Consolidation type pier-beam connecting structure suitable for steel-concrete composite beam bridge

The concrete-filled steel tube piers and the steel-concrete composite beam system are consolidated and combined with the steel structure beam system to form a steel-concrete composite structure, which solves the problems of low overall stress performance and material conservation of steel-concrete composite bridges in the existing technology, and realizes It provides an efficient and safe bridge structure and improves the overall seismic performance and landscape effect of the bridge.

CN221798126UActive Publication Date: 2024-10-01林同棪国际工程咨询(中国)有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323258326.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-30
Publication Date
2024-10-01
Estimated Expiration
2033-11-30

AI Technical Summary

Technical Problem

The existing steel-concrete composite bridge adopts the structural form of cap beam + bearing. The overall mechanical performance is not high, the materials are not saved, the scale of the bridge is increased, the maintenance cost is high, the durability is poor, the space under the bridge is large, the construction period and quality are poor It is difficult to control, the degree of industrial construction is low, and the landscape effect is poor.

Method used

The concrete-filled steel tube piers and the steel-concrete composite beam system are consolidated into one body, combined with the steel structure beam system, and the cast-in-place concrete is used to form a steel-concrete composite structure. The supports are eliminated and I-beam main beams and prefabricated concrete bridge decks are used. The shear force Nail groups and shear connecting plates form a semi-hidden overall structure.

Benefits of technology

It improves the efficiency of use of structures and materials, enhances the overall stiffness and seismic performance of the bridge, reduces the amount of materials and the scale of the bridge, simplifies construction and maintenance, improves the landscape effect and degree of industrialization, and is suitable for complex environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798126U_ABST
    Figure CN221798126U_ABST
Patent Text Reader

Abstract

The utility model discloses a consolidation type pier-beam connecting structure suitable for a steel-concrete composite beam bridge, which comprises a concrete filled steel tube pier and a steel-concrete composite beam system, and the concrete filled steel tube pier and the steel-concrete composite beam system are consolidated into a whole through cast-in-place concrete to form rigid frame stress. The problems that in the prior art, a structural form of a bent cap and a support is adopted for a steel-concrete composite bridge, the overall stress performance is not high, materials are not saved, the bridge scale is enlarged, the maintenance cost is high, durability is poor, the occupied space under the bridge is large, the construction period and quality are not easy to control, the industrial building degree is low, and the landscape effect is poor are solved. And the quality is easy to control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge engineering, in particular to a consolidated pier-beam connection structure suitable for a steel-concrete composite beam bridge. Background Art

[0002] Multi-span beam bridges generally adopt the structural form of continuous beam bridges or continuous rigid frames. The force transmission technology between the piers and the main beams of beam bridges is very critical. Continuous beam bridges achieve force transmission by setting supports between the piers (or cap beams) and the main beams, and continuous rigid frames achieve force transmission by forming a consolidation structure between the piers and the main beams. Since the overall structural performance of continuous rigid frames is better, the design should give priority to the structure of consolidation of piers and main beams. Since steel-concrete composite bridges have good force-bearing performance and a high degree of industrialized construction, they are increasingly used in engineering. For steel-concrete composite beams with multiple main beams in the transverse direction of the bridge, the existing technology adopts a continuous beam structure, that is, the upper steel-concrete composite beam and the lower steel tube concrete pier (or concrete pier) transmit force through the form of supports + cap beams. Existing steel-concrete composite bridges adopt the structural form of cap beams + supports, which mainly have the following problems:

[0003] 1. The upper and lower structures of the bridge are not connected as a whole, and no rigid frame is formed to bear stress. The structural integrity is poor, and the stress performance is not fully utilized; 2. The height of the bearing + cap beam is large. When there is a requirement for the clearance under the bridge in the transverse direction of the bridge, the bridge deck needs to be raised, which will greatly increase the scale of the bridge and have a greater impact on urban bridges; 3. The bearings are easily damaged, have a service life, and are expensive to maintain and repair. Replacement is troublesome, which increases the subsequent operating costs; 4. In areas with large longitudinal slopes and high earthquake intensity, the bearings of steel plate composite beam bridges may suffer from large dislocation and shear damage, and even bearing detachment or beam overturning accidents; 5 1. The cap beam and the piers form a cantilevered frame. The concrete cap beam is mainly subjected to bending moment and shear force. The structural efficiency of concrete materials is low, and the force requirements must be met by reasonably arranging the pier spacing and tensioning prestressing; 6. The pier spacing under the cap beam is large, which will occupy a larger space under the bridge, which is not conducive to land use control; 7. If the cap beam adopts cast-in-place reinforced concrete structure, the construction risk is high, the quality control is difficult, and the construction period is long; 8. If the cap beam adopts prefabricated reinforced concrete structure, the cap beam structure is large in size and weight, and it is difficult to transport and install, and the degree of industrialization is low; 9. The cap beam is large and abrupt between the main beam and the pier, and the landscape effect is poor. Utility Model Content

[0004] In view of this, the purpose of the utility model is to provide a consolidated pier-beam connection structure suitable for steel-concrete composite beam bridges, which solves the problems in the prior art (steel-concrete composite bridges adopt a cap beam + support structure) such as low overall force performance, no material conservation, increased bridge scale, high maintenance cost, poor durability, large space occupied under the bridge, difficult to control construction period and quality, low degree of industrialized construction, poor landscape effect, etc., and has the characteristics of simple, fast, efficient construction and easy quality control.

[0005] The utility model is applicable to a consolidated pier-beam connection structure of a steel-concrete composite beam bridge, comprising a steel tube concrete pier and a steel-concrete composite beam system, wherein the steel tube concrete pier and the steel-concrete composite beam system are consolidated into one to form a rigid structure for bearing force;

[0006] Furthermore, a steel structure cross beam system is provided between the steel tube concrete bridge pier and the steel-concrete composite beam system, and the steel structure cross beam system, the steel tube concrete bridge pier and the steel-concrete composite beam system are consolidated into one by cast-in-place concrete to form a steel-concrete composite structure;

[0007] Furthermore, the steel structure beam system has a plurality of box structures spaced apart by partitions, and the steel pipes at the top of the steel tube concrete piers are extended into the box structures of the steel structure beam system and welded therein, and are consolidated with the steel structure beam system by cast-in-place concrete;

[0008] Further, the steel structure cross beam system includes a top plate, a bottom plate, bottom plate stiffening ribs, a web plate, a side sealing plate and a transverse diaphragm, the web plate is vertically connected between the top plate and the bottom plate, the side sealing plate and the transverse diaphragm, the web plate and the bottom plate form a concrete filling box chamber symmetrically arranged along the web plate, the concrete filling box chamber is provided with installation grooves for overlapping I-beam main beams at intervals in the transverse direction of the bridge, and the installation groove is provided with a sealing plate for overlapping the I-beam beam and then covering the installation groove to form a steel beam consolidation filling box chamber;

[0009] Furthermore, the steel-concrete composite beam system includes an I-beam main beam and a precast concrete bridge deck arranged on the I-beam main beam, a shear nail group is arranged between the I-beam main beam and the precast concrete bridge deck, and the I-beam main beam is overlapped in the box structure of the steel structure beam system and is consolidated with the steel structure beam system through cast-in-place concrete;

[0010] Furthermore, the end of the I-beam main beam extends outward to form a shear connection plate located in the steel beam consolidation filling box, and a plurality of connection plate shear nails are distributed on the shear connection plate;

[0011] Furthermore, the side sealing plates are arranged parallel to the web plates, the transverse diaphragms vertically connect the web plates and the side sealing plates, the transverse diaphragms are provided with circulation holes for the circulation of concrete during the pouring process, and the stiffening ribs are arranged crisscross along the bottom plate;

[0012] Furthermore, the pier top steel pipe extends into the concrete filling box chamber to 1 / 2 of its height, and the pier top steel pipe is welded to the bottom plate, the bottom plate stiffening ribs and the web;

[0013] Furthermore, a stiffening plate is radially arranged inside the steel tube at the top of the steel tube concrete pier, and the stiffening plate is welded to the steel tube and the web of the steel structure cross beam system;

[0014] Furthermore, the steel tube concrete pier includes two steel tubes and a connecting plate longitudinally connecting the two steel tubes into one, the two steel tubes and the connecting plate are filled with concrete, and the connecting plate extends from the bottom plate of the steel structure beam system to the bottom of the steel tube concrete pier.

[0015] Beneficial effects of the utility model: The consolidation type pier-beam connection structure applicable to the steel-concrete composite beam bridge of the utility model integrates the assembled bridge structure components such as the steel structure crossbeam system, the steel tube concrete bridge pier, and the steel-concrete composite beam system, improves the use efficiency of the structure and materials, is convenient for processing and manufacturing, component transportation and on-site assembly, and solves the problems of low overall force performance, material conservation, large bridge scale, high maintenance cost, poor durability, large space under the bridge, difficult control of construction period and quality, low degree of industrialized construction, and poor landscape effect in the structure of the steel-concrete composite bridge in the prior art. It has the advantages of reasonable force, safety and reliability, good durability, material conservation, reduced scale, conducive to the utilization of space under the bridge and land use control, easy processing, transportation and installation, strong applicability to complex environments, high degree of industrialization, small impact on the environment, and beautiful appearance.

[0016] The utility model is suitable for the consolidation type pier-beam connection structure of the steel-concrete composite beam bridge. It adopts the form of pier-beam consolidation to improve the overall stiffness of the bridge. The pier-beam consolidation position is reasonably stressed and the force transmission is reliable. The upper and lower structures of the bridge form an integral whole, which increases the number of statically indeterminate times of the bridge span structure and improves the overall seismic performance of the bridge structure. The steel-concrete composite structure is adopted to give full play to the mechanical properties of both steel and concrete materials and improve the structural efficiency. The pier-beam connection structure has a semi-hidden feature, forms an integral whole with the main beam, and has a beautiful shape. At the same time, it increases the clearance under the bridge and improves the landscape effect of the bridge. It can also adopt a prefabricated assembly construction method, and can realize the construction without or with less support on site to ensure the construction quality. In addition, during construction, the structural steel plate itself can be used as the side formwork for concrete pouring, without the need to build additional formwork, and the construction process is simpler, reducing the cost of bridge construction. At the same time, the use of bearings is omitted, which reduces the cost of bridge construction and the cost of bridge operation. Steel structure beam systems, steel tube concrete piers and steel-concrete composite beam systems can use standardized size components, with a high degree of prefabrication industrialization and simple on-site installation operations, which effectively reduces on-site work and shortens construction time. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0018] Figure 1 It is a schematic diagram of the structure of the consolidated pier-beam connection structure applicable to the steel-concrete composite beam bridge of the utility model;

[0019] Figure 2 It is a structural schematic diagram of the steel structure beam system of the utility model;

[0020] Figure 3 for Figure 2 A top view of

[0021] Figure 4 It is a structural schematic diagram of the steel-concrete composite beam system of the utility model;

[0022] Figure 5 This is a schematic diagram of the end structure of the I-beam main beam of the utility model;

[0023] Figure 6 It is a structural schematic diagram of the utility model steel tube concrete pier.

[0024] Among them, the figure markings are: 1-steel structure beam system, 2-steel tube concrete pier, 3-steel-concrete composite beam system, 11-top plate, 12-web plate, 13-bottom plate, 14-bottom plate stiffening rib, 15-side cover plate, 16-partition, 17-partition flange, 18-pier top steel tube, 19-pier stiffening plate, 21-connecting plate, 31-I-beam main beam, 32-shear connecting plate, 33-connecting plate shear nail, 34-shear nail group, 35-precast concrete bridge deck, 36-slot. DETAILED DESCRIPTION

[0025] The consolidated pier-beam connection structure of the embodiment, which is applicable to a steel-concrete composite beam bridge, comprises a steel tube concrete pier and a steel-concrete composite beam system, wherein the steel tube concrete pier and the steel-concrete composite beam system are consolidated into one to form a rigid structure for bearing force; the upper and lower structures of the bridge are consolidated into one, the structure has strong integrity and better bearing performance; and the problems of low overall bearing performance, no material conservation, increased bridge scale, high maintenance cost, poor durability, large space occupied under the bridge, difficulty in controlling construction period and quality, low degree of industrialized construction, and poor landscape effect, etc., in the prior art, are solved.

[0026] In this embodiment, a steel structure cross beam system is arranged between the steel tube concrete pier and the steel-concrete composite beam system. The steel structure cross beam system 1, the steel tube concrete pier 2 and the steel-concrete composite beam system 3 are consolidated into one by cast-in-place concrete to form a steel-concrete composite structure; the steel tube concrete pier 2 supports the steel structure cross beam system 1, and the steel structure cross beam system 1 supports the steel-concrete composite beam system 3. The consolidation form is adopted to make the upper and lower structures of the bridge become a rigid frame system, with good overall stress performance, reduced structural size, and reduced material consumption, and it is a high-performance structure.

[0027] In this embodiment, the steel structure beam system 1 has a plurality of box structures spaced apart by partitions 16; the pier top steel pipe 18 of the steel tube concrete pier 2 extends into the box structure of the steel structure beam system 1 and is welded therein, and is consolidated with the steel structure beam system 1 by cast-in-place concrete; the pier top steel pipe 18 extends into the steel structure beam system 1 and is welded and fixed thereto, and is consolidated by cast-in-place concrete to form a connection structure of a steel-concrete composite structure, so that the beam and the pier form a consolidation system.

[0028] In this embodiment, the steel-concrete composite beam system 3 includes an I-beam main beam 31 and a precast concrete bridge deck 35 arranged on the I-beam main beam 31, and a shear nail group 34 is arranged between the I-beam main beam 31 and the precast concrete bridge deck 35. The I-beam main beam 31 is overlapped in the box structure of the steel structure beam system 1 and is consolidated with the steel structure beam system 1 through cast-in-place concrete; the so-called "shear nail group" refers to a plurality of shear nails combined together in a clustered manner, a plurality of shear nail groups are evenly distributed at equal intervals on the I-beam top plate 11, and a shear nail group is provided on the corresponding precast concrete bridge deck 35. The precast concrete bridge deck 35 is supported on the I-steel main beam 31 through the notch 36 of 34. The cast-in-place concrete includes the cast-in-place part of the steel structure cross beam system 1 and the cast-in-place section of the pier top bridge deck 35. The pier top bridge deck 35 is connected with steel bars during the erection of the precast concrete bridge deck 35. After the precast concrete bridge deck 35 is installed on the I-steel main beam 31, cast-in-place concrete is poured into the notch 36 with shear nails to realize the consolidation of the I-steel main beam 31 and the precast concrete bridge deck 35. The precast concrete bridge deck 35 is connected to the I-steel beam through the clustered shear nails to form a steel-concrete composite beam. The steel structure cross beam system 1 is integrated with the shear connection plate 32 at the end of the I-steel main beam through cast-in-place concrete, thereby forming the upper and lower structures of the bridge into a whole, increasing the number of statically indeterminate times of the bridge span structure, and improving the overall seismic performance of the bridge structure.

[0029] In this embodiment, the steel structure beam system 1 includes a top plate 11, a web 12, a bottom plate 13, a bottom plate stiffening rib 14, a side sealing plate 15 and a partition 16. The web 12 is vertically connected between the top plate 11 and the bottom plate 13. The side sealing plate 15, the partition 16, the web 12 and the bottom plate 13 form a concrete filling box chamber symmetrically arranged along the web 12. The concrete filling box chamber is transversely spaced with mounting grooves for overlapping the I-beam main beam 31. The mounting groove is provided with a sealing plate for overlapping the I-beam and then covering it on the mounting groove to form a steel beam consolidation filling box chamber; the side sealing plate 15 is arranged parallel to the web 12, and the partition 16 is vertically connected to the web 12 and the side sealing plate 15. The partition 16 is provided with a flow hole for concrete during the pouring process. The bottom plate stiffening ribs 14 are arranged in a crisscross pattern along the bottom plate 13; the top plate 11 and the bottom plate 13 are arranged parallel to each other, the two ends of the web 12 are vertically connected to the top plate 11 and the bottom plate 13, the side sealing plates 15 are vertically arranged on the bottom plate 13 in a manner parallel to the web 12, and the side sealing plates 15 are arranged on both sides of the web 12. The partition 16 vertically connects the bottom plate 13, the side sealing plates 15 and the web 12 to form a plurality of concrete-filled chambers distributed along the transverse bridge direction. The width of the bottom plate 13 is greater than that of the top plate 11. The top plate 11 plays a role in fixing the web 12. A pouring port for pouring concrete is formed between the top plate 11 and the side sealing plates 15. During construction, concrete is poured on site through the opening end of the chamber. The opening of the partition 16 effectively ensures the circulation of concrete during the pouring process. The partition 16 has a partition flange 17, which is welded to the partition 16, the top plate 11 and the side sealing plates 15 to strengthen the overall structure. The partition 16, the web 12, the bottom plate 13, and the bottom plate stiffening ribs 14 form an installation groove for installing the I-beam. The I-beam steel beam is overlapped on the bottom plate stiffening ribs 14, and then the side sealing plates 15 in the installation groove range are welded to form a steel beam consolidation filling box chamber, and then it is integrated with the end of the I-beam main beam 31 through cast-in-place concrete, saving a lot of vertical space. When there is a requirement for the clearance under the bridge in the transverse direction of the bridge, the scale of the bridge is greatly reduced. For example, the original bridge deck longitudinal slope is 4%, the bridge deck elevation is reduced by 1.5m, and the bridge length is reduced by 75m. This structure makes the main force-bearing structure of the steel structure crossbeam system 1 an "I"-shaped structure, the upper flange is a single top plate 11, and the lower flange is composed of the bottom plate 13 and the stiffening ribs 14, which is more in line with the force state of the upper flange being pulled and the lower flange being compressed in the cantilever state, and the force transmission is reliable and the force is reasonable. The top plate 11, the bottom plate 13, the bottom plate stiffening ribs 14, the web 12, the side sealing plates 15 and the partitions 16 are all made of steel plates and connected and fixed by welding. After the side sealing plates 15 in the installation groove range are welded, the concrete is poured to the top plate 11 for the first time. Through the first cast-in-place concrete, the steel structure beam is transformed into a steel-concrete composite structure beam structure, and the steel structure beam is initially consolidated with the I-beam main beam 31, realizing the transformation of the I-beam main beam 31 from a simply supported constraint to a consolidated constraint, which greatly improves the bearing capacity of the beam.

[0030] In this embodiment, the end of the I-beam main beam 31 extends outward to form a shear connection plate 32 located in the concrete filling box of the steel structure cross beam, and a plurality of connection plate shear nails 33 are distributed on the shear connection plate 32; the shear connection plate 32 is used to set the connection plate shear nails 33, and when the concrete is poured, the connection performance between the concrete and the I-beam main beam 31 is improved;

[0031] In this embodiment, the pier top steel pipe 18 extends into the concrete filling box chamber to 1 / 2 of its height, and the pier top steel pipe 18 is welded to the bottom plate 13, the bottom plate stiffening ribs 14 and the web 12; a stiffening plate 19 is radially arranged inside the pier top steel pipe 18 of the steel tube concrete bridge pier 2, and the stiffening plate 19 is welded to the steel pipe and the web 12 of the steel structure beam system 1; the bottom plate 13 of the steel structure beam system 1 is provided with stiffening ribs 14 to transfer the deadweight load of the steel structure during construction. The top plate 11, web 12, bottom plate 13 and bottom plate stiffening ribs 14 of the steel structure beam system 1 form the main force-bearing system, which together provide the bending stiffness in the transverse direction of the bridge. The main force-bearing structure of the steel structure beam system 1 is an "I"-shaped structure, with the upper flange being a single top plate 11 and the lower flange being composed of the bottom plate 13 and stiffening ribs 14, which is more in line with the force state of the upper flange being under tension and the lower flange being under compression in the cantilever state, with reliable force transmission and reasonable force bearing. This structure is suitable for large cantilever stress states, and the space under the bridge occupied by the transverse bridge pier 2 is greatly reduced, which is very beneficial to the utilization of the space under the bridge and land control.

[0032] In this embodiment, the steel tube concrete pier 2 includes two steel tubes and a connecting plate 21 longitudinally connecting the two steel tubes into one body, the two steel tubes and the connecting plate 21 are filled with concrete, and the connecting plate 21 extends from the bottom plate 13 of the steel structure beam system 1 to the bottom of the steel tube concrete pier 2. The steel tube concrete pier 2 adopts a dumbbell-shaped cross section and a steel-concrete composite structure, so that it has good bearing capacity and seismic performance.

[0033] The utility model discloses a consolidation type pier-beam connection structure suitable for a steel-concrete composite beam bridge, which has the following advantages:

[0034] 1. The force transmission between the pier and the main beam adopts the form of consolidation, making the upper and lower structures of the bridge a rigid frame system, with good overall force performance, reduced structural size, and reduced material consumption, making it a high-performance structure.

[0035] 2. The steel structure cross beam system 1 is integrated with the end of the I-beam main beam 31 through cast-in-place concrete, saving a lot of vertical space. When there is a requirement for the clearance under the bridge in the transverse direction, the bridge scale is greatly reduced. For example, if the original bridge deck longitudinal slope is 4%, the bridge deck elevation is reduced by 1.5m, and the bridge length is reduced by 75m.

[0036] 3. It saves a lot of bearings, avoids bearing damage and maintenance during operation, and reduces the cost of bridge maintenance. The structure is convenient for later maintenance and improves the durability of the bridge.

[0037] 4. The overall stiffness of the bridge is improved, the disaster resistance is enhanced, and the deformation of the main beam under live load is reduced.

[0038] 5. The main force-bearing structure of the steel structure beam system 1 is an "I"-shaped structure. The upper flange is a single top plate 1, and the lower flange is composed of a bottom plate 3 and stiffening ribs 4. It is more in line with the force state of the upper flange being tensile and the lower flange being compressed in the cantilever state, and the force transmission is reliable and the force is reasonable.

[0039] 6. The steel structure beam system 1, the steel tube concrete pier 2, the steel-concrete composite beam system 3 and the cast-in-place concrete form a steel-concrete composite structure, which gives full play to the advantages of the two materials. Its stress performance is further improved, and the compressed steel plate is restrained by the concrete, avoiding local instability.

[0040] 7. This structure is suitable for large cantilever stress state, and the space under the bridge occupied by the transverse bridge piers is greatly reduced, which is very beneficial to the utilization of space under the bridge and land control.

[0041] 8. The steel structure beam system 1 is processed in the factory and transported to the site, which is conducive to quality and construction period control.

[0042] 9. The steel structure beam system 1 is small in size and light in weight, which makes it easier to transport and hoist, and has a high degree of industrialized construction.

[0043] 10. Cast-in-place concrete construction does not require additional supports and formwork. The concrete pouring process of the pier top steel pipe and the steel structure beam system 1 is the same, the process is compact, the on-site construction is simple, fast and efficient, the quality is easy to control, and an efficient structure is achieved with simple technology.

[0044] 11. The structure is semi-hidden in appearance, forming a whole with the I-beam main beam and the steel tube concrete pier. It has a beautiful shape and enhances the landscape effect of the bridge.

[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A consolidated pier-beam connection structure suitable for a steel-concrete composite beam bridge, characterized in that: It includes a steel tube concrete pier and a steel-concrete composite beam system, which are consolidated into one to form a rigid structure to bear force, a steel structure cross beam system is arranged between the steel tube concrete pier and the steel-concrete composite beam system, and the steel structure cross beam system, the steel tube concrete pier and the steel-concrete composite beam system are consolidated into one by cast-in-place concrete to form a steel-concrete composite structure.

2. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 1, characterized in that: The steel structure cross beam system has a plurality of box structures spaced apart by partitions. The top steel pipe of the steel tube concrete pier is extended into the box structure of the steel structure cross beam system for welding and is consolidated with the steel structure cross beam system by cast-in-place concrete.

3. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 2 is characterized in that: The steel structure beam system includes a top plate, a bottom plate, bottom plate stiffening ribs, a web plate, a side sealing plate and a transverse partition. The web plate is vertically connected between the top plate and the bottom plate. The side sealing plates and the transverse partition, web plate and bottom plate form a concrete-filled box chamber symmetrically arranged along the web plate. The concrete-filled box chamber is transversely spaced with mounting grooves for overlapping I-beam main beams. The mounting grooves are provided with sealing plates for overlapping I-beams and are covered on the mounting grooves to form a steel beam consolidation filling box chamber.

4. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 3 is characterized in that: The steel-concrete composite beam system includes an I-beam main beam and a precast concrete bridge deck arranged on the I-beam main beam, a shear nail group is arranged between the I-beam main beam and the precast concrete bridge deck, and the I-beam main beam is overlapped in the box structure of the steel structure beam system and consolidated with the steel structure beam system through cast-in-place concrete.

5. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 3 is characterized in that: The side sealing plates are arranged parallel to the web plates, the transverse diaphragms vertically connect the web plates and the side sealing plates, the transverse diaphragms are provided with circulation holes for the circulation of concrete during the pouring process, and the stiffening ribs are arranged crisscross along the bottom plate.

6. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 3, characterized in that: The end of the I-beam main beam extends outward to form a shear connection plate located in the steel beam consolidation filling box, and a plurality of connection plate shear nails are distributed on the shear connection plate.

7. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 3 is characterized in that: The pier top steel pipe extends into the concrete filling box chamber to 1 / 2 of its height, and the pier top steel pipe is welded to the bottom plate, the bottom plate stiffening ribs and the web.

8. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 7, characterized in that: A stiffening plate is radially arranged inside the steel tube at the top of the steel tube concrete pier, and the stiffening plate is welded to the steel tube and the web of the steel structure cross beam system.

9. The consolidated pier-beam connection structure applicable to a steel-concrete composite beam bridge according to claim 8, characterized in that: The steel tube concrete bridge pier includes two steel tubes and a connecting plate longitudinally connecting the two steel tubes into one body. The two steel tubes and the connecting plate are filled with concrete. The connecting plate extends from the bottom plate of the steel structure beam system to the bottom of the steel tube concrete bridge pier.

Citation Information

Cited By

  • Pier-beam connecting structure of steel-concrete composite beam bridge and construction method of pier-beam connecting structure

    CN117626782A