Building engineering waste collecting structure
By introducing a smoke filter and dust pump system into the construction waste treatment equipment, combined with the design of the crushing bin and crushing roller, the problem of smoke diffusion is solved, the crushing efficiency is improved, and gravel splashing is prevented, achieving effective dust treatment and Protection of worker health.
Patent Information
- Application Number
- CN202323381380.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-12
AI Technical Summary
Existing construction waste treatment equipment produces a large amount of smoke and dust during the crushing process, causing air pollution and health hazards to workers. There is a lack of effective smoke and dust treatment measures.
A construction waste collection structure is designed, including a smoke filter, dust pump, crushing bin and crushing roller. The dust is captured through the smoke filter and dust pump system, and the crushing bin and crushing roller are used for effective crushing, combined with buffering. Plates and springs prevent gravel from flying around.
It effectively captures and filters dust generated during waste processing to prevent environmental pollution and workers' health hazards. It also improves the crushing efficiency of waste and prevents injuries from splashing gravel.
Smart Images

Figure CN221789417U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction waste treatment, in particular to a construction engineering waste collection structure. Background Art
[0002] Construction waste refers to the general term for slag, waste concrete, waste bricks and stones and other wastes generated during people's production activities in the construction industry such as demolition, construction, decoration and repair. Construction waste can be divided into slag, concrete blocks, crushed stones, waste plastics, waste bamboo and wood, etc. These materials are of no help to the building itself, but they are substances generated in the process of construction and need to be processed accordingly. There is an existing construction waste collection and processing equipment for civil engineering (Announcement No.: CN216025133U), wherein: "By providing a second motor, the second motor drives a second crushing roller to rotate. Under the action of the belt and the gear, the rotation directions of the first crushing roller and the second crushing roller are relative, that is, during crushing, an extrusion effect can be produced on the waste. The second crushing roller above performs a pre-crushing on the large pieces of waste, and the first crushing roller below performs a secondary crushing on the waste, with good crushing effect, high efficiency, and not easy to be blocked." However, when crushing construction waste, a large amount of smoke and dust will be generated. The existing collection and processing equipment lacks the processing of smoke and dust, causing the smoke and dust to spread into the air, which will not only cause air pollution, but also endanger the health of workers. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] In view of the deficiencies in the prior art, the utility model provides a construction waste collection structure, which has the advantages of being able to quickly and effectively process dust generated during waste collection and processing, avoid leakage and spread of dust, avoid environmental pollution and maintain the health of workers, and solve the problems raised in the above-mentioned background technology.
[0005] (II) Technical solution
[0006] To achieve the above-mentioned purpose, the following technical scheme is provided: a construction waste collection structure, comprising a base, a collecting box is fixedly installed on the upper part of the base, a discharge port is arranged at the lower part of the collecting box, a feed port is arranged at the upper part of the collecting box, a first crushing bin is arranged on the upper layer inside the collecting box, a second crushing bin is arranged on the lower layer inside the collecting box, a smoke filter is fixedly installed on the side of the collecting box, a dust pump is fixedly installed on the side of the collecting box, an air intake pipe is connected to the lower part of the dust pump, a four-way pipe is installed on the upper part of the dust pump, the three connecting ports of the four-way pipe are all equipped with the first dust pipe, the front and rear outer sides of the collecting box and the outer side of the feed port are all equipped with the second dust pipe, and the inner wall of the first crushing bin, the inner wall of the second crushing bin and the inner wall of the feed port are all equipped with hollow dust extraction plates.
[0007] Preferably, the lower end of the air inlet pipe is interconnected with the smoke filter, the first dust extraction pipe is connected with the second dust extraction pipe, the hollow dust extraction plate is connected with the second dust extraction pipe, and a partition net is arranged on the outer side of the dust extraction plate.
[0008] Preferably, a first crushing roller is movably installed inside the first crushing bin, a first crushing motor is installed outside the collecting box, the output end of the first crushing motor is fixedly connected to the right end of the first crushing roller, a second crushing roller is movably installed inside the second crushing bin, a second crushing motor is fixedly installed outside the collecting box, and the output end of the second crushing motor is fixedly connected to the right end of the second crushing roller.
[0009] Preferably, a buffer plate is movably mounted on the inner wall of the discharge port, and a plurality of buffer springs are fixedly mounted on the inner wall of the discharge port, and the upper ends of the plurality of buffer springs are fixedly connected to the lower portion of the buffer plate.
[0010] Preferably, a discharge channel is fixedly installed on the upper part of the base, and the discharge channel is arranged at the lower part of the discharge port, and the discharge channel is an inclined surface.
[0011] (III) Beneficial effects
[0012] Compared with the prior art, the utility model provides a construction waste collection structure, which has the following beneficial effects:
[0013] 1. The construction waste collection structure can quickly and effectively process the dust generated during waste collection and processing through the coordinated arrangement of a smoke filter, a dust pump, an air inlet pipe, a first dust extraction pipe, a second dust extraction pipe, and a hollow dust extraction plate, thereby avoiding the leakage and spread of dust, avoiding environmental pollution, and maintaining the health of workers.
[0014] 2. The construction waste collection structure can fully crush the waste and improve the crushing efficiency through the arrangement of the first crushing bin, the first crushing roller, the first crushing motor, the second crushing bin, the second crushing roller and the second crushing motor.
[0015] 3. The construction waste collection structure can avoid splashing of gravel when it falls and avoid hurting workers by setting up buffer plates, buffer springs and discharge ramps. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the internal cross-sectional structure of the utility model;
[0018] Figure 3 It is a schematic diagram of the side structure of the utility model.
[0019] In the figure: 1. base; 2. collecting box; 3. discharge port; 4. first crushing chamber; 5. smoke filter; 6. dust pump; 7. air inlet pipe; 8. first dust extraction pipe; 9. second dust extraction pipe; 10. hollow dust extraction plate; 11. second crushing chamber; 12. feed port; 13. first crushing roller; 14. first crushing motor; 15. second crushing roller; 16. second crushing motor; 17. buffer plate; 18. buffer spring; 19. discharge ramp. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments, not all of the embodiments. Based on the embodiments in the embodiments, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection.
[0021] Embodiment 1:
[0022] See also Figure 1-3 A construction waste collection structure comprises a base 1, a collecting box 2 is fixedly installed on the upper part of the base 1, a discharge port 3 is arranged at the lower part of the collecting box 2, a feed port 12 is arranged at the upper part of the collecting box 2, a first crushing bin 4 is arranged on the upper layer inside the collecting box 2, a second crushing bin 11 is arranged on the lower layer inside the collecting box 2, a smoke filter 5 is fixedly installed on the side of the collecting box 2, a dust pump 6 is fixedly installed on the side of the collecting box 2, an air intake pipe 7 is connected to the lower part of the dust pump 6, a four-way pipe is installed on the upper part of the dust pump 6, and a first dust pipe 8 is installed on the three connecting ports of the four-way pipe, a second dust pipe 9 is installed on the front and rear outer sides of the collecting box 2 and the outer side of the feed port 12, and a hollow dust plate 10 is arranged on the inner wall of the first crushing bin 4, the inner wall of the second crushing bin 11 and the inner wall of the feed port 12.
[0023] The lower end of the air inlet pipe 7 is interconnected with the smoke filter 5 , the first dust extraction pipe 8 is connected with the second dust extraction pipe 9 , the hollow dust extraction plate 10 is interconnected with the second dust extraction pipe 9 , and a partition net is arranged on the outer side of the hollow dust extraction plate 10 .
[0024] Working principle: waste materials on the construction site are thrown into the first crushing bin 4 from the feed port 12 for waste crushing. After being crushed by the first crushing bin 4 and the second crushing bin 11, the waste materials are fully crushed. Then, while being crushed, the dust extraction pump 6 is started. Through the connection of the first dust extraction pipe 8 and the second dust extraction pipe 9, the hollow dust extraction plate 10 inside the collection box begins to suck the dust generated by the crushing. The dust extraction plates are respectively arranged in the first crushing bin 4, the second crushing bin 11 and the feed port 12. The dust can be sucked immediately after it is generated. The partition net can prevent the gravel from entering the hollow dust extraction plate 10. The sucked dust enters the smoke filter 5 through the air inlet pipe 7, and the smoke filter 5 filters the dust, thereby achieving the goal of quickly and effectively processing the dust generated during the waste collection and processing, avoiding the leakage and spread of dust, avoiding environmental pollution and maintaining the health of workers.
[0025] Embodiment 2:
[0026] See also Figure 1-3 A first crushing roller 13 is movably installed inside the first crushing bin 4, a first crushing motor 14 is installed on the outside of the collecting box 2, and the output end of the first crushing motor 14 is fixedly connected to the right end of the first crushing roller 13; a second crushing roller 15 is movably installed inside the second crushing bin 11, a second crushing motor 16 is fixedly installed on the outside of the collecting box 2, and the output end of the second crushing motor 16 is fixedly connected to the right end of the second crushing roller 15.
[0027] Working principle: The first crushing motor 14 drives the first crushing roller 13 to rotate, and the waste is crushed for the first time. Then the second crushing motor 16 drives the second crushing roller 15 to rotate, and the waste is crushed for the second time, thereby achieving full crushing of the waste and improving the crushing efficiency.
[0028] Embodiment 3:
[0029] See also Figure 1-3 A buffer plate 17 is movably mounted on the inner wall of the discharge port 3 , and a plurality of buffer springs 18 are fixedly mounted on the inner wall of the discharge port 3 . The upper ends of the plurality of buffer springs 18 are fixedly connected to the lower portion of the buffer plate 17 .
[0030] A discharge channel 19 is fixedly installed on the upper part of the base 1. The discharge channel 19 is arranged at the lower part of the discharge port 3. The discharge channel 19 is an inclined surface.
[0031] Working principle: The crushed gravel will fall downwards, and a buffer plate 17 is provided at the discharge port 3. Under the action of the buffer spring 18, the falling gravel can be buffered, and the gravel will fall into the discharge channel, and then the crushed waste will be placed in the designated position, thereby avoiding splashing when the gravel falls and avoiding injury to workers.
[0032] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit thereof, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A construction waste collection structure, comprising a base (1), Features: A collecting box (2) is fixedly mounted on the upper part of the base (1), a discharge port (3) is arranged at the lower part of the collecting box (2), a feed port (12) is arranged at the upper part of the collecting box (2), a first crushing bin (4) is arranged at the upper layer inside the collecting box (2), a second crushing bin (11) is arranged at the lower layer inside the collecting box (2), a smoke filter (5) is fixedly mounted on the side of the collecting box (2), and a dust filter (6) is fixedly mounted on the side of the collecting box (2). A dust extraction pump (6) is provided, the lower part of the dust extraction pump (6) is connected to an air intake pipe (7), the upper part of the dust extraction pump (6) is provided with a four-way pipe, the three connecting ports of the four-way pipe are provided with a first dust extraction pipe (8), the front and rear outer sides of the collection box (2) and the outer side of the feed port (12) are provided with a second dust extraction pipe (9), and the inner wall of the first crushing bin (4), the inner wall of the second crushing bin (11) and the inner wall of the feed port (12) are provided with a hollow dust extraction plate (10).
2. A construction waste collection structure according to claim 1, Features: The lower end of the air inlet pipe (7) is interconnected with the smoke filter (5), the first dust extraction pipe (8) is interconnected with the second dust extraction pipe (9), the hollow dust extraction plate (10) is interconnected with the second dust extraction pipe (9), and a partition net is arranged on the outer side of the hollow dust extraction plate (10).
3. A construction waste collection structure according to claim 1, Features: A first crushing roller (13) is movably mounted inside the first crushing bin (4), a first crushing motor (14) is mounted on the outside of the collecting box (2), an output end of the first crushing motor (14) is fixedly connected to the right end of the first crushing roller (13), a second crushing roller (15) is movably mounted inside the second crushing bin (11), a second crushing motor (16) is fixedly mounted on the outside of the collecting box (2), an output end of the second crushing motor (16) is fixedly connected to the right end of the second crushing roller (15).
4. A construction waste collection structure according to claim 1, Features: A buffer plate (17) is movably mounted on the inner wall of the discharge port (3), and a plurality of buffer springs (18) are fixedly mounted on the inner wall of the discharge port (3), wherein the upper ends of the plurality of buffer springs (18) are fixedly connected to the lower part of the buffer plate (17).
5. A construction waste collection structure according to claim 1, Features: A discharge channel (19) is fixedly mounted on the upper portion of the base (1), and the discharge channel (19) is arranged at the lower portion of the discharge port (3), and the discharge channel (19) is an inclined surface.