Net hanging device

By designing a net-hanging device including a bracket body, an adjusting winch and a flexible net roll, the net-hanging operation at the end of the coal mine's fully mechanized mining face is simplified, solving the problems of complex processes and high labor intensity, improving work efficiency and reducing costs. Safety hazard.

CN221799841UActive Publication Date: 2024-10-01SHENHUA SHENDONG COAL GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420098081.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-10-01
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

When the fully-mechanized coal mining working face is hung with nets at the end of the mining process, the process is complex and the labor intensity is high, resulting in low work efficiency, safety hazards and risks of roof leakage and roof collapse.

Method used

A net-hanging device is designed, including a bracket body, an adjusting winch and a flexible net roll. By adjusting the winch, the traction rope is tightened and the supporting rope is relaxed, driving the free end of the flexible net roll to move to the through hole, and through the fixing part Fixed on the working surface, it simplifies the net-hanging operation and reduces personnel working time and accident risks.

Benefits of technology

It greatly reduces the workload of hanging the net, reduces the risk of operating accidents, improves work efficiency, ensures the safety of operators, and avoids the risk of roof leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799841U_ABST
    Figure CN221799841U_ABST
Patent Text Reader

Abstract

The utility model provides a net hanging device which comprises a support body, an adjusting winch and a flexible net roll. The adjusting winch is rotatably arranged on the support body, a traction rope and a bearing rope are wound on the adjusting winch in opposite directions, a through hole is formed in a top beam of the support body, the free end of the traction rope penetrates through the through hole to be connected with the free end of the bearing rope, and a bearing space is formed between the traction rope and the bearing rope; the flexible net roll is arranged in the bearing space, and the free end of the flexible net roll is connected with the free end of the bearing rope, so that the traction rope is tightened by rotating the adjusting winch, the bearing rope is loosened, and the free end of the flexible net roll is driven to move to the through hole; and the fixing piece penetrates through the free end of the flexible net roll and then penetrates through the working face for net hanging, so that the problems that in the prior art, when a fully mechanized coal mining face of a coal mine is subjected to net hanging in the end mining process, the working procedure is complex, the labor intensity is high, and the working efficiency is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coal mining, in particular to a net hanging device. Background Art

[0002] At present, in mechanized mining of coal mines, the final mining of the mining face is the last link of the coal mining face, and it is also an important link to prepare for the withdrawal of the fully-mechanized hydraulic support of the coal mining face. During the final mining, it is necessary to first place the end of the high-strength flexible net on the front end of the top beam of the fully-mechanized hydraulic support, and then through the operation of cutting coal and moving the frame and coordinating the deployment of the flexible net, the hydraulic support is finally completely covered by the flexible net. At this time, it can effectively prevent the top plate of the working face from breaking and leaking, and provide a safe working environment for the withdrawal of equipment. Therefore, adopting a safe and efficient net laying process is a prerequisite for the safe and rapid withdrawal of the working face equipment.

[0003] The general practices for hanging nets in existing fully mechanized mining faces are:

[0004] 1. Construct anchor rods at the top plate at the front end of the top beam of the fully mechanized mining support, install horseshoe rings on the anchor rods, pass a steel wire rope through them as the fixing edge for the subsequent hanging net, and then fix the end of the flexible net on the anchor rods;

[0005] 2. Lower the walking support, insert the end of the flexible net into the front end of the top beam, raise the front end of the support top beam, and complete the net hanging process. After hanging the net, use a self-locking hand winch with a wire rope to lift the flexible net to provide space for the coal mining machine to pass through.

[0006] However, the above-mentioned mesh hanging process has a large workload, complicated process and high labor intensity, and this part of the operation requires multiple workers to cooperate in working under the empty wall of the coal wall between frames for a long time. In addition, there are safety hazards such as roof spalling and roof leakage during the operation, as well as frequent high-altitude operations. In addition, it takes a long time to install anchor rods, hang wire ropes and lift the mesh, which is not conducive to roof control. There is a high risk of roof leakage and roof collapse, which makes it difficult to ensure the personal safety of operators, further affecting operation safety. Utility Model Content

[0007] The main purpose of the utility model is to provide a mesh hanging device to solve the problem of complex procedures and high labor intensity when hanging mesh at the end of coal mine comprehensive mining working face in the prior art, resulting in low work efficiency.

[0008] In order to achieve the above-mentioned purpose, the utility model provides a net hanging device, comprising: a bracket body; an adjusting winch, which is rotatably arranged on the bracket body, a traction rope and a supporting rope are respectively wound on the adjusting winch in opposite directions, a through hole is arranged on the top beam of the bracket body, the free end of the traction rope passes through the through hole and is connected with the free end of the supporting rope, and a supporting space is formed between the traction rope and the supporting rope; a flexible net roll is arranged in the supporting space, and the free end of the flexible net roll is connected with the free end of the supporting rope, so that the traction rope can be tightened and the supporting rope can be loosened by rotating the adjusting winch, so as to drive the free end of the flexible net roll to move to the through hole, and the net can be hung by passing the fixing piece through the free end of the flexible net roll and then passing it on the working surface.

[0009] Furthermore, there is a gap between the through hole and one end of the top beam close to the supporting space in the extension direction of the top beam, and the gap is greater than or equal to 1 m.

[0010] Furthermore, the extension direction of the top beam is arranged parallel to the working surface, and a mesh gap is provided between the top beam and the working surface. The central axis of the through hole is arranged obliquely relative to the extension direction of the top beam, and the through hole is connected to the mesh gap.

[0011] Furthermore, the opening edges of the through holes are all arc-shaped structures protruding outwards.

[0012] Furthermore, contact pieces for respectively contacting the traction rope, the supporting rope and the flexible net roll are arranged on the end of the top beam, and the contact pieces are made of flexible material or have a smooth surface.

[0013] Furthermore, the net hanging device also includes a connecting piece, and the free ends of the traction rope, the supporting rope and the flexible net roll are respectively detachably connected to the connecting piece.

[0014] Furthermore, a guide member is provided on the top beam, and the guide member is located between the adjusting winch and the through hole along the extension direction of the traction rope. The free ends of the traction rope and the supporting rope are respectively passed through the guide member, and the free end of the traction rope passes through the guide member and the through hole in sequence and is connected to the free end of the supporting rope.

[0015] Further, the guide member is a guide ring, and the traction rope and the supporting rope pass through the guide ring respectively; or, the guide member is a pulley, and there are two pulleys, and the traction rope and the supporting rope are respectively wound around the corresponding pulleys.

[0016] Furthermore, a partition is provided on the adjusting winch so that the adjusting winch forms two installation grooves, and the traction rope and the supporting rope are respectively wound in the corresponding installation grooves.

[0017] Furthermore, the traction rope comprises a plurality of sub-rope segments connected in sequence, and two adjacent sub-rope segments among the plurality of sub-rope segments are detachably connected.

[0018] By applying the technical solution of the utility model, the net hanging device includes a bracket body, an adjusting winch and a flexible net roll; the adjusting winch is rotatably arranged on the bracket body, a traction rope and a supporting rope are respectively wound on the adjusting winch in opposite directions, a through hole is arranged on the top beam of the bracket body, the free end of the traction rope passes through the through hole and is connected with the free end of the supporting rope, and a supporting space is formed between the traction rope and the supporting rope; the flexible net roll is arranged in the supporting space, and the free end of the flexible net roll is connected with the free end of the supporting rope, so that the traction rope can be tightened and the supporting rope can be loosened by rotating the adjusting winch, so as to drive the free end of the flexible net roll to move to the through hole, and the net can be hung by passing the fixing part through the free end of the flexible net roll and then passing it on the working surface. The above arrangement contracts the traction rope by rotating the adjusting winch to pull the supporting rope and the free end of the flexible mesh roll toward the top beam respectively; and relaxes the supporting rope to support the flexible mesh roll as it continues to release the net, and then the free ends of the supporting rope and the flexible mesh roll respectively pass over the end of the top beam and move to the through hole, and then the free ends of the flexible mesh roll and the supporting rope are firmly fixed on the working surface by fixing parts to complete the net hanging operation of the flexible mesh roll, that is, there is no need for multiple workers to work continuously on the coal wall for a long time, which greatly reduces the workload of net hanging and effectively reduces the risk of operational accidents, thereby solving the problem of complex procedures and high labor intensity in the final net hanging of the coal mine comprehensive mining working face in the prior art, resulting in low work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0020] Figure 1 A schematic structural diagram of a first state of a net hanging device provided according to an embodiment of the net hanging device of the utility model is shown;

[0021] Figure 2 A schematic structural diagram of a second state of a net hanging device provided according to an embodiment of the net hanging device of the utility model is shown;

[0022] Figure 3 A schematic structural diagram of a third state of a net hanging device provided according to an embodiment of the net hanging device of the utility model is shown;

[0023] Figure 4 The schematic diagram of the structure of the adjusting winch provided according to the embodiment of the net hanging device of the utility model is shown.

[0024] The above drawings include the following reference numerals:

[0025] 1. Working surface; 10. Support body; 11. Top beam; 110. Through hole; 12. Telescopic rod; 20. Adjusting winch; 21. Traction rope; 22. Support rope; 23. Partition; 24. Mounting groove; 30. Flexible mesh roll; 40. Connector; 50. Guide. DETAILED DESCRIPTION

[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0027] Please refer to Figures 1 to 4 As shown, applying the technical solution of the utility model, the net hanging device includes a bracket body 10, an adjusting winch 20 and a flexible net roll 30; the adjusting winch 20 is rotatably arranged on the bracket body 10, and a traction rope 21 and a supporting rope 22 are respectively wound on the adjusting winch 20 in opposite directions, and a through hole 110 is arranged on the top beam 11 of the bracket body 10, and the free end of the traction rope 21 passes through the through hole 110 and is connected with the free end of the supporting rope 22, and a supporting space is formed between the traction rope 21 and the supporting rope 22; the flexible net roll 30 is arranged in the supporting space, and the free end of the flexible net roll 30 is connected with the free end of the supporting rope 22, so that the traction rope 21 is tightened by rotating the adjusting winch 20, and the supporting rope 22 is loosened, so as to drive the free end of the flexible net roll 30 to move to the through hole 110, and the fixing piece is passed through the free end of the flexible net roll 30 and then passed on the working surface 1 to hang the net.

[0028] By applying the technical solution of the present embodiment, the traction rope 21 is contracted by rotating the adjustment winch 20 to pull the supporting rope 22 and the free end of the flexible mesh roll 30 toward the top beam 11 respectively; and the supporting rope 22 is relaxed to support the flexible mesh roll 30 when it continues to release the net, so that the free ends of the supporting rope 22 and the flexible mesh roll 30 respectively pass over the end of the top beam 11 and move to the through hole 110, and then the free ends of the flexible mesh roll 30 and the supporting rope 22 are firmly fixed on the working face 1 by using the fixing parts to complete the net hanging operation of the flexible mesh roll 30, that is, there is no need for multiple workers to work continuously on the coal wall for a long time, which greatly reduces the workload of net hanging and effectively reduces the risk of operational accidents, thereby solving the problem of complex procedures and high labor intensity in the net hanging of the coal mine comprehensive mining working face 1 in the prior art, resulting in low work efficiency.

[0029] In this embodiment, the support body 10 is a hydraulic support seat.

[0030] In this embodiment, the bracket body 10 also includes a telescopic rod 12 and a bracket base, the two ends of the telescopic rod 12 are respectively connected to the bracket base and the top beam 11, and the top beam 11 is hinged to the bracket base. The telescopic rod 12 is telescopically arranged to adjust the angle of the top beam 11 relative to the horizontal plane by controlling the telescopic movement of the telescopic rod 12, so that the top beam 11 can be tilted relative to the working surface 1.

[0031] Specifically, there is a gap between the through hole 110 and one end of the top beam 11 close to the supporting space in the extending direction of the top beam 11 , and the gap is greater than or equal to 1 m. In the above-mentioned arrangement, the through hole 110 is opened on the top beam 11 and has a certain interval from the end of the top beam 11, so that when the traction rope 21 drives the free ends of the supporting rope 22 and the flexible mesh roll 30 to move to the through hole 110 respectively, the telescopic rod 12 is controlled to extend and retract to drive the end of the top beam 11 to move downward and tilt relative to the working surface 1, so that the free ends of the supporting rope 22 and the flexible mesh roll 30 respectively pass through the opening between the top beam 11 and the working surface 1 and move to the through hole 110, and then the top beam 11 is adjusted to move back to press the net edge of the flexible mesh roll 30 against the working surface 1. Since the through hole 110 is at a certain interval at the end of the top beam 11, the top beam 11 presses a certain length of the flexible mesh roll 30 to ensure that the free end of the flexible mesh roll 30 can be firmly fixed on the top beam 11, which is convenient for the subsequent walking of the bracket body 10 to gradually unfold the flexible mesh roll 30, and finally fully unfold it to effectively prevent the working surface 1 from breaking and forming a leaky roof.

[0032] Specifically, the extension direction of the top beam 11 is arranged parallel to the working surface 1, and there is a mesh gap between the top beam 11 and the working surface 1, the central axis of the through hole 110 is arranged obliquely relative to the extension direction of the top beam 11, and the through hole 110 is connected to the mesh gap. With the above arrangement, under normal circumstances, the extension direction of the top beam 11 is arranged parallel to the working surface 1, and the net hanging gap between the top beam 11 and the working surface 1 is used for the traction rope 21, the supporting rope 22 and the flexible net roll 30 to pass through, and the central axis of the through hole 110 is inclined in the direction away from the supporting space than the extension direction of the top beam 11, so that after the free end of the traction rope 21 passes through the through hole 110, passes through the net hanging gap and crosses the end of the top beam 11 to be respectively connected with the free ends of the supporting rope 22 and the flexible net roll 30, the traction rope 21 is tightened by rotating the adjusting winch 20, so that the traction rope 21 moves in the through hole 110 along the extension direction of the through hole 110, so as to prevent the traction rope 21 from being worn due to long-term friction with the opening edge of the through hole 110.

[0033] Specifically, the opening edges of the through hole 110 are all arc-shaped structures protruding outwards. The above arrangement allows the traction rope 21 to contact the opening edges of the through hole 110 that are the arc-shaped structures protruding outwards when the winch 20 is rotated to control the traction rope 21 to tighten, so as to reduce the friction between the traction rope 21 and the through hole 110.

[0034] Optionally, a contact piece for respectively contacting the traction rope 21, the supporting rope 22 and the flexible net roll 30 is arranged on the end of the top beam 11, and the contact piece is made of a flexible material or has a smooth surface. With the above arrangement, after the traction rope 21 passes through the through hole 110, it passes over the end of the top beam 11 and is respectively connected to the free ends of the supporting rope 22 and the flexible net roll 30, so that when the winch 20 is rotated to tighten the traction rope 21 and drive the supporting rope 22 and the flexible net roll 30 to move, the traction rope 21, the supporting rope 22 and the flexible net roll 30 are respectively in contact with the contact piece on the end of the top beam 11. Since the contact piece is made of an elastic material or has a smooth surface, the friction force of the traction rope 21, the supporting rope 22 and the flexible net roll 30 in contact with the end of the top beam 11 when they move is reduced.

[0035] Specifically, the net hanging device further includes a connecting member 40 , and the free ends of the traction rope 21 , the supporting rope 22 and the flexible net roll 30 are respectively detachably connected to the connecting member 40 .

[0036] In this embodiment, the connecting member 40 is a horseshoe ring.

[0037] Specifically, a guide member 50 is provided on the top beam 11, and the guide member 50 is located between the adjusting winch 20 and the through hole 110 along the extension direction of the traction rope 21. The free ends of the traction rope 21 and the supporting rope 22 are respectively passed through the guide member 50, and the free end of the traction rope 21 passes through the guide member 50 and the through hole 110 in sequence and is connected to the free end of the supporting rope 22. In the above configuration, after the traction rope 21 is passed through the guide member 50, it passes through the through hole 110 and crosses the end of the top beam 11 to be connected to the supporting rope 22 passing through the guide member 50. The guide member 50 guides the traction rope 21 and the supporting rope 22, and at the same time, it also supports the traction rope 21 and the supporting rope 22.

[0038] Optionally, the guide member 50 is a guide ring, and the traction rope 21 and the supporting rope 22 pass through the guide ring respectively; in this way, the guide ring is hinged on the bottom of the top, and the free ends of the traction rope 21 and the supporting rope 22 are respectively passed through the guide ring.

[0039] Optionally, the guide member 50 is a pulley, and there are two pulleys, and the traction rope 21 and the supporting rope 22 are respectively wound around the corresponding pulleys. In the above configuration, the two pulleys are respectively arranged at the bottom of the top beam 11, and the traction rope 21 and the supporting rope 22 are respectively wound around a corresponding pulley, so that when the winch 20 is rotated and adjusted, the two pulleys guide the traction rope 21 and the supporting rope 22 in opposite directions.

[0040] like Figure 4As shown, a partition plate 23 is provided on the adjusting capstan 20 so that the adjusting capstan 20 forms two mounting grooves 24, and the traction rope 21 and the supporting rope 22 are respectively wound in the corresponding mounting grooves 24. With the above arrangement, the traction rope 21 and the supporting rope 22 are respectively wound in the corresponding mounting grooves 24 in opposite directions, so that when the handle is turned, the traction rope 21 and the supporting rope 22 are respectively tightened or loosened.

[0041] Optionally, the traction rope 21 includes a plurality of sub-rope segments connected in sequence, and two adjacent sub-rope segments among the plurality of sub-rope segments are detachably connected. With the above arrangement, after the free ends of the supporting rope 22 and the flexible net roll 30 are respectively moved to the through hole 110 and fixed to the working surface 1 by means of fixing members, the two adjacent sub-rope segments near the through hole 110 are removed (or the traction rope 21 is cut off at a position near the through hole 110), so that when the support body 10 moves along the extension direction of the working surface 1, the flexible net roll 30 and the supporting rope 22 are respectively released to release the net and the rope. Finally, the net is fully unfolded to complete the net laying operation.

[0042] In this embodiment, the specific screen hanging process is as follows:

[0043] S1: When the coal mining face 1 is recovered to the final mining stage, the adjusting winch 20 is installed on the telescopic rod 12 of the support body 10 using a clamp in advance (the number of the support bodies 10 of the comprehensive mining face 1 is as few as about one hundred and as many as several hundred. In order to ensure the pulling force on the flexible mesh roll 30 and improve the net-catching capacity of the flexible mesh roll 30, at least one adjusting winch 20 is installed for every 1 to 2 support bodies 10), and the traction rope 21 and the supporting rope 22 are respectively wound in opposite directions in the installation grooves 24 on both sides of the circular partition 23 on the adjusting winch 20, and the free ends of the traction rope 21 and the supporting rope 22 are respectively passed through the guide member 50.

[0044] S2: After the free end of the traction rope 21 passes through the guide member 50, it passes upward from the bottom end of the through hole 110. At this time, the front end of the top beam 11 needs to be slightly "dipped" downward (i.e., the top beam 11 is adjusted to be inclined relative to the working surface 1), and the traction rope 21 continues to pass through the gap between the hanging nets and pass over the end of the top beam 11, so that the free end of the traction rope 21 hangs down from the end of the top beam 11 of the bracket body 10;

[0045] S3: Use the connector 40 to connect the free end of the traction rope 21 to the free end of the flexible net roll 30 , and pass the free end of the support rope 22 around the bottom of the flexible net roll 30 and then connect it to the connector 40 .

[0046] S4: Adjust the top beam 11 of the bracket body 10 so that its front end is in a slightly "diving" state, turn the handle of the adjusting winch 20, so that the traction rope 21 is gradually wound up and the supporting rope 22 is simultaneously relaxed and spread out, so that the traction rope 21 gradually pulls up the free end of the flexible mesh roll 30, and pulls it to the position corresponding to the connection between the through hole 110 and the net hanging gap, and then adjust the top beam 11 of the bracket body 10 to return to its original position to compress the flexible mesh roll 30 and the working surface 1, and then cut the traction rope 21 at the position corresponding to the bottom end of the through hole 110 to complete the net hanging operation.

[0047] S5: The adjusting winch 20 is rotated accordingly so that the supporting rope 22 is gradually wound up to ensure that the flexible net roll 30 is “hooked up” to meet the space requirement for the coal mining machine to pass through.

[0048] From the above description, it can be seen that the above embodiments of the utility model achieve the following technical effects:

[0049] The net hanging device includes a support body, an adjusting winch and a flexible net roll; the adjusting winch is rotatably arranged on the support body, a traction rope and a supporting rope are respectively wound on the adjusting winch in opposite directions, a through hole is arranged on the top beam of the support body, the free end of the traction rope passes through the through hole and is connected with the free end of the supporting rope, and a supporting space is formed between the traction rope and the supporting rope; the flexible net roll is arranged in the supporting space, and the free end of the flexible net roll is connected with the free end of the supporting rope, so that the traction rope can be tightened and the supporting rope can be loosened by rotating the adjusting winch, so as to drive the free end of the flexible net roll to move to the through hole, and the net can be hung by passing the fixing part through the free end of the flexible net roll and then passing it on the working surface. The above arrangement contracts the traction rope by rotating the adjusting winch to pull the supporting rope and the free end of the flexible mesh roll toward the top beam respectively; and relaxes the supporting rope to support the flexible mesh roll as it continues to release the net, and then the free ends of the supporting rope and the flexible mesh roll respectively pass over the end of the top beam and move to the through hole, and then the free ends of the flexible mesh roll and the supporting rope are firmly fixed on the working surface by fixing parts to complete the net hanging operation of the flexible mesh roll, that is, there is no need for multiple workers to work continuously on the coal wall for a long time, which greatly reduces the workload of net hanging and effectively reduces the risk of operational accidents, thereby solving the problem of complex procedures and high labor intensity in the final net hanging of the coal mine comprehensive mining working face in the prior art, resulting in low work efficiency.

[0050] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0051] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values ​​of the parts and steps described in these embodiments do not limit the scope of the utility model. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, methods and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in one drawing, it does not need to be further discussed in subsequent drawings.

[0052] In the description of the present utility model, it needs to be understood that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present utility model and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction, and therefore cannot be understood as limiting the scope of protection of the present utility model; the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.

[0053] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.

[0054] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A net hanging device, characterized in that: include: a bracket body (10); An adjusting winch (20) is rotatably arranged on the support body (10), a traction rope (21) and a supporting rope (22) are respectively wound around the adjusting winch (20) in opposite directions, a through hole (110) is provided on the top beam (11) of the support body (10), a free end of the traction rope (21) passes through the through hole (110) and is connected to the free end of the supporting rope (22), and a supporting space is formed between the traction rope (21) and the supporting rope (22); A flexible mesh roll (30) is arranged in the supporting space, and the free end of the flexible mesh roll (30) is connected to the free end of the supporting rope (22), so that the traction rope (21) is tightened by rotating the adjusting winch (20) and the supporting rope (22) is loosened, thereby driving the free end of the flexible mesh roll (30) to move to the through hole (110), and the fixing piece is passed through the free end of the flexible mesh roll (30) and then installed on the working surface (1) to hang the net.

2. The net hanging device according to claim 1, characterized in that: There is a gap between the through hole (110) and one end of the top beam (11) close to the supporting space in the extending direction of the top beam (11), and the gap is greater than or equal to 1m.

3. The net hanging device according to claim 1, characterized in that: The extension direction of the top beam (11) is arranged parallel to the working surface (1), and a mesh gap is provided between the top beam (11) and the working surface (1). The central axis of the through hole (110) is arranged obliquely relative to the extension direction of the top beam (11), and the through hole (110) is connected to the mesh gap.

4. The net hanging device according to claim 1, characterized in that: The opening edges of the through holes (110) are all arc-shaped structures that bulge outward.

5. The net hanging device according to claim 1, characterized in that: Contact members for respectively contacting the traction rope (21), the support rope (22) and the flexible net roll (30) are arranged on the end of the top beam (11); the contact members are made of flexible material or have a smooth surface.

6. The net hanging device according to claim 1, characterized in that: The net hanging device further comprises a connecting piece (40), and the free ends of the traction rope (21), the supporting rope (22) and the flexible net roll (30) are respectively detachably connected to the connecting piece (40).

7. The net hanging device according to claim 1, characterized in that: A guide member (50) is provided on the top beam (11), and the guide member (50) is located between the adjusting winch (20) and the through hole (110) along the extension direction of the traction rope (21). The free ends of the traction rope (21) and the supporting rope (22) are respectively passed through the guide member (50), and the free end of the traction rope (21) passes through the guide member (50) and the through hole (110) in sequence and is connected to the free end of the supporting rope (22).

8. The net hanging device according to claim 7, characterized in that: The guide member (50) is a guide ring, and the traction rope (21) and the support rope (22) pass through the guide ring respectively; or, The guide member (50) is a pulley, and there are two pulleys. The traction rope (21) and the supporting rope (22) are respectively wound around the corresponding pulleys.

9. The net hanging device according to claim 1, characterized in that: A partition (23) is provided on the adjusting winch (20) so that the adjusting winch (20) forms two installation grooves (24), and the traction rope (21) and the supporting rope (22) are respectively wound in the corresponding installation grooves (24).

10. The net hanging device according to claim 1, characterized in that: The traction rope (21) comprises a plurality of sub-rope segments connected in sequence, and two adjacent sub-rope segments among the plurality of sub-rope segments are detachably connected.