Drainage facility maintenance device

By designing adjustable supports and lifting devices, we solve the problems of existing sandblasting machines and spraying machines that are heavy and difficult to adjust, achieve flexible support for drainage pipes and efficient rust removal spraying, reduce labor intensity and improve equipment durability. Versatility.

CN221809257UActive Publication Date: 2024-10-08烟台哈尔滨工程大学研究院
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323481413.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-08
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

Existing sandblasting machines and spraying machines are heavy, which can easily cause fatigue for workers when used. Moreover, the auxiliary support device is difficult to adjust and the distance from the drainage pipe cannot be flexibly adjusted.

Method used

A drainage facility maintenance device is designed, including a sandblasting pipe and a spraying pipe, equipped with a support device and a lifting device. The support device consists of first and second mounting brackets, connecting plates, stands and walking mechanisms. The walking mechanism can be adjusted to Adaptable to different pipe diameters, the lifting device can adjust the distance between the sandblasting pipe and the drainage pipe.

Benefits of technology

It reduces the work intensity of workers, improves the flexibility and versatility of the equipment, can be adjusted according to the diameter of the drainage pipe, is suitable for drainage pipes of various specifications, and avoids damage to the anti-rust film after spraying.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221809257U_ABST
    Figure CN221809257U_ABST
Patent Text Reader

Abstract

The utility model discloses a drainage facility maintenance device which comprises a sand blasting pipe and a spraying pipe, a supporting device and a lifting device are arranged outside the sand blasting pipe, the supporting device comprises a first mounting frame, a second mounting frame, a connecting plate, a vertical frame and a walking mechanism, the first mounting frame is detachably connected with the second mounting frame through a bolt, and the first mounting frame is detachably connected with the second mounting frame through a bolt. The two sets of supporting devices are arranged, the lifting device is arranged between the two sets of supporting devices, a sand blasting pipe can be conveniently installed on the lifting device, the sand blasting pipe is supported in an auxiliary mode through the two sets of supporting devices, the sand blasting pipe can be conveniently installed on the lifting device, and the sand blasting pipe can be conveniently installed on the lifting device. And the working intensity of workers is relieved, and the lifting device can adjust the distance between the sand blasting pipe and the drainage pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of maintenance devices, and more specifically, to a drainage facility maintenance device. Background Art

[0002] Drainage pipes are common drainage facilities. The outer wall of existing drainage pipes is generally provided with an anti-rust coating, but after the coating is damaged, the outer wall of the drainage pipe will still be prone to rust. If it is not cleaned for a long time, the degree of rust will gradually increase, and eventually cause the drainage pipe to break. When maintaining the drainage pipe, the outer wall of the pipe is generally sandblasted and rusted with a sandblasting machine. After the rust is removed, the anti-rust coating is sprayed on the outer wall of the pipe by a sprayer to improve the anti-rust ability of the pipe. However, when using sandblasting machines and spraying machines, workers generally need to hold them in their hands, but these two types of equipment are heavy and can easily cause fatigue to workers when used for a long time; in addition, some sandblasting machines and spraying machines are equipped with auxiliary support devices to facilitate walking on the pipe and reduce the work intensity of workers, but the auxiliary support device is not easy to adjust according to the pipe diameter, and the distance between the sandblasting machine and the pipe is fixed and difficult to adjust. Utility Model Content

[0003] 1. Technical issues to be solved

[0004] In view of the problems existing in the prior art, the utility model provides a drainage facility maintenance device to solve the technical problem mentioned in the background technology that the sandblasting machine and the spraying machine are heavy and easily cause fatigue to the workers when used for a long time.

[0005] (II) Technical solution

[0006] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a drainage facility maintenance device, comprising a sandblasting pipe and a spraying pipe, the sandblasting pipe is provided with a supporting device and a lifting device outside the sandblasting pipe, the supporting device comprises a first mounting frame, a second mounting frame, a connecting plate, a vertical frame and a walking mechanism, the first mounting frame and the second mounting frame are detachably connected by bolts, four walking mechanisms are provided, and are respectively arranged on the first mounting frame and the second mounting frame, the two ends of the connecting plate are respectively connected to the first mounting frame and the vertical frame, the supporting devices are provided with two, the lifting device comprises a mounting plate, both sides of the mounting plate are provided with a first dovetail block and a second dovetail block, the two groups of the vertical frames are provided with dovetail grooves matching the first dovetail block and the second dovetail block, and the top and bottom of the vertical frame are respectively provided with a first limit plate and a second limit plate.

[0007] The utility model is further configured as follows: the walking mechanism includes a supporting plate, a moving wheel, an adjusting screw, an adjusting knob and a guide rod, two moving wheels are provided, and both are rotatably connected to the supporting plate, one end of the adjusting screw is rotatably connected to the supporting plate, and the other end is fixedly connected to the adjusting knob, and the guide rod is fixedly connected to the supporting plate.

[0008] The utility model is further configured such that the adjusting screws in two groups of the walking mechanisms penetrate the first mounting frame and are threadedly connected to the first mounting frame, the guide rod penetrates the first mounting frame and is slidably matched with the first mounting frame, and the adjusting screws in the other two groups of the walking mechanisms penetrate the second mounting frame and are threadedly connected to the second mounting frame, the guide rod penetrates the second mounting frame and is slidably matched with the second mounting frame.

[0009] The utility model is further configured such that the first limiting plate and the second limiting plate are both detachably connected to the stand by bolts.

[0010] The utility model is further configured that the mounting plate is provided with a first through hole matched with the sandblasting tube.

[0011] The utility model is further configured that a connecting seat is provided on the upper surface of the connecting plate, and a second through hole matching with the spray pipe is provided on both the connecting plate and the connecting seat.

[0012] The utility model is further configured that a first connecting rod is provided between the two first mounting frames, and two ends of the first connecting rod are respectively detachably connected to the two first mounting frames by bolts.

[0013] The utility model is further configured that a second connecting rod is provided between the two second mounting frames, and two ends of the second connecting rod are respectively detachably connected to the two second mounting frames by bolts.

[0014] (III) Beneficial effects

[0015] Compared with the prior art, the utility model provides a drainage facility maintenance device having the following features:

[0016] Beneficial effects:

[0017] 1. The utility model is provided with two sets of supporting devices, and a lifting device is provided between the two sets of supporting devices, so as to facilitate the installation of the sandblasting tube on the lifting device. The sandblasting tube is auxiliary supported by the two sets of supporting devices, so as to reduce the work intensity of the workers, and the lifting device can adjust the distance between the sandblasting tube and the drainage pipe.

[0018] 2. The utility model is provided with a second through hole cooperating with the spray pipe. When it is necessary to spray the anti-rust film, only one set of supporting devices needs to be installed, and the spray pipe is installed on the set of supporting devices. Auxiliary support for the spray pipe can also be achieved to reduce the labor intensity of the workers. When the set of supporting devices moves along the drainage pipe, it will not press the area where the anti-rust film has been sprayed.

[0019] 3. The position of the walking mechanism in the utility model can be adjusted according to the diameter of the drainage pipe, so that it can be matched with drainage pipes of various specifications, thereby improving versatility. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of a drainage facility maintenance device and the connection state of an external drainage pipeline;

[0021] Figure 2 is a schematic diagram of the structure of the supporting device;

[0022] Figure 3 It is a structural schematic diagram of the connection state of two supporting devices and a lifting device;

[0023] Figure 4 It is a structural schematic diagram of the mounting plate;

[0024] Figure 5 It is a structural schematic diagram of the connection status of the support device and the spray pipe.

[0025] In the figure: 1. sandblasting tube; 2. spraying tube; 3. first mounting frame; 4. second mounting frame; 5. connecting plate; 6. vertical frame; 7. mounting plate; 8. first dovetail block; 9. second dovetail block; 10. dovetail groove; 11. first limit plate; 12. second limit plate; 13. receiving plate; 14. moving wheel; 15. adjusting screw; 16. adjusting knob; 17. guide rod; 18. first through hole; 19. connecting seat; 20. second through hole; 21. first connecting rod; 22. second connecting rod. DETAILED DESCRIPTION

[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0027] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0028] In the present invention, unless otherwise specified, directions such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.

[0029] See also Figure 1-5 A drainage facility maintenance device includes a sandblasting pipe 1 and a spraying pipe 2. The sandblasting pipe 1 is provided with a supporting device and a lifting device. The supporting device includes a first mounting frame 3, a second mounting frame 4, a connecting plate 5, a stand 6 and a walking mechanism. The first mounting frame 3 and the second mounting frame 4 are detachably connected by bolts. There are four walking mechanisms, which are respectively arranged on the first mounting frame 3 and the second mounting frame 4. The two ends of the connecting plate 5 are respectively connected to the first mounting frame 3 and the stand 6. There are two supporting devices. The lifting device includes a mounting plate 7. The two sides of the mounting plate 7 are respectively provided with a first dovetail block 8 and a second dovetail block 9. Both sets of stands 6 are provided with a dovetail groove 10 that matches the first dovetail block 8 and the second dovetail block 9. The top and bottom of the stand 6 are respectively provided with a first limit plate 11 and a second limit plate 12. The first limit plate 11 and the second limit plate 12 are both detachably connected to the stand 6 by bolts. The mounting plate 7 is provided with a first through hole 18 that matches the sandblasting pipe 1. A first connecting rod 21 is provided between the two first mounting frames 3, and the two ends of the first connecting rod 21 are detachably connected to the two first mounting frames 3 by bolts. A second connecting rod 22 is provided between the two second mounting frames 4, and the two ends of the second connecting rod 22 are detachably connected to the two second mounting frames 4 by bolts.

[0030] In this embodiment, the two ends of the first connecting rod 21 are first connected to the two first mounting frames 3, and then the two ends of the two second connecting rods 22 are connected to the two second mounting frames 4, and the two first mounting frames 3 and the two second mounting frames 4 are sleeved on the outside of the drainage pipe, and the first mounting frame 3 and the second mounting frame 4 are fixed by bolts, and the walking mechanism is adjusted to fit it with the drainage pipe.

[0031] More specifically, when it is necessary to remove rust from the drainage pipe, the sandblasting tube 1 is installed at the first through hole 18 and is connected and fixed to the mounting plate 7. When sandblasting and rust removal are performed, the external sandblasting equipment sprays high-speed airflow and spray material outside the drainage pipe to remove rust from the drainage pipe. When it is necessary to adjust the distance between the sandblasting tube 1 and the drainage pipe, the sandblasting tube 1 is pulled outward or pushed inward, thereby driving the mounting plate 7 to move in the direction of the first dovetail block 8 and the second dovetail block 9. When it is necessary to perform sandblasting and rust removal on different positions on the drainage pipe, the sandblasting tube 1 is pulled to move, and the walking mechanism walks on the drainage pipe, thereby removing rust from various positions of the drainage pipe.

[0032] See also Figure 1-5 As an implementation of the walking mechanism: the walking mechanism includes a receiving plate 13, a moving wheel 14, an adjusting screw 15, an adjusting knob 16 and a guide rod 17. Two moving wheels 14 are provided, and both are rotatably connected to the receiving plate 13. One end of the adjusting screw 15 is rotatably connected to the receiving plate 13, and the other end is fixedly connected to the adjusting knob 16. The guide rod 17 is fixedly connected to the receiving plate 13. The adjusting screws 15 in two groups of walking mechanisms penetrate the first mounting frame 3 and are threadedly connected to the first mounting frame 3. The guide rod 17 penetrates the first mounting frame 3 and is slidably matched with the first mounting frame 3. The adjusting screws 15 in the other two groups of walking mechanisms penetrate the second mounting frame 4 and are threadedly connected to the second mounting frame 4. The guide rod 17 penetrates the second mounting frame 4 and is slidably matched with the second mounting frame 4.

[0033] Specifically, first install the first mounting frame 3 and the second mounting frame 4 on the outside of the drainage pipe, and rotate the adjusting knob 16 to drive the adjusting screw 15 to rotate. Since it is threadedly connected to the first mounting frame 3 and the second mounting frame 4, when the adjusting screw 15 rotates, the adjusting screw 15 drives the receiving plate 13 to approach the drainage pipe along the direction of the guide rod 17 until it fits with the drainage pipe. In the same way, the four sets of walking mechanisms are all fitted with the drainage pipe.

[0034] See also Figure 1-5 As a further implementation of the connecting plate 5 : a connecting seat 19 is provided on the upper surface of the connecting plate 5 , and a second through hole 20 cooperating with the spray pipe 2 is provided on both the connecting plate 5 and the connecting seat 19 .

[0035] Specifically, when it is necessary to use the spray tube 2 to spray anti-rust material on the drainage pipe, it is only necessary to install a set of supporting devices outside the drainage pipe, and install the spray tube 2 at the second through hole 20, and connect the spray tube 2 and the connecting plate 5. At this time, the spray tube 2 is supported by the cooperation of this set of supporting devices and the drainage pipe to prevent the other set of supporting devices from fitting with the sprayed drainage pipe, causing damage to the anti-rust film outside the drainage pipe.

[0036] In summary, when the overall equipment is in use:

[0037] First, connect the two ends of the first connecting rod 21 to the two first mounting frames 3, and then connect the two ends of the second connecting rods 22 to the two second mounting frames 4, and set the two first mounting frames 3 and the two second mounting frames 4 on the outside of the drainage pipe, and fix the first mounting frame 3 and the second mounting frame 4 by bolt connection, and turn the adjusting knob 16 to drive the adjusting screw 15 to rotate. Since it is threadedly connected to the first mounting frame 3 and the second mounting frame 4, when the adjusting screw 15 rotates, the adjusting screw 15 drives the receiving plate 13 to approach the drainage pipe along the direction of the guide rod 17 until it fits with the drainage pipe. In the same way, the four sets of walking mechanisms are all fitted with the drainage pipe.

[0038] When it is necessary to remove rust from the drainage pipe, the sandblasting tube 1 is installed at the first through hole 18 and is connected and fixed to the mounting plate 7. When sandblasting and rust removal are performed, the external sandblasting equipment sprays high-speed airflow and spray material outside the drainage pipe to remove rust from the drainage pipe. When it is necessary to adjust the distance between the sandblasting tube 1 and the drainage pipe, the sandblasting tube 1 is pulled outward or pushed inward, thereby driving the mounting plate 7 to move in the direction of the first dovetail block 8 and the second dovetail block 9. When it is necessary to sandblast and rust remove at different positions on the drainage pipe, the sandblasting tube 1 is pulled to move, and the walking mechanism walks on the drainage pipe, thereby removing rust from various positions of the drainage pipe.

[0039] When it is necessary to use the spray tube 2 to spray anti-rust material on the drainage pipe, at this time, only one set of supporting devices needs to be installed outside the drainage pipe, and the spray tube 2 is installed at the second through hole 20, and the spray tube 2 and the connecting plate 5 are connected. At this time, the spray tube 2 is supported by the cooperation of the group of supporting devices and the drainage pipe to prevent the other group of supporting devices from fitting with the sprayed drainage pipe and causing damage to the anti-rust film outside the drainage pipe.

[0040] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described here one by one. In the above, all fixed connections are preferably welded. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.

Claims

1. A drainage facility maintenance device, comprising a sandblasting pipe (1) and a spraying pipe (2), Its characteristics are: The sandblasting tube (1) is provided with a supporting device and a lifting device outside. The supporting device comprises a first mounting frame (3), a second mounting frame (4), a connecting plate (5), a vertical frame (6) and a walking mechanism. The first mounting frame (3) and the second mounting frame (4) are detachably connected by bolts. Four walking mechanisms are provided and are respectively arranged on the first mounting frame (3) and the second mounting frame (4). The two ends of the connecting plate (5) are respectively connected to the first mounting frame (3) and the vertical frame (6). The supporting device is provided with two. The lifting device comprises a mounting plate (7). The two sides of the mounting plate (7) are respectively provided with a first dovetail block (8) and a second dovetail block (9). Both groups of the vertical frames (6) are provided with dovetail grooves (10) that cooperate with the first dovetail block (8) and the second dovetail block (9). The top and bottom of the vertical frame (6) are respectively provided with a first limit plate (11) and a second limit plate (12).

2. A drainage facility maintenance device according to claim 1, Its characteristics are: The walking mechanism comprises a receiving plate (13), a moving wheel (14), an adjusting screw (15), an adjusting knob (16) and a guide rod (17); two moving wheels (14) are provided and both are rotatably connected to the receiving plate (13); one end of the adjusting screw (15) is rotatably connected to the receiving plate (13) and the other end is fixedly connected to the adjusting knob (16); and the guide rod (17) is fixedly connected to the receiving plate (13).

3. A drainage facility maintenance device according to claim 2, Its characteristics are: The adjusting screws (15) in two groups of the walking mechanisms pass through the first mounting frame (3) and are threadedly connected to the first mounting frame (3), and the guide rod (17) passes through the first mounting frame (3) and is slidably matched with the first mounting frame (3); the adjusting screws (15) in the other two groups of the walking mechanisms pass through the second mounting frame (4) and are threadedly connected to the second mounting frame (4), and the guide rod (17) passes through the second mounting frame (4) and is slidably matched with the second mounting frame (4).

4. A drainage facility maintenance device according to claim 1, Its characteristics are: The first limiting plate (11) and the second limiting plate (12) are both detachably connected to the stand (6) via bolts.

5. A drainage facility maintenance device according to claim 1, Its characteristics are: The mounting plate (7) is provided with a first through hole (18) which cooperates with the sandblasting tube (1).

6. A drainage facility maintenance device according to any one of claims 1 to 5, Its characteristics are: A connecting seat (19) is provided on the upper surface of the connecting plate (5), and a second through hole (20) cooperating with the spray pipe (2) is provided on both the connecting plate (5) and the connecting seat (19).

7. A drainage facility maintenance device according to claim 1, Its characteristics are: A first connecting rod (21) is provided between the two first mounting frames (3), and two ends of the first connecting rod (21) are detachably connected to the two first mounting frames (3) respectively by bolts.

8. A drainage facility maintenance device according to claim 7, Its characteristics are: A second connecting rod (22) is provided between the two second mounting frames (4), and two ends of the second connecting rod (22) are detachably connected to the two second mounting frames (4) respectively by bolts.