Pile foundation fixing device for civil engineering
By designing a pile foundation fixing device that includes a base plate, a suspension frame and a transmission mechanism, the problems of stability and unloading time during the transportation of prefabricated pile foundations are solved, the stable fixation and rapid unloading of the pile foundations are achieved, and the construction efficiency is improved.
Patent Information
- Application Number
- CN202420158576.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-23
AI Technical Summary
In the existing technology, prefabricated pile foundations are easily damaged during transportation, and because they need to be placed vertically and tied with multiple ropes, time is wasted in unloading and unloading, which affects construction efficiency.
A pile foundation fixing device including a base plate, a suspension frame, a rotating cavity, a double-headed screw, a transmission mechanism and a clamping plate is designed. Synchronous operation is achieved through the rotating shaft and transmission mechanism, and the clamping plate and rubber pad are used for stable fixation. It adapts to a variety of pile foundation sizes and achieves quick fixing and unfixing through fastening bolts and power units.
It improves the stability and scope of application of pile foundations during transportation, simplifies the unloading process, reduces loading and unloading time, and reduces the risk of damage.
Smart Images

Figure CN221795437U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fixing, in particular to a pile foundation fixing device for civil engineering. Background Art
[0002] Civil engineering is a general term for the science and technology of building various land engineering facilities. Pile foundations are usually used for reinforcement and construction during the construction process. Pile foundations are composed of foundation piles and caps connected to the top of the piles. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation. If the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. Building pile foundations are usually low cap pile foundations. Existing high-requirement construction usually uses prefabricated piles for construction strength. Prefabricated piles need to be transported to the construction site after production.
[0003] Transportation needs to be achieved with the help of a transport vehicle. Generally, the pile foundations are stacked. The pile foundation at the bottom of the stack bears a larger load and is easily damaged during transportation, resulting in economic losses. Therefore, in the prior art, it is often changed to a vertical method. If it is placed vertically, it is generally tied and fixed with ropes. When the ropes are tied and fixed, in order to ensure stability, multiple ropes will be tied, which will affect the subsequent untying and unloading, and waste more loading and unloading time. In order to deal with the above problems, a pile foundation fixing device for civil engineering is proposed. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a pile foundation fixing device for civil engineering.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A pile foundation fixing device for civil engineering comprises a base plate, a plurality of hanging brackets are fixedly provided on the upper end surface of the base plate, a plurality of circular holes are provided on the upper end surface of the base plate, a plurality of rotating cavities connected with the circular holes are provided inside the base plate, a rotating shaft and a double-headed screw are rotatably provided in each of the rotating cavities, the rotating shaft is connected to the double-headed screw through a rotating mechanism, movable plates are threadedly installed on the outer walls at both ends of the double-headed screw, a clamping plate is installed on the end of the movable plate, and the rotating shaft located in the middle is connected to the other two rotating shafts through a transmission mechanism.
[0007] Preferably, the rotating mechanism comprises a driving gear arranged on the outer wall of the rotating shaft, and a transmission gear is installed in the middle position of the double-headed screw, and the transmission gear is meshed with the driving gear.
[0008] Preferably, the transmission mechanism comprises a double-layer pulley arranged on the middle rotating shaft, and the other two rotating shafts are each provided with a transmission pulley, and the double-layer pulley is connected to the double-layer pulley via a connecting belt.
[0009] Preferably, the clamping plate is located in the circular hole, the clamping plate is designed to be arc-shaped, a rubber pad is provided on the surface of the clamping plate in contact with the pile foundation, and the surface of the rubber pad is provided with anti-slip grooves.
[0010] Preferably, the suspension bracket is U-shaped, and fastening bolts are installed on the suspension bracket.
[0011] Preferably, a support plate is fixedly provided in the rotating chamber, the double-headed screw is rotatably connected to the support plate, and the upper and lower end surfaces of the movable plate are in sliding contact with the upper and lower inner walls of the rotating chamber.
[0012] Beneficial effects of the utility model:
[0013] 1. By setting up components such as a bottom plate, a hanging frame, fastening bolts, a double-headed screw, a movable plate and a clamping plate, the above components are used together to be stably placed in the cargo box of the transport vehicle, and the pile foundation is clamped and fixed in the circular hole for a long time, and can adapt to pile foundations of various thicknesses within a certain range, thereby ensuring its stability during transportation and also ensuring the scope of application of the device.
[0014] 2. By setting a rotating shaft, a double-layer pulley, a transmission pulley, a connecting belt, a driving gear and a transmission gear, and by virtue of the cooperation of the above components, this scheme only needs to set up one power device to realize the synchronous operation of all components, thereby ensuring the linkage of the device and enhancing the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a structural schematic diagram of a pile foundation fixing device for civil engineering proposed by the utility model;
[0016] Figure 2 for Figure 1 Schematic diagram of the cross-sectional structure;
[0017] Figure 3 for Figure 2 Schematic diagram of the structure of some components.
[0018] In the figure: 1 bottom plate, 2 round hole, 3 clamping plate, 4 hanging frame, 5 fastening bolt, 6 rotating chamber, 7 rotating shaft, 8 double-layer pulley, 9 driving pulley, 10 connecting belt, 11 double-headed screw, 12 driving gear, 13 driving gear, 14 moving plate. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0020] Reference Figure 1-3A pile foundation fixing device for civil engineering includes a base plate 1, a plurality of hanging frames 4 are fixedly provided on the upper end surface of the base plate 1, a plurality of circular holes 2 are provided on the upper end surface of the base plate 1, a plurality of rotating chambers 6 connected with the circular holes 2 are provided inside the base plate 1, a rotating shaft 7 and a double-headed screw 11 are rotatably provided in each rotating chamber 6, the rotating shaft 7 is connected to the double-headed screw 11 through a rotating mechanism, the outer walls at both ends of the double-headed screw 11 are threadedly installed with moving plates 14, the ends of the moving plates 14 are installed with clamping plates 3, and the rotating shaft 7 in the middle is connected to the other two rotating shafts 7 through a transmission mechanism.
[0021] The rotating mechanism includes a driving gear 13 arranged on the outer wall of the rotating shaft 7, and a transmission gear 12 is installed in the middle position of the double-headed screw 11. The transmission gear 12 is meshed with the driving gear 13. With the help of the above-mentioned driving gear 13 and transmission gear 12, multiple double-headed screws 11 can be driven to rotate synchronously when the rotating shaft 7 rotates.
[0022] The transmission mechanism includes a double-layer pulley 8 arranged on the middle rotating shaft 7, and the other two rotating shafts 7 are each provided with a transmission pulley 9. The double-layer pulley 8 is connected to the double-layer pulley 8 through a connecting belt 10. With the help of the above-mentioned double-layer pulley 8 and the transmission pulley 9, the synchronous rotation of the other two rotating shafts 7 can be achieved when the middle rotating shaft 7 rotates.
[0023] The clamping plate 3 is located in the circular hole 2. The clamping plate 3 is designed to be arc-shaped. A rubber pad is provided on the surface of the clamping plate 3 that contacts the pile foundation. The surface of the rubber pad is provided with anti-skid patterns. A pile foundation is vertically placed between every two clamping plates 3. The clamping and fixing operation of the pile foundation is achieved with the help of the clamping plate 3. The rubber pad with anti-skid patterns not only plays a protective role to avoid damage to the outer wall of the pile foundation, but also provides anti-skid function to ensure stability during clamping.
[0024] The suspension bracket 4 is U-shaped, with fastening bolts 5 installed on the suspension bracket 4. Threaded holes corresponding to the fastening bolts 5 are provided on the outer wall of the truck bed. The fastening bolts 5 and the threaded holes are used to fix the suspension bracket 4 on the truck bed, thereby ensuring the stability of components such as the bottom plate 1 when placed in the truck bed.
[0025] A support plate is fixedly provided in the rotating chamber 6, and the double-headed screw 11 is rotatably connected to the support plate. The upper and lower end surfaces of the movable plate 14 are in sliding contact with the upper and lower inner walls of the rotating chamber 6. The above-mentioned design scheme ensures that the double-headed screw 11 rotates stably in the rotating chamber 6, and realizes the limiting of the movable plate 14, thereby preventing the movable plate 14 from rotating together with the double-headed screw 11.
[0026] When the utility model is used, the suspension frame 4 is hung on the truck bed, and the fastening bolts 5 are screwed into the threaded holes on the outer wall of the truck bed to achieve a stable connection between the suspension frame 4 and the truck bed, the bottom plate 1 is stably placed in the truck bed, the pile foundation is vertically placed in the circular hole 2, and the outer wall of the bottom plate 1 is provided with a power device (not shown in the figure) connected to a middle rotating shaft 7. After the power device is started, it drives the middle rotating shaft 7 to rotate, and the rotating shaft 7 can drive the other two rotating shafts 7 to rotate with the help of a double-layer pulley 8, a transmission pulley 9 and a connecting belt 10. The rotation of the three rotating shafts 7 can drive the double-headed screw 11 to rotate with the help of a driving gear 13 and a transmission gear 12. When the double-headed screw 11 rotates, the movable plate 14 on its outer wall can drive the clamping plate 3 to move, and the two clamping plates 3 in each circular hole 2 move close to each other, and finally the impact clamping and fixing operation is realized, thereby ensuring its stability in the truck bed.
[0027] When unloading after reaching the destination, the power device can be reversed to move the clamping plate 3 away, thereby contacting the clamping and fixing of the above-mentioned pile foundation, thereby facilitating the unloading operation of the pile foundation.
[0028] After the fastening bolts 5 are unscrewed, the suspension frame 4 can drive the bottom plate 1 and other components to be separated from the truck bed, and after being disassembled, it will not affect the transportation of other equipment components by the transport vehicle.
[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pile foundation fixing device for civil engineering, comprising a base plate (1), characterized in that: A plurality of hanging frames (4) are fixedly provided on the upper end surface of the base plate (1), a plurality of circular holes (2) are provided on the upper end surface of the base plate (1), a plurality of rotating chambers (6) connected to the circular holes (2) are provided inside the base plate (1), a rotating shaft (7) and a double-headed screw (11) are rotatably provided in each of the rotating chambers (6), the rotating shaft (7) is connected to the double-headed screw (11) through a rotating mechanism, movable plates (14) are threadedly installed on the outer walls at both ends of the double-headed screw (11), a clamping plate (3) is installed at the end of the movable plate (14), and the rotating shaft (7) located in the middle is connected to the other two rotating shafts (7) through a transmission mechanism.
2. A pile foundation fixing device for civil engineering according to claim 1, characterized in that: The rotating mechanism comprises a driving gear (13) arranged on the outer wall of the rotating shaft (7), and a transmission gear (12) is installed in the middle position of the double-headed screw (11), and the transmission gear (12) is meshed with the driving gear (13).
3. A pile foundation fixing device for civil engineering according to claim 2, characterized in that: The transmission mechanism comprises a double-layer pulley (8) arranged on the middle rotating shaft (7), and the other two rotating shafts (7) are each provided with a transmission pulley (9), and the double-layer pulley (8) is connected to the double-layer pulley (8) via a connecting belt (10).
4. A pile foundation fixing device for civil engineering according to claim 3, characterized in that: The clamping plate (3) is located in the circular hole (2); the clamping plate (3) is designed to be arc-shaped; a rubber pad is provided on the surface of the clamping plate (3) in contact with the pile foundation; and anti-slip grooves are provided on the surface of the rubber pad.
5. A pile foundation fixing device for civil engineering according to claim 4, characterized in that: The suspension frame (4) is designed to be U-shaped, and a fastening bolt (5) is installed on the suspension frame (4).
6. A pile foundation fixing device for civil engineering according to claim 5, characterized in that: A support plate is fixedly provided in the rotating chamber (6), the double-headed screw (11) is rotatably connected to the support plate, and the upper and lower end surfaces of the movable plate (14) are in sliding contact with the upper and lower inner walls of the rotating chamber (6).
