Support-free suspension type bridge construction worker operation platform

By designing an unsupported suspension bridge construction operator operating platform and adopting a crane-based component cantilever assembly method, the problems of long construction period, high cost, positioning accuracy and difficult to control welding deformation in the cantilever bridge erecting machine technology are solved. It achieves the effects of shortened construction period, reduced cost and precise splicing.

CN221822740UActive Publication Date: 2024-10-11NINGBO MUNICIPAL ENG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323485109.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-11
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

During the construction process of the all-welded steel truss bridge, the cantilever bridge erecting machine technology has problems such as long construction period, high cost, difficult control of component positioning accuracy and welding deformation, and inconvenient setting and movement of personnel working channels, especially when there is no supporting platform. The bottom is more prominent.

Method used

Design an unsupported suspension bridge construction operator operating platform, using the crane-based cantilever assembly method of individual parts, through low-side and high-side connecting beams, shoulder pole beams, temporary support piles, main support beams and support channel steel, etc. components, providing a fast and convenient operating platform to achieve rapid assembly and welding between segments.

Benefits of technology

It achieves shortened construction period, reduced cost and precise splicing, meets the requirements of construction safety regulations, controls welding deformation, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822740U_ABST
    Figure CN221822740U_ABST
Patent Text Reader

Abstract

The utility model discloses a support-free suspension type bridge construction worker operation platform which comprises a low-side connecting beam, a high-side connecting beam, a carrying pole beam, a main supporting beam, a side supporting beam, horizontal supporting channel steel, inclined supporting channel steel and a temporary supporting steel pipe pile. Therefore, the novel quick-release and low-cost operation platform is designed, convenience is provided for operation of personnel, meanwhile, the operation platform has the advantages of being convenient to mount, dismount, move and the like, and an implementation foundation is provided for a crane-based spare part cantilever assembly construction method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, in particular to an unsupported suspended bridge construction worker operating platform. Background Art

[0002] The construction process of all-welded steel truss bridges needs to consider many factors, which are affected by the construction hydrological environment, nearby ground buildings, underground pipelines, and construction costs and cycles. At the same time, when erecting bridge segments, as the bridge span extends toward the center of the river, the cost of using the underbridge support system will increase significantly, and the cantilever bridge erection machine on the bridge is usually used for the operation.

[0003] However, engineering practice shows that the time required for a single installation and removal of a bridge erection machine is relatively long (about 14 to 21 days), and the amount of machinery required is not low (7 shifts for a 200T truck crane, 6 shifts for a 130T truck crane, and 15 shifts for an 80T truck crane). When the number of sections assembled at a time by a cantilever bridge erection machine (or the "aerial work platform" described in the aforementioned patent scheme) is small (2 to 3 sections), the cantilever bridge erection machine process is not economical. Engineering practice shows that when a cantilever bridge erection machine is used to assemble a fully welded steel truss bridge, the construction period required for a single section is approximately 7 days (for thin plates, the number of welds exceeding 30mm is less than 30%) to 10 days (for thick plates, the number of welds exceeding 30mm is more than 30%). The assembly time of a cantilever bridge erection machine is close to or even exceeds the component hoisting time, so it is not suitable.

[0004] When there is a conflict between the aerial work platform and the existing structure, mainly in the first section (near the main pier), and when the lower operating platform of the cantilever bridge-erecting machine conflicts with the existing bridge piers, it is still necessary to adopt the cantilever scattered parts assembly process without a temporary support platform, which is very costly and takes a longer construction period.

[0005] like Figure 1 As shown in the figure, the support conditions for building a truss bridge on a common water body in reality are that the main span of the main bridge has several segments (8), most of which are located in the mudflat area, which has the conditions for building a trestle and a temporary support system; while the remaining segments (2) are located above the river channel. The cost of building a trestle or support system underwater will inevitably increase, and the use of conventional cantilever bridge erection machines will extend the construction period. In addition, the conventional cantilever crane assembly process has the following problems:

[0006] (1) The positioning accuracy of components is difficult to control. When there is a supporting platform, the components only need to be hoisted to the platform, and then they can be accurately positioned using vertical jacks and lateral hand winches. After positioning, the components are in a supported state, and no lateral displacement will occur before the temporary fixed components (code plate system) are installed. However, when there is no supporting working platform, hoisting equipment is required for positioning. At this time, from the time the components are accurately positioned to the time the temporary fixed components (code plate system) are installed, lateral displacement caused by hoisting mechanical factors (it is extremely difficult to control the crane to be completely stable during the hoisting stage, and it must operate in a windless or light wind state. On open water (Class A sites described in the "Highway Bridge Wind Resistance Design Code"), similar construction conditions are difficult to control) is inevitable and uncontrollable;

[0007] (2) The welding deformation of a single component is difficult to control. The temporary supporting operation platform can bear the weight of two lower chords and one lower bridge deck at the same time, so that the three components can be formed into a whole and then spliced ​​with the completed steel truss of the previous section. When there is no operation platform, the lower chord must be assembled separately and separately with the lower chord of the completed steel truss of the previous section before the bridge deck is connected to it as a whole. At this time, the welding deformation of a single lower chord segment in the "cantilever state" is not subject to any constraints, and it is very easy to cause lateral and height deviations due to uneven cooling of the weld. Taking the assembly of the lower chord of the first section of the main bridge as an example, the maximum lateral deviation of a single section after welding was 4.5 cm, and the maximum height deviation was 6 cm, which could not meet the requirements of the steel structure installation specification.

[0008] (3) The conflict between the setting of personnel operation channels and the convenience of channel installation, removal and movement. If a personnel operation platform is not provided during the cantilever assembly stage, it will violate the relevant requirements of the national construction safety regulations. However, if a personnel operation platform is provided, the operation cycle and mechanical consumption of its installation, removal and movement should be controlled within 1 day. Otherwise, the implementation of this process will not be advanced.

[0009] Therefore, it is necessary to design a shorter and more economical cantilever assembly construction method for all-welded steel truss bridge components without a supporting platform. Utility Model Content

[0010] Purpose of the utility model: In view of the above existing problems and shortcomings, the proposed solution is to use a crane-based cantilever assembly method to complete a single assembly of 2-3 segments of cantilever assembly. In order to realize the crane-based cantilever assembly method, the utility model provides an unsupported suspended bridge construction worker operating platform, which provides convenience for the workers' operations and has the advantages of convenient installation, dismantling, and movement.

[0011] In order to achieve the above technical objectives, the utility model will adopt the following technical solutions:

[0012] An unsupported suspended bridge construction worker operating platform, wherein the bridge construction is completed by segment assembly, and the segments are assembled and welded in sequence during the construction process, comprising:

[0013] A low-side connecting beam and a high-side connecting beam welded and anchored to the top of the segment along the longitudinal direction of the bridge, wherein the low-side connecting beam and the high-side connecting beam are both provided with an outrigger extending out of the segment;

[0014] Two shoulder beams are located on the outrigger support and are arranged on the low-side connecting beam and the high-side connecting beam in the transverse direction of the bridge, and the two ends of the shoulder beam are respectively provided with extended load-bearing sections relative to the segment;

[0015] two temporary support piles respectively connected to the extended load-bearing section;

[0016] Two main supporting beams connected to the bottom ends of the temporary supporting piles in the transverse direction of the bridge, the two main supporting beams corresponding to the projection positions of the shoulder beam;

[0017] Two side support beams connected to the bottom ends of the temporary support piles along the bridge direction;

[0018] Multiple groups of horizontally arranged horizontal bracing channel steels are fixed between two temporary supporting piles on the same side by channel steel welding, and diagonal bracing channel steels are also connected between the horizontal braces;

[0019] The contact surface between the high-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate along the direction of the bridge, so that the high-side connecting beam is in a horizontal position as a whole; the contact surface between the low-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate and a double-piece I-beam along the direction of the bridge, so that the low-side connecting beam and the high-side connecting beam are maintained on the same horizontal plane as a whole.

[0020] Preferably, steel gangways and railing systems are provided between and around the main supporting beams.

[0021] Preferably, the lower surface of the wedge-shaped steel plate arranged at the bottom of the high-side connecting beam and the low-side connecting beam is an inclined surface, and the upper surface is a horizontal surface.

[0022] Preferably, the low-side connecting beam and the high-side connecting beam are both made of HN700 steel beams; the shoulder beam and the main supporting beam are both made of 45a I-beams; the temporary supporting piles, horizontal bracing channel steels and diagonal bracing channel steels are all made of 20a channel steels.

[0023] Preferably, a stiffening weld plate is vertically provided on the outer edge of the connection between the shoulder beam and the temporary support pile, and the temporary support pile is fixedly connected to the stiffening weld plate by welding anchoring.

[0024] Preferably, the temporary support piles are welded and anchored to the horizontal support channel steels, the diagonal support channel steels and the main support beams through external stiffening welding plates.

[0025] Beneficial effects: Compared with the prior art, the utility model has the following advantages:

[0026] The utility model designs a new type of quick-disassembly and low-cost operating platform, which provides convenience for personnel operations and has the advantages of convenient installation, dismantling, and movement. It provides an implementation basis for the crane-based scattered cantilever assembly method. The crane-based scattered cantilever assembly method is suitable for the working condition where only 2-3 segment cantilever assembly is required in a single assembly, and has the advantages of short construction period, low cost, and fast and accurate splicing. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the side support conditions of the fully welded steel truss bridge of the utility model;

[0028] Figure 2 This is a schematic diagram of the hoisting state of the trestle bridge in the first embodiment of the utility model;

[0029] Figure 3 It is a schematic diagram of the state of the crane's travel limit position in the first trestle hoisting scheme of the utility model implementation scheme;

[0030] Figure 4 It is a schematic diagram of the operating radius of the crane and the operating radius of the lower chord in the first trestle hoisting scheme of the utility model implementation scheme;

[0031] Figure 5 It is a schematic diagram of the crane operating radius and the upper bridge deck operating radius in the trestle hoisting scheme of the first implementation scheme of the utility model;

[0032] Figure 6 It is a schematic diagram of the forward limit state of the crawler crane in the second bridge hoisting scheme of the implementation scheme of the utility model;

[0033] Figure 7 It is a plane schematic diagram of the crawler crane in the forward limit state in the second bridge hoisting scheme of the implementation scheme of the utility model;

[0034] Figure 8 It is a structural schematic diagram of the bridge segment of the utility model;

[0035] Fig. 9 This is the elevation structure layout diagram of the operator operating platform described in the utility model

[0036] Fig.10 This is a side structural layout diagram of the operator operating platform of the utility model;

[0037] Fig.11 This is a top view of the structural layout of the operator operating platform of the utility model

[0038] Fig.12 for Fig. 9 Enlarged view of the middle sample A;

[0039] Fig.13 for Fig. 9 Enlarged view of the middle sample B;

[0040] Fig.14 for Fig. 9 Enlarged view of the C in the middle sample;

[0041] Fig.15 This is a state diagram of the truss bridge of the utility model when it is corrected and docked by temporary matching parts;

[0042] Fig.16 It is a schematic diagram of the lateral state of the truss bridge of the utility model when the docking is corrected by a temporary matching piece;

[0043] Fig.17 It is a structural schematic diagram of the temporary matching piece of the utility model;

[0044] Fig.18 It is a schematic diagram of the lateral structure of the temporary matching piece of the utility model.

[0045] Among them, segment 1, low-side connecting beam 2, high-side connecting beam 3, outrigger support 4, shoulder beam 5, temporary support piles 6, main supporting beam 7, side supporting beam 8, horizontal support channel steel 9, diagonal support channel steel 10, wedge-shaped steel plate 11, double-piece I-beam 12, steel springboard 13, railing system 14, stiffening weld plate 15, upper chord 16, lower chord 17, first web member 18, second web member 19, lower bridge deck 20, upper bridge deck 21, temporary matching parts 22, stiffening plate 23, and pins 24. DETAILED DESCRIPTION

[0046] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0047] like Figure 9-18 As shown, the utility model provides an unsupported suspended bridge construction worker operating platform, wherein the bridge construction is completed by segment assembly, and each segment is assembled and welded in sequence during the construction process, including:

[0048] A low-side connecting beam and a high-side connecting beam welded and anchored to the top of the segment along the longitudinal direction of the bridge, wherein the low-side connecting beam and the high-side connecting beam are both provided with an outrigger extending out of the segment;

[0049] Two shoulder beams are located on the outrigger support and are arranged on the low-side connecting beam and the high-side connecting beam in the transverse direction of the bridge. Both ends of the shoulder beam are respectively provided with extended load-bearing sections relative to the segment.

[0050] two temporary support piles respectively connected to the extended load-bearing section,

[0051] The cross bridge is connected to the bottom end of the temporary support pile and has two main support beams corresponding to the projection position of the shoulder beam.

[0052] Two side support beams connected to the bottom ends of the temporary support piles along the bridge direction;

[0053] Multiple groups of horizontally arranged horizontal bracing channel steels are fixed between two temporary supporting piles on the same side by channel steel welding, and diagonal bracing channel steels are also connected between the horizontal braces;

[0054] The contact surface between the high-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate along the direction of the bridge, so that the high-side connecting beam is in a horizontal position as a whole; the contact surface between the low-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate and a double-piece I-beam along the direction of the bridge, so that the low-side connecting beam and the high-side connecting beam are maintained on the same horizontal plane as a whole.

[0055] Specifically, Figure 2-5 As shown in the figure, crawler cranes were used to assemble and assemble the 14#-15# sections of the main span of the all-welded steel truss bridge. Figure 8 As shown, the components of each segment include the lower deck, two lower chords, two adjustable webs, the upper deck, two upper chords and two cantilever panels; the two lower chords correspond to the first and second side lower chords, which are arranged on both sides of the lower deck in the transverse direction of the bridge; the two upper chords correspond to the first and second side upper chords, which are arranged on both sides of the upper deck in the transverse direction of the bridge, and the two cantilever panels are arranged on the outside of an upper deck, and the upper and lower chords on the same side are connected by an adjustable web. The order of cantilever hoisting is: lower chord-lower deck-adjustable web-upper chord-upper deck-cantilever panel.

[0056] When hoisting the lower chord, it is necessary to provide an operating platform for the construction and installation personnel and the inspection personnel. To ensure the overall stability of the operating platform, Figure 9-10As shown, the connecting beam of the operator's operating platform adopts a 15m HN700 steel beam. The HN700 steel extends 5m as the support part of the lower operating platform. The HN700 steel beam is welded and anchored to the completed upper chord of the steel structure. In order to meet the requirements of the transverse slope of the main truss structure, the two HN700 steel beams shown are the low-side connecting beam and the high-side connecting beam. The low-side connecting beam is leveled with a wedge-shaped steel plate, while the bottom of the high-side connecting beam is leveled with "200mm long double-piece I14a I-beam + wedge-shaped steel plate" to adapt to the multi-directional slope of the bridge deck (that is, uneven slopes exist in both the horizontal and longitudinal directions). This is a technical problem of truss bridges.

[0057] On the two HN700 steel beams as weighing bases, two 15m I45a I-beams are used as shoulder beams in the transverse direction of the bridge, with a spacing of 2.5m. In order to eliminate the influence of the longitudinal slope on the installation accuracy, the shoulder beams made of I45a I-beams are equipped with 300mm thickened external reinforcements connected to the diagonal braces of the operating platform [20a channel steel, which also serves as a ladder for operators to climb up and down.

[0058] The lower operating platform adopts a longitudinal and transverse beam system. In the transverse direction, two 15m I45a I-beams are used as the main supporting beams, with a spacing of 2.5m, corresponding to the projection position of the shoulder beam; in the longitudinal direction, two 3.4m [20a channel steels are used as supporting beams, with a spacing of 14m. A 3.0m (length) × 0.5m (width) steel springboard is set between the main supporting beams of the lower operating platform as the working surface for construction personnel, and a 1.5m railing system is set along the outer perimeter of the main and secondary supporting beams of the lower operating platform.

[0059] Solution 1: Crawler crane trestle cantilever operation solution

[0060] After the operator completes the installation of the operating platform, the crawler crane is used on the trestle to complete the assembly of the main span steel structure of the 14#-15# segment. Figure 2-Figure 5 As shown. The maximum operating radius of a 150-ton crawler crane is 30m. Among them, the minimum operating radius of the lower chord is 14.7m, and the minimum operating radius of the upper bridge deck is 11.1m, which meets the operating requirements of a 150-ton crawler crane. When the crawler crane's forward position limit state is located at a minimum distance of 1000mm from the front end of the crawler crane's crawler to the end of the trestle, it can meet the lifting requirements of each component, thereby determining the crawler crane's lifting tonnage and operating radius. The specific splicing steps are as follows:

[0061] Component lifting: The crane moving through the trestle lifts the components to the corresponding assembly positions in turn; Positioning and matching: When the components are lifted to the corresponding positions, the components are initially positioned by traction ropes and fixed limiters, and then temporary matching parts are fixed on the lateral edges of the components. The temporary matching parts are made of angle steels, and bolt holes and pin holes are provided on the fixing surfaces of the angle steels; Correction and fixation: On the temporary matching parts of the mounting surfaces of the two initially positioned components, the pin holes are firstly used to penetrate and fix them so as to realize secondary positioning and correction in the transverse direction of the bridge, and then the bolts are installed in the bolt holes of the temporary matching parts to realize secondary positioning and correction in the longitudinal direction of the bridge between the components; Welding and anchoring: The components after correction and fixation are welded and anchored by stiffening plates, and the temporary matching parts are removed after the welding is completed and firmly fixed; The remaining components are constructed and assembled in sequence according to the above steps to complete.

[0062] This solution is applicable to working radius not exceeding 30m (usually the cumulative length of 2 segments) and segment weight less than 15 tons (in the process of loose parts assembly, components in the 1 / 3 area of ​​the mid-span usually meet this requirement).

[0063] Option 2: Crawler crane bridge operation plan

[0064] like Figure 6 , Figure 7 As shown in the figure, compared with Scheme 1, this scheme is different in that it does not need to build trestle ancillary facilities at the construction site, and directly adopts the crane bridge scheme, which is less restricted by the operating radius and the weight of the hoisting segment, and a low-specification crane can meet the requirements. Compared with Scheme 1, it is necessary to add the "crawler crane bridge" operation step, which takes about 1 to 2 days of construction, and is equipped with a 60T-100T truck crane and 2 shifts. The hoisting and assembly process is the same as Scheme 1.

[0065] It should be noted that after completing the secondary positioning correction, the seam welding of a single chord must be completed by one worker, that is, the subjective factors of the weld variables are equally controlled - the current size, the speed of the welding gun movement, and the difference in the control of the weld leg size during a single welding is reduced to a minimum.

[0066] Compared with welding on both sides at the same time, except for the disadvantage of the order of setting the welds (the time interval for welding a single weld is about 15 minutes), the rest are advantages. Engineering practice has proved that when the ambient temperature exceeds 15°C, the cooling effect of the weld caused by the 15-minute time interval is relatively low. When welding by one person, the lateral deviation of the lower chord can be controlled within 1.5cm, and the height deviation can be controlled within 1cm, which is much lower than the symmetrical welding of two people (lateral deviation of more than 4cm, height deviation of more than 5cm).

Claims

1. An unsupported suspended bridge construction worker operating platform, wherein the bridge construction is completed by segment assembly, and each segment is assembled and welded in sequence during the construction process, characterized in that: include: A low-side connecting beam and a high-side connecting beam welded and anchored to the top of the segment along the longitudinal direction of the bridge, wherein the low-side connecting beam and the high-side connecting beam are both provided with an outrigger extending out of the segment; Two shoulder beams are located on the outrigger support and are arranged on the low-side connecting beam and the high-side connecting beam in the transverse direction of the bridge, and the two ends of the shoulder beam are respectively provided with extended load-bearing sections relative to the segment; two temporary support piles respectively connected to the extended load-bearing section; Two main supporting beams connected to the bottom ends of the temporary supporting piles in the transverse direction of the bridge, the two main supporting beams corresponding to the projection positions of the shoulder beam; Two side support beams connected to the bottom ends of the temporary support piles along the bridge direction; Multiple groups of horizontally arranged horizontal bracing channel steels are fixed between two temporary supporting piles on the same side by channel steel welding, and diagonal bracing channel steels are also connected between the horizontal braces; The contact surface between the high-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate along the direction of the bridge, so that the high-side connecting beam is in a horizontal position as a whole; the contact surface between the low-side connecting beam and the top of the segment is provided with a wedge-shaped steel plate and a double-piece I-beam along the direction of the bridge, so that the low-side connecting beam and the high-side connecting beam are maintained on the same horizontal plane as a whole.

2. The unsupported suspended bridge construction worker operating platform according to claim 1 is characterized by: Steel springboards and railing systems are respectively provided between and around the main supporting beams.

3. The unsupported suspended bridge construction worker operating platform according to claim 1 is characterized by: The lower surface of the wedge-shaped steel plate arranged at the bottom of the high-side connecting beam and the low-side connecting beam is an inclined surface, and the upper surface is a horizontal surface.

4. The unsupported suspended bridge construction worker operating platform according to claim 1 is characterized by: The low-side connecting beam and the high-side connecting beam are both made of HN700 steel beams; the shoulder beam and the main supporting beam are both made of 45a I-beams; the temporary supporting piles, horizontal bracing channel steels and diagonal bracing channel steels are all made of 20a channel steels.

5. The unsupported suspended bridge construction worker operating platform according to claim 4 is characterized by: A stiffening weld plate is vertically provided at the outer edge of the connection between the shoulder pole beam and the temporary support pile, and the temporary support pile is fixedly connected to the stiffening weld plate by welding anchoring.

6. The unsupported suspended bridge construction worker operating platform according to claim 4 is characterized by: The temporary support piles are welded and anchored to the horizontal support channel steels, the diagonal support channel steels and the main support beams through externally provided stiffening welding plates.