating the revenue from peak shaving ancillary services is as follows:
[0107]
[0108] in, To regulate peak power, The market price for peak shaving services.
[0109] Through the above-mentioned capacity compensation benefits Electricity arbitrage income FM ancillary service revenue Revenue from peak shaving ancillary services By performing a summation calculation, the overall benefit can be obtained. The calculation formula is:
[0110]
[0111] This comprehensive revenue is the sum of all revenue sources within a complete statistical period for independent energy storage, and can objectively and completely reflect the true profitability of independent energy storage.
[0112] S140: Construct a multi-constraint optimization model with the goal of maximizing comprehensive benefits. Use an improved particle swarm optimization algorithm to solve for the optimal charging and discharging strategy of the independent energy storage power station, and output the optimal operation scheme and the contribution analysis of each source of benefits.
[0113] In this step, the calculation formula for the multi-constraint optimization model is:
[0114]
[0115] in, For capacity compensation revenue, For arbitrage profits in electrical energy, For revenue from FM ancillary services, Revenue from peak shaving ancillary services.
[0116] The constraints of this multi-constraint optimization model include:
[0117] State of charge constraints: In this embodiment, , ;
[0118] Power constraints: ,in, This represents the charging / discharging power; a positive value indicates discharging, and a negative value indicates charging. This refers to the rated power of the energy storage power station;
[0119] Charge and discharge mutual exclusion constraint: This means that charging and discharging cannot occur simultaneously at the same time.
[0120] Daily cycle constraint: ,in, The state of charge at the start of a single-day operating cycle. This represents the maximum permissible decrease in state of charge per day. The state of charge at the end of a single day's operating cycle is a constraint that ensures that the daily energy supply is not excessively depleted.
[0121] Capacity compensation assessment constraints: ,in, This represents the actual usable capacity. This constraint serves as the minimum available capacity threshold for capacity compensation assessment, ensuring that energy storage power stations always maintain sufficient available capacity to meet capacity compensation assessment requirements.
[0122] This embodiment also employs an improved particle swarm optimization (IPSO) algorithm to generate the optimal charge / discharge power sequence for the next 24 hours. The improvements to this algorithm include:
[0123] The position and velocity of the particles are encoded in a hybrid manner, and each particle corresponds to a complete 24-hour energy storage charging and discharging strategy.
[0124] An adaptive inertia weight factor is introduced to dynamically balance global search and local optimization capabilities based on the iteration process;
[0125] A multimodal mutation strategy based on crowding is adopted to divide the particle swarm into multiple subgroups for parallel search;
[0126] A constraint handling mechanism is set up to correct the parameters of particles that violate the constraints, rather than directly eliminating them.
[0127] Based on the aforementioned multi-constraint optimization model and improved particle swarm optimization algorithm, the globally optimal 24-hour charging and discharging strategy, hourly SOC change curve, and power operation curve can be output. Furthermore, a complete contribution analysis can be generated based on the amount, proportion, and intraday trend of four revenue sources: capacity compensation revenue, energy arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue.
[0128] In summary, the revenue calculation method for independent energy storage under a capacity compensation mechanism provided in this application constructs a three-layer capacity compensation calculation model that includes basic capacity compensation, effective available capacity assessment, and dynamic compensation coefficients. This model, for the first time, accurately quantifies capacity compensation revenue and incorporates it into a multi-source revenue calculation system, solving the problems of single revenue calculation dimensions and insufficient accuracy in capacity compensation calculations in traditional methods. The proposed multi-constraint optimization model coordinates the optimization of capacity compensation assessment constraints with other operational constraints and uses an improved particle swarm optimization algorithm to solve for the optimal charging and discharging strategy, effectively overcoming the defect of disconnect between revenue calculation and operational strategy in existing technologies. Furthermore, by considering battery health status and actual available capacity through the effective available capacity coefficient and linking the compensation amount to call performance and response quality through the dynamic compensation coefficient, the accuracy of revenue calculation and the practicality of strategy optimization are significantly improved. This provides comprehensive, accurate, and executable technical support for investment decisions and operation management of independent energy storage power stations under a capacity compensation mechanism.
[0129] like Figure 2 As shown, this application also provides a revenue calculation system for independent energy storage under a capacity compensation mechanism. This system can be deployed within an independent energy storage system to implement any step of the revenue calculation method for independent energy storage under the aforementioned capacity compensation mechanism and its optional embodiments. (Refer to...) Figure 2 As shown, the system includes a data acquisition module 210, a capacity compensation calculation module 220, a multi-source revenue calculation module 230, a strategy optimization module 240, and a result output module 250.
[0130] The data acquisition module 210 is used to collect operating parameters, electricity market price data, and capacity compensation policy parameters of the independent energy storage power station, and performs outlier detection, missing value filling, and normalization on the collected raw data. The capacity compensation calculation module 220 is used to construct a capacity compensation calculation model based on the capacity compensation policy parameters, which includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, and calculates the capacity compensation revenue through the capacity compensation calculation model. The multi-source revenue calculation module 230 is used to decompose the total revenue of independent energy storage into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue, and calculates each sub-item revenue separately and then sums them to obtain the comprehensive revenue. The strategy optimization module 240 is used to construct a multi-constraint optimization model with the maximization of comprehensive revenue as the optimization objective, and uses an improved particle swarm optimization algorithm to solve the optimal charging and discharging strategy of the independent energy storage power station. The result output module 250 is used to output the optimal operation scheme and the contribution analysis of each revenue source.
[0131] It should be understood that the systems or modules in the embodiments of this application can be implemented by software, for example, by computer programs or instructions having the above-described functions. The corresponding computer programs or instructions can be stored in the internal memory of the terminal, and the processor reads the corresponding computer programs or instructions from the memory to implement the above functions. Alternatively, the systems or modules in the embodiments of this application can also be implemented by hardware. Or, the systems or modules in the embodiments of this application can also be implemented by a combination of a processor and software modules.
[0132] It should be understood that the processing details of the system or module in the embodiments of this application can be found by referring to... Figure 1 The descriptions of the embodiments and related extended embodiments shown will not be repeated in this application.
[0133] Figure 3 This is a schematic structural diagram of a computing device 1000 provided in an embodiment of this application. This computing device can execute or implement various optional embodiments of the above-described methods. The computing device can be a terminal, or a chip or chip system within the terminal. Figure 3 As shown, the computing device 1000 includes: a processor 1010, a memory 1020, and a communication interface 1030.
[0134] It should be understood that Figure 3 The communication interface 1030 in the computing device 1000 shown can be used to communicate with other devices, and may specifically include one or more transceiver circuits or interface circuits.
[0135] The processor 1010 can be connected to the memory 1020. The memory 1020 can be used to store the program code and data. Therefore, the memory 1020 can be a storage unit inside the processor 1010, an external storage unit independent of the processor 1010, or a component that includes both the storage unit inside the processor 1010 and the external storage unit independent of the processor 1010.
[0136] Optionally, the computing device 1000 may also include a bus. The memory 1020 and communication interface 1030 can be connected to the processor 1010 via the bus. The bus can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 The symbol is represented by a line without an arrow, but this does not mean that there is only one bus or one type of bus.
[0137] It should be understood that in the embodiments of this application, the processor 1010 may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor. Alternatively, the processor 1010 may employ one or more integrated circuits to execute relevant programs to implement the technical solutions provided in the embodiments of this application.
[0138] The memory 1020 may include read-only memory and random access memory, and provides instructions and data to the processor 1010. A portion of the processor 1010 may also include non-volatile random access memory. For example, the processor 1010 may also store device type information.
[0139] When the computing device 1000 is running, the processor 1010 executes computer execution instructions stored in the memory 1020 to perform any of the operation steps of the above method and any of the optional embodiments thereof.
[0140] It should be understood that the computing device 1000 according to the embodiments of this application can correspond to the corresponding subject in executing the methods according to the various embodiments of this application, and the above and other operations and / or functions of each module in the computing device 1000 are respectively for implementing the corresponding processes of the methods of this embodiment. For the sake of brevity, they will not be described in detail here.
[0141] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.
[0142] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.
[0143] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or units may be electrical, mechanical, or other forms.
[0144] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0145] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.
[0146] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0147] This application also provides a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, is used to perform the above-described method, which includes at least one of the schemes described in the above embodiments.
[0148] The computer storage medium in this application embodiment can be any combination of one or more computer-readable media. A computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. For example, a computer-readable storage medium can be, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device.
[0149] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, carrying computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, capable of sending, propagating, or transmitting programs for use by or in connection with an instruction execution system, apparatus, or device.
[0150] The program code contained on a computer-readable medium may be transmitted using any suitable medium, including, but not limited to, wireless, wire, optical fiber, RF, etc., or any suitable combination thereof.
[0151] Computer program code for performing the operations of this application can be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, and C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or it can be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0152] Furthermore, the terms "first, second, third, etc." or similar terms such as module A, module B, and module C used in the specification and claims are only used to distinguish similar objects and do not represent a specific ordering of objects. It is understood that, where permissible, a specific order or sequence may be interchanged so that the embodiments of this application described herein can be implemented in an order other than that illustrated or described herein.
[0153] In the above description, the labels of the steps involved, such as S110, S120, etc., do not mean that the steps will necessarily be executed. The order of the steps can be interchanged or executed simultaneously if permitted.
[0154] The term "comprising" as used in the specification and claims should not be construed as limiting itself to what follows; it does not exclude other elements or steps. Therefore, it should be interpreted as specifying the presence of the mentioned feature, integral, step, or component, but does not exclude the presence or addition of one or more other features, integrals, steps, or components, or groups thereof. Thus, the statement "device comprising means A and B" should not be limited to a device consisting solely of components A and B.
[0155] The terms "an embodiment" or "an embodiment" as used in this specification mean that a particular feature, structure, or characteristic described in conjunction with that embodiment is included in at least one embodiment of this application. Therefore, the terms "in one embodiment" or "in an embodiment" appearing throughout this specification do not necessarily refer to the same embodiment, but may refer to the same embodiment. Furthermore, in one or more embodiments, the particular features, structures, or characteristics can be combined in any suitable manner, as will be apparent to those skilled in the art from this disclosure.
[0156] Note that the above are merely preferred embodiments and the technical principles employed in this application. Those skilled in the art will understand that this application is not limited to the specific embodiments described herein, and various obvious changes, readjustments, and substitutions can be made without departing from the scope of protection of this application. Therefore, although this application has been described in detail through the above embodiments, this application is not limited to the above embodiments, and may include many other equivalent embodiments without departing from the concept of this application, all of which fall within the scope of protection of this application.
Claims
1. A method for calculating the revenue of independent energy storage under a capacity compensation mechanism, characterized in that, include: The system collects operating parameters, electricity market price data, and capacity compensation policy parameters of independent energy storage power stations, and performs outlier detection, missing value filling, and normalization on the collected raw data. Based on the aforementioned capacity compensation policy parameters, a capacity compensation calculation model is constructed that includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient. The capacity compensation benefit is then calculated using this capacity compensation calculation model. The total revenue of independent energy storage is decomposed into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue, and peak shaving ancillary service revenue. The revenue of each sub-item is calculated separately and then summed to obtain the comprehensive revenue. A multi-constraint optimization model is constructed with the goal of maximizing comprehensive benefits. An improved particle swarm optimization algorithm is used to solve the optimal charging and discharging strategy of an independent energy storage power station, and the optimal operation scheme and contribution analysis of each source of benefits are output.
2. The method according to claim 1, characterized in that, The operating parameters of the independent energy storage power station include rated capacity, rated power, charging efficiency, discharging efficiency, real-time state of charge, and maximum number of battery cycles. The electricity market price data includes time-of-use pricing, frequency regulation market clearing prices, and peak-shaving service market prices. The capacity compensation policy parameters include the capacity compensation unit price, compensation period, available capacity assessment standards, and compensation coefficient adjustment rules.
3. The method according to claim 1, characterized in that, The calculation formula for the capacity compensation calculation model is as follows: ; in, For capacity compensation revenue, This refers to the rated capacity of the energy storage power station. The unit price is for capacity compensation. For the compensation period, The effective usable capacity factor. This is the dynamic capacity compensation coefficient.
4. The method according to claim 3, characterized in that, The effective available capacity coefficient The calculation method is as follows: ; in, For the width of the sliding window, This represents the actual usable capacity. The health status of the energy storage battery; The actual available capacity according to calculate, In a charged state, Preserve boundaries for discharge depth; The health status Based on cyclic aging model calculate, To accumulate the number of loops, The maximum number of loops. This is the aging index.
5. The method according to claim 3, characterized in that, The dynamic capacity compensation coefficient The calculation formula is as follows: The adjustment is dynamically made based on the actual usage of the energy storage power station, response time, and completion rate indicators. ; in, As the benchmark compensation coefficient, In order to invoke the incentive factor, To call the frequency function, In response to the penalty factor, In response to the timeout function, As a quality incentive factor, To call the quality scoring function.
6. The method according to claim 1, characterized in that, The revenue from electrical energy arbitrage, frequency regulation ancillary services, and peak shaving ancillary services are calculated using the following formulas: Electricity arbitrage profits: ,in, For discharge power, For the price of electricity, For charging power, For the price of electricity, For time step; FM ancillary service revenue: ,in, Quoting for frequency modulation capacity, To clear out prices in the FM market This is the frequency modulation performance rating coefficient; Peak shaving ancillary service revenue: ,in, To regulate peak power, For peak shaving service market prices; The formula for calculating the comprehensive income is as follows: ; in, For capacity compensation revenue.
7. The method according to claim 1, characterized in that, The calculation formula for the multi-constraint optimization model is as follows: ; in, For capacity compensation revenue, For arbitrage profits in electrical energy, For revenue from FM ancillary services, For revenue from peak shaving ancillary services; The constraints of this multi-constraint optimization model include: State of charge constraints: ; Power constraints: ,in, For charging and discharging power, This refers to the rated power of the energy storage power station; Charge and discharge mutual exclusion constraint: charging and discharging cannot occur simultaneously at the same time; Daily cycle constraint: ,in, The state of charge at the start of a single-day operating cycle. This represents the maximum permissible decrease in state of charge per day. The state of charge at the end of a single day's operating cycle; Capacity compensation assessment constraints: ,in, This represents the actual usable capacity. The minimum available capacity threshold for capacity compensation assessment.
8. The method according to claim 1, characterized in that, The improvements to the particle swarm optimization algorithm include: The position and velocity of the particles are mixed and encoded, and each particle corresponds to a complete 24-hour energy storage charging and discharging strategy. An adaptive inertia weighting factor is introduced to dynamically balance global search and local optimization capabilities based on the iteration process; A multimodal mutation strategy based on crowding is adopted to divide the particle swarm into multiple subgroups for parallel search; A constraint handling mechanism is set up to correct the parameters of particles that violate the constraints, rather than directly eliminating them.
9. The method according to claim 1, characterized in that, The contribution analysis of each revenue source includes the amount, proportion, and trend analysis of each revenue source.
10. A revenue calculation system for independent energy storage under a capacity compensation mechanism, characterized in that, include: The data acquisition module is used to collect operating parameters, electricity market price data, and capacity compensation policy parameters of independent energy storage power stations, and to perform outlier detection, missing value filling, and normalization on the collected raw data. The capacity compensation calculation module is used to construct a capacity compensation calculation model based on the capacity compensation policy parameters, which includes basic capacity compensation, effective available capacity assessment, and dynamic capacity compensation coefficient, and to calculate the capacity compensation benefits through the capacity compensation calculation model. The multi-source revenue calculation module is used to decompose the total revenue of independent energy storage into capacity compensation revenue, electricity arbitrage revenue, frequency regulation ancillary service revenue and peak shaving ancillary service revenue, and calculate each sub-item revenue separately and then sum them to obtain the comprehensive revenue. The strategy optimization module is used to construct a multi-constraint optimization model with the goal of maximizing comprehensive benefits, and to solve the optimal charging and discharging strategy of independent energy storage power stations using an improved particle swarm optimization algorithm. The results output module is used to output the optimal operating plan and the contribution analysis of each source of revenue.