Derrick for petroleum drilling
By using a combined structure of concrete blocks, fixing screws and limiting bolts in the derrick for oil drilling, the problem of tilt and collapse of the existing derrick during long-term use is solved, and higher stability and earthquake resistance are achieved.
Patent Information
- Application Number
- CN202323530396.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2033-12-25
AI Technical Summary
Existing derricks used for oil drilling are prone to tilting and collapse due to environmental complexity during long-term use, and lack sufficient stability and earthquake resistance.
A derrick structure including a concrete block, fixed screw rod, load-bearing bottom plate, derrick body, disk, threaded ring and limit bolt is designed. Through the cooperation of the fixed screw rod and disk in the concrete block and the threaded ring, multiple limiters are combined. The connection of bolts enhances the supporting force and earthquake resistance of the derrick.
This design improves the stability and earthquake resistance of the derrick, making it safer and more reliable in the oil drilling environment and preventing collapse.
Smart Images

Figure CN221761827U
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of oil drilling, in particular to a derrick for oil drilling. Background Art
[0002] Oil and natural gas are buried in oil and gas layers tens to thousands of meters underground. To extract them, it is necessary to build an oil and gas channel between the ground and the underground oil and gas layers. This channel is a well. In order to open a wellbore that has been drilled, there is drilling fluid and mud cake in the well to protect the well wall. At this time, the well is called an open hole well. To extract oil and natural gas, in the process of oil and gas exploration and development, all wells drilled to obtain oil and gas from underground are collectively called oil wells.
[0003] In the process of drilling and extracting oil, it is necessary to use an oil drilling derrick. The existing derrick needs to be installed above the drilling well. Due to the complex environment in the oil extraction area, the derrick will be directly installed above the drilling well in the oil extraction area. There will be no accidents in the short term, but this makes the derrick prone to tilting in the subsequent long-term use, which may cause collapse when it is seriously tilted. Therefore, we propose an oil drilling derrick to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to overcome the deficiencies in the above-mentioned background technology and to propose a derrick for oil drilling.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A derrick for oil drilling comprises a concrete block, a plurality of fixing screws and a well pipe arranged on the top of the concrete block, a mounting groove is provided on the top of the concrete block, a load-bearing base plate is slidably connected to the inner wall of the mounting groove, a derrick body is fixedly connected to the top of the load-bearing base plate, a disc is fixedly connected to the bottom of the fixing screw, the fixing screw and the disc are both located inside the concrete block, a plurality of through holes are provided on the top of the load-bearing base plate, a threaded ring is threadedly sleeved on the outer wall of the fixing screw, the threaded ring and the load-bearing base plate are connected by a plurality of limiting bolts, and a plurality of limiting ring grooves are provided on the outer wall of the fixing screw.
[0007] Preferably, the disc and the fixing screw are connected via a plurality of reinforcing plates.
[0008] Preferably, a plurality of threaded holes are provided on the top of the load-bearing base plate, and the limiting bolts penetrate the bottom of the threaded ring and are threadedly connected to the inner side walls of the threaded holes.
[0009] Preferably, the distances between the plurality of fixing screws and the well pipe are the same.
[0010] Preferably, a plurality of the limiting bolts are distributed in a circular array on the top of the threaded ring.
[0011] Preferably, the fixing screw and the disc are coaxially arranged.
[0012] The beneficial effects of the utility model are:
[0013] Under the interaction of concrete blocks, fixing screws, load-bearing base plates, derrick bodies, discs, threaded rings and limit bolts, the concrete blocks can provide more stable and strong supporting force for the load-bearing base plates and the derrick bodies thereon. The fixing screws and discs located in the concrete blocks, together with the threaded rings, can fix the load-bearing base plates and the derrick bodies on the concrete blocks. Multiple limit bolts can prevent the threaded rings from loosening, thereby making the derrick bodies more solid, more earthquake-resistant and safer. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the structure of a derrick for oil drilling proposed by the utility model;
[0015] Figure 2 This is a top view of a load-bearing bottom plate in a derrick for oil drilling proposed by the utility model;
[0016] Figure 3 The utility model is a top view of a fixing screw in a derrick for oil drilling.
[0017] In the figure: 1. concrete block; 2. well pipe; 3. mounting groove; 4. load-bearing bottom plate; 5. derrick body; 6. fixing screw; 7. disc; 8. threaded ring; 9. limit bolt; 10. limit ring groove; 11. reinforcement plate. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0019] Reference Figure 1-3 , a derrick for oil drilling, comprising a concrete block 1 and a plurality of fixing screws 6 and a well pipe 2 arranged on the top of the concrete block 1, a steel cage for increasing the supporting force and stability is arranged inside the concrete block 1, and the concrete block 1 is formed by pouring and solidifying concrete;
[0020] A mounting groove 3 is provided on the top of the concrete block 1, a load-bearing bottom plate 4 is slidably connected to the inner wall of the mounting groove 3, a derrick body 5 is fixedly connected to the top of the load-bearing bottom plate 4, a disc 7 is fixedly connected to the bottom of the fixing screw 6, the disc 7 and the fixing screw 6 are connected by a plurality of reinforcing plates 11, and the distances between the plurality of fixing screws 6 and the well pipe 2 are the same;
[0021] The fixing screw 6 and the disc 7 are both located inside the concrete block 1. A plurality of through holes are provided on the top of the load-bearing bottom plate 4. A threaded ring 8 is threadedly sleeved on the outer wall of the fixing screw 6. The fixing screw 6 and the disc 7 are coaxially arranged. The threaded ring 8 and the load-bearing bottom plate 4 are connected by a plurality of limit bolts 9. The plurality of limit bolts 9 are distributed in a ring array on the top of the threaded ring 8.
[0022] A plurality of threaded holes are provided on the top of the load-bearing base plate 4, and a limiting bolt 9 passes through the bottom of the threaded ring 8 and is threadedly connected to the inner wall of the threaded hole. A plurality of limiting ring grooves 10 are provided on the outer wall of the fixing screw 6. The limiting ring grooves 10 can increase the friction between the fixing screw 6 and the concrete block 1, thereby allowing the fixing screw 6 to be more firmly located in the concrete block 1.
[0023] Working principle: When installing the derrick body 5, it is necessary to dig a reserved pit around the well pipe 2 in advance, install the braided steel cage in the reserved pit, fix the disc 7 and the fixing screw 6 in the steel cage, and inject concrete into the reserved pit. The concrete will cover the steel cage and the disc 7, and the concrete will also cover most of the fixing screw 6 and the well pipe 2. At this time, the position of the device is as follows: Figure 1 As shown;
[0024] A mounting groove 3 is reserved at the top of the concrete block 1 for installing the load-bearing base plate 4. The load-bearing base plate 4 is hoisted into the mounting groove 3. The fixing screw 6 passes through the through hole, and workers use the threaded ring 8 to screw on the fixing screw 6 until the bottom of the threaded ring 8 and the top of the load-bearing base plate 4 are in close contact. Then use multiple limit bolts 9 to fix the threaded ring 8 and the load-bearing base plate 4 together until all the threaded rings 8 are fixed, and the derrick body 5 can be fixed on the load-bearing base plate 4.
[0025] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A derrick for oil drilling, comprising a concrete block (1), a plurality of fixing screws (6), and a well pipe (2) arranged on the top of the concrete block (1), characterized in that: The concrete block (1) is provided with a mounting groove (3) at the top, the inner wall of the mounting groove (3) is slidably connected to a load-bearing base plate (4), the top of the load-bearing base plate (4) is fixedly connected to a derrick body (5), the bottom of the fixing screw (6) is fixedly connected to a disc (7), the fixing screw (6) and the disc (7) are both located inside the concrete block (1), a plurality of through holes are provided at the top of the load-bearing base plate (4), a threaded ring (8) is threadedly sleeved on the outer wall of the fixing screw (6), the threaded ring (8) and the load-bearing base plate (4) are connected via a plurality of limiting bolts (9), and a plurality of limiting ring grooves (10) are provided on the outer wall of the fixing screw (6).
2. A derrick for oil drilling according to claim 1, characterized in that: The disc (7) and the fixed screw rod (6) are connected via a plurality of reinforcing plates (11).
3. The oil drilling derrick according to claim 1, characterized in that: A plurality of threaded holes are provided on the top of the load-bearing base plate (4), and the limiting bolts (9) penetrate the bottom of the threaded ring (8) and are threadedly connected to the inner side walls of the threaded holes.
4. The oil drilling derrick according to claim 1, characterized in that: The distances between the plurality of fixing screw rods (6) and the well pipe (2) are the same.
5. The oil drilling derrick according to claim 1, characterized in that: The plurality of limit bolts (9) are distributed in a ring array on the top of the threaded ring (8).
6. The oil drilling derrick according to claim 1, characterized in that: The fixing screw rod (6) and the disc (7) are coaxially arranged.
