Reinforcing and soil filling equipment for bridge construction

By using rotating components and vibration components in bridge construction equipment, the problem of uneven soil handling during bridge construction is solved, achieving a more efficient filling process and extending the service life of the equipment.

CN221810607UInactive Publication Date: 2024-10-08HIGHWAY NO 2 BRANCH OF SICHUAN HIGHWAY & BRIDGE CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420106201.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the filling process of the bridge construction, the soil is not easy to be processed evenly, which leads to the need for separate processing in the later stage, which is time-consuming.

Method used

A reinforced filling equipment for bridge construction is designed. It adopts rotating components and vibration components. Through structures such as support columns, pulleys, positioning rods and vibration rods, the flexible adjustment and vibration cleaning of the feeding barrel are realized to ensure even filling of soil. and avoid clogging.

Benefits of technology

It achieves uniform filling of soil, improves soil filling efficiency, reduces manual processing time, and extends the service life of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810607U_ABST
    Figure CN221810607U_ABST
Patent Text Reader

Abstract

The utility model discloses reinforcing and filling equipment for bridge construction, which belongs to the technical field of bridge construction and comprises a conveying barrel, a feed hopper is mounted on the upper surface of the conveying barrel in a communicated manner, a dust cover is fixedly mounted on the side wall of the conveying barrel, and a rotating component is arranged on the lower surface of the conveying barrel. According to the material conveying device, the material conveying barrel moves in the guide rails of the first track and the second track through the supporting columns and the pulleys respectively, the discharging port of the material conveying barrel is adjusted, one end of the positioning rod is inserted into the positioning hole under the action of the positioning spring, and therefore the supporting columns are fixed through the fixing plate under the action of the positioning rod; according to the soil filling device, the conveying barrel is fixed, soil filling in different directions can be achieved by rotating the conveying barrel, and compared with a traditional mode that soil is conveyed to one place through a vehicle and then manually spread, on one hand, soil filling can be more uniform, on the other hand, time and labor are saved, and the soil filling efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, and in particular relates to a reinforcement filling device used for bridge construction. Background Art

[0002] A bridge generally refers to a structure built across rivers, lakes, and the sea to enable vehicles and pedestrians to pass smoothly. To adapt to the modern high-speed development of the transportation industry, a bridge is also extended to mean a building that is built across mountain streams, poor geology, or to meet other transportation needs to make travel more convenient. During the construction process of a bridge, the piers are reinforced by filling soil.

[0003] The Chinese patent discloses a bridge reinforcement filling device, including a main body, a slide groove is arranged on one side of the top of the main body, slide blocks are symmetrically arranged on both sides of the slide groove, a servo motor A is arranged on the top of the main body, a storage bin is arranged at the output end of the servo motor A, and the bottom of the storage bin is connected to the slide block, a loading and unloading assembly is arranged on one side of the storage bin, a partition is hinged on one side of the bottom of the storage bin, an electric push rod is hinged on the other side of the bottom of the storage bin, and the output end of the electric push rod is connected to the partition; the utility model can not only extract the soil inside the device, but also extract the soil from the outside through the mutual cooperation of the mounting rod, bevel gear A, push rod A, bevel gear B, push rod B, feeding pipe A, servo motor B and feeding pipe B, without the need for manual feeding, so that the operator can use it more conveniently. At present, most of the filling methods are to transport the soil to the bridge pier by a transport vehicle, which is not convenient to move when dumping the soil, resulting in the need for manual processing in the later stage. Therefore, a reinforcement filling device for bridge construction is provided. Utility Model Content

[0004] The purpose of the utility model is to solve the problem that it is inconvenient to evenly process the soil in the current filling process, and that it needs to be processed separately at a later stage, which is time-consuming, and to propose a reinforcement filling device for bridge construction.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a reinforcement filling device for bridge construction, comprising a feeding cylinder, the upper surface of which is connected to a feeding hopper, a dust cover is fixedly installed on the side wall of the feeding cylinder, a driving motor is fixedly installed on the inner wall of the dust cover, a conveying roller is fixedly installed on the output end of the driving motor, one end of the conveying roller extends to the interior of the feeding cylinder, and a rotating component is arranged on the lower surface of the feeding cylinder;

[0006] The rotating assembly comprises a first track, a connecting column is fixedly mounted on the side wall of the first track, a second track is fixedly mounted on one end of the connecting column, and a positioning hole is arranged on the upper surface of the second track.

[0007] As a further description of the above technical solution:

[0008] Two support columns are fixedly installed on the lower surface of the feeding cylinder, one end of the support column extends to a groove, a pulley is rotatably installed on the inner wall of the groove through a rotating shaft, and the outer surface of the pulley is slidably connected to the inner wall of the guide rail of the first track and the second track respectively.

[0009] As a further description of the above technical solution:

[0010] A fixing plate is fixedly installed on the outer surface of the support column, a positioning spring is fixedly installed on the lower surface of the fixing plate, a baffle is fixedly installed on one end of the positioning spring, a positioning rod is fixedly installed on the inner wall of the baffle, one end of the positioning rod passes through the interior of the positioning spring and extends to the outside of the upper surface of the fixing plate, the other end of the positioning rod extends to the interior of the positioning hole, and a vibration assembly is arranged on the inner wall of the support column.

[0011] As a further description of the above technical solution:

[0012] The vibration assembly includes a rotating rod, the outer surface of the rotating rod is rotatably connected to the inner wall of the support column, the outer surface of the rotating rod is respectively fixedly installed with a half gear and a first toothed sprocket, the outer surface of the first toothed sprocket is installed with a second toothed sprocket through a toothed chain meshing, and the inner wall of the second toothed sprocket is fixedly connected to the outer surface of the conveying roller.

[0013] As a further description of the above technical solution:

[0014] A telescopic spring is fixedly mounted on the lower surface of the feeding cylinder, a partition is fixedly mounted on one end of the telescopic spring, an impact rod is fixedly mounted on the upper surface of the partition, and one end of the impact rod passes through the interior of the telescopic spring and fits against the lower surface of the feeding cylinder.

[0015] As a further description of the above technical solution:

[0016] A transmission rack is fixedly mounted on the lower surface of the partition, and the transmission rack is meshed and connected with the half gear.

[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0018] 1. In the utility model, a rotating assembly is provided to place the pier of the bridge in the middle of the first track, and the feed drum is moved in the guide rails of the first track and the second track respectively through the support column and the pulley, so as to adjust the discharge port of the feed drum. After the feed drum is adjusted to an appropriate position, one end of the positioning rod is inserted into the positioning hole under the action of the positioning spring, so that the support column is fixed by the fixing plate under the action of the positioning rod, and then the feed drum is fixed. By rotating the feed drum, soil filling in different directions can be achieved. Compared with the traditional method of using a vehicle to transport the soil to a place and then spreading it manually, on the one hand, the soil filling can be made more even, and on the other hand, time and labor can be saved, and the efficiency of soil filling can be improved.

[0019] 2. In the utility model, a vibration component is provided, and when the conveying roller rotates, it will drive the second sprocket to rotate. Under the action of the toothed chain, the first sprocket will drive the rotating rod to rotate on the inner wall of the supporting column. As the rotating rod rotates, the half gear will be driven to rotate. When the half gear is meshed with the transmission rack, the transmission rack will drive the impact rod to move downward through the partition. At this time, the telescopic spring is in a stretched state. When the half gear loses meshing with the transmission rack, under the action of the telescopic spring, the partition drives the impact rod to move upward, so that the impact rod hits the lower surface of the feed barrel. The impacted feed barrel will vibrate, and the soil debris adhered to the inner wall of the feed barrel will be shaken off. By vibrating the feed barrel, it can be avoided that as the use time increases, the feed barrel is blocked due to more soil debris adhering. At the same time, cleaning the soil debris can prevent the moisture in the soil from corroding the feed barrel, thereby improving the service life of the filling device. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a three-dimensional structural schematic diagram of a reinforcement fill equipment used in bridge construction.

[0021] Figure 2 A schematic diagram of the internal structure of a reinforcement fill device used in bridge construction.

[0022] Figure 3 A reinforcement filling device for bridge construction Figure 2 Schematic diagram of the enlarged structure at point A in the middle.

[0023] Figure 4 The diagram is a partial exploded structural diagram of a vibration component in a reinforcement fill device used in bridge construction.

[0024] Legend:

[0025] 1. Feed barrel; 2. Dust cover; 3. Feed hopper; 4. Rotating assembly; 41. First track; 42. Connecting column; 43. Second track; 44. Positioning hole; 45. Support column; 46. Pulley; 47. Fixed plate; 48. Positioning spring; 49. Baffle; 410. Positioning rod; 5. Vibrating assembly; 51. Rotating rod; 52. Half gear; 53. First sprocket; 54. Second sprocket; 55. Telescopic spring; 56. Partition; 57. Impact rod; 58. Transmission rack; 6. Driving motor; 7. Conveying roller. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-4 The utility model provides a technical solution: a reinforcement filling device for bridge construction, comprising a feeding barrel 1, a feeding hopper 3 is connected and installed on the upper surface of the feeding barrel 1, a dust cover 2 is fixedly installed on the side wall of the feeding barrel 1, a driving motor 6 is fixedly installed on the inner wall of the dust cover 2, a conveying roller 7 is fixedly installed on the output end of the driving motor 6, one end of the conveying roller 7 extends to the inside of the feeding barrel 1, and a rotating component 4 is arranged on the lower surface of the feeding barrel 1;

[0028] The rotating assembly 4 includes a first track 41, a connecting column 42 is fixedly installed on the side wall of the first track 41, a second track 43 is fixedly installed on one end of the connecting column 42, a positioning hole 44 is provided on the upper surface of the second track 43, two supporting columns 45 are fixedly installed on the lower surface of the feeding cylinder 1, one end of the supporting column 45 extends to a groove, a pulley 46 is rotatably installed on the inner wall of the groove through a rotating shaft, and the outer surface of the pulley 46 is respectively connected to the inner wall of the guide rail of the first track 41 and the second track 43. Sliding connection, a fixing plate 47 is fixedly installed on the outer surface of the support column 45, a positioning spring 48 is fixedly installed on the lower surface of the fixing plate 47, a baffle 49 is fixedly installed on one end of the positioning spring 48, a positioning rod 410 is fixedly installed on the inner wall of the baffle 49, one end of the positioning rod 410 passes through the interior of the positioning spring 48 and extends to the outside of the upper surface of the fixing plate 47, the other end of the positioning rod 410 extends to the interior of the positioning hole 44, and a vibration component 5 is arranged on the inner wall of the support column 45.

[0029] The specific implementation method is as follows: the bridge pier is placed in the middle of the first track 41, and the feed tube 1 is moved in the guide rails of the first track 41 and the second track 43 respectively through the support column 45 and the pulley 46, so as to adjust the discharge port of the feed tube 1. After the feed tube 1 is adjusted to the appropriate position, one end of the positioning rod 410 is inserted into the positioning hole 44 under the action of the positioning spring 48, so that the support column 45 is fixed by the fixing plate 47 under the action of the positioning rod 410, and then the feed tube 1 is fixed, and the driving motor 6 drives the conveying roller 7 to rotate in the feed tube 1, and then the soil is poured into the feed tube 1 through the feed hopper 3, and the soil is poured into the gap of the pier under the action of the conveying roller 7 to reinforce the pier.

[0030] The vibration assembly 5 includes a rotating rod 51, the outer surface of which is rotatably connected to the inner wall of the support column 45, and the outer surface of the rotating rod 51 is respectively fixedly mounted with a half gear 52 and a first sprocket 53, the outer surface of the first sprocket 53 is meshed with a second sprocket 54 through a sprocket, and the inner wall of the second sprocket 54 is fixedly connected to the outer surface of the conveying roller 7, and a telescopic spring 55 is fixedly mounted on the lower surface of the feeding cylinder 1, and a partition 56 is fixedly mounted on one end of the telescopic spring 55, and an impact rod 57 is fixedly mounted on the upper surface of the partition 56, and one end of the impact rod 57 passes through the interior of the telescopic spring 55 and fits with the lower surface of the feeding cylinder 1, and a transmission rack 58 is fixedly mounted on the lower surface of the partition 56, and the transmission rack 58 is meshed with the half gear 52.

[0031] The specific implementation method is as follows: when the conveying roller 7 rotates, the second sprocket wheel 54 is driven to rotate. Under the action of the tooth chain, the first sprocket wheel 53 drives the rotating rod 51 to rotate on the inner wall of the support column 45. As the rotating rod 51 rotates, the half gear 52 is driven to rotate. When the half gear 52 is engaged with the transmission rack 58, the transmission rack 58 drives the impact rod 57 to move downward through the partition plate 56. At this time, the telescopic spring 55 is in a stretched state. When the half gear 52 loses engagement with the transmission rack 58, under the action of the telescopic spring 55, the partition plate 56 drives the impact rod 57 to move upward, so that the impact rod 57 impacts the lower surface of the feed barrel 1. The impacted feed barrel 1 will vibrate, and the soil debris adhered to the inner wall of the feed barrel 1 will be shaken off.

[0032] Working principle: put the bridge pier in the middle of the first track 41, and the feeding tube 1 moves in the guide rails of the first track 41 and the second track 43 respectively through the support column 45 and the pulley 46, so as to adjust the discharge port of the feeding tube 1. After the feeding tube 1 is adjusted to the appropriate position, one end of the positioning rod 410 is inserted into the positioning hole 44 under the action of the positioning spring 48, so that the support column 45 is fixed through the fixing plate 47 under the action of the positioning rod 410, and then the feeding tube 1 is fixed. The driving motor 6 drives the conveying roller 7 to rotate in the feeding tube 1, and then the soil is poured into the feeding tube 1 through the feed hopper 3, and the soil is poured into the gap of the bridge pier under the action of the conveying roller 7 to reinforce the bridge pier. When the conveying roller 7 rotates, the second sprocket wheel 54 is driven to rotate. Under the action of the tooth chain, the first sprocket wheel 53 drives the rotating rod 51 to rotate on the inner wall of the support column 45. As the rotating rod 51 rotates, the half gear 52 is driven to rotate. When the half gear 52 is engaged with the transmission rack 58, the transmission rack 58 drives the impact rod 57 to move downward through the partition plate 56. At this time, the telescopic spring 55 is in a stretched state. When the half gear 52 loses engagement with the transmission rack 58, under the action of the telescopic spring 55, the partition plate 56 drives the impact rod 57 to move upward, so that the impact rod 57 impacts the lower surface of the feeding barrel 1. The impacted feeding barrel 1 will vibrate, and the soil debris adhered to the inner wall of the feeding barrel 1 will be shaken off.

[0033] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A reinforcement filling device for bridge construction, comprising a feeding cylinder (1), the upper surface of the feeding cylinder (1) is connected to a feeding hopper (3), a dust cover (2) is fixedly installed on the side wall of the feeding cylinder (1), a driving motor (6) is fixedly installed on the inner wall of the dust cover (2), a conveying roller (7) is fixedly installed at the output end of the driving motor (6), one end of the conveying roller (7) extends to the interior of the feeding cylinder (1), Features: The lower surface of the feeding cylinder (1) is provided with a rotating assembly (4); The rotating assembly (4) comprises a first track (41), a connecting column (42) is fixedly mounted on the side wall of the first track (41), a second track (43) is fixedly mounted on one end of the connecting column (42), and a positioning hole (44) is provided on the upper surface of the second track (43).

2. A reinforcement filling device for bridge construction according to claim 1, It is characterized in that Two support columns (45) are fixedly mounted on the lower surface of the feeding cylinder (1), one end of each support column (45) extends to a groove, a pulley (46) is rotatably mounted on the inner wall of the groove via a rotating shaft, and the outer surface of the pulley (46) is slidably connected to the inner walls of the guide rails of the first track (41) and the second track (43), respectively.

3. A reinforcement filling device for bridge construction according to claim 2, It is characterized in that A fixing plate (47) is fixedly mounted on the outer surface of the support column (45), a positioning spring (48) is fixedly mounted on the lower surface of the fixing plate (47), a baffle (49) is fixedly mounted on one end of the positioning spring (48), a positioning rod (410) is fixedly mounted on the inner wall of the baffle (49), one end of the positioning rod (410) passes through the interior of the positioning spring (48) and extends to the outside of the upper surface of the fixing plate (47), and the other end of the positioning rod (410) extends to the interior of the positioning hole (44), and a vibration assembly (5) is arranged on the inner wall of the support column (45).

4. A reinforcement filling device for bridge construction according to claim 3, It is characterized in that The vibration assembly (5) comprises a rotating rod (51), the outer surface of the rotating rod (51) is rotatably connected to the inner wall of the support column (45), the outer surface of the rotating rod (51) is respectively fixedly mounted with a half gear (52) and a first toothed sprocket (53), the outer surface of the first toothed sprocket (53) is mounted with a second toothed sprocket (54) through a toothed chain meshing, and the inner wall of the second toothed sprocket (54) is fixedly connected to the outer surface of the conveying roller (7).

5. A reinforcement filling device for bridge construction according to claim 4, It is characterized in that A telescopic spring (55) is fixedly mounted on the lower surface of the feeding cylinder (1), a partition (56) is fixedly mounted on one end of the telescopic spring (55), an impact rod (57) is fixedly mounted on the upper surface of the partition (56), and one end of the impact rod (57) passes through the interior of the telescopic spring (55) and fits against the lower surface of the feeding cylinder (1).

6. A reinforcement filling device for bridge construction according to claim 5, It is characterized in that A transmission rack (58) is fixedly mounted on the lower surface of the partition (56), and the transmission rack (58) is meshingly connected with the half gear (52).