Cooling water communicating and supplementing device for multiple cooling-water machines
By designing the cooling water connection and replenishment device of multiple chillers, and using the cache water tank and parallel valve system, the problem of frequent water refilling and failure shutdown of the chillers is solved, the water refilling cycle is extended, the system stability and fault tolerance are enhanced, and the lithium Normal operation of battery drying equipment.
Patent Information
- Application Number
- CN202323398729.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-13
AI Technical Summary
In the existing lithium battery drying equipment, the vacuum pump cannot work properly due to substandard water quality, frequent water addition, malfunctions, shutdowns, and water transportation risks, affecting the overall pumping speed.
Design a cooling water connection and replenishment device for multiple chillers. Through the buffer water tank and parallel valve system, the cooling water can be connected and replenished, extending the water refilling cycle, reducing the risk of water transportation, and balancing the water level in case of failure to ensure system stability.
It extends the cooling water filling cycle, reduces the risk of product defects caused by water transportation, enhances the stability and fault tolerance of the system, and ensures the normal operation of the vacuum pump. Even if a single chiller fails, it can support the operation of multiple vacuum pumps.
Smart Images

Figure CN221802132U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of lithium battery drying, and in particular relates to a cooling water connecting and replenishing device for multiple chillers. Background Art
[0002] The lithium battery drying line heats and insulates the battery cell through a contact clamp, and evacuates the vacuum chamber through a vacuum pump to provide a vacuum environment for the battery cell baking. Under constant temperature and vacuum conditions, the water in the battery cell pole piece is quickly vaporized and overflowed to achieve the purpose of controlling the water content of the battery cell pole piece.
[0003] The current mainstream drying equipment for battery cells mostly uses a dry screw & Roots pump combination vacuum pump to achieve vacuuming of the unloaded oven cavity to Pa level within 5 minutes. At present, the mainstream configuration of manufacturers using large cavities is 1 combination vacuum pump corresponding to 4 cavities. A production line above 12ppm requires 12 vacuum drying cavities, which requires 3 combination vacuum pumps. When the dry screw pump is running, cooling water is required to cool the screw cavity, and the quality of the cold water is extremely high. At present, the 7-12℃ cold water provided by the auxiliary station in the factory area is seriously substandard in water quality. Forcible use can easily cause blockage and scaling of the cooling pipe inside the vacuum pump, and ultimately cause the vacuum pump to fail to work properly. The conventional practice is to configure a small air-cooled or water-cooled chiller for each vacuum pump, and add cooling water with the water quality requirements of the load screw pump to the water tank of the chiller. According to the configuration of a single-line 12ppm production capacity, each drying line needs to be equipped with 3 chillers. Since the water tank of this type of small chiller is usually small, due to normal loss, the cooling water in the water tank needs to be manually replenished with cooling water (about 40kg) every 15 days or so. The drying and injection areas have extremely high humidity requirements, and the environmental dew point needs to be ≤-35℃. In summary, the defects of current chillers are: the water addition cycle is too frequent, which increases the workload of personnel; the water transportation path must pass through several process areas with humidity control, which will cause the risk of affecting the environment of the area; once the chiller circulation pump fails and stops, the cooling water in the water supply part will flow back to the water tank. If the water addition amount is not properly controlled, it will cause cooling water overflow; once a chiller refrigeration system fails (such as compressor failure or refrigerant loss, etc.), the corresponding vacuum pump will face shutdown, affecting the pumping speed of the overall vacuum system. The patent document with authorization announcement number CN215810294 U discloses an automatic water replenishing device for a cooling tower in a gravure printing production line, including a cooling tower and a monitoring box connected to a water reservoir in the cooling tower through a connecting pipe, the top of the monitoring box is higher than a predetermined maximum liquid level of the water reservoir, the bottom of the connecting pipe and the monitoring box are lower than a predetermined minimum liquid level of the water reservoir, and a water level sensing module is arranged in the monitoring box.The patent document with the authorization announcement number CN 216521917 U discloses a borehole heating system based on mid-deep geothermal energy, including a well, the well being opened on the surface of the formation, the upper surface of the formation being provided with a cold medium mechanism and a hot medium mechanism; the cold medium mechanism comprising four fixed blocks, the four fixed blocks being fixedly connected to the upper surface of the formation, the side surfaces of the four fixed blocks being provided with slide grooves, the inner bottom ends of the four slide grooves being fixedly connected to springs, the inner parts of the four slide grooves being slidably connected to support sliders, a cold medium box being fixedly connected between the four support sliders, the upper surface of the cold medium box being fixedly connected to a first circulation pipe, and one side of the bottom end of the cold medium box The surface is provided with through holes, and the inner wall surfaces of the through holes are fixedly connected with sealing gaskets; the heat medium mechanism includes a heat medium box, the heat medium box is fixedly connected to the upper surface of the formation, the side surface of the heat medium box close to the bottom end is fixedly connected with a second circulation pipe, the bottom surface of the heat medium box away from the heat medium box is fixedly connected with a first insulation pipe, the inner wall surface of the well close to the bottom end is fixedly connected with a heat exchanger and a second insulation pipe, the side surface of the well is provided with a side groove, the inside of the side groove is fixedly connected with a circulation pump, the input and output ends of the circulation pump are fixedly connected with connecting pipes, and the inside of the second insulation pipe is fixedly connected with a valve. Utility Model Content
[0004] The utility model aims to overcome the shortcomings of the prior art and provide a cooling water connecting and replenishing device for multiple chillers, thereby avoiding the risks and defects caused by cooling water shutdown, periodic water replenishment and water circulation. Compensation is implemented through a buffer water tank to reduce the cooling water loss of the chiller.
[0005] In order to achieve the above-mentioned purpose, the utility model is implemented through the following technical scheme: a cooling water connecting and replenishing device for multiple chillers, including a first chiller water tank, a second chiller water tank and a third chiller water tank, the first chiller water tank, the second chiller water tank and the third chiller water tank are connected to the main line through their own valves and branch pipes, the main line is connected to the cache water tank through a water tank drain valve placed at the bottom of the cache water tank, the first chiller water tank, the second chiller water tank 7 and the third chiller water tank are connected in parallel with the cache water tank and are connected through the normally open valves of the four water tanks to form a communicating vessel replenishing mechanism in which the water levels of the four water tanks are always kept consistent.
[0006] Furthermore, a main line drainage ball valve is provided at one end of the main line.
[0007] Furthermore, a water tank cover is provided on the cache water tank, and a water tank drain valve is provided at the bottom of the cache water tank.
[0008] Furthermore, the cache water tank is coated with a flame retardant rubber-plastic insulation layer with a thickness of 25 mm on all sides.
[0009] Furthermore, the branch pipeline and the main pipeline are made of PPR pipes and are connected by heat welding.
[0010] Furthermore, the branch pipeline and the main pipeline are coated with a thermal insulation layer.
[0011] Beneficial effects: Compared with the prior art, the utility model extends the original water-adding frequency of once every 15 days to once every quarter; a water-adding cycle can be adjusted according to the actual production situation to ensure that the production line is in a non-production state when water is transported, thereby reducing the risk of product defects caused by water transportation; when a chiller stops due to a malfunction, the water refluxed from the system and the capacity of the buffer water tank can balance the rise in the water level, thus preventing the occurrence of return water overflow; the single machine is systematized, so that even if a chiller fails to refrigerate, the cooling capacity of the other two chillers and the cold storage capacity in the buffer water tank can basically support the operation of three vacuum pumps, thereby increasing the stability of the system and making it more fault-tolerant. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a pipeline configuration system diagram of the utility model;
[0013] Figure 2 It is a schematic diagram of the structure of the utility model.
[0014] In the figure: 1. First chiller water tank, 2. First drain outlet ball valve, 3. DN20 male thread connector, 4. Branch pipe, 5. PPR tee, 6. Main pipe, 7. Second chiller water tank, 8. Third chiller water tank, 9. Second drain outlet ball valve, 10. Third drain outlet ball valve, 11. Main pipe drain ball valve, 12. Buffer water tank, 13. Water tank drain valve, 14. DN32 male thread connector, 15. Rubber-plastic insulation layer, 16. Water tank cover. DETAILED DESCRIPTION
[0015] The following is a detailed description of the specific implementation method provided according to the utility model in combination with the preferred embodiment: See the accompanying drawings for details. This embodiment provides a cooling water connecting and replenishing device for multiple chillers, including a first chiller water tank 1, a second chiller water tank 7 and a third chiller water tank 8. The first chiller water tank, the second chiller water tank and the third chiller water tank are connected to the main line 6 through their respective first drain outlet ball valves 2, second drain outlet ball valves 9, third drain outlet ball valves 10 and branch pipes 4 and tees 5. The main line is connected to the cache water tank 12 through a water tank drain valve 13 placed at the bottom of the cache water tank. The first chiller water tank, the second chiller water tank and the third chiller water tank are connected in parallel with the cache water tank and are connected through the normally open valves of the three water tanks to form a communicating vessel replenishing mechanism in which the water levels of the four water tanks are always kept consistent.
[0016] A preferred solution of this embodiment is that a main line drainage ball valve 11 is provided at one end of the main line.
[0017] The preferred solution of this embodiment is that a water tank cover 16 is provided on the cache water tank, and a water tank drain valve 13 is provided at the bottom of the cache water tank.
[0018] The preferred solution of this embodiment is that the cache water tank is coated with a flame retardant rubber-plastic insulation layer 15 with a thickness of 25 mm on all sides.
[0019] The preferred solution of this embodiment is that the branch pipeline and the main pipeline are made of PPR pipes and connected by heat fusion. In this embodiment, the branch pipeline diameter is DN20 pipe and is heat fused through DN20 external thread joint 3; the main pipeline diameter is DN32 pipe and is heat fused through DN32 external thread joint 14.
[0020] A preferred solution of this embodiment is that the branch pipelines and the main pipeline are coated with a thermal insulation layer.
[0021] The working principle and working process of the device are further explained below in combination with its structure.
[0022] like Figure 1 , 2 As shown, the DN20 valves of the drain outlets of the first chiller water tank, the second chiller water tank, and the third chiller water tank are connected through PPR pipes and aggregated to the DN32 main line 6, the three independent water tanks are connected in parallel, and a main line drainage ball valve 11 is installed at one end of the main line 6 to achieve total drainage of the entire system device.
[0023] The other end of the main line 6 is connected to the drain valve 13 of the cache water tank 12. When all valves except the main line drain ball valve 11 are opened, the system forms a communicating vessel device. It is only necessary to add cooling water that meets the water quality required for vacuum pump cooling to the cache water tank 12. The entire system is based on the communicating vessel principle, and each chiller achieves a balanced and consistent water level. Keep adding water to the cache water tank 12 until the upper limit water level required by the chiller is reached. Start the chiller and the water level inside the chiller water tank drops. Continue to add water to the cache water tank 12 until the upper limit water level of the chiller water tank is reached. After completion, cover the cache water tank lid 16 tightly.
[0024] On the basis of the existing configuration, a cache water tank, a set of piping systems and valves are added. The drain outlet at the bottom of the chiller is used to connect the drain outlet at the bottom of the three chillers with the drain outlet at the bottom of the cache water tank. Water is added directly to the water tank, and the water flows synchronously into the chiller water tank due to gravity. Until the standard water level required by the chiller, according to the principle of communicating vessels in physics, the water levels of the four are always kept consistent. Therefore, the cooling water loss of the chiller will be compensated in real time by the cache water tank. Through such a set of devices for connecting and replenishing the cooling water of multiple chillers, the replenishment cycle is effectively extended, the risk of product defects caused by water transportation is reduced, the stability of the system is increased, and the risk resistance is stronger. According to the design principle, multiple chillers can be connected to realize the connection and replenishment of cooling water of multiple chillers.
[0025] The above-mentioned reference embodiment describes in detail a device for connecting cooling water and replenishing water for multiple chillers, which is illustrative rather than restrictive, and several embodiments can be listed according to the limited scope. Therefore, changes and modifications without departing from the overall concept of the utility model should fall within the scope of protection of the utility model.
Claims
1. A cooling water connecting and replenishing device for multiple chillers, comprising a first chiller water tank, a second chiller water tank and a third chiller water tank, characterized in that: The first chiller water tank, the second chiller water tank and the third chiller water tank are connected to the main pipeline through their respective valves and branch pipelines, and the main pipeline is connected to the cache water tank through a water tank drain valve disposed at the bottom of the cache water tank. The first chiller water tank, the second chiller water tank (7) and the third chiller water tank are connected in parallel with the cache water tank and are connected through the normally open valves of the four water tanks to form a communicating vessel water replenishment mechanism in which the water levels of the four water tanks are always kept consistent.
2. The cooling water connecting and replenishing device for multiple chillers according to claim 1 is characterized in that: A main pipe drainage ball valve is arranged at one end of the main pipe.
3. The cooling water connecting and replenishing device for multiple chillers according to claim 1 is characterized in that: The cache water tank is provided with a water tank cover, and the bottom of the cache water tank is provided with a water tank drain valve.
4. The cooling water connecting and replenishing device for multiple chillers according to claim 1 or 3, characterized in that: The cache water tank is coated with a flame retardant rubber-plastic insulation layer with a thickness of 25 mm on all sides.
5. The cooling water connecting and replenishing device for multiple chillers according to claim 1 is characterized in that: The branch pipeline and the main pipeline are made of PPR pipes and are connected by heat welding.
6. The cooling water connecting and replenishing device for multiple chillers according to claim 1 or 5, characterized in that: The branch pipeline and the main pipeline are covered with a thermal insulation layer.