Novel innovative wall formwork

The formwork is connected by connecting ribs and connecting arms to reduce the use of iron nails. The use of plastic formwork and reserved vibrator holes solve the problems of cumbersome installation and poor molding effect of traditional wall formwork, achieving fast installation, improved durability and environmental protection performance. effect.

CN221799129UActive Publication Date: 2024-10-01新乡市万宏建筑有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323514920.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-01
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

Traditional wall formwork is cumbersome to install, difficult to remove, easy to deform, has poor surface shaping effect, uses a lot of nails, and requires a lot of wood, which is not conducive to energy conservation and environmental protection, and the initial investment cost is high.

Method used

Use connecting ribs and connecting arms to connect the upper, lower, left and right formwork to reduce the use of nails. Use plastic formwork, reserve holes for vibrators, and install vibration devices to improve the molding effect.

Benefits of technology

It realizes the convenient and quick installation of the formwork, reduces the burden on the staff, improves the durability and molding effect of the formwork, reduces the demand for wood, and has good economic benefits and environmental protection performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799129U_ABST
    Figure CN221799129U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building wall formworks, and discloses a novel innovative wall formwork which comprises a formwork body, first grooves are formed in the upper portion and the bottom of the formwork body, a vibrator preformed hole is formed in the middle of the formwork body, transverse edges are fixedly installed on the formwork body, vertical edges are fixedly installed on the formwork body, and the vertical edges are fixedly installed on the formwork body. The upper end of the vertical edge is fixedly connected to the transverse edge above a preformed hole of the vibrator, the lower end of the vertical edge is fixedly connected to the transverse edge below the preformed hole of the vibrator, a connecting rib is movably clamped in the first groove, a second groove is formed in the connecting rib, the second groove and the first groove are matched with each other, a connecting arm is movably clamped to the vertical edge, and the connecting arm is fixedly connected to the connecting rib. The upper formwork body and the lower formwork body are connected through the connecting ribs, the left formwork body and the right formwork body are connected through the connecting arms, iron nails are reduced, installation is convenient and fast, plastic formwork bodies are utilized, loss of wooden formwork bodies is reduced, and environmental protection is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building wall formwork, in particular to a novel innovative wall formwork. Background Art

[0002] The wall formwork is a tool-type formwork that is professionally designed and industrially processed. It is generally connected to the bracket as one body. During construction, it needs to be equipped with corresponding lifting and transportation machinery. It is used for on-site pouring of concrete walls. It has the advantages of easy installation and dismantling, accurate size, flat board surface, and many turnover times. Wall formwork is the main construction method. This construction method has simple process, fast construction speed, good project quality, strong structural integrity, good seismic resistance, smooth concrete surface, can reduce wet plastering operations, and has a high degree of industrialization and mechanization.

[0003] Traditionally, wooden formwork or plastic formwork is used for pouring concrete on vertical walls, and then wooden beams are placed on the back of the wooden formwork or plastic formwork for construction. However, the work efficiency is low, the installation is cumbersome, the removal is very difficult, and it is easy to deform. The surface cannot achieve the effect of a clear water wall. A large amount of iron nails are used, and the iron nails after removal are easy to stab the feet. The waste is not easy to handle, and the molding effect after construction is poor. At the same time, the demand for wood is also large, which is not conducive to energy conservation and environmental protection. There are also aluminum alloy formworks used for construction, which have good construction effects, but the initial investment cost is high. Therefore, in order to solve the above problems, the utility model proposes a new innovative wall formwork. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a new innovative wall formwork, in which the upper and lower formworks are connected by connecting ribs, and the left and right formworks are connected by connecting arms, thereby reducing the use of nails and being quick and easy to install. By using plastic formworks, the loss of wooden formworks is reduced, which is beneficial to environmental protection. Vibrator holes are reserved in the formworks, and the vibration device can be installed in the holes after pouring, which helps the concrete achieve a clear water wall effect after solidification.

[0005] The utility model provides the following technical solutions: a novel innovative wall template, comprising a template, wherein the template is provided with a groove one at the top and the bottom, the groove one is two in number, a vibrator reserved hole is provided in the middle of the template, a horizontal ridge is fixedly installed on the template, the horizontal ridge is two in number and respectively located above and below the vibrator reserved hole, a vertical ridge is fixedly installed on the template, the vertical ridge is two in number and respectively located on the left and right sides of the vibrator reserved hole, the upper end of the vertical ridge is fixedly connected to the horizontal ridge above the vibrator reserved hole, and the lower end of the vertical ridge is fixedly connected to the horizontal ridge below the vibrator reserved hole.

[0006] Preferably, a connecting rib is movably connected in the groove one, and a groove two is provided on the connecting rib. The grooves two are two in number and are symmetrically distributed on the front and rear sides of the connecting rib, and the grooves two and the groove one fit each other.

[0007] Preferably, a connecting arm is movably connected to the vertical edge, the connecting arms are two in number and are evenly distributed on the vertical edge, a groove three is provided on the connecting arm, the groove three is two in number and are symmetrically distributed at the left and right ends of the connecting arm, and the groove three fits with the vertical edge.

[0008] Preferably, screw holes are provided on the transverse edges, vertical edges, connecting ribs and connecting arms, and fixing screws are movably engaged in the screw holes.

[0009] Preferably, a vibration block is movably connected to the middle of the template, the vibration block faces the side of pouring concrete and is located in the vibrator reserved hole, the top and bottom ends of the vibration block are respectively fixedly installed with springs, the number of the springs is two, and the end of the spring away from the vibration block is fixedly connected to the inner wall of the vibrator reserved hole.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] 1. Use connecting ribs to connect the upper and lower templates, and use connecting arms to connect the left and right templates, so that the entire wall template is easy and quick to install. The template can be fixed with a small number of bolts, which reduces the workload of workers for installation and removal and improves work efficiency. Compared with traditional wooden templates, the use of plastic templates is more environmentally friendly and can be reused much more than wooden templates, which improves the durability of the entire wall template and has good economic benefits. At the same time, the plastic template will not deform, which improves the wall forming effect and has good stability.

[0012] 2. A vibration device installation hole is reserved in the template, which avoids the tedious steps of traditional wall templates that need to be poured in batches to facilitate the insertion of the vibration device. The vibrator can be used in time after the wall concrete is poured to discharge the gas in the concrete, which helps the concrete to solidify to form a clear water wall, improves the accuracy and durability of wall pouring, and at the same time improves the efficiency of pouring, effectively solving the problems of poor construction effect of existing wall templates and high initial investment costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the wall formwork of the utility model;

[0014] Figure 2 This is a schematic diagram of a frame template of the utility model;

[0015] Figure 3 This is a schematic diagram of the connecting rib of the utility model;

[0016] Figure 4 This is a schematic diagram of the connecting arm of the utility model;

[0017] Figure 5 This is a schematic diagram of the reserved hole structure of the vibrator of the utility model.

[0018] In the figure: 11, template; 12, groove one; 13, vibrator reserved hole; 2, horizontal edge; 3, vertical edge; 41, connecting rib; 42, groove two; 51, connecting arm; 52, groove three; 6, screw hole; 7, fixing screw; 8, vibration block; 9, spring. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-Figure 5 A new innovative wall template includes a template 11, a groove 12 is provided at the top and bottom of the template 11, the number of the grooves 12 is two, a vibrator reserved hole 13 is provided in the middle of the template 11, a horizontal rib 2 is fixedly installed on the template 11, the number of the horizontal rib 2 is two and they are respectively located above and below the vibrator reserved hole 13, a vertical rib 3 is fixedly installed on the template 11, the number of the vertical rib 3 is two and they are respectively located on the left and right sides of the vibrator reserved hole 13, the upper end of the vertical rib 3 is fixedly connected to the horizontal rib 2 above the vibrator reserved hole 13, and the lower end of the vertical rib 3 is fixedly connected to the vibrator reserved hole On the transverse rib 2 below the hole 13, a connecting rib 41 is movably connected in the groove 12, and a groove 2 42 is provided on the connecting rib 41. There are two grooves 42 and they are symmetrically distributed on the front and rear sides of the connecting rib 41. The groove 2 42 and the groove 1 12 fit each other. The lower half of the connecting rib 41 is inserted into the groove 12 on the upper part of the template 11, and then the upper half of the connecting rib 41 is inserted into the groove 12 at the bottom of another template 11. The connecting rib 41 and the screw holes 6 on the transverse rib 2 are aligned, so that the fixing screws 7 are fixed in the screw holes 6, so that the upper and lower templates 11 are connected to form a whole;

[0021] A connecting arm 51 is movably connected to the vertical edge 3. There are two connecting arms 51 and they are evenly distributed on the vertical edge 3. A groove 3 52 is provided on the connecting arm 51. There are two grooves 52 and they are symmetrically distributed at the left and right ends of the connecting arm 51. The groove 3 52 fits with the vertical edge 3. The connecting arm 51 is placed at a suitable position on the vertical edge 3 so that the groove 3 52 fits with the vertical edge 3. The groove 3 52 at the other end of the connecting arm 51 fits with the vertical edge 3 on another template 11 so that the connecting arm 51 and the screw holes 6 on the vertical edge 3 correspond to each other. Then the fixing screw 7 is fixed in the screw hole 6 so that the left and right templates 11 are connected to form a whole. Screw holes 6 are provided on the transverse edge 2, the vertical edge 3, the connecting rib 41 and the connecting arm 51. The fixing screw 7 is movably connected to the screw hole 6 The upper and lower templates 11 are connected by connecting ribs 41, and the left and right templates 11 are connected by connecting arms 51, so that the entire wall template 11 can be installed conveniently and quickly. A vibration block 8 is movably connected to the middle of the template 11. The vibration block 8 faces the side of pouring concrete and is located in the vibrator reserved hole 13. Springs 9 are fixedly installed on the top and bottom ends of the vibration block 8 respectively. There are two springs 9. One end of the spring 9 away from the vibration block 8 is fixedly connected to the inner wall of the vibrator reserved hole 13. After pouring concrete, a concrete vibrator is installed in the vibrator reserved hole 13. The vibrator drives the vibration block 8. Under the action of the spring 9, the vibration block 8 can vibrate up and down, so that the gas in the concrete is discharged, which helps the concrete to solidify to form a clear water wall and improve the accuracy and durability of wall casting.

[0022] Working principle: first insert the lower part of the connecting rib 41 into the groove 12 on the upper part of the template 11, then insert the upper part of the connecting rib 41 into the groove 12 at the bottom of the other template 11, make the connecting rib 41 correspond to the screw hole 6 on the horizontal edge 2, so that the fixing screw 7 is fixed in the screw hole 6, so that the upper and lower templates 11 are connected to form a whole, and the connecting arm 51 is placed at a suitable position on the vertical edge 3, so that the groove 3 52 fits with the vertical edge 3, and the groove 3 52 at the other end of the connecting arm 51 fits with the vertical edge 3 on the other template 11, so that the connecting arm 51 and the vertical edge 3 are connected. The screw hole 6 corresponds to the screw hole 6, and then the fixing screw 7 is fixed in the screw hole 6, so that the left and right templates 11 are connected to form a whole, and the required wall casting template is built reciprocatingly. After pouring concrete, the concrete vibrator is installed in the vibrator reserved hole 13, and the vibrator drives the vibration block 8. Under the action of the spring 9, the vibration block 8 can vibrate up and down, so that the gas in the concrete is discharged. After the concrete solidifies, the fixing screw 7 is first unscrewed from the screw hole 6, and then the connecting arm 51 and the connecting rib 41 are removed in turn, so that the template 11 connected to form a whole can be recycled.

Claims

1. A new innovative wall formwork, comprising a formwork (11), characterized in that: The template (11) is provided with grooves (12) at the top and bottom, the number of the grooves (12) being two, the template (11) is provided with a vibrator reserved hole (13) at the middle, the template (11) is provided with transverse edges (2) fixedly mounted on the template (11), the number of the transverse edges (2) being two and respectively located above and below the vibrator reserved hole (13), the template (11) is provided with vertical edges (3) fixedly mounted on the template (11), the number of the vertical edges (3) being two and respectively located on the left and right sides of the vibrator reserved hole (13), the upper ends of the vertical edges (3) being fixedly connected to the transverse edges (2) above the vibrator reserved hole (13), and the lower ends of the vertical edges (3) being fixedly connected to the transverse edges (2) below the vibrator reserved hole (13).

2. A new innovative wall formwork according to claim 1, characterized in that: A connecting rib (41) is movably engaged in the groove one (12), and a groove two (42) is provided on the connecting rib (41). The groove two (42) is two in number and symmetrically distributed on the front and rear sides of the connecting rib (41), and the groove two (42) and the groove one (12) fit each other.

3. A new innovative wall formwork according to claim 2, characterized in that: A connecting arm (51) is movably connected to the vertical edge (3), the connecting arms (51) are two in number and are evenly distributed on the vertical edge (3), the connecting arm (51) is provided with a groove three (52), the groove three (52) are two in number and are symmetrically distributed at the left and right ends of the connecting arm (51), and the groove three (52) and the vertical edge (3) are mutually matched.

4. A new innovative wall formwork according to claim 3, characterized in that: The transverse edges (2), the vertical edges (3), the connecting ribs (41) and the connecting arms (51) are all provided with screw holes (6), and fixing screws (7) are movably engaged in the screw holes (6).

5. A new innovative wall formwork according to claim 1, characterized in that: A vibration block (8) is movably connected to the middle of the template (11), the vibration block (8) faces the side of the poured concrete and is located in the vibrator reserved hole (13), and springs (9) are fixedly installed on the top and bottom ends of the vibration block (8), respectively. The number of the springs (9) is two, and one end of the spring (9) away from the vibration block (8) is fixedly connected to the inner wall of the vibrator reserved hole (13).