Pile driver for road and bridge construction

By designing a sliding structure and arc disc in the pile driver to reduce noise, and welding grid columns in the drill pipe for cooling, the problems of high noise and poor cooling of traditional pile drivers are solved, and the working rate and drill pipe life are improved.

CN221798426UActive Publication Date: 2024-10-01QINGHAI FIRST ROAD & BRIDGE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420048855.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-10-01
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

Traditional pile drivers used in road and bridge construction are noisy and cannot cool down drill pipes and drill bits quickly and effectively, shortening their service life.

Method used

A pile driver including a moving component, a load-bearing component, a sliding component and a support rod is designed. A sliding structure is formed by a built-in plate and a fixed plate to provide a positioning effect. An arc disk is used to reduce the friction of the hanging wire, and a grid is welded in the drill rod. The columns allow cold air to circulate and achieve rapid cooling.

Benefits of technology

It reduces the noise at the construction site, improves the working speed and efficiency of the pile driver, extends the service life of the drill pipe, and prevents the occurrence of dull blades.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798426U_ABST
    Figure CN221798426U_ABST
Patent Text Reader

Abstract

The utility model discloses a pile driver for road and bridge construction, which belongs to the technical field of road and bridge construction and comprises a moving component, a bearing component, a sliding component and supporting rods, the bearing component is mounted on one side of the top end of the moving component, the sliding component is mounted on the outer surface of the bearing component, and the supporting rods are fixed at two ends of the bearing component. A pay-off assembly is arranged at the top end of the bearing assembly, and a suspension wire is installed on one side of the pay-off assembly. According to the pile driver for road and bridge construction, a positioning ring of the pile driver is placed under a drilling assembly through a fixing plate and a built-in plate, a positioning effect can be provided for the beginning of drilling, after drilling is completed, only the positioning ring needs to be pulled, the positioning ring can stretch out and draw back through the fixing plate and the built-in plate, a limiting and supporting effect is provided for a pile pipe of the pile driver, and the pile pipe is prevented from being damaged. And the drilling assembly is matched with the paying-off assembly to conduct piling in road and bridge construction, and the noise of a construction site can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road and bridge construction, in particular to a pile driver for road and bridge construction. Background Art

[0002] A pile driver consists of a pile hammer, a pile frame and ancillary equipment. The pile hammer is attached between two parallel vertical guide rods at the front of the pile frame and is lifted by a lifting hook. The pile frame is a steel structure tower with a winch at the rear to lift the pile and the pile hammer. There is a guide frame composed of two guide rods in front of the pile frame to control the direction of piling so that the pile can be accurately penetrated into the stratum according to the designed direction. Pile drivers are often required to drive pile holes during road and bridge construction.

[0003] For traditional pile drivers used in road and bridge construction, a pile hammer is generally attached between two parallel vertical guide rods in front of a pile frame and lifted by a lifting hook. The pile frame is a steel structure tower with a winch at the rear for lifting piles and pile hammers. A guide frame composed of two guide rods is provided in front of the pile frame for controlling the direction of piling so that the piles are accurately penetrated into the stratum according to the designed orientation. However, the pile hammer is used to hammer the pile frame into the ground, which makes a lot of noise. At the same time, most pile drivers used in road and bridge construction cannot quickly and effectively cool the drill rod and drill bit, which reduces the service life of the drill rod and drill bit. For this reason, we propose a pile driver for road and bridge construction. Utility Model Content

[0004] The content of this application is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this application is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0005] The purpose of the utility model is to provide a pile driver for road and bridge construction to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pile driver for road and bridge construction, comprising a moving component, a bearing component, a sliding component and a support rod, characterized in that: a bearing component is installed on one side of the top of the moving component, a sliding component is installed on the outer surface of the bearing component, and support rods are fixed at both ends of the bearing component, a wire-laying component is provided at the top of the bearing component, and a suspension line is installed on one side of the wire-laying component, a motor is installed on the top surface of the sliding component, and a drilling component is connected to the bottom end of the motor, an auxiliary component is installed on one side of the bottom end of the bearing component, the auxiliary component comprises a positioning ring and a fixing plate, and fixing plates are installed on both ends of the positioning ring, a matching plate is provided at one end of the fixing plate, and a mounting plate is connected to one end of the matching plate.

[0007] Furthermore, the fixing plate forms a sliding structure between the built-in plate and the matching plate, and the matching plate and the mounting plate are fixedly connected.

[0008] Furthermore, the pay-off assembly includes a body and an arc disk, and the arc disk is installed at the center position of both sides of the body.

[0009] Furthermore, the machine body and the arc disks are sleeve-connected, and the arc disks are symmetrically distributed.

[0010] Furthermore, the drilling assembly includes a refrigerator and a drill rod, and the drill rod is installed at the bottom end of the refrigerator, the top end of the drill rod is connected to a grid column, and a grid sealing column is installed on the outer surface of the grid column.

[0011] Furthermore, the refrigerator forms a fixed structure with the grid sealing column through the connecting rod, and the grid sealing column and the grid column are sleeve-connected.

[0012] Furthermore, the grid column and the drill rod are fixedly connected, and the drill rod is a hollow structure.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The pile driver for road and bridge construction forms a sliding structure between a fixed plate and a matching plate through an internal plate. When its drilling assembly is working, its positioning ring is placed directly below the drilling assembly through the fixed plate and the internal plate, which can provide a positioning effect for the beginning of drilling. After the drilling is completed, it only needs to pull the positioning ring, and the positioning ring will be extended and retracted outward through the fixed plate and the internal plate, thereby providing a limiting support for the pile pipe, so as to facilitate the rapid placement of the pile pipe, thereby improving the working speed of the pile driver for road and bridge construction.

[0015] By sleeve-installing arc disks at the center positions on both sides of the machine body, the friction between the suspension line in contact with the arc disk and the line-releasing assembly is reduced during the pipe hanging period, thereby increasing the service life of the suspension line. At the same time, the static friction between the suspension line and the line-releasing assembly is converted into dynamic friction, which also facilitates the rapid descent of piles and increases the pile-releasing rate of the pile driver for road and bridge construction. The use of drilling assemblies in conjunction with line-releasing assemblies for pile driving in road and bridge construction can greatly reduce the noise on the construction site.

[0016] By welding a grid column to the middle part of the drill rod, cold air produced by a refrigerator can enter the inside of the open-heart structure drill rod, thereby quickly cooling the surface temperature of the drill rod to ensure the service life of the drill rod, prevent the drill rod temperature from rising and causing a dull tool, and improve the work efficiency of the pile driver used in road and bridge construction. The outer surface of the grid column is connected with a grid sealing column, so that cold air can enter the inside of the drill rod normally when the drill rod and the grid column rotate smoothly. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of the pile driver of the utility model;

[0018] Figure 2 This is a schematic diagram of the three-dimensional structure of the wire-laying assembly of the utility model;

[0019] Figure 3 This is a schematic diagram of the three-dimensional structure of the drilling assembly of the utility model;

[0020] Figure 4 It is a three-dimensional structural schematic diagram of the auxiliary component of the utility model.

[0021] In the figure: 1. moving assembly; 2. bearing assembly; 3. sliding assembly; 4. supporting rod; 5. wire-laying assembly; 501. machine body; 502. arc disk; 6. hanging wire; 7. motor; 8. drilling assembly; 801. refrigerator; 802. drill rod; 803. grid column; 804. grid sealing column; 9. auxiliary assembly; 901. positioning ring; 902. fixing plate; 903. matching plate; 904. mounting plate. DETAILED DESCRIPTION

[0022] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0023] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0024] It should be noted that the concepts of "first" and "second" mentioned in this disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0025] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0026] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0027] The utility model provides Figure 1-4A pile driver for road and bridge construction shown in the figure comprises a moving component 1, a bearing component 2, a sliding component 3 and a support rod 4, the bearing component 2 is installed on one side of the top of the moving component 1, the sliding component 3 is installed on the outer surface of the bearing component 2, and the support rods 4 are fixed at both ends of the bearing component 2, a wire-laying component 5 is provided at the top of the bearing component 2, and a suspension line 6 is installed on one side of the wire-laying component 5, a motor 7 is installed on the top surface of the sliding component 3, and the bottom end of the motor 7 is connected to a drilling component 8, an auxiliary component 9 is installed on one side of the bottom end of the bearing component 2, the auxiliary component 9 comprises a positioning ring 901 and a fixing plate 902, and the fixing plates 902 are installed at both ends of the positioning ring 901, a matching plate 903 is provided at one end of the fixing plate 902, and a mounting plate 904 is connected at one end of the matching plate 903, the fixing plate 902 forms a sliding structure with the matching plate 903 through the built-in plate, and the matching plate 903 and the mounting plate 904 are fixedly connected. A sliding structure is formed between the fixed plate 902 and the matching plate 903 through the built-in plate. When the drilling assembly 8 is working, the positioning ring 901 is placed directly below the drilling assembly 8 through the fixed plate 902 and the built-in plate, which can provide a positioning effect for the beginning of drilling. When the drilling is completed, it is only necessary to pull the positioning ring 901, and the positioning ring 901 will be extended and retracted outward through the fixed plate 902 and the built-in plate, thereby providing a limiting support for the pile pipe, so as to facilitate the rapid placement of the pile pipe, thereby improving the working speed of the pile driver used in road and bridge construction.

[0028] In order to significantly reduce the noise at the construction site, Figure 1 and Figure 2 As shown, the line-releasing assembly 5 includes a body 501 and an arc disk 502, and the arc disk 502 is installed at the center position of both sides of the body 501, the body 501 and the arc disk 502 are socketed and connected, and the arc disks 502 are symmetrically distributed. By socketing and installing the arc disk 502 at the center position of both sides of the body 501, the friction between the suspension line 6 in contact with the arc disk 502 and the line-releasing assembly 5 during the pipe hanging period is reduced, thereby improving the service life of the suspension line 6. At the same time, the static friction between the suspension line 6 and the line-releasing assembly 5 is converted into dynamic friction, which is also convenient for the rapid descent of the pile column, and the pile placing rate of the pile driver used for road and bridge construction is improved. The use of the drilling assembly 8 in cooperation with the line-releasing assembly 5 for pile driving in road and bridge construction can greatly reduce the noise on the construction site.

[0029] Finally, in order to quickly cool down the surface temperature of the drill rod 802 to ensure the service life of the drill rod 802 and prevent the drill rod 802 from becoming blunt due to the increase in temperature, Figure 1 and Figure 3As shown, the drilling assembly 8 includes a refrigerator 801 and a drill rod 802, and the drill rod 802 is installed at the bottom end of the refrigerator 801, and the top of the drill rod 802 is connected to a grid column 803, and the outer surface of the grid column 803 is installed with a grid sealing column 804, the refrigerator 801 forms a fixed structure with the grid sealing column 804 through a connecting rod, and the grid sealing column 804 and the grid column 803 are sleeve-connected, the grid column 803 and the drill rod 802 are fixedly connected, and the drill rod 802 is a hollow structure. A grid column 803 is welded on the middle part so that the cold air produced by the refrigerator 801 can enter the inside of the drill rod 802 with an open-heart structure, thereby quickly cooling the surface temperature of the drill rod 802 to ensure the service life of the drill rod 802, prevent the drill rod 802 from becoming blunt due to the increase in temperature, and improve the working efficiency of the pile driver used in road and bridge construction. The outer surface of the grid column 803 is sleeved with the grid sealing column 804, so that the cold air can normally enter the inside of the drill rod 802 when the drill rod 802 and the grid column 803 rotate smoothly.

[0030] In summary, when the pile driver for road and bridge construction is in use, first, a sliding structure is formed between the fixed plate 902 and the matching plate 903 through the built-in plate. When the drilling assembly 8 is working, the positioning ring 901 is placed directly below the drilling assembly 8 through the fixed plate 902 and the built-in plate, which can provide a positioning effect for the start of drilling. When the drilling is completed, it is only necessary to pull the positioning ring 901, and the positioning ring 901 will be extended and retracted outward through the fixed plate 902 and the built-in plate, thereby providing a limiting support for the pile pipe. By welding the grid column 803 to the middle part of the drill rod 802, the cold air produced by the refrigerator 801 can enter the drill rod 802 with a happy structure, thereby quickly cooling the surface temperature of the drill rod 802, and then the arc disk 502 is sleeved and installed at the center position of both sides of the body 501, so that the friction between the suspension line 6 in contact with the arc disk 502 and the line-release assembly 5 is reduced during the pipe hanging period, thereby improving the service life of the suspension line 6, thereby realizing the use of the pile driver.

[0031] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.

Claims

1. A pile driver for road and bridge construction, comprising a moving assembly (1), a bearing assembly (2), a sliding assembly (3) and a support rod (4), characterized in that: A bearing component (2) is installed on one side of the top of the moving component (1), a sliding component (3) is installed on the outer surface of the bearing component (2), and support rods (4) are fixed at both ends of the bearing component (2), a wire-releasing component (5) is provided at the top of the bearing component (2), and a suspension line (6) is installed on one side of the wire-releasing component (5), a motor (7) is installed on the top surface of the sliding component (3), and a drilling component (8) is connected to the bottom end of the motor (7), an auxiliary component (9) is installed on one side of the bottom end of the bearing component (2), the auxiliary component (9) comprises a positioning ring (901) and a fixing plate (902), and the fixing plates (902) are installed at both ends of the positioning ring (901), a matching plate (903) is provided at one end of the fixing plate (902), and a mounting plate (904) is connected to one end of the matching plate (903).

2. A pile driver for road and bridge construction according to claim 1, characterized in that: The fixed plate (902) forms a sliding structure with the built-in plate and the matching plate (903), and the matching plate (903) and the mounting plate (904) are fixedly connected.

3. A pile driver for road and bridge construction according to claim 1, characterized in that: The wire-releasing assembly (5) comprises a machine body (501) and an arc disk (502), and the arc disk (502) is installed at the center positions of both sides of the machine body (501).

4. A pile driver for road and bridge construction according to claim 3, characterized in that: The machine body (501) and the arc disk (502) are sleeve-connected, and the arc disks (502) are symmetrically distributed.

5. A pile driver for road and bridge construction according to claim 1, characterized in that: The drilling assembly (8) comprises a refrigerator (801) and a drill rod (802), wherein the drill rod (802) is installed at the bottom end of the refrigerator (801), the top end of the drill rod (802) is connected to a grid column (803), and a grid sealing column (804) is installed on the outer surface of the grid column (803).

6. A pile driver for road and bridge construction according to claim 5, characterized in that: The refrigerator (801) forms a fixed structure with the grid sealing column (804) through a connecting rod, and the grid sealing column (804) and the grid column (803) are connected by a sleeve connection.

7. A pile driver for road and bridge construction according to claim 5, characterized in that: The grid column (803) and the drill rod (802) are fixedly connected, and the drill rod (802) is a hollow structure.