Geophysical exploration reamer

By designing a fixed ring and a drainage fan blade in the geophysical survey reamer to inhale and filter dust smoke, the impact of dust smoke on health and drilling results during drilling survey is solved, and more accurate drilling operations are achieved.

CN221761816UActive Publication Date: 2024-09-242003 INST OF NUCLEAR IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420298232.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-19
Publication Date
2024-09-24
Estimated Expiration
2034-02-19

AI Technical Summary

Technical Problem

During the drilling and survey process, the smoke of rock dust in the geology affects the health of workers, blocks the drilling area, and affects the drilling effect.

Method used

A geophysical survey reamer is designed, including a drill pipe, a drill shaft and a drill bit. A fixed ring and a drainage fan blade are installed on the side wall of the drill shaft to form an airflow to suck the dust smoke into the second cavity and filter it through the dust interception net to reduce the smoke. diffusion.

Benefits of technology

It effectively reduces the health impact of dust smoke on workers, improves the visibility of the drilling area, and improves the drilling effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221761816U
    Figure CN221761816U
Patent Text Reader

Abstract

The utility model belongs to the technical field of reamers, and particularly relates to a geophysical prospecting reamer which comprises a drill rod, a drill spindle and a drill bit, the bottom end of the drill rod is detachably connected with a reaming pipe, the reaming pipe is provided with a first cavity and a second cavity, the drill spindle is installed on the inner wall of the first cavity, the side wall of the drill spindle is connected with a fixing ring in a sliding mode, and the fixing ring is connected with the drill bit. A plurality of drainage fan blades are fixedly connected to the side wall of the fixing ring, the positions of the drainage fan blades are evenly distributed, and a plurality of airflow through holes are formed in the reaming pipe; a plurality of drainage fan blades are driven by a fixing ring to rotate to form upward airflow, the airflow drives dust smoke to enter a second cavity to be stored, the amount of smoke diffused to the external environment is reduced, the influence on respiratory tract health of operators is reduced, dust smoke spread in an operation drilling area is reduced, and the working efficiency is improved. Therefore, shielding of dust and smoke on a drilling operation area is reduced, and accurate judgment of information such as drilling angles and positions by operators is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of hole expanders, and in particular relates to a hole expander for geophysical prospecting and exploration. Background Art

[0002] Engineering geophysical exploration is a physical exploration method to solve engineering geology and hydrogeology problems in civil engineering investigation. It is referred to as engineering geophysical exploration. By observing, analyzing and studying these physical fields and combining them with relevant geological data, geological structural problems related to engineering investigation can be determined.

[0003] When conducting geophysical prospecting, drilling and exploration techniques are often used. The reamer is an important tool in the field of exploration. Drilling in areas with complex geology exposes the internal structure of the geology, which makes it easier for personnel to observe the specific conditions of the geology in the borehole. For this study, the cylindrical reamer cooperates with the drill bit to cut the geology after drilling, so that a borehole is formed in the geology. However, when drilling the geology, hard components such as rocks in the geology form a large amount of dust and smoke that floats around, and the scattered dust particles can easily reach the mouth and nose of the operators, which has a great impact on the respiratory health of the operators. In addition, the spreading dust and smoke causes obstruction to the operating drilling area, affecting the operators' accurate judgment of information such as drilling angles and positions, thereby affecting the drilling effect. Utility Model Content

[0004] The utility model provides a geophysical prospecting reamer, which has the characteristics of solving the problem that dust and smoke during geological drilling and reaming affect the operation and endanger the health of surrounding workers.

[0005] The utility model provides the following technical solution: it includes a drill rod, a drill shaft and a drill bit, the bottom end of the drill rod is detachably connected with a reaming tube, the reaming tube is provided with a first cavity and a second cavity, the drill shaft is installed on the inner wall of the first cavity, the side wall of the drill shaft is slidably connected with a fixing ring, the side wall of the fixing ring is fixedly connected with a plurality of drainage blades, the positions of the plurality of drainage blades are evenly distributed, a plurality of air flow holes are provided in the reaming tube, the first cavity is connected with the internal space of the second cavity through the plurality of air flow holes, the side wall of the second cavity is provided with two dust interception nets, and the plurality of drainage blades are used to drive the airflow into the second cavity.

[0006] Among them, the side wall of the drill shaft is rotatably connected to an interception ring, and the side wall of the interception ring is fixedly connected to a plurality of stop rods, and the plurality of stop rods are not in contact with the inner wall of the first cavity. The interception ring is used to shield and protect the space below the fixed ring.

[0007] Wherein, a spring is fixedly connected to the top of the fixing ring, the spring is in contact with the inner wall of the top of the first cavity, and the spring is sleeved on the side wall of the drill shaft.

[0008] Among them, a connecting ring is arranged at the bottom end of the fixing ring, and the connecting ring is rotatably connected to the top end of the intercepting ring. Two connecting rods are fixedly connected between the fixing ring and the connecting ring, and the two connecting rods are symmetrically distributed.

[0009] Wherein, the side wall of the intercepting ring is provided with a reinforcement ring, and the reinforcement ring passes through the side walls of several of the gear levers, and several of the gear levers are slidably connected to the side wall of the reinforcement ring.

[0010] Among them, a plurality of sealing plates are hinged on the inner wall of the second cavity, and the plurality of sealing plates correspond to the positions of the plurality of air flow holes one by one, and a torsion spring is arranged between the plurality of sealing plates and the second cavity.

[0011] The beneficial effects of the utility model are as follows: a plurality of drainage blades are driven to rotate by a fixed ring to form an upward airflow, and the airflow drives the dust and smoke into the second cavity for storage, thereby reducing the amount of smoke diffusing to the external environment, thereby reducing the impact on the respiratory health of the operators, and reducing the spread of dust and smoke in the drilling area, thereby reducing the obstruction of the drilling area by dust and smoke, improving the operators' accurate judgment of information such as drilling angles and positions, and thereby improving the drilling effect.

[0012] The parts not involved in the device are the same as those in the prior art or can be implemented by using the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0014] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;

[0015] Figure 3 It is a three-dimensional enlarged structural diagram of the components such as the expansion tube, the fixed ring and the rotating ring in the utility model;

[0016] Figure 4 It is a schematic diagram of the structure of the utility model.

[0017] In the figure: 1. drill rod; 11. drill shaft; 12. drill bit; 2. expansion tube; 21. first cavity; 22. second cavity; 221. dust interception net; 23. air flow hole; 3. fixing ring; 31. drainage fan blade; 32. spring; 33. connecting ring; 34. connecting rod; 4. interception ring; 41. gear lever; 42. reinforcement ring; 5. sealing plate; 51. torsion spring. DETAILED DESCRIPTION

[0018] See also Figure 1-Figure 4The utility model provides the following technical solutions: including a drill rod 1, a drill shaft 11 and a drill bit 12, the bottom end of the drill rod 1 is detachably connected with a reaming tube 2, the reaming tube 2 is provided with a first cavity 21 and a second cavity 22, the drill shaft 11 is installed on the inner wall of the first cavity 21, the side wall of the drill shaft 11 is slidably connected with a fixing ring 3, the side wall of the fixing ring 3 is fixedly connected with a plurality of drainage blades 31, the positions of the plurality of drainage blades 31 are evenly distributed, a plurality of air flow holes 23 are provided in the reaming tube 2, the first cavity 21 is connected with the internal space of the second cavity 22 through the plurality of air flow holes 23, two dust interception nets 221 are installed on the side wall of the second cavity 22, and the plurality of drainage blades 31 are used to drive the airflow into the second cavity 22.

[0019] In this embodiment: the drill rod 1 supports and drives each component of the device, the drill rod 1 is installed at the bottom of the output end of the reamer rotation drive motor, the reaming tube 2 drives the drill shaft 11 to rotate, the drill shaft 11 drives the drill bit 12 to rotate, the drill bit 12 and the drill shaft 11 drill holes for geological survey, the reaming tube 2 rotates synchronously with the drill shaft 11 and the drill bit 12, the reaming tube 2 cooperates with the drill bit 12 to expand the geology, the drill shaft 11 drives the fixed ring 3 to rotate synchronously when rotating, the fixed ring 3 drives a plurality of drainage blades 31 to rotate, the first cavity 21 makes space for the drill shaft 11, the fixed ring 3 and a plurality of drainage blades 31, and a plurality of drainage blades 31 rotate to form an upward airflow, so that the drill bit 12 and the reaming tube 2 attract and extract the dust and smoke generated during geological drilling, and the airflow drives the dust and smoke to surge upward along the space of the first cavity 21, and then the powder The dusty airflow passes through a plurality of air flow holes 23 and enters the second cavity 22, where the two dust interception nets 221 in the second cavity 22 intercept and filter the dust smoke, and the gas is discharged from the second cavity 22, while the dust smoke is stored in the second cavity 22, so that the smoke generated by drilling can be concentrated in the second cavity 22, reducing the amount of smoke diffusing to the external environment, thereby reducing the impact on the respiratory health of the operators, and reducing the spread of dust smoke in the drilling area, thereby reducing the obstruction of the drilling area by dust smoke, and improving the operators' accurate judgment of information such as the drilling angle and position, thereby improving the drilling effect. There is no need to carry water to reduce dust, which reduces the physical exertion caused by carrying water. By opening the dust interception net 221, the dust inside the second cavity 22 can be easily discharged and cleaned, which is beneficial to subsequent use.

[0020] The side wall of the drill shaft 11 is rotatably connected to an interception ring 4, and the side wall of the interception ring 4 is fixedly connected to a plurality of gear rods 41, and the plurality of gear rods 41 do not contact the inner wall of the first cavity 21, and the interception ring 4 is used to shield and protect the space below the fixed ring 3; the interception ring 4 is located at the bottom of the fixed ring 3, and the interception ring 4 supports the plurality of gear rods 41, and the interception ring 4 drives the plurality of gear rods 41 to rotate and slide vertically on the side wall of the drill shaft 11, and the interception ring 4 and the plurality of gear rods 41 contact the top of the geology drilled inside the first cavity 21, and the interception ring 4 and the plurality of gear rods 41 shield the drilled geology blocks to prevent the blocks from contacting the fixed ring 3 and the drainage blades 31, and interfering with the rotation of the drainage blades 31, so that the drainage blades 31 can always form a certain spatial distance with the geology blocks above and below, which is convenient for the drainage blades 31 to guide the airflow.

[0021] A spring 32 is fixedly connected to the top of the fixing ring 3, and the spring 32 is in contact with the inner wall of the top of the first cavity 21. The spring 32 is sleeved on the side wall of the drill shaft 11; the spring 32 pushes the fixing ring 3 downward, so that the fixing ring 3 can push the intercepting ring 4. As the depth of the drilling and expansion hole increases, the cutting block pushes the fixing ring 3 upward through the intercepting ring 4, so that the fixing ring 3 can bring a number of drainage blades 31 to slide toward the second cavity 22, so as to meet the demand of gradually deepening the drilling.

[0022] A connecting ring 33 is provided at the bottom end of the fixing ring 3, and the connecting ring 33 is rotatably connected to the top of the intercepting ring 4. Two connecting rods 34 are fixedly connected between the fixing ring 3 and the connecting ring 33, and the two connecting rods 34 are symmetrically distributed. The fixing ring 3 is connected to the connecting rod 34 through the two connecting rings 33, and the connecting rod 34 is connected to the intercepting ring 4, so that the fixing ring 3 can always maintain a constant distance from the intercepting ring 4.

[0023] A reinforcement ring 42 is provided on the side wall of the interception ring 4, and the reinforcement ring 42 passes through the side walls of several guard rods 41, and several guard rods 41 are slidably connected to the side walls of the reinforcement ring 42; the reinforcement ring 42 connects several guard rods 41 together, strengthens the working strength of several guard rods 41, and the reinforcement ring 42 increases the range of interception of geological blocks by several guard rods 41.

[0024] A plurality of sealing plates 5 are hingedly connected to the inner wall of the second cavity 22, and the positions of the plurality of sealing plates 5 correspond to the plurality of air flow holes 23 one by one, and a torsion spring 51 is arranged between the plurality of sealing plates 5 and the second cavity 22; when the airflow passes through the air flow holes 23 from the first cavity 21 and enters the interior of the second cavity 22, the airflow pushes and flips the sealing plates 5 so that the air flow holes 23 can be opened; when the drill rod 1 is not working, the torsion spring 51 drives the sealing plates 5 to flip downward, and the sealing plates 5 block the top opening of the air flow holes 23, thereby preventing the dust inside the second cavity 22 from flowing back into the first cavity 21.

[0025] The working principle and use process of the utility model are as follows: when drilling and surveying the geology, the drill bit 12 contacts the geological surface and drills down, then the reaming tube 2 contacts the geological surface to carry out reaming work, the interception ring 4, a plurality of stop rods 41 and the reinforcement ring 42 contact the drilled geological block, as the reaming tube 2 and the drill shaft 11 are adjusted to the depth of the geology, the geology switches to push the interception ring 4 upward, the interception ring 4 pushes the fixed ring 3 to slide upward through the connecting rod 34 and the connecting ring 33, the drill shaft 11 drives the fixed ring 3 to rotate, the fixed ring 3 drives the plurality of drainage blades 31 to rotate, and the plurality of drainage blades 31 rotate to form an upward airflow, so that the drill bit 12 and the reaming tube 2 can remove the dust generated during geological drilling. The smoke is sucked and extracted, and the dust airflow passes through a plurality of air flow holes 23 into the second cavity 22, and the two dust interception nets 221 in the second cavity 22 intercept and filter the dust smoke, and the gas is discharged from the second cavity 22, and the dust smoke is stored in the second cavity 22, so that the smoke generated by drilling can be concentrated in the second cavity 22, reducing the amount of smoke diffusing to the external environment, thereby reducing the impact on the respiratory health of the operators, and reducing the spread of dust smoke in the drilling area, thereby reducing the obstruction of the drilling area by dust smoke, and improving the operators' accurate judgment of information such as drilling angles and positions, thereby improving the drilling effect.

Claims

1. A geophysical prospecting reamer, comprising a drill rod (1), a drill shaft (11) and a drill bit (12), Features: The bottom end of the drill rod (1) is detachably connected to a reaming tube (2), and a first cavity (21) and a second cavity (22) are provided on the reaming tube (2); the drill shaft (11) is mounted on the inner wall of the first cavity (21); a fixing ring (3) is slidably connected to the side wall of the drill shaft (11); a plurality of drainage blades (31) are fixedly connected to the side wall of the fixing ring (3); the plurality of drainage blades (31) are evenly distributed; a plurality of air flow holes (23) are provided in the reaming tube (2); the first cavity (21) is connected to the internal space of the second cavity (22) through the plurality of air flow holes (23); two dust interception nets (221) are installed on the side wall of the second cavity (22); and the plurality of drainage blades (31) are used to drive airflow into the second cavity (22).

2. A geophysical prospecting reamer according to claim 1, Features: The side wall of the drill shaft (11) is rotatably connected to an interception ring (4), and the side wall of the interception ring (4) is fixedly connected to a plurality of stop rods (41), and the plurality of stop rods (41) are not in contact with the inner wall of the first cavity (21). The interception ring (4) is used to shield and protect the space below the fixed ring (3).

3. A geophysical prospecting reamer according to claim 1, Features: A spring (32) is fixedly connected to the top of the fixing ring (3), the spring (32) is in contact with the inner wall of the top of the first cavity (21), and the spring (32) is sleeved on the side wall of the drill shaft (11).

4. A geophysical prospecting reamer according to claim 2, Features: A connecting ring (33) is provided at the bottom end of the fixing ring (3), and the connecting ring (33) is rotatably connected to the top end of the intercepting ring (4). Two connecting rods (34) are fixedly connected between the fixing ring (3) and the connecting ring (33), and the two connecting rods (34) are symmetrically distributed.

5. A geophysical prospecting reamer according to claim 4, Features: The side wall of the interception ring (4) is provided with a reinforcement ring (42), and the reinforcement ring (42) penetrates the side walls of a plurality of the shift rods (41), and the plurality of the shift rods (41) are slidably connected to the side wall of the reinforcement ring (42).

6. A geophysical prospecting reamer according to claim 1, Features: A plurality of sealing plates (5) are hingedly connected to the inner wall of the second cavity (22); the plurality of sealing plates (5) correspond to the plurality of air flow holes (23) in position one by one; and a torsion spring (51) is provided between the plurality of sealing plates (5) and the second cavity (22).