Novel urban road widening structure

By adopting a new split-width structure in urban road widening, including inclined gravel cushion and precast concrete base, combined with asphalt layer and anti-cracking cloth, the existing technology solves the problem of large excavation volume, damaged pipelines and difficulty in controlling construction quality. solve the problem and achieve higher road bearing capacity, anti-skid performance and construction efficiency.

CN221822667UActive Publication Date: 2024-10-11CRRC P & D INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420365703.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-10-11
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Existing urban road widening technology has problems such as large excavation volume, serious pollution, high risk of damaging pipelines, long construction period, difficult to control construction quality, and safety hazards in areas immediately adjacent to construction. The splicing width is narrow and cannot effectively solve these problems.

Method used

A new type of urban road width structure is adopted, including old road subgrade, road bed, pavement, gravel cushion, concrete base, asphalt lower layer and upper layer. The gravel cushion is set at an angle, and the concrete base is composed of prefabricated concrete panels. The anti-cracking fabric is reinforced with tie rods and warp knitting to ensure structural stability and anti-skid performance.

Benefits of technology

The amount of excavation is reduced, the bearing capacity and anti-skid performance of the road structure are improved, the construction time is shortened, the stability and service life of the road are enhanced, and the risk of pipeline damage and safety accidents is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822667U_ABST
    Figure CN221822667U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel urban road widening structure, which relates to the technical field of urban road pavement reconstruction and comprises an old road subgrade, an old road bed arranged at the top end of the old road subgrade, an old road pavement arranged at the top end of the old road bed, a road groove formed in one side of the old road pavement, and a broken stone hardcore arranged at the top end of the road groove. A concrete base layer is arranged at the top end of the matched broken stone hardcore; an asphalt lower surface layer is paved at the top ends of the old road pavement and the concrete base layer; and an asphalt upper surface layer is paved at the top end of the asphalt lower surface layer. The road widening structure aims at the unfavorable phenomena that the construction period is long, pipelines are damaged and the like if a road bed pavement is excavated due to the fact that the splicing width of an urban road is narrow, and the road widening structure is provided with the broken stone hardcore and the concrete base layer, so that the bearing capacity of the road structure is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of urban road pavement reconstruction, in particular to a novel urban road widening structure. Background Art

[0002] Roads refer to roads that reach various areas of the city, provide transportation and pedestrian use within the city, facilitate residents' lives, work, cultural and entertainment activities, and connect with roads outside the city to carry external traffic. The main function of roads is transportation.

[0003] With the continuous development of urban traffic, the cross-section of urban roads can no longer meet people's travel needs. Many cities have seen large-scale road reconstruction, such as the transformation of two-way four-lane roads into two-way six-lane roads.

[0004] At present, the widening of urban roads mostly adopts the method of digging out green belts and splicing the roadbed and road surface separately, but there are many problems:

[0005] 1) The amount of excavation is large, which is very likely to cause urban pollution.

[0006] 2) It is easy to dig out important pipelines, and the backfill construction of road materials can easily damage the pipelines.

[0007] 3) The construction period is long, affecting urban road traffic.

[0008] 4) It is close to the building area and has high requirements for enclosure. If not handled properly, safety accidents are likely to occur.

[0009] 5) The splicing width is narrow and the construction quality is not easy to control.

[0010] Currently, no effective solution has been proposed for the problems in the related technologies. Utility Model Content

[0011] In view of the problems in the related technologies, the utility model proposes a novel urban road widening structure to overcome the above technical problems existing in the existing related technologies.

[0012] To this end, the specific technical solutions adopted by the utility model are as follows:

[0013] A new urban road widening structure comprises an old road foundation, an old road roadbed is arranged on the top of the old road foundation, an old road pavement is arranged on the top of the old road roadbed, a road groove is opened on one side of the old road pavement, a crushed stone cushion layer is arranged on the top of the road groove, and a concrete base layer is arranged on the top of the crushed stone cushion layer; an asphalt lower layer is paved on the top of the old road pavement and the concrete base layer, and an asphalt upper layer is paved on the top of the asphalt lower layer.

[0014] Furthermore, in order to ensure that the bottom of the concrete base has an inward slope of 1:10 after backfilling with crushed stone, so as to ensure the anti-skid performance under the action of vehicle load, the top of the crushed stone cushion layer is inclined, and the height of the crushed stone cushion layer gradually increases in the direction away from the old road surface, and the inclination slope of the top of the crushed stone cushion layer is 1:10; the bottom of the crushed stone cushion layer is laid with a steel-plastic geogrid.

[0015] Furthermore, in order to realize the prefabrication of precast concrete slabs, and make the production of precast concrete slabs simple and easy to install, and at least shorten the maintenance time of conventional water-stabilized base by seven days, the concrete base is a precast concrete slab composed of steel mesh, corner steel bars and concrete.

[0016] Furthermore, in order to prevent the road widening structure from slipping, which not only improves the service life of the road widening structure but also ensures the stability of the road widening structure, a pull rod is arranged between the concrete base and the old road pavement; a warp-knitted composite reinforced anti-cracking cloth is laid on the top of the connection between the concrete base and the old road pavement.

[0017] The beneficial effects of the utility model are:

[0018] 1. The utility model is aimed at the narrow splicing width of urban roads. If the roadbed and pavement are excavated, it will cause unfavorable phenomena such as long construction period and damage to pipelines. The road widening structure is equipped with a crushed stone cushion layer and a concrete base layer to ensure the bearing capacity of the road structure.

[0019] 2. By setting up a crushed stone cushion layer, the bottom end of the concrete base layer can be guaranteed to have an inward slope of 1:10 after backfilling with crushed stone, so as to ensure the anti-slip performance under the action of vehicle load.

[0020] 3. By setting up a concrete base, prefabricated concrete panels can be prefabricated, making the prefabricated concrete panels simple to manufacture and easy to install, and at least shortening the maintenance time of the conventional water-stable base by seven days.

[0021] 4. By setting the pull rod, the road widening structure can be prevented from slipping, which not only improves the service life of the road widening structure, but also ensures the stability of the road widening structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1The utility model is a schematic structural diagram of a novel urban road widening structure according to an embodiment of the utility model.

[0024] In the figure:

[0025] 1. Old road subgrade; 2. Old road roadbed; 3. Old road pavement; 4. Road trench; 5. Gravel cushion layer; 6. Concrete base layer; 7. Asphalt lower layer; 8. Asphalt upper layer; 9. Steel-plastic geogrid; 10. Tie rod; 11. Warp-knitted composite reinforced anti-cracking cloth. DETAILED DESCRIPTION

[0026] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.

[0027] According to an embodiment of the utility model, a novel urban road widening structure is provided.

[0028] The present invention is now further described in conjunction with the accompanying drawings and specific implementation methods. Figure 1 As shown, the new urban road widening structure according to the embodiment of the utility model includes an old road subgrade 1, characterized in that an old road roadbed 2 is arranged on the top of the old road subgrade 1, an old road pavement 3 is arranged on the top of the old road roadbed 2, a road groove 4 is opened on one side of the old road pavement 3, a crushed stone cushion layer 5 is arranged on the top of the road groove 4, and a concrete base layer 6 is arranged on the top of the crushed stone cushion layer 5; an asphalt lower layer 7 is laid on the top of the old road pavement 3 and the concrete base layer 6, and an asphalt upper layer 8 is laid on the top of the asphalt lower layer 7.

[0029] In addition, it should be noted that the total thickness of the urban road splicing is only about 60 cm, which can not only ensure the road bearing capacity but also reduce the excavation of old roads. The asphalt lower layer 7 is set to 8 cm thick and the asphalt upper layer 8 is set to 4 cm thick.

[0030] With the help of the above technical solution of the utility model, the utility model is aimed at the narrow splicing width of urban roads. If the roadbed and pavement are excavated, it will cause unfavorable phenomena such as long construction period and damage to pipelines. The road widening structure is provided with a crushed stone cushion layer 5 and a concrete base layer 6 to ensure the bearing capacity of the road structure.

[0031] In one embodiment, for the above-mentioned crushed stone cushion layer 5, the top of the crushed stone cushion layer 5 is inclined, and the height of the crushed stone cushion layer 5 gradually increases in the direction away from the old road surface 3; the bottom end of the crushed stone cushion layer 5 is paved with a steel-plastic geogrid 9, and the top of the crushed stone cushion layer 5 has an inclination gradient of 1:10, which can ensure that the bottom end of the concrete base layer 6 has an inward slope of 1:10 after backfilling with crushed stone, so as to ensure the anti-skid performance under the action of vehicle load.

[0032] In addition, it should be noted that the tensile yield strength of the steel-plastic geogrid 9 is ≥80KN / m, and the maximum load elongation is ≤3%.

[0033] In one embodiment, for the above-mentioned concrete base 6, the concrete base 6 is a precast concrete slab composed of a steel mesh, corner steel bars and concrete; a tie rod 10 is arranged between the concrete base 6 and the old road pavement 3; a warp-knitted composite reinforced anti-cracking cloth 11 is laid on the top of the connection between the concrete base 6 and the old road pavement 3, which can be prefabricated through the precast concrete slab, and makes the production of the precast concrete slab simple, which can be easy to install, and at least shortens the maintenance time of the conventional water-stable base by seven days; by setting the tie rod 10, the road widening structure can be prevented from slipping, which not only improves the service life of the road widening structure, but also ensures the stability of the road widening structure.

[0034] In addition, it should be noted that, before the prefabricated concrete slab is manufactured, a notch that meets the requirements is reserved to facilitate the installation of the tie rod 10 later.

[0035] In order to facilitate understanding of the above technical solution of the present invention, the working principle or operation method of the present invention in the actual process is described in detail below.

[0036] In actual application, firstly, the old road surface 3 is excavated by milling, a 50cm step is excavated, and a road groove 4 is formed. Then, the road groove 4 is leveled and compacted to make the compaction degree not less than 92%. A layer of 3m wide steel-plastic geogrid 9 is laid at the bottom of the road groove 4, and 10cm graded crushed stone is backfilled on the order of the steel-plastic geogrid 9, and the stone crushing value is less than 28%, and the particle size meets the requirements of the urban road construction specifications to form a crushed stone cushion layer 5, and then a tie rod 10 is implanted on one side of the old road surface 3, and the tie rod is set to be straight The steel bars with a diameter of 16 cm are arranged in a length of 80 cm and a spacing of 60 cm. Then a 40 cm thick precast concrete slab is placed to form a concrete base 6. Then, anti-cracking stickers are laid at the joints between the precast concrete slab and the old road surface 3 to reduce stress concentration at the joints of the concrete slabs. To ensure a smooth surface, grouting can be used. Before laying the asphalt lower layer 7 and the asphalt upper layer 8, a 2 cm thick rubber asphalt stress absorption layer needs to be laid on the top of the concrete base 6 to reduce the probability of reflective cracks.

[0037] Specifically, the side surfaces of the joints between the precast concrete slab and the old road pavement 3 can be evenly coated with emulsified asphalt tack coat oil to enhance interlayer adhesion.

[0038] In summary, with the aid of the above-mentioned technical scheme of the utility model, the utility model is aimed at the narrow splicing width of urban roads. If the roadbed and pavement are excavated, it will cause unfavorable phenomena such as long construction period and damage to pipelines, and the road widening structure is provided with a crushed stone cushion layer 5 and a concrete base layer 6 to ensure the bearing capacity of the road structure; by providing the crushed stone cushion layer 5, it can be ensured that the bottom end of the concrete base layer 6 has an inward slope of 1:10 after backfilling the crushed stone, so as to ensure the anti-skid performance under the action of traffic load; by providing the concrete base layer 6, it is possible to prefabricate precast concrete slabs, and make the production of precast concrete slabs simple, which can be easy to install, and at least shorten the maintenance time of conventional water-stable base layers by seven days; by providing the pull rod 10, it is possible to prevent the road widening structure from slipping, which not only improves the service life of the road widening structure, but also ensures the stability of the road widening structure.

[0039] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A new urban road widening structure, comprising an old roadbed (1), characterized in that: An old road bed (2) is arranged at the top of the old road subgrade (1), an old road pavement (3) is arranged at the top of the old road bed (2), a road groove (4) is opened on one side of the old road pavement (3), a crushed stone cushion layer (5) is arranged at the top of the road groove (4), and a concrete base layer (6) is arranged at the top of the crushed stone cushion layer (5); An asphalt lower layer (7) is laid on the top of the old road surface (3) and the concrete base layer (6), and an asphalt upper layer (8) is laid on the top of the asphalt lower layer (7).

2. A new urban road widening structure according to claim 1, characterized in that: The top of the crushed stone cushion layer (5) is arranged to be inclined, and the height of the crushed stone cushion layer (5) gradually increases in a direction away from the old road surface (3).

3. A new urban road widening structure according to claim 1, characterized in that: The bottom end of the gravel cushion layer (5) is provided with a steel-plastic geogrid (9).

4. The novel urban road widening structure according to claim 1 is characterized in that: The concrete base (6) is a prefabricated concrete slab consisting of a steel mesh, corner steel bars and concrete.

5. The novel urban road widening structure according to claim 2 is characterized in that: A tension rod (10) is provided between the concrete base layer (6) and the old road surface (3).

6. The novel urban road widening structure according to claim 3 is characterized in that: A warp-knitted composite reinforced anti-cracking fabric (11) is laid on the top of the connection between the concrete base layer (6) and the old road surface (3).

7. The novel urban road widening structure according to claim 2 is characterized in that: The inclination gradient of the top of the crushed stone cushion layer (5) is 1:10.