Construction hanging bracket
By arranging an intermediate beam group and multiple lifting point holes in the middle of the longitudinal beam group of the construction hanger, a field-shaped and eye-shaped structure is formed, which solves the problem of being unable to hoist structures of different sizes in the existing technology, and improves construction efficiency and The versatility and scope of application of the hanger.
Patent Information
- Application Number
- CN202323329795.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-06
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-06
AI Technical Summary
Existing construction hangers cannot hoist structures of different sizes, resulting in the need to frequently replace hangers, which reduces construction efficiency.
A construction hanger including a hanger beam, a first cross beam, a second cross beam and a longitudinal beam group is designed, by setting an intermediate beam group in the middle of the longitudinal beam group, and placing the first beam, the second cross beam and the middle beam group on Multiple hanging point holes are set up to form a field-shaped and eye-shaped structure, which enhances the versatility and scope of application of the hanger.
This design shortens the minimum width that the hanger can support, keeping the maximum width unchanged, improving the versatility and scope of application of the hanger, reducing the number of hanger replacements, improving construction efficiency, and enhancing the stability of the overall structure. and security.
Smart Images

Figure CN221821632U_ABST
Abstract
Description
[Technical field]
[0001] The present application belongs to the field of construction technology, and specifically relates to a construction hanger. [Background technology]
[0002] In the field of building construction, a construction hanger is a commonly used lifting tool used to support, suspend and move construction parts during the construction process for assembly, installation and other work. Existing construction hangers are only used to lift by setting lifting point holes on two beams. The size of the supported lifting structure is limited by the distance between the two beams, and it does not support lifting of smaller structures, resulting in the size of the supported lifting structure being limited. The hanger needs to be replaced according to the size of the structure, resulting in low construction efficiency. [Contents of the utility model]
[0003] In order to solve the problem in the prior art that the construction hanger cannot hoist construction objects of different sizes and needs to be replaced, thereby resulting in low construction efficiency, the present application provides a construction hanger that supports hoisting of objects of different sizes.
[0004] This application is implemented through the following technical solutions:
[0005] A construction hanger includes a hanger beam, a first crossbeam and a second crossbeam connected to the hanger beam, a longitudinal beam group for connecting the first crossbeam and the second crossbeam, an intermediate beam group arranged on the longitudinal beam group and located between the first crossbeam and the second crossbeam, and a plurality of hanging point holes arranged along the length direction of the first crossbeam, the second crossbeam and the intermediate beam group.
[0006] A construction hanger as described above, the longitudinal beam group includes a first longitudinal beam, a second longitudinal beam, a third longitudinal beam, a fourth longitudinal beam, a fifth longitudinal beam and a sixth longitudinal beam arranged in sequence along the length direction of the first cross beam, and the middle beam group includes a first middle beam for connecting the first longitudinal beam and the second longitudinal beam, a second middle beam for connecting the second longitudinal beam and the third longitudinal beam, a third middle beam for connecting the third longitudinal beam and the fourth longitudinal beam, a fourth middle beam for connecting the fourth longitudinal beam and the fifth longitudinal beam, and a fifth middle beam for connecting the fifth longitudinal beam and the sixth longitudinal beam.
[0007] The construction hanger as described above comprises two third intermediate beams for connecting the third longitudinal beam and the fourth longitudinal beam.
[0008] As described above, in a construction hanger, the first cross beam and the second cross beam cooperate with the first longitudinal beam, the second longitudinal beam, the third longitudinal beam, the first middle beam and the second middle beam to form a T-shaped structure, the first cross beam and the second cross beam cooperate with the third longitudinal beam, the fourth longitudinal beam and the two third middle beams to form a M-shaped structure, and the first cross beam and the second cross beam cooperate with the fourth longitudinal beam, the fifth longitudinal beam, the sixth longitudinal beam, the fourth middle beam and the fifth middle beam to form a T-shaped structure.
[0009] In the construction hanger as described above, the first middle beam, the second middle beam, the third middle beam, the fourth middle beam and the fifth middle beam are all provided with a plurality of hanging point holes arranged along the length direction thereof.
[0010] In the construction hanger as described above, the distances from the first middle beam, the second middle beam, the third middle beam, the fourth middle beam and the fifth middle beam to the first cross beam and the second cross beam are all S respectively.
[0011] In the construction hanger as described above, the spacing distance between the two third middle beams is L, wherein S<L<2S.
[0012] In a construction hanger as described above, the hanging point holes of the first cross beam and the hanging point holes on the second cross beam correspond one by one to the hanging point holes on the first middle beam, the second middle beam, the third middle beam, the fourth middle beam and the fifth middle beam, and are all located on the same vertical line.
[0013] In the construction hanger as described above, the spacing distance between adjacent hanging point holes on the first crossbeam and the second crossbeam is 400 mm.
[0014] In the construction hanger as described above, the lengths of the first crossbeam and the second crossbeam are 9000 mm.
[0015] Compared with the prior art, this application has the following advantages:
[0016] A construction hanger of the present application is provided with an intermediate beam group between a first crossbeam and a second crossbeam, and a plurality of lifting point holes are provided on the first crossbeam, the second crossbeam and the intermediate beam group, so as to shorten the minimum width of the hanger that can support the lifting of the structure, and keep the maximum width of the supported lifting structure unchanged, thereby improving the versatility and application scope of the construction hanger, so as to flexibly support the lifting of structures of different sizes. Since it can adapt to the lifting of structures of different sizes, the number of times the hanger is replaced during the construction process can be reduced, thereby improving the construction efficiency.
Brief Description of the Drawings
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0018] Figure 1 This is a top view of the embodiment of the present application. Figure 1 ;
[0019] Figure 2 This is a top view of the embodiment of the present application. Figure 2 . [Specific implementation method]
[0020] In order to make the technical problems, technical solutions and beneficial effects solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0021] See also Figure 1 to Figure 2 A construction hanger includes a hanger beam 3, a first crossbeam 1 and a second crossbeam 2 connected to the hanger beam 3, a longitudinal beam group 5 for connecting the first crossbeam 1 and the second crossbeam 2, an intermediate beam group 6 arranged on the longitudinal beam group 5 and located between the first crossbeam 1 and the second crossbeam 2, and a plurality of hanging point holes 4 arranged along the length direction of the first crossbeam 1, the second crossbeam 2 and the intermediate beam group 6.
[0022] A construction hanger of the present application is provided with an intermediate beam group between a first crossbeam and a second crossbeam, and a plurality of lifting point holes are provided on the first crossbeam, the second crossbeam and the intermediate beam group, so as to shorten the minimum width of the hanger that can support the lifting of the structure, and keep the maximum width of the supported lifting structure unchanged, thereby improving the versatility and application scope of the construction hanger, so as to flexibly support the lifting of structures of different sizes. Since it can adapt to the lifting of structures of different sizes, the number of times the hanger is replaced during the construction process can be reduced, thereby improving the construction efficiency.
[0023] Further, as a preferred embodiment of the present scheme but not a limitation, the longitudinal beam group 5 includes a first longitudinal beam 51, a second longitudinal beam 52, a third longitudinal beam 53, a fourth longitudinal beam 54, a fifth longitudinal beam 55 and a sixth longitudinal beam 56 which are arranged in sequence along the length direction of the first cross beam 1, and the middle beam group 6 includes a first middle beam 61 for connecting the first longitudinal beam 51 and the second longitudinal beam 52, a second middle beam 62 for connecting the second longitudinal beam 52 and the third longitudinal beam 53, a third middle beam 63 for connecting the third longitudinal beam 53 and the fourth longitudinal beam 54, a fourth middle beam 64 for connecting the fourth longitudinal beam 54 and the fifth longitudinal beam 55, and a fifth middle beam 65 for connecting the fifth longitudinal beam 55 and the sixth longitudinal beam 56.
[0024] In this embodiment, the overall structure of the hanger is made more stable and strong. The two ends of the longitudinal beam group are perpendicular to the first cross beam and the second cross beam, which further enhances the load-bearing capacity and stability of the hanger and effectively improves the safety and efficiency of the hoisting operation. Secondly, the function of each intermediate beam is to connect the adjacent longitudinal beams, effectively transfer the load and force, so that the structure can achieve balanced distribution when subjected to force, reduce local stress, and improve the safety and stability of the overall structure. In addition, such an organizational structure is also easy to manufacture and install, reduces the complexity and risk in the construction process, and improves construction efficiency. At the same time, it also provides reliable protection for the construction process, with significant practical value and economic benefits.
[0025] Furthermore, as a preferred implementation manner of the present solution but not limiting, two third intermediate beams 63 for connecting the third longitudinal beam 53 and the fourth longitudinal beam 54 are included.
[0026] In this embodiment, the setting of the double middle beam can effectively enhance the connection stability between the third longitudinal beam and the fourth longitudinal beam, share the load, reduce local stress, and improve the safety and stability of the overall structure. Secondly, the use of the double middle beam can make the connection more uniform, reduce the pressure on a single connection point, effectively disperse the range of force, and improve the bearing capacity of the overall structure. The design of the double middle beam also helps to improve the durability and deformation resistance of the structure and extend its service life.
[0027] Further, as a preferred embodiment of the present scheme but not a limitation, the first cross beam 1 and the second cross beam 2 cooperate with the first longitudinal beam 51, the second longitudinal beam 52, the third longitudinal beam, the first middle beam 61 and the second middle beam 62 to form a T-shaped structure, the first cross beam 1 and the second cross beam 2 cooperate with the third longitudinal beam 53, the fourth longitudinal beam 54 and the two third middle beams 63 to form a M-shaped structure, the first cross beam 1 and the second cross beam 2 cooperate with the fourth longitudinal beam 54, the fifth longitudinal beam 55, the sixth longitudinal beam, the fourth middle beam 64 and the fifth middle beam 65 to form a T-shaped structure.
[0028] In this embodiment, this structural form can effectively enhance the stability and bearing capacity of the overall structure. Through the cooperation of the first crossbeam, the second crossbeam, the longitudinal beam and the middle beam, a solid structural connection is formed, so that the components support and cooperate with each other, share the pressure when bearing external loads, reduce local stress, and thus ensure the safety and stability of the overall structure. Secondly, this structural design also makes the assembly process of the structure more simple and efficient, reduces the complexity and risk in the construction process, and improves the construction efficiency. In addition, the field-shaped and eye-shaped structures can also achieve balanced distribution of the overall structure when subjected to force, ensuring the stability and reliability of the structure.
[0029] Further, as a preferred implementation of the present solution but not a limitation, the first middle beam 61, the second middle beam 62, the third middle beam 63, the fourth middle beam 64 and the fifth middle beam 65 are all provided with a plurality of the hanging point holes 4 arranged along their length direction.
[0030] In this embodiment, the construction hanger has stronger flexibility and applicability. By selecting the appropriate lifting point position according to actual needs, it can effectively support the lifting of structures of different sizes and shapes. This design can maximize the efficiency of the lifting operation while ensuring construction safety, while also reducing the manpower and time costs during the construction process. The design of multiple lifting point holes allows the initial installation position of the structure to be adjusted, and better positioning during lifting, which has significant practical value and economic benefits.
[0031] Further, as a preferred embodiment of the present solution but not a limitation, the distances from the first middle beam 61 , the second middle beam 62 , the third middle beam 63 , the fourth middle beam 64 and the fifth middle beam 65 to the first cross beam 1 and the second cross beam 2 are all S respectively.
[0032] In this embodiment, the structure of the hanger is made more balanced and stable. By maintaining an equal distance S, it is possible to ensure that the support force of the middle beam on the first crossbeam and the second crossbeam is evenly distributed, effectively reducing the stress of a single component, thereby improving the bearing capacity and safety of the entire hanger. In addition, the evenly distributed support force also helps to maintain the stability of the hanger during use, further improving the safety and efficiency of the construction process.
[0033] Further, as a preferred implementation of the present solution but not limiting, the spacing distance between the two third middle beams 63 is L, wherein S<L<2S.
[0034] In this embodiment, the structure of the construction hanger is made more stable and balanced. By maintaining a moderate spacing distance L, the load-bearing weight of the hanger can be effectively dispersed, avoiding the uneven stress caused by the center of gravity being concentrated in a specific area. In addition, L is ensured to be less than 2S, and it is also ensured that the support range of the middle beam covers the entire length of the longitudinal beam, further enhancing the overall stability of the hanger. This structural design can effectively improve the load-bearing capacity and safety of the hanger in actual application on the construction site, and also provides reliable protection for the construction process, with significant practical value and economic benefits.
[0035] Furthermore, as a preferred embodiment of the present invention but not a limitation, the hanging point holes 4 of the first cross beam 1 and the hanging point holes 4 on the second cross beam 2 correspond one by one to the hanging point holes 4 on the first middle beam 61, the second middle beam 62, the third middle beam 63, the fourth middle beam 64 and the fifth middle beam 65, and are all located on the same vertical line.
[0036] In this embodiment, the structure can be kept balanced during the hoisting process, and the alignment rate can be guaranteed when the structure is installed, reducing the difficulty or instability of hoisting caused by position deviation. This structural design can improve the accuracy and efficiency of hoisting in actual construction operations.
[0037] Further, as a preferred implementation manner of the present solution but not a limitation, the spacing distance between adjacent hanging point holes 4 is 400 mm.
[0038] In this embodiment, the 400mm spacing setting of the hanging point holes can adapt to most building sizes in the largest range, while also taking into account the stability and reliability of the structure, providing reliable protection for the construction process, and having significant practical value and economic benefits.
[0039] Further, as a preferred implementation of the present solution but not a limitation, the length of the first crossbeam 1 and the second crossbeam 2 is 9000 mm.
[0040] In this embodiment, the hanger is 9 meters long and 2-3 meters wide. The hanger can cover a larger working range during construction, thereby supporting the hoisting of larger structures. In addition, the long beam arm can effectively disperse the weight during the hoisting process, reduce the stress of a single beam arm, support a load of 40 tons, and improve the load-bearing capacity and safety of the entire hanger.
[0041] The working principle of this embodiment is as follows:
[0042] A construction hanger of the present application can support the hoisting of structures of larger sizes by fixing the hoisting ropes to four hoisting point holes at the left and right ends of the first crossbeam and the left and right ends of the second crossbeam respectively, and can support the hoisting of structures of smaller sizes by fixing the hoisting ropes to four hoisting point holes at the left and right ends of the two third middle beams located between the third longitudinal beam and the fourth longitudinal beam respectively, and can adapt to the hoisting requirements of structures of different sizes by adjusting the hoisting ropes fixed to the hoisting holes between the first crossbeam, the second crossbeam and the middle beam group.
[0043] The above are implementation methods provided in combination with specific contents, and it is not intended that the specific implementation of this application is limited to these descriptions. Any method structure similar to the present application, or a number of technical deductions or replacements based on the concept of the present application, should be considered as the protection scope of this application.
Claims
1. A construction hanger, comprising a hanger beam (3), a first crossbeam (1) and a second crossbeam (2) connected to the hanger beam (3), and a longitudinal beam group (5) for connecting the first crossbeam (1) and the second crossbeam (2), characterized in that: It includes an intermediate beam group (6) provided on the longitudinal beam group (5) and located between the first cross beam (1) and the second cross beam (2), and a plurality of hanging point holes (4) arranged along the lengths of the first cross beam (1), the second cross beam (2) and the intermediate beam group (6); The longitudinal beam group (5) includes a first longitudinal beam (51), a second longitudinal beam (52), a third longitudinal beam (53), a fourth longitudinal beam (54), a fifth longitudinal beam (55) and a sixth longitudinal beam (56) arranged in sequence along the length direction of the first cross beam (1). The intermediate beam group (6) includes a first intermediate beam (61) for connecting the first longitudinal beam (51) and the second longitudinal beam (52), a second intermediate beam (62) for connecting the second longitudinal beam (52) and the third longitudinal beam (53), a third intermediate beam (63) for connecting the third longitudinal beam (53) and the fourth longitudinal beam (54), a fourth intermediate beam (64) for connecting the fourth longitudinal beam (54) and the fifth longitudinal beam (55), and a fifth intermediate beam (65) for connecting the fifth longitudinal beam (55) and the sixth longitudinal beam (56).
2. A construction hanger according to claim 1, characterized in that: It includes two third intermediate beams (63) for connecting the third longitudinal beam (53) and the fourth longitudinal beam (54).
3. A construction hanger according to claim 2, characterized in that: The first cross beam (1) and the second cross beam (2) cooperate with the first longitudinal beam (51), the second longitudinal beam (52), the third longitudinal beam, the first intermediate beam (61) and the second intermediate beam (62) to form a square structure. The first cross beam (1) and the second cross beam (2) cooperate with the third longitudinal beam (53), the fourth longitudinal beam (54) and two third intermediate beams (63) to form a rectangular structure with a horizontal bar in the middle. The first cross beam (1) and the second cross beam (2) cooperate with the fourth longitudinal beam (54), the fifth longitudinal beam (55), the sixth longitudinal beam, the fourth intermediate beam (64) and the fifth intermediate beam (65) to form a square structure.
4. A construction hanger according to claim 1, characterized in that: A plurality of the hanging point holes (4) are arranged along the lengths of the first intermediate beam (61), the second intermediate beam (62), the third intermediate beam (63), the fourth intermediate beam (64) and the fifth intermediate beam (65).
5. A construction hanger according to claim 1, characterized in that: The distances from the first intermediate beam (61), the second intermediate beam (62), the third intermediate beam (63), the fourth intermediate beam (64) and the fifth intermediate beam (65) to the first cross beam (1) and the second cross beam (2) are all S.
6. A construction hanger according to claim 5, characterized in that: The interval distance between the two third intermediate beams (63) is L, where S < L < 2S.
7. A construction hanger according to claim 1, characterized in that: The hanging point holes (4) on the first cross beam (1) and the hanging point holes (4) on the second cross beam (2) correspond one by one to the hanging point holes (4) on the first intermediate beam (61), the second intermediate beam (62), the third intermediate beam (63), the fourth intermediate beam (64) and the fifth intermediate beam (65), and are all located on the same vertical line.
8. A construction hanger according to claim 1, characterized in that: The spacing between adjacent hanging point holes (4) on the first crossbeam (1) and the second crossbeam (2) is 400 mm.
9. A construction hanger according to claim 1, characterized in that: The length of the first crossbeam (1) and the second crossbeam (2) is 9000 mm.
