Socket and spigot joint structure of glass fiber reinforced plastic mortar pipe
Through the design of using grooves to embed rubber rings and pressure test bolts in the fiberglass sand-filled pipe interfaces, the leakage problem of the pipe interfaces was solved, the watertightness of the pipe interfaces was effectively detected and guaranteed, and the construction quality was improved.
Patent Information
- Application Number
- CN202323390290.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The low stiffness of FRP sand-filled pipes causes frequent leaks at the interface, which affects the quality of pipeline installation. It is difficult to effectively ensure the watertightness of the interface with existing technology.
A fiberglass sand-filled pipe socket interface structure is designed. Rubber rings are embedded in the grooves of the socket end and socket end, and water tightness tests are conducted through pressure test bolts to ensure the tightness of the interface, including hollow screws, nuts, solid For the screw and gasket assembly, use the pressure test bolt to conduct a hydraulic test to detect the sealing effect of the rubber ring.
Through the design of the rubber ring and pressure test bolts embedded in the groove, the water tightness of the pipeline interface is tested and guaranteed, reducing rework and improving the construction quality and engineering quality.
Smart Images

Figure CN221811121U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline interfaces, in particular to a glass fiber reinforced plastic sand-filled pipe socket interface structure. Background Art
[0002] Glass fiber reinforced thermosetting resin sand-filled pipe (referred to as FRP sand-filled pipe) is a flexible composite pipe currently used in China. It is widely used in chemical industry, drinking water transportation and sewage treatment, and its installation methods are also diverse. However, the use of double rubber ring socket connection and the construction method of independent interface water tightness test with special pressure test bolts can effectively ensure the installation quality of pipeline interfaces.
[0003] Socket-type FRP sand-filled pipes are prone to interface installation quality problems during installation. Based on our years of construction experience, we have made appropriate improvements to the installation method of FRP sand-filled pipe interfaces, and used special pressure test bolts to independently conduct water tightness tests on each pipe interface, with better results. Utility Model Content
[0004] The purpose of the utility model is to provide a glass fiber reinforced plastic sand-filled pipe socket joint structure. In view of the low cost and investment saving of glass fiber reinforced plastic sand-filled pipe, it is adopted by many water supply and drainage projects. However, due to the low rigidity of the pipe, the joint leakage phenomenon is prone to occur, resulting in the failure to ensure the quality of pipe installation. To this end, drawing on previous installation experience and combining construction process management, this joint technology is summarized, and the effect is good.
[0005] In order to achieve the above purpose, the utility model provides a glass fiber reinforced plastic sand-filled pipe socket joint structure, and the technical solution adopted is as follows:
[0006] A glass fiber reinforced plastic sand-filled pipe socket joint structure comprises a spigot end and a bell end, wherein the spigot end is provided with two grooves, each groove is embedded with a rubber ring, the rubber ring is engaged with the inner wall of the bell end and the inner wall of the spigot end, the bell end is provided with a pressure test hole, a pressure test bolt is assembled through the pressure test hole, and the pressure test bolt is arranged between the two rubber rings.
[0007] Furthermore, the pressure test bolt includes a hollow screw and a nut, and the hollow screw is assembled in the pressure test hole through the nut.
[0008] Furthermore, the hollow screw is connected to one interface end of the three-way joint, and the other two interface ends of the three-way joint are connected to the exhaust valve and the manual pressure test pump connector.
[0009] Furthermore, the pressure test bolt also includes a solid screw rod, and the solid screw rod is movably connected to the hollow screw rod.
[0010] Furthermore, the pressure test bolt also includes a gasket assembly, which includes a first rubber gasket, a second rubber gasket, a third rubber gasket and a fourth rubber gasket, the first rubber gasket is arranged at one end of the hollow screw, the second rubber gasket is arranged between the hollow screw and the solid screw, the third rubber gasket is arranged between the hollow screw and the nut, and the fourth rubber gasket is arranged between the nut and the three-way joint.
[0011] Furthermore, the inner diameter of the hollow screw is 2 to 6 mm, and the outer diameter is 6 to 10 mm.
[0012] Furthermore, the diameters of the first rubber gasket and the third rubber gasket are 12-18 mm.
[0013] Furthermore, the outer diameter of the solid screw is 6 to 10 mm.
[0014] The beneficial effects of the utility model are:
[0015] 1) The water tightness of the connection between the spigot end and the socket end is ensured by two rubber rings embedded in the groove, and a pressure test bolt is added. The water tightness test can be carried out through the pressure test bolt to ensure that the pipe interface is tightly connected.
[0016] 2) Two grooves are set on the spigot end. During installation, a rubber sealing ring is embedded in each groove, so that the outer wall of the spigot end and the inner wall of the socket end can achieve a sealed combination effect by relying on the rubber ring. In order to detect whether the socket is installed tightly, a pressure test hole is set in the middle of the two rubber rings at the top of the pipe, and a pressure test bolt is installed on the pressure test hole. Through the special structure of the pressure test bolt, clean water is injected into the gap between the two rubber rings using a water injection pressure device. After the clean water is filled, continue to add water until the pressure gauge value on the pressure device reaches 1.5 times the design pressure of the pipeline. Stop injection, and then observe the pressure stabilization state of the pressure gauge value. If the pressure gauge value cannot maintain a stable pressure, it means that the rubber ring is not sealed, the socket installation is unqualified, and rework and reinstallation are required. If the pressure gauge value can maintain a stable pressure, it means that the two rubber rings have achieved a sealed effect and the socket installation is temporarily qualified; screw on the actual core screw.
[0017] 3) During the backfilling process on both sides of the pipeline, if the airtightness of a socket is in doubt, the solid screw can be removed at any time and water injection and pressure testing can be carried out; when the backfill soil on both sides is rammed to the top of the pipe, in order to ensure the overall quality of the pipeline section, each socket can be tested again in sequence by water injection and pressure testing. If there is any abnormality, it can be reworked in time; if it is normal, tighten the solid screw and the installation is completed.
[0018] 4) Use pressure test bolts to conduct water tightness test on the installation quality of the socket to ensure that the pipe interface is tightly connected, fully guaranteeing the quality of the pipe installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0020] Figure 1 The present invention shows a structural diagram of a glass fiber reinforced plastic sand-filled pipe socket structure according to an embodiment of the present invention.
[0021] Figure 2 The invention shows a structural diagram of a pressure test bolt in a glass fiber reinforced plastic sand-filled pipe socket joint structure according to an embodiment of the utility model.
[0022] Figure 3 The present invention shows a structural diagram of a glass fiber reinforced plastic sand-filled pipe socket joint structure when a pressure test pump is connected and water is poured into the joint to increase pressure.
[0023] Figure 4 The structure diagram of a glass fiber reinforced plastic sand-filled pipe socket joint structure according to an embodiment of the utility model is shown in a state where a solid screw is about to block a hollow screw.
[0024] Figure 5 A schematic diagram of storing glass fiber reinforced plastic pipes according to an embodiment of the utility model is shown.
[0025] Figure 6 A schematic diagram of pipeline installation according to an embodiment of the utility model is shown.
[0026] Figure 7 The following is a flowchart of the interface tightness test process according to an embodiment of the utility model.
[0027] In the figure, 1 is the socket end, 2 is the socket end, 3 is the groove, 4 is the rubber ring, 5 is the pressure test hole, 6 is the pressure test bolt, 601 is the hollow screw, 602 is the nut, 603 is the solid screw, 604 is the first rubber gasket, 605 is the second rubber gasket, 606 is the third rubber gasket, 607 is the fourth rubber gasket, 7 is the three-way joint, 8 is the exhaust valve, and 9 is the manual pressure test pump joint. DETAILED DESCRIPTION
[0028] The following describes the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0029] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] The specific implementation of the utility model is further described in detail below in conjunction with the drawings and embodiments.
[0032] The utility model provides a glass fiber reinforced plastic sand-filled pipe socket joint structure, such as Figure 1 As shown, the fiberglass sand-filled pipe bell-and-spigot joint structure includes a spigot end 1 and a bell end 2, the spigot end 1 is provided with two grooves 3, each groove 3 is embedded with a rubber ring 4, the rubber ring 4 is engaged with the inner wall of the bell end 2 and the inner wall of the spigot end 1, the bell end 2 is provided with a pressure test hole 5, a pressure test bolt 6 is assembled through the pressure test hole 5, and the pressure test bolt 6 is arranged between the two rubber rings 4.
[0033] In this embodiment, the double rubber ring socket connection has the characteristics of reliable connection and convenient and fast construction. In addition, by setting the pressure test bolt 6, the intermediate control during the pipeline construction process is strengthened, and the double rubber ring interfaces of the pipeline are pressure tested one by one. Only when the interface pressure test is qualified can the subsequent pipeline installation be started, and then the previous interface is pressure tested again, which effectively ensures the installation quality of the pipeline interface and reduces the phenomenon of rework during the pipeline installation process. At the same time, it also improves the construction quality of the overall project.
[0034] The utility model can be applied to the construction of glass fiber reinforced plastic sand-filled pipe pressure water supply pipelines with double rubber ring socket-type connection and different rigidities under general engineering geological conditions and with a pipe diameter greater than 500mm.
[0035] In this embodiment, two grooves 3 are processed on the socket end 1, two rubber rings 4 are embedded in the grooves 3, and then the socket end 1 is inserted into the socket end, so that the rubber ring 4 is tightly engaged with the inner wall of the socket end 2 and the outer wall of the socket end 1 to form a sealing area at the interface. The water tightness test can be performed independently on each interface through the pressure test bolt 6 to ensure that the pipeline interface is tightly connected.
[0036] In some embodiments, a specific structure of the pressure test bolt 6 is provided, such as Figure 2 and Figure 3 As shown, the pressure test bolt 6 includes a hollow screw 601 and a nut 602. The hollow screw 601 is assembled to the pressure test hole 5 through the nut 602. The hollow screw 601 is connected to one interface end of the three-way joint 7, and the other two interface ends of the three-way joint 7 are connected to the exhaust valve 8 and the manual pressure test pump joint 9.
[0037] Install the pressure test bolt 6 (such as Figure 3 ), after the pipeline is installed, bolt the manual pressure test pump to fill the interface with water, and inject water from the hollow screw 601 into the enclosed space formed by the two rubber rings and the pipe wall. At the same time, open the exhaust valve 8 at the highest point, and then slowly increase the pressure in stages. First, gradually increase the water pressure to the working pressure, and check whether the interface has leakage. If there is no leakage, increase it to the test pressure. The test pressure is 1.5 times the working pressure. Observe for 10 minutes. The pressure remains unchanged, and the appearance inspection shows no leakage. It is qualified. After the pressure test is qualified, drain the water in the enclosed space, and then close the pressure test hole and the drain hole. If the water pressure test fails, the cause of the leakage should be found out, and the pipeline should be reinstalled or adjusted and tested again until it is qualified. Only then can the subsequent pipeline installation be carried out.
[0038] like Figure 4 As shown, the pressure test bolt 6 also includes a solid screw 603, and the solid screw 603 is movably connected to the hollow screw 601. The solid screw 603 is used to close the pressure test hole 5 after the water pressure test is qualified, specifically, the three-way joint 7 is removed and the hollow screw 601 is closed by the solid screw 603.
[0039] In some embodiments, Figures 2 to 4 As shown, the pressure test bolt also includes a gasket assembly, the purpose of which is to increase the sealing performance. The gasket assembly includes a first rubber gasket 604, a second rubber gasket 605, a third rubber gasket 606 and a fourth rubber gasket 607. The first rubber gasket 604 is arranged at one end of the hollow screw 601, the second rubber gasket 605 is arranged between the hollow screw 601 and the solid screw 603, the third rubber gasket 606 is arranged between the hollow screw 601 and the nut 602, and the fourth rubber gasket 607 is arranged between the nut 602 and the three-way joint 7.
[0040] This embodiment provides specific dimensions of the components included in the pressure test bolt 6. The inner diameter of the hollow screw 601 is 4 mm and the outer diameter is 8 mm. The diameters of the first rubber gasket 604 and the third rubber gasket 606 are 15 mm. The outer diameter of the solid screw is 8 mm.
[0041] It should be noted that the above dimensions are merely examples and are not limitations of the present invention.
[0042] The following embodiment will specifically introduce the construction method of the glass fiber reinforced plastic sand-filled pipe socket joint structure to further prove the feasibility and progress of the utility model.
[0043] The overall construction process of the FRP sand-filled pipe socket joint structure can be realized as follows: measurement and layout → trench excavation → foundation treatment → pipeline laying and assembly → interface water tightness detection → fixed piers → pipeline backfilling → system pipeline water tightness test → system flushing and disinfection.
[0044] Measurement and setting out include the following steps:
[0045] Before starting construction, calibrate the plane position and elevation of the existing pipelines and structures connected to this project. When measuring, first measure the center line of the pipeline system and the positions of the inspection wells and valve wells, set up construction control piles at the turns and branches of the pipeline, and spread out lime lines for excavation. When mechanically excavating the trench, set up a level to track and measure the elevation of the bottom of the pipe.
[0046] Trench excavation includes the following steps:
[0047] 1. Before trench excavation, conduct an investigation according to construction needs, master the on-site terrain, landforms, buildings, various pipelines and other facilities along the pipeline, as well as engineering geology, hydrogeology data, drainage conditions, and prepare a drainage plan. Wastewater discharged from the construction drainage system must be transported outside the pumping influence radius, and must not affect traffic or damage roads, farmland, river banks and other structures. When the pipeline does not have anti-floating conditions, it is strictly forbidden to stop drainage.
[0048] 2. During trench excavation, timely control the excavation depth to prevent over-excavation. After trench excavation, timely restore the trench centerline and control elevation, use the method of setting slope plates to control elevation and centerline, and check the accuracy of the slope plate setting position and elevation at any time to ensure that the trench centerline, slope and auxiliary structure positions are correct.
[0049] 3. The width of the trench should be convenient for pipe laying and installation, compaction equipment operation and groundwater drainage. The minimum width of the trench can be calculated and determined according to the following formula:
[0050] b≥D 1 +2S
[0051] Where: b – minimum width of the groove (mm);
[0052] D 1 --Outer diameter of the tube (mm);
[0053] S - the distance from the pipe wall to the groove wall (mm), determined according to Table 1.
[0054] Table 1. Distance from pipe wall to groove wall
[0055]
[0056] 4. The steepest slope of the trench side slope should be determined according to the soil quality of the trench. If necessary, the trench wall should be supported by supports or guard plates. 3 When excavating with an excavator, the side width of the bucket is 1.2m, a 20cm protective layer is reserved at the bottom of the trench, and the bottom is cleaned manually. Over-excavation is strictly prohibited during the excavation process to prevent disturbance of the foundation.
[0057] 5. It is not advisable to set static or dynamic loads on the top of the soft soil trench slope; if it is necessary to set them, the bearing capacity of the soil and the stability of the slope need to be verified.
[0058] 6. When the trench is dug deep, the depth of layered excavation should be reasonably determined according to the mechanical properties.
[0059] Basic processing includes the following steps:
[0060] 1. When the bearing capacity of the soil layer is 80-100KPa and it is non-rock, the original soil is used as the foundation; when the bearing capacity of the soil layer is 50-70KPa, the compacted original soil is used as the foundation, and the compaction density reaches 95%.
[0061] 2. When the trench bottom encounters silt, pebbles, rocks, hard soil, irregular gravel and soaked soil, it needs to be excavated and then treated with the corresponding pipe foundation. When the pipeline passes through poor geology, the pipe foundation should be reinforced according to the design requirements.
[0062] Pipeline laying and assembly includes the following steps:
[0063] 1. Pipe transportation and storage
[0064] 1) During loading and unloading, the pipe must be handled with care and no dropping or collision is allowed. When lifting the pipe, the pipe must be balanced in the air. One or two supporting points can be used for lifting. It is forbidden to use ropes to pass through both ends of the pipe for loading and unloading.
[0065] 2) The lifting rope used for loading and unloading should be a flexible, wide belt, sling or rope. It is strictly forbidden to use wire rope or iron chain to lift the pipe. When transporting pipes in cold seasons, it is strictly forbidden to hit them violently to prevent cracks.
[0066] 3) Pipes should be stacked according to specifications. When pipes are stored directly on the ground, the ground should be flat. It is strictly forbidden to store pipes on sharp hard objects. All stacked pipes must be wedge-shaped to prevent rolling.
[0067] 4) During transportation and storage, wooden wedges should be added to prevent the pipes from rolling. Sleepers should be placed on each layer, and the distance between sleepers should be less than 1 / 2 of the pipe length. The pipe stacking height should not exceed 2m, and pipes with a nominal diameter greater than DN1400 should not be stacked. Figure 5 shown.
[0068] 2. Down tube
[0069] After the trench foundation quality inspection is qualified and the position of the pipe joints and pipe fittings is checked, the pipes are lowered in time. The pipes are lowered by hoisting equipment and manual labor. When lowering the pipes, pay attention to the direction of the socket being consistent with the direction of the pipeline installation, and dig working pits at each interface. The size of the working pit is appropriate to facilitate the installation of the pipeline. Figure 6 shown.
[0070] 3. Rubber ring installation
[0071] Select the corresponding rubber ring according to the pipe diameter, clean the pipe socket and rubber ring. When installing the rubber ring, bend the rubber ring into a heart shape or flower shape and place it in the socket groove, and press it with your hands to ensure that all parts are not warped or twisted.
[0072] The rubber ring lubricant is provided by the supporting manufacturer and lubricants made from petroleum are not allowed.
[0073] 4. Pipeline connection
[0074] 1) Before installation, the pipe end, groove and rubber ring must be thoroughly cleaned to ensure that there is no oil or dust. The rubber ring must be clean and intact. A pressure test hole should be pre-drilled on the socket pipe wall. The hole should be located between the two rubber rings of the interface after installation. The hole diameter should match the special pressure test bolt.
[0075] 2) When connecting glass fiber reinforced plastic sand-filled pipes, the pressure test bolts at the socket end must be installed in place. The surface of the pipe socket and the socket in contact with the rubber ring must be flat and smooth, without scratches or pores, to ensure that the rubber ring fits evenly with the groove and the pipe wall.
[0076] 3) When the pipeline is in place, align the spigot with the socket, with the pressure test hole facing upwards, put on the canvas rope, adjust the lifting machinery, and push the spigot end into the socket.
[0077] 4) The first and second sections of the pipe should be installed accurately, with the pipe socket facing the incoming water direction. There should be a certain gap between the spigot end and the socket reducer in the axial direction. The gap of DN300-DN1500mm pipes is controlled at 5-15mm. The allowable angle of the interface is provided by the manufacturer. After installation, check whether the position of the spigot pushed into the socket meets the requirements, and insert a probe into the gap between the spigot and the socket to check whether the position of the rubber ring is correct. After checking and confirming that the interface installation meets the requirements, fix the pipe with sandbags.
[0078] 5) In areas where the soil or groundwater is corrosive to the rubber ring, use asphalt mastic, asphalt hemp or asphalt sawdust and other materials to seal the rubber ring interface before backfilling.
[0079] 5. Pipes with non-fixed lengths can be customized after on-site measurement, and elbows and tees with non-standard angles are made on-site by pipe manufacturers. When connecting glass fiber reinforced plastic sand-filled pipes with steel pipes, cast iron pipes and their fittings, pumps or other equipment, disc bearing flange short pipe conversion is used.
[0080] The interface water tightness test includes the following steps:
[0081] 1. The purpose of the interface water tightness test is to check whether the two rubber rings are tightly connected to the pipe wall and whether they meet the design test pressure requirements. Figure 7 .
[0082] 2. The test pressure gauge can only be used after it has passed the inspection according to the measurement requirements. When using a spring pressure gauge, the accuracy shall not be lower than Grade 1.5. The maximum range should be 1.3 to 1.5 times the test pressure, and the nominal diameter of the case shall not be less than 150 mm.
[0083] 3. Install the special bolts for pressure test before connecting the pipeline. After the pipeline is installed, connect the bolts to the manual pressure test pump, inject water into the interface, and inject water from the small hole in the pressure test screw into the closed space formed by the two rubber rings and the pipe wall. At the same time, open the exhaust valve at the highest point, and then slowly increase the pressure in stages. First, gradually increase the water pressure to the working pressure, check whether the interface has leakage, and if there is no leakage, increase it to the test pressure. The test pressure is 1.5 times the working pressure. Observe for 10 minutes. The pressure remains unchanged, and the appearance inspection shows no leakage. It is qualified. After the pressure test is qualified, drain the water in the closed space, and then close the pressure test hole and drain hole.
[0084] 4. If the water pressure test fails, the cause of the leakage should be found out, and the pipeline should be reinstalled or adjusted and tested again until it passes, and then subsequent pipeline installation can be carried out.
[0085] Fixing the buttress includes the following steps:
[0086] Concrete fixed piers shall be set at elbows, reducers, tees and valves according to design requirements. Concrete anti-floating piers shall be set as required in areas passing through ponds, rivers and other sections. The pressure test of the pipeline system can be carried out only after the concrete strength of each pier reaches the design strength. The force-bearing side of the thrust pier is supported on the original soil layer, and the pier and the soil body are in close contact, otherwise the soil should be compacted in layers or filled with C15 plain concrete. For the specific construction of the pier, please refer to the standard atlas "Flexible Interface Water Supply Pipeline Piers" (03SS505).
[0087] Trench backfilling includes the following steps:
[0088] 1. After the pipeline is connected, backfilling and system water pressure testing must be carried out as soon as possible to prevent pipeline floating and thermal deformation. When backfilling, the pipe area backfilling material must be correctly selected, and the pipe area backfilling and compaction must be carried out according to the design requirements.
[0089] 2. Before backfilling, remove the debris in the trench and drain the accumulated water. Do not backfill when there is accumulated water. The depth of soil covering the top of the pipe meets the design requirements. When the soil covering the pipeline is shallow, the bearing capacity of the pipeline is low, the load of the compaction tool is large, or the original soil backfill does not meet the required compaction, you can consult with the design unit to use lime soil, sand, gravel and other materials with structural strength or that can meet the requirements for backfilling.
[0090] 3. The pipe area must be backfilled symmetrically in layers, and unilateral backfilling is strictly prohibited. The thickness of each backfill must be determined according to the backfill material and backfill method, and the backfill steps must comply with the "Water Supply and Drainage Pipeline Engineering Construction and Acceptance Specification" GB50268. Before the hydraulic pressure test, except for the interface, the backfill height on both sides of the pipeline and above the top of the pipe shall not be less than 0.5m; after the hydraulic pressure test is qualified, the rest of the backfill shall be backfilled in time.
[0091] 4. When the pipeline passes through railways and highways, it should be constructed according to the requirements of the railway and highway departments. When crossing obstacles, it should be protected by culverts and other forms according to the design requirements based on the size of the vehicle load and the requirements for burial depth.
[0092] System tightness test, including the following steps:
[0093] 1. The water pressure test should be carried out in accordance with the test method specified in GB50268 "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering", and the planning and design of water source connection and drainage diversion route should be completed before the test.
[0094] 2. After the pipeline is installed, a water pressure test must be carried out as soon as possible. The length of each test should not exceed 1km. The length of the segment with accessories in the middle should not be greater than 500m. Pipes of different materials in the system should be pressure tested separately. The flexible FRP sand-filled pipe coil bearing flange short pipe interface installed at the connection between the FRP sand-filled pipe and the steel pipe and its pipe fittings, or other equipment can be used for segmented pressure testing. The test pipe section shall not use gate valves as plugging plates, and shall not have accessories such as fire hydrants and safety valves. The pressure test pump and pressure gauge are set at the lowest point of the test pipe section.
[0095] 3. Before the water pressure test, the deformation of the pipeline should comply with the regulations; the joints should be installed correctly; the system thrust device should be in place and fully reach the specified strength; the trench backfill should meet the pressure test requirements; the valve pump should be fixed.
[0096] 4. Slowly pour water into the pipeline from the downstream, and install an exhaust valve at the top of the upstream pipe of the test pressure section and the highest point in the pipe section to exhaust the gas in the pipeline. After the pipeline is filled with water, the immersion time shall not be less than 24 hours. The test pressure is 1.5 times the working pressure, and the water pressure test shall meet the following requirements:
[0097] 1) Slowly pressurize the pipeline, first gradually increase the pressure in the pipe section to the working pressure, check the pipeline and joints, if there is no leakage, then increase it to the test pressure, and observe that the pressure drop does not exceed 0.05MPa to pass.
[0098] 2) The calculation method for tightness test is carried out according to the water discharge method specified in GB50268 "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering", and the water seepage is calculated as follows:
[0099]
[0100] Where: q——pipeline water seepage;
[0101] W – the amount of water flowing out per descent;
[0102] T 1 - the time taken for the test pressure to drop without releasing water;
[0103] T 2 - the time taken for the test pressure to drop when the water is released;
[0104] L – length of the test pipe section.
[0105] 3) The allowable water seepage volume shall be determined according to the allowable water seepage volume for steel pipes specified in the current "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Projects" GB50268.
[0106] 4) If the test fails, check the cause of the leakage, reinstall or plug the leak, and then test again until it passes. If the test passes, remove the plugs on valves, fire hydrants, safety valves, etc. in time to restore the equipment function.
[0107] System flushing and disinfection, including the following steps:
[0108] 1. After the hydraulic pressure test of the pipeline, it should be flushed and disinfected before the completion acceptance. The upstream water source can be used or a temporary water pump can be installed to continuously flush the pipeline at a water flow rate of not less than 1m / s until the turbidity and color at the outlet are equivalent to those at the inlet.
[0109] 2. After flushing the drinking water pipes, the pipes should be filled with water containing no less than 20 mg / L of free chlorine using liquid chlorine or bleaching powder for disinfection. The chlorinated water should be kept in the pipes for more than 24 hours. The amount of water and bleaching powder used for every 100 m of pipe can be selected according to Table 2. After soaking, drain the disinfectant solution and then flush with drinking water until the water quality management department takes samples for testing and the results are qualified.
[0110] Table 2. Amount of water and bleaching powder used for disinfection of each 100m pipeline
[0111]
[0112] The labor organization situation of each work team is shown in Table 3.
[0113] Table 3. Labor organization of each work group
[0114] Serial number Job Name Number of people Certification status 1 electrician 1 Hold a special work operation certificate 2 Plumber 3 3 General Worker 2 4 Excavator driver 1 Hold a special work operation certificate 5 Crane operator 1 Hold a special work operation certificate total 15
[0115] Materials and equipment:
[0116] Material:
[0117] Materials must be sampled and inspected before they are brought in and installed, and their appearance and dimensions must be strictly inspected. Unqualified materials are strictly prohibited from being used in projects. The pipe performance, pipe grade and characteristics of FRP sand-filled pipes and pipe fittings should comply with the requirements of the current industry standard "Glass Fiber Reinforced Plastic Sand-Filled Pipes" CJ / T3079 for product quality, and should have a product factory certificate. Rubber rings are provided by pipe suppliers, and the physical and mechanical indicators of their raw materials must comply with relevant national standards. The diameter and ring diameter coefficient of the rubber rings must meet the design requirements; the water hygiene performance of pipes and rubber rings used in drinking water projects should comply with the national "Safety Evaluation Standard for Drinking Water Distribution Equipment and Protective Materials" GB / T17219.
[0118] equipment:
[0119] The main machines and equipment used are shown in Table 4:
[0120] Table 4 Main machinery and equipment
[0121]
[0122] Quality Control:
[0123] Engineering quality control standards:
[0124] 1. The quality of pipeline construction shall comply with the "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" GB50268 and the "Construction and Acceptance Procedure for Buried Water Supply and Drainage Glass Fiber Reinforced Thermosetting Resin Sand-Filled Pipe Pipeline Engineering" CECS129:2001.
[0125] 2. The allowable deviation of pipeline foundation and installation shall be in accordance with Table 5:
[0126] Table 5 Pipeline foundation and installation allowable deviation table
[0127]
[0128] Note: D is the inner diameter of the pipe (mm).
[0129] 3. The initial and long-term radial deflection values of the pipeline after installation shall not exceed the requirements of Table 6:
[0130] Table 6 Allowable radial deflection values for pipes
[0131]
[0132] Quality Assurance Measures:
[0133] 1. Select pipes according to the nominal pressure specifications and rigidity required by the design. The pipe wall must not have cracks or broken skin, the interface working surface must be flat and smooth, and the pipe mouth ovality error must meet the requirements of the interface gap, that is, the compression rate of the rubber ring. During the transportation of the pipeline, the pipe wall and the joint should be protected, and the socket groove should be wrapped with plastic cloth to prevent the groove from being damaged. After the pipes enter the site, they should be inspected one by one and the "Pipe Sampling Inspection Record" should be filled out.
[0134] 2. To prevent outdoor pipes from aging due to ultraviolet rays from the sun, anti-aging agents can be added to the outer protective layer resin, or anti-aging resin can be brushed on the pipes after they are installed.
[0135] 3. The rubber ring should be stored in a room with a temperature of -5 to 30°C and a humidity of no more than 80%. The storage location should not be exposed to ultraviolet light for a long time and the distance from the heat source should be no less than 1m. It should be taken out on site for use and should be placed to avoid long-term squeezing, stretching, and deformation. It should be prevented from contact with volatile solutions and greases.
[0136] Safety measures:
[0137] 8.1 Before construction, the water supply, drainage, gas, electricity, telecommunications and underground pipelines of adjacent buildings and structures must be investigated, their locations must be ascertained, appropriate markings must be made and reliable safety protection measures must be taken.
[0138] 8.2 The trench should be excavated according to the design requirements, and attention should be paid to observe whether there are signs of landslides. If necessary, protective measures should be taken on the trench wall and an emergency plan for accidents should be prepared.
[0139] 8.3 When lifting pipes, check whether the lifting equipment is safe, and no one should stay under the lifting pipes. The parking position of the crane should prevent the soil from being soaked and softened, and use square wood or other measures to prevent the body and legs from sinking or tilting. Lifting operations cannot be carried out on rainy days.
[0140] 8.4 During the installation process, prevent sparks from welding or cutting from causing fire.
[0141] 8.5 During the water pressure test, the ends need to be supported and people are strictly prohibited from standing at both ends of the pipeline. During the water pressure test, it is strictly prohibited to knock on the pipe body and joints or repair defects. When defects are encountered, they should be marked and repairs can only be carried out after the pressure is released.
[0142] 8.6 For sections of roads that affect traffic and travel for surrounding residents, special personnel will be assigned to direct traffic, set up prominent construction signs, and add fences and red warning lights.
[0143] Environmental protection measures:
[0144] 1. Protect existing green vegetation and minimize the damage to vegetation caused by construction. When roads, vegetation, etc. are damaged due to the construction of temporary projects, they should be restored in time after the temporary projects are demolished.
[0145] 2. During pipeline excavation, drainage work must be done at all times to prevent soil erosion or pollution.
[0146] 3. The disposal of waste soil during construction should be carried out strictly in accordance with the design requirements, and protective measures should be taken to prevent pollution of rivers and farmland.
[0147] 4. Strengthen the repair and maintenance of construction machinery. Machinery that leaks oil or water must be repaired before it can continue to participate in construction. Waste oil must be collected and stored in a centralized manner for unified treatment.
[0148] 5. Flushing and disinfection water discharge should be connected to drainage ditches that allow discharge to prevent disinfection water from polluting the environment.
[0149] Benefit Analysis:
[0150] 1. This construction method is easy to operate, simple to install, and not technically difficult. The quality of the pipeline installation process is easy to control, which improves the construction efficiency. The pipeline has a high one-time installation pass rate, reduces the rework of interface installation, saves machinery and labor costs, and has better economic benefits compared with traditional construction methods.
[0151] 2. By adopting the above construction method, the trench exposure time is shortened, dust emissions are reduced, the impact on traffic and the environment is reduced, and it is conducive to civilized construction; it can effectively avoid the problem of interface seepage and leakage during the pressure test of the pipeline system, and reduce the adverse effects caused by pipeline rework; with the widespread application of FRP pipes, this construction method will be better implemented and obtain better social benefits.
[0152] The above implementation modes are only used to illustrate the present invention, but not to limit the present invention. Ordinary technicians in the relevant technical field can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions also belong to the scope of the present invention. The scope of patent protection of the present invention should be limited by the claims.
Claims
1. A glass fiber reinforced plastic sand-filled pipe socket joint structure, characterized in that: It comprises a spigot end and a bell end, the spigot end is provided with two grooves, each groove is embedded with a rubber ring, the rubber ring is engaged with the inner wall of the bell end and the inner wall of the spigot end, the bell end is provided with a pressure test hole, a pressure test bolt is installed through the pressure test hole, and the pressure test bolt is arranged between the two rubber rings; The pressure test bolt comprises a hollow screw and a nut, and the hollow screw is assembled in the pressure test hole through the nut; The hollow screw is connected to one interface end of the three-way joint, and the other two interface ends of the three-way joint are connected to the exhaust valve and the manual pressure test pump connector; The pressure test bolt further comprises a solid screw rod, and the solid screw rod is movably connected to the hollow screw rod; The pressure test bolt also includes a gasket assembly, which includes a first rubber gasket, a second rubber gasket, a third rubber gasket and a fourth rubber gasket. The first rubber gasket is arranged at one end of the hollow screw rod, the second rubber gasket is arranged between the hollow screw rod and the solid screw rod, the third rubber gasket is arranged between the hollow screw rod and the nut, and the fourth rubber gasket is arranged between the nut and the three-way joint.
2. The glass fiber reinforced plastic sand-filled pipe socket joint structure according to claim 1, characterized in that: The inner diameter of the hollow screw is 2-6 mm, and the outer diameter is 6-10 mm.
3. The glass fiber reinforced plastic sand-filled pipe socket joint structure according to claim 1, characterized in that: The diameters of the first rubber gasket and the third rubber gasket are 12-18 mm.
4. The glass fiber reinforced plastic sand-filled pipe socket joint structure according to claim 1, characterized in that: The outer diameter of the solid screw is 6-10 mm.