Through prefabricated revetment piers and snap-fit methods, combined with guardrails and connecting rods, the problem of long construction period of traditional revetment structures has been solved, rapid construction and efficient construction have been achieved, and the stability and protective capabilities of the guardrails have been enhanced.
Patent Information
- Application Number
- CN202420344153.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The traditional bank protection structure has a long construction period, which affects the construction efficiency and needs to be improved.
Prefabricated revetment piers and snap-fitting methods are used to connect adjacent pier blocks, combined with guardrails and connecting rods to achieve rapid construction and fixation.
Shorten the construction period, improve construction efficiency, and enhance the stability and protective capabilities of the guardrail.
Smart Images

Figure CN221810558U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of reservoir construction, in particular to a bank protection structure. Background Art
[0002] Bank protection is an engineering measure to artificially reinforce the original coastal slope to prevent the invasion and scouring of waves and currents and the action of groundwater, and to maintain the stability of the coastline. The building form of bank protection is similar to that of seawalls. According to the outer slope form, it can be divided into slope-type bank protection, steep wall-type bank protection and a combination of the two.
[0003] During the construction process of traditional bank protection structures, stone masonry and concrete are usually used for stacking and then maintenance. However, this construction cycle is long, time-consuming and labor-intensive, which affects construction efficiency and needs to be improved. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model aims to provide a bank protection structure which has the effect of improving construction efficiency.
[0005] The above technical purpose of the utility model is achieved through the following technical scheme: a bank protection structure, including a prefabricated bank protection pier, one side of the prefabricated bank protection pier is vertically provided with multiple limit strips, and the other side is provided with limit grooves for the limit strips to slide and embed, the cross-sections of the limit strips located on both sides are rectangular, and the cross-sections of the other limit strips are T-shaped.
[0006] In a preferred example, the utility model can be further configured as follows: a guardrail is vertically provided on the upper end surface of the prefabricated revetment pier.
[0007] In a preferred example, the utility model can be further configured as follows: a plurality of plug rods are arranged at intervals on the lower end surface of the guardrail, a plug hole for the plug rods to be inserted is arranged on the prefabricated revetment pier, a rectangular locking rod is arranged on the lower end surface of the plug rod, a locking hole for the locking rod to be inserted is arranged on the bottom wall of the plug hole, oblique clamping blocks are arranged on both sides of the locking hole, and a clamping hole for the oblique clamping block to be embedded is arranged on the locking rod.
[0008] In a preferred example, the utility model can be further configured as follows: a connecting rod is provided between two adjacent guardrails.
[0009] In a preferred example, the utility model can be further configured as follows: the connecting rod includes a pair of main rods, a pair of baffles and a hook, the pair of main rods horizontally penetrate the guardrail, the baffle is arranged at one end of the main rods and abuts against the inner side of the guardrail, and the hook is arranged on one of the main rods and is used to insert and hook the other main rod.
[0010] In a preferred example, the utility model can be further configured as follows: a plurality of warning lights are arranged at intervals on the guardrail.
[0011] In a preferred example, the utility model can be further configured as follows: a planting groove is provided on the upper end surface of the prefabricated revetment pier.
[0012] In summary, the utility model has the following beneficial effects:
[0013] 1. By setting up prefabricated revetment piers and using the snap-fit method to connect and fix adjacent prefabricated revetment piers, the revetment structure can be quickly constructed, the construction period can be shortened, and the construction efficiency can be improved;
[0014] 2. By setting up conveniently installed guardrails on prefabricated revetment piers, the revetment and guardrails are integrated to improve practicality, and the construction process is convenient and fast, thereby improving construction efficiency;
[0015] 3. By setting connecting rods to connect the guardrails together, the stability between the guardrails is increased and the protection capability of the guardrails is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of an embodiment;
[0017] Figure 2 Schematic diagram of the connection relationship between the guardrail and the prefabricated revetment pier of the embodiment;
[0018] Figure 3 Schematic diagram of the structure of the connecting rod of the embodiment.
[0019] Figure numerals: 1. Prefabricated revetment pier; 11. Planting trough; 2. Limit strip; 3. Limit groove; 4. Guardrail; 41. Insert rod; 42. Insert hole; 43. Lock rod; 44. Lock hole; 45. Block; 46. Lock hole; 5. Warning light; 6. Connecting rod; 61. Main rod; 62. Baffle; 63. Hook. DETAILED DESCRIPTION
[0020] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0021] like Figure 1 As shown, a revetment structure includes a prefabricated revetment pier 1, and a planting groove 11 is provided on the upper end surface of the prefabricated revetment pier 1 for planting plants to realize green ecological building. A plurality of limit bars 2 are vertically provided on one side of the prefabricated revetment pier 1, and a limit groove 3 for the limit bars 2 to slide and embed is provided on the other side, so as to realize the clamping and fixing between adjacent prefabricated revetment piers 1.
[0022] Therefore, by providing prefabricated revetment piers 1 and adopting a snap-fitting method to achieve connection and fixation between adjacent prefabricated revetment piers 1, rapid construction of the revetment structure is achieved, the construction period is shortened, and the construction efficiency is improved.
[0023] like Figure 1 As shown, the cross-section of the limiting strips 2 located on both sides is rectangular, so as to form a labyrinth seal, thereby increasing the sealing performance at the front and rear sides of the adjacent prefabricated revetment piers 1, and the cross-section of the remaining limiting strips 2 is T-shaped, so as to realize the clamping fixation between the adjacent prefabricated revetment piers 1, thereby increasing the stability and fastening degree between the adjacent prefabricated revetment piers 1.
[0024] like Figure 1 As shown, a guardrail 4 is vertically arranged on the upper end surface of the prefabricated revetment pier 1, so that the revetment and the guardrail are integrated to improve the practicality of the entire revetment structure. A plurality of warning lights 5 are arranged at intervals on the guardrail 4 to serve as a warning and provide convenience for the travel of pedestrians and vehicles.
[0025] like Figure 1 , Figure 2 As shown, a plurality of plug rods 41 are arranged at intervals on the lower end surface of the guardrail 4, and a plug hole 42 for plugging the plug rods 41 is arranged on the prefabricated revetment pier 1. A rectangular locking rod 43 is arranged on the lower end surface of the plug rod 41, and a locking hole 44 for plugging the locking rod 43 is arranged on the bottom wall of the plug hole 42. Oblique clamping blocks 45 are arranged on both sides of the locking hole 44, and a clamping hole 46 for the oblique clamping block 45 to be inserted is arranged on the locking rod 43.
[0026] When installing the guardrail 4, the insertion rod 41 is inserted into the insertion hole 42. At this time, the insertion rod 41 drives the locking rod 43 to move synchronously and is inserted into the locking hole 44. At this time, the locking rod 43 presses the oblique clamping block 45 to compress and deform until the locking rod 43 is completely inserted into the locking hole 44. The oblique clamping block 45 pops open and is clamped and embedded in the clamping hole 46, thereby realizing the clamping and fixing of the guardrail 4, thereby realizing the rapid installation and fixation of the guardrail 4.
[0027] like Figure 1 , Figure 3 As shown, a connecting rod 6 is provided between two adjacent guardrails 4, and the connecting rod 6 includes a pair of main rods 61, a pair of baffles 62 and a hook 63, and the pair of main rods 61 horizontally penetrate the guardrail 4. The baffle 62 is provided at one end of the main rod 61 and abuts against the inner side of the guardrail 4. The hook 63 is provided on one of the main rods 61 and is used to insert and hook the other main rod 61.
[0028] After the guardrail 4 is installed, each connecting rod 6 is taken out, the main rod 61 is passed through the guardrail 4 from the inside to the outside, and then the hook 63 is inserted into the main rod 61, and then the pair of main rods 61 are pushed closer to each other until the baffle 62 hits the inner side of the guardrail 4. The pair of main rods 61 are also hooked and fixed by the hook 63, thereby connecting adjacent guardrails 4 together, increasing the stability between the guardrails 4, and improving the protection capability of the guardrail 4.
[0029] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A bank protection structure, characterized in that: The invention comprises a prefabricated revetment pier (1), wherein a plurality of limit strips (2) are vertically arranged on one side of the prefabricated revetment pier (1), and a limit groove (3) is arranged on the other side for the limit strips (2) to slide and embed, wherein the cross-sections of the limit strips (2) located at the two side positions are rectangular, and the cross-sections of the other limit strips (2) are T-shaped.
2. A bank protection structure according to claim 1, characterized in that: A guardrail (4) is vertically arranged on the upper end surface of the prefabricated revetment pier (1).
3. A bank protection structure according to claim 2, characterized in that: A plurality of insertion rods (41) are arranged at intervals on the lower end surface of the guardrail (4); a plugging hole (42) for the insertion rods (41) to be inserted is arranged on the prefabricated revetment pier (1); a rectangular locking rod (43) is arranged on the lower end surface of the insertion rod (41); a locking hole (44) for the insertion rod (43) to be inserted is arranged on the bottom wall of the plugging hole (42); oblique clamping blocks (45) are arranged on both sides of the locking hole (44); and a clamping hole (46) for the oblique clamping block (45) to be embedded is arranged on the locking rod (43).
4. A bank protection structure according to claim 2, characterized in that: A connecting rod (6) is provided between two adjacent guardrails (4).
5. A bank protection structure according to claim 4, characterized in that: The connecting rod (6) comprises a pair of main rods (61), a pair of baffles (62) and a hook (63); the pair of main rods (61) horizontally penetrate the guardrail (4); the baffle (62) is arranged at one end of the main rods (61) and contacts the inner side of the guardrail (4); the hook (63) is arranged on one of the main rods (61) and is used to insert into and hook the other main rod (61).
6. A bank protection structure according to claim 2, characterized in that: A plurality of warning lights (5) are arranged at intervals on the guardrail (4).
7. A bank protection structure according to claim 1, characterized in that: The upper end surface of the prefabricated revetment pier (1) is provided with a planting groove (11).