Modularized supporting truss system of cantilever bridge girder erection machine

The cantilever bridge erecting machine is assembled on-site through factory prefabricated modular components, which solves the problems of slow assembly speed and difficulty in precision control, achieves efficient and safe on-site assembly, and reduces the risk of high-altitude operations.

CN221822761UActive Publication Date: 2024-10-11NINGBO MUNICIPAL ENG CONSTR GROUP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323141536.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-21
Publication Date
2024-10-11
Estimated Expiration
2033-11-21

AI Technical Summary

Technical Problem

The existing cantilever bridge erecting machine has slow assembly speed and difficult precision control during the construction process. High-altitude welding increases risks, and the removal of on-site welds is complicated, which affects the function of the equipment.

Method used

It is assembled on site using multiple factory-prefabricated modular components, including movable front strut modules, movable rear strut modules, anchoring section truss connection sections, cantilever section truss connection sections, etc., which are spliced ​​through detachable connection components. , reduce high-strength bolt nodes and improve structural stiffness and bearing capacity.

Benefits of technology

It improves the accuracy of on-site assembly, reduces the difficulty and risk of high-altitude operations, simplifies the on-site splicing process, and meets the requirements of highway transportation and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822761U_ABST
    Figure CN221822761U_ABST
Patent Text Reader

Abstract

The utility model discloses a modularized supporting truss system of a cantilever bridge girder erection machine. The modularized supporting truss system is formed by assembling a plurality of modularized components prefabricated in a factory on site. The modularized components prefabricated in each factory comprise a movable front supporting rod module, a front supporting point parallel connection, a movable rear supporting rod module, a rear supporting point parallel connection, an anchoring section truss connecting section and a cantilever section truss connecting section. The two movable front supporting rod modules are spliced in a parallel connection mode through a front supporting point arranged between the two movable front supporting rod modules to form a movable front supporting rod segment. The two movable rear supporting rod modules are horizontally connected through a rear supporting point arranged between the two movable rear supporting rod modules to be spliced to form a movable rear supporting rod section; the anchoring section truss connecting section and the cantilever section truss connecting section are arranged on the two sides of the movable front supporting rod section respectively. Therefore, on the premise that the requirements for rigidity and bearing capacity are met, on-site assembly precision is effectively improved, and on-site operation difficulty and risks are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a modularized supporting truss system of a cantilever bridge erecting machine, belonging to auxiliary equipment for bridge construction. Background Art

[0002] Chinese patent CN202211543500.0 discloses a piece-by-piece cantilever assembly aerial work platform for all-welded steel truss bridges and its construction method. The aerial work platform is a bridge construction equipment that implements the "front cantilever, rear beam feeding" construction method and is suitable for truss bridges that "cannot arrange temporary support or auxiliary ships and cross valleys and waterways". It combines the "hanging basket" used for cantilever construction and the "bridge erection machine" system used for simple support and continuous construction.

[0003] As a large-scale bridge construction equipment, its design stage needs to focus not only on the safety and functional efficiency of the equipment, but also on the convenience of equipment installation and removal. Domestic large-scale bridge erection machines that cross rivers and valleys either have large components and are installed using large-tonnage floating cranes, large-tonnage truck cranes or crawler cranes; or have small components and are installed using tower cranes or small-tonnage truck cranes.

[0004] The above-mentioned aerial work platform adopts a truss system. The individual components are light (the maximum specification is HN700 steel), but the overall frame size is large. When the first set of equipment was manufactured and installed, the "small steps and slow running" strategy was adopted, and the loose parts method was conservatively used for assembly, such as Chinese patent CN202211543500.0 (patent name: loose parts cantilever assembly aerial work platform for all-welded steel truss bridge and its construction method). During use, the following defects were found:

[0005] 1. Slow assembly speed: Taking Yinzhou Avenue Expressway as an example, a single aerial work platform assembled a total of 9 steel truss segments (cumulative weight 960 tons) in a single area. The average installation period for each segment was 6 days. Considering the 10% weather restriction, the single construction period was 60 days. The first cantilever bridge erection machine took 36 days to install and 18 days to dismantle, a total of 54 days, which was almost the same as the operation time, seriously affecting the equipment turnover efficiency.

[0006] 2. It is difficult to control the assembly accuracy, the setting and removal of high-altitude welds are extremely troublesome, and the risk of high-altitude operations is high: the outline dimensions are large, 34m long, 15m wide, and 15m high. High-altitude welding operations increase the difficulty of assembly and also increase the safety risk of assembly. Moreover, the quality of high-altitude welding is not easy to control. More importantly, it is very troublesome to remove the welds on site. When reused, the welds will be restored after removal, which will bring additional residual stress and affect the functional requirements of the cantilever bridge crane.

[0007] Therefore, in order to improve the assembly accuracy of the above-mentioned aerial work platform and reduce the difficulty and risk of on-site operations, on the one hand, it is necessary to avoid on-site welding construction methods as much as possible, and on the other hand, the number of on-site splicing nodes, especially the number of high-strength bolt assembly nodes, should be reduced as much as possible. This means that the structural joints of the system should be as small as possible, that is, the specifications of the single segment structure should be as large as possible. The composition of the single segment structure and the splicing between them need to meet the stiffness and bearing capacity requirements of the system. At the same time, it is also necessary to meet the upper limit requirements of the conventional approval of oversized components for road transportation and the spatial adjustment requirements of on-site splicing. These are the technical difficulties that need to be solved at present. Utility Model Content

[0008] The utility model aims to provide a modular supporting truss system for a cantilever bridge erecting machine, which effectively improves the accuracy of on-site assembly and reduces the difficulty and risk of on-site operations while meeting its own rigidity and bearing capacity requirements.

[0009] In order to achieve the above technical objectives, the utility model will adopt the following technical solutions:

[0010] A modular support truss system for a cantilever bridge erecting machine is assembled on site using a plurality of factory-prefabricated modular components; the factory-prefabricated modular components include a movable front support rod module, a front support point parallel connection, a movable rear support rod module, a rear support point parallel connection, an anchor section truss connection segment, a cantilever section truss connection segment, a lower connecting chord, a lower diagonal web member, and an upper diagonal web member; wherein:

[0011] The number of movable front strut modules and movable rear strut modules are both two; the two movable front strut modules are respectively the first and second movable front strut modules, which are symmetrically arranged on both sides of the bridge in the transverse direction, and are connected on site to form movable front strut segments through front support points; the two movable rear strut modules are respectively the first and second movable rear strut modules, which are symmetrically arranged on both sides of the bridge in the transverse direction, and are connected on site to form movable rear strut segments through rear support points;

[0012] The number of the anchoring section truss connection segment and the cantilever section truss connection segment is one, and the anchoring section truss connection segment and the cantilever section truss connection segment are respectively arranged on both sides of the movable front strut segment, and both ends of the anchoring section truss connection segment are connected between the movable front strut module and the movable rear strut module through a detachable connection component A, while the cantilever section truss connection segment is cantilever-connected to the movable front strut module through a detachable connection component B, and a V-shaped lateral support is installed at the cantilever end of the cantilever section truss connection segment;

[0013] The movable front strut module and the movable rear strut module are also connected by a lower connecting chord, and both ends of the lower connecting chord are respectively connected to the movable front strut module and the movable rear strut module via a detachable connecting component C;

[0014] The number of lower oblique abdominal rods and upper oblique abdominal rods are both two, the two lower oblique abdominal rods correspond to the first and second lower oblique abdominal rods, and the two upper oblique abdominal rods correspond to the first and second upper oblique abdominal rods;

[0015] The first and second lower diagonal web members are symmetrically arranged between the anchoring section truss connection segment and the lower connection chord, and both ends of the first lower diagonal web member are respectively connected to the movable rear support rod module and the anchoring section truss connection segment through a detachable connection component D, and both ends of the second lower diagonal web member are respectively connected to the movable front support rod module and the anchoring section truss connection segment through a detachable connection component E;

[0016] The first and second upper diagonal web members are respectively arranged on both sides of the top of the movable front support module and are arranged symmetrically with each other, and the two ends of the first upper diagonal web member are respectively connected to the top of the movable front support module and the anchor section truss connecting segment, and the two ends of the second upper diagonal web member are respectively connected to the top of the movable front support module and the cantilever section truss connecting segment.

[0017] Preferably, the movable front support rod module is a modular component prefabricated in a factory, including a front support point carriage, a front support point lower chord rod, a front support point lower vertical rod, a front support point middle chord rod, a front support point middle vertical rod, a front support point upper chord rod and a front support point upper vertical rod;

[0018] The front pivot lower chord is arranged horizontally, and the front pivot travel is installed at the bottom of the front pivot lower chord, and the front pivot lower vertical rod is installed vertically above the front pivot lower chord. In addition, the rear end of the front pivot lower chord is provided with a splicing joint A and a splicing joint B. The splicing joint A is arranged along the horizontal direction of the front pivot lower chord, and the splicing joint B is arranged obliquely relative to the front pivot lower chord.

[0019] A front fulcrum middle chord is transversely mounted on the upper end of the front fulcrum lower vertical rod, and two ends of the front fulcrum middle chord are symmetrically arranged relative to the front fulcrum lower vertical rod, and two ends of the front fulcrum middle chord are respectively arranged with a splicing joint C and a splicing joint D;

[0020] A front support middle vertical bar is installed vertically above the front support middle chord bar, and a front support upper chord bar is arranged horizontally above the front support middle vertical bar. Splicing joints E and splicing joints F are arranged at both ends of the front support upper chord bar, and truss splicing nodes A and truss splicing nodes B are arranged on the left and right sides of the connection point of the front support upper chord bar with the front support middle vertical bar.

[0021] The upper end of the front support upper chord rod is vertically installed with the front support upper vertical rod, and the left and right sides of the top end of the front support upper vertical rod are respectively arranged with a truss splicing node C and a truss splicing node D.

[0022] Preferably, the movable rear support rod module is a modular component prefabricated in a factory, including a rear anchor lower rod, a rear anchor upper rod, a jack, a tank, a rear anchor point lower chord rod, a rear anchor point lower vertical rod, a rear anchor point middle chord rod, a rear anchor point upper vertical rod and a rear anchor point upper chord rod; wherein:

[0023] The lower chord of the rear anchor point is arranged transversely, and the lower part of the lower chord of the rear anchor point is connected to the lower chord of the rear anchor point through the upper rod of the rear anchor point. At the same time, a tank and a jack are installed under the lower chord of the rear anchor point. In addition, a splicing joint G is arranged at the front end of the lower chord of the rear anchor point.

[0024] A rear anchor lower vertical rod is vertically installed above the rear anchor lower chord rod, and a splicing joint H is arranged at the rear anchor lower chord rod close to the connection position with the rear anchor lower vertical rod, and the splicing joint H is arranged obliquely relative to the rear anchor lower chord rod;

[0025] A rear anchor point middle chord rod is transversely installed at the upper end of the lower vertical rod of the rear anchor point, and a splicing joint I is arranged at the front end of the rear anchor point middle chord rod;

[0026] The upper end of the rear anchor middle chord is vertically installed with the rear anchor upper vertical rod, and a truss splicing node E is arranged inside the connection point between the rear anchor middle chord and the rear anchor upper vertical rod;

[0027] The upper end of the upper vertical rod of the rear anchor point is transversely installed with the upper chord rod of the rear anchor point, and the front end of the upper chord rod of the rear anchor point is provided with a splicing joint J.

[0028] Preferably, each end of the lower connecting chord is provided with a splicing joint, which corresponds to the splicing joint A of the lower chord of the front fulcrum and the splicing joint G of the lower chord of the rear anchor point, respectively, so that the two ends of the lower connecting chord can be connected to the lower chord of the front fulcrum and the lower chord of the rear anchor point through a splicing assembly, thereby forming a transversely placed lower chord.

[0029] Preferably, the anchoring section truss connection segment is a modular component prefabricated in a factory, comprising two anchoring section connection trusses parallel to each other and arranged along the longitudinal direction of the bridge, and an anchoring section transverse connection system connecting the two anchoring section connection trusses and arranged along the transverse direction of the bridge;

[0030] The anchoring section connecting truss has splicing joints C' and E' respectively arranged at positions corresponding to the splicing joints C and E of the movable front support module, and splicing joints I' and J' respectively arranged at positions corresponding to the splicing joints I and J of the movable rear support module. By configuring splicing connection components between splicing joints C and C', between splicing joints E and E', between splicing joints I and I', and between splicing joints J and J', the movable front support module can be connected to the movable rear support module as a whole through the anchoring section truss connecting segment.

[0031] Preferably, the anchoring section connecting truss comprises an upper connecting chord, a middle connecting chord, two main truss connecting vertical rods, and a main truss middle diagonal web rod, and the two main truss connecting vertical rods correspond to the first connecting vertical rod of the main truss and the second connecting vertical rod of the main truss;

[0032] The upper connecting chord is located above the middle connecting chord, and the two main truss connecting vertical rods are arranged parallel to each other between the upper connecting chord and the middle connecting chord, and the two main truss connecting vertical rods are connected to the upper connecting chord and the middle connecting chord by rigid nodes, and the main truss middle diagonal web rod is arranged on the diagonal line of the square frame surrounded by the upper connecting chord, the middle connecting chord and the two main truss connecting vertical rods, so as to form a modular component; both ends of the main truss middle diagonal web rod are respectively connected and fixed to the truss welding nodes arranged on the upper connecting chord and the middle connecting chord by welding;

[0033] The two ends of the upper connecting chord are respectively provided with a splicing joint E' and a splicing joint J', so that during on-site assembly, the upper connecting chord can be installed between the upper chord of the rear anchor point and the upper chord of the front support point through the splicing connection assembly;

[0034] The lower surface of the middle connecting chord is provided with a splicing joint G' and a splicing joint B' at positions corresponding to the connection points of the two main trusses connecting the vertical rods; the upper surface of the upper connecting chord is provided with a truss splicing node C';

[0035] The truss splicing node C and the truss splicing node C' are connected by the first upper diagonal web member at the construction site;

[0036] The anchoring section transverse connection system comprises a first anchoring section connecting cross beam and a second anchoring section connecting cross beam, wherein the first anchoring section connecting cross beam is connected between the upper connecting chords of the two anchoring section connecting trusses, and the second anchoring section connecting cross beam is installed between the middle connecting chords of the two anchoring section connecting trusses;

[0037] A horizontal cross-tie rod system is arranged between the upper connecting chord and the middle connecting chord of the trusses connecting the two anchor sections.

[0038] Preferably, the cantilever section truss connecting segment is a modular component prefabricated in a factory, comprising two cantilever section connecting trusses which are parallel to each other and arranged along the longitudinal direction of the bridge, and a cantilever section transverse connection system which connects the above-mentioned two cantilever section connecting trusses and is arranged along the transverse direction of the bridge; the cantilever section connecting trusses are respectively provided with splicing joints D' and splicing joints F' at positions corresponding to the splicing joints D and splicing joints F of the movable front support module, and the cantilever section truss connecting segment can be installed on the movable front support module by configuring a splicing connection assembly between the splicing joints D and the splicing joints D' and between the splicing joints F and the splicing joints F'.

[0039] Preferably, the cantilever section connecting trusses comprises a cantilever upper chord, a cantilever lower suspender, three cantilever vertical rods and two cantilever middle diagonal web rods, the three cantilever vertical rods correspond to the cantilever first vertical rod, the cantilever second vertical rod and the cantilever third vertical rod; the two cantilever middle diagonal web rods correspond to the cantilever first diagonal web rod and the cantilever second diagonal web rod; the cantilever upper chord and the cantilever lower suspender are arranged parallel to each other, and the cantilever upper chord is located above the cantilever lower suspender, and the three cantilever vertical rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower suspender, so that two rectangular frames are surrounded by the cantilever upper chord and the cantilever lower suspender, and each rectangular frame has a cantilever middle diagonal web rod arranged along its own diagonal in the cantilever, and the two cantilever middle diagonal web rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower suspender;

[0040] The left end of the cantilever upper chord is provided with a splicing joint F' corresponding to the splicing joint F of the front fulcrum upper chord, so that the cantilever upper chord can be spliced ​​into one with the front fulcrum upper chord through the splicing connection assembly;

[0041] The left end of the lower suspension rod of the cantilever is also provided with a splicing joint D' corresponding to the splicing joint D of the middle chord rod of the front support, so that the lower chord rod of the cantilever can be spliced ​​into one with the middle chord rod of the front support through the splicing connection assembly;

[0042] A truss splicing node B' is arranged on the upper surface of the cantilever lower chord, so that the two ends of the cantilever third middle diagonal web member can be welded to the truss splicing node B and the truss splicing node B' on site respectively.

[0043] Based on the above technical objectives, compared with the prior art, the utility model has the following advantages:

[0044] 1. The support truss system described in the utility model adopts a joint design with columns as the core, so as to divide the support truss system as a whole into several modular components: movable front support rod module, movable rear support rod module, anchor section truss connection segment, cantilever section truss connection segment, so that when assembling on site, it is only necessary to splice each modular component at the joint position. It can be seen that the support truss system described in the utility model, under the premise of meeting its own rigidity and bearing capacity requirements and meeting the requirements of road transportation restrictions, effectively improves the on-site assembly accuracy and reduces the difficulty of on-site operations and the risk of high-altitude operations.

[0045] 2. The utility model only sets three parallel connections at the front and rear fulcrums and the cantilever end. At the same time, in order to balance the influence of the weakening of the overall rigidity of the cantilever bridge erection machine caused by the reduction of the number of parallel connections, a horizontal cross-tie system is set between the upper chord and the middle chord of the main support truss and between each crossbeam. It can be seen that the lateral support system of the utility model adopts an integrated treatment, which effectively overcomes the defects of low assembly efficiency and low assembly precision caused by the horizontal connection of on-site loose parts assembly in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a three-dimensional structural schematic diagram of the cantilever bridge erecting machine described in the utility model;

[0047] Figure 2 yes Figure 1 Structural schematic diagram of the middle support truss system along the bridge direction;

[0048] Figure 3 yes Figure 1 Schematic diagram of the structure of the upper part of the center support truss system;

[0049] Figure 4 yes Figure 1 Schematic diagram of the structure of the middle layer of the center support truss system;

[0050] Figure 5 yes Figure 1 Schematic diagram of the structure of the bottom part of the middle support truss system;

[0051] Figure 6 yes Figure 1 A schematic diagram of the structure of the front support lateral connection system of the middle support truss system at the location of the front support;

[0052] Figure 7 yes Figure 1 A schematic diagram of the structure of the rear anchor point transverse connection system of the supporting truss system at the location of the rear anchor point;

[0053] Figure 8 yes Figure 1A schematic diagram of the structure of the transverse connection system of the main truss vertical rods of the central support truss system at the location of the main truss connecting vertical rods;

[0054] Fig. 9 yes Figure 1 A schematic diagram of the structure of the cantilever end transverse connection system of the central support truss system at the cantilever end position;

[0055] Fig.10 It is a flow chart of on-site assembly of the support truss system described in the utility model;

[0056] 101. first upper oblique abdominal bar; 102. second upper oblique abdominal bar;

[0057] 111, front pivot driving; 112, front pivot lower chord rod; 113, front pivot lower vertical rod; 114, front pivot middle chord rod; 115, front pivot middle vertical rod; 116, front pivot upper chord rod; 117, front pivot upper vertical rod;

[0058] 121. Lower rod of rear anchor; 122. Upper rod of rear anchor; 123. Jack; 124. Tank; 125. Lower chord rod of rear anchor point; 126. Lower vertical rod of rear anchor point; 127. Middle chord rod of rear anchor point; 128. Upper vertical rod of rear anchor point; 129. Upper chord rod of rear anchor point;

[0059] 13. Lower connecting chord;

[0060] 141, first lower oblique abdominal bar; 142, second lower oblique abdominal bar;

[0061] 151, upper connecting chord; 152, middle connecting chord; 153, first connecting vertical rod of main truss; 154, second connecting vertical rod of main truss; 155, first middle diagonal web member of main truss;

[0062] 161. The second diagonal web member of the main truss; 162. The third diagonal web member of the main truss;

[0063] 171, cantilever lower chord; 172, cantilever upper chord; 173, cantilever first vertical rod; 174, cantilever second vertical rod; 175, cantilever third vertical rod; 176, cantilever first middle diagonal web rod; 177, cantilever second middle diagonal web rod;

[0064] 181, cantilever third middle oblique abdominal rod;

[0065] 191. Anchor beam on the first working platform; 192. Anchor beam on the second working platform;

[0066] 201, first upper layer support beam; 202, second upper layer support beam; 203, third upper layer support beam; 204, fourth upper layer support beam; 205, fifth upper layer support beam; 211, first upper layer cross rod; 212, second upper layer cross rod; 213, third upper layer cross rod; 214, fourth upper layer cross rod; 215, fifth upper layer cross rod;

[0067] 221, first middle layer support beam; 222, second middle layer support beam; 223, third middle layer support beam; 224, fourth middle layer support beam; 225, fifth middle layer support beam; 226, sixth middle layer support beam; 227, seventh middle layer support beam; 228, eighth middle layer support beam; 231, first middle layer cross rod; 232, second middle layer cross rod; 233, third middle layer cross rod; 234, fourth middle layer cross rod; 235, fifth middle layer cross rod;

[0068] 24. The lower support connects the beams;

[0069] 110, front fulcrum cantilever truss; 251, first front fulcrum connected to cross beam; 252, second front fulcrum connected to cross beam; 253, first front fulcrum cross beam connected to vertical rod; 254, second front fulcrum cross beam connected to vertical rod; 255, first split of first front fulcrum cross rod; 256, second split of first front fulcrum cross rod; 257, second front fulcrum cross rod;

[0070] 120, rear anchor point cantilever truss; 271, first rear anchor point connecting crossbeam; 272, second rear anchor point connecting crossbeam; 273, first rear anchor point crossbeam connecting vertical rod; 274, second rear anchor point crossbeam connecting vertical rod; 275, first split of first rear anchor point cross-tie rod; 276, second split of first rear anchor point cross-tie rod; 277, second rear anchor point cross-tie rod;

[0071] 281, middle track beam; 282, first overhanging track beam; 283, second overhanging track beam; 284, lower support beam; 285, first overhanging diagonal brace; 286, first connecting diagonal brace; 287, second connecting diagonal brace; 288, second overhanging diagonal brace;

[0072] 291. The vertical rods of the first main truss are connected to the horizontal beams; 292. The vertical rods of the second main truss are connected to the horizontal beams. DETAILED DESCRIPTION

[0073] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means any restriction on the utility model and its application or use. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Unless otherwise specified, the relative arrangement, expressions and numerical values ​​of the components and steps described in these embodiments do not limit the scope of the utility model. The techniques, methods and equipment known to ordinary technicians in the relevant fields may not be discussed in detail, but in appropriate cases, the techniques, methods and equipment should be regarded as part of the specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, not as a limitation. Therefore, other examples of the exemplary embodiments may have different values.

[0074] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations).

[0075] like Figure 1 As shown, the cantilever bridge erecting machine described in the utility model includes: a supporting truss system, a forward-anchoring system, a lifting system, an operating platform system and a beam transport system, wherein:

[0076] The supporting truss system is a core force-bearing structure system, and its specific structure is as follows: Figure 2As shown, the overall structure is a cantilever support structure, including a main support system and a lateral support system. The main support system includes two support trusses that are parallel to each other and arranged along the longitudinal direction of the bridge. The two support trusses are connected by a lateral support system. Rigid nodes are used between the chords and straight webs of each support truss. The rigid nodes are achieved by "aligning the flanges and web stiffeners of equal-width H-shaped steels", thereby converting the traditional "truss system" into a "frame system", greatly improving the overall stability. In addition, each support truss adopts a "three-interval" structure to control the inclination angle of the diagonal web within 45°±10°. At the same time, the diagonal webs are designed as "pull rods", and the two ends of the diagonal webs are designed as "hinged" structures, that is, the diagonal webs adopt a "double-jointed channel steel" structure, and the two ends are connected to the truss nodes through connecting steel plates. There are two types of truss nodes. One is the truss welding node, which adopts a three-sided fillet weld structure and is used to connect with the diagonal web by welding. It is only used to complete the connection manufacturing in the factory. The other is the truss splicing node, which adopts a high-strength bolt connection structure and is used to complete the splicing with the diagonal web on site.

[0077] The advancing-anchoring system provides the supporting truss system with the functions of "support (anchoring)" and "advancing".

[0078] The hoisting system is mainly responsible for the hoisting of components, including hoisting equipment, track system and travel equipment along the bridge, and track system and travel equipment across the bridge. The hoisting system is set on the supporting truss system;

[0079] The operating platform system is mainly responsible for supporting the main bridge segments and providing operating space for construction machinery and operators;

[0080] The beam transport system is responsible for transporting the main bridge segments, including beam transport trolleys, beam transport tracks, etc.

[0081] The specific structure of the support truss system of the utility model will be described in detail below with reference to the accompanying drawings. Figure 2-10As shown, the supporting truss system described in the utility model is assembled on site using multiple factory-prefabricated modular components to reduce the difficulty of on-site assembly of parts and improve the rigidity and bearing capacity of the structural system. In order to ensure the "vertical bearing capacity" and "vertical rigidity" requirements of the supporting truss, it is necessary to specially consider the specific composition of the modular components prefabricated in each factory and the prefabrication of the on-site splicing nodes and their connecting components. Specifically, the modular components prefabricated in each factory described in the utility model include a movable front support rod module, a movable rear support rod module, an anchoring section truss connection segment, a cantilever section truss connection segment, a lower connecting chord, a lower diagonal web member, an upper diagonal web member and a horizontal tie rod; wherein: the number of movable front support rod modules and movable rear support rod modules are both two; the two movable front support rod modules are respectively the first and second movable front support rod modules, which are symmetrically arranged on both sides of the transverse direction of the bridge and connected by the front support rod module. The fulcrum is connected on site to form a movable front strut segment; the two movable rear strut modules are respectively the first and second movable rear strut modules, which are symmetrically arranged on both sides of the bridge in the transverse direction, and the movable rear strut segment is connected on site through the rear fulcrum; the number of the anchoring section truss connection segment and the cantilever section truss connection segment is one, the anchoring section truss connection segment and the cantilever section truss connection segment are respectively arranged on both sides of the movable front strut segment, and both ends of the anchoring section truss connection segment are connected between the movable front strut module and the movable rear strut module through a detachable connection component A, while the cantilever section truss connection segment is cantilevered with the movable front strut module through a detachable connection component B. In addition, the movable front strut module and the movable rear strut module are also connected through a lower connecting chord, and both ends of the lower connecting chord are respectively connected to the movable front strut module and the movable rear strut module through a detachable connection component C. There are two lower diagonal web members and two upper diagonal web members, the two lower diagonal web members correspond to the first and second lower diagonal web members, and the two upper diagonal web members correspond to the first and second upper diagonal web members; the first and second lower diagonal web members are symmetrically arranged between the anchoring section truss connecting segment and the lower connecting chord, and the two ends of the first lower diagonal web member are respectively connected to the movable rear support rod module and the anchoring section truss connecting segment through a detachable connecting component D, and the two ends of the second lower diagonal web member are respectively connected to the movable front support rod module and the anchoring section truss connecting segment through a detachable connecting component E, the first and second upper diagonal web members are respectively arranged on both sides of the top of the movable front support rod module and are symmetrically arranged with each other, and the two ends of the first upper diagonal web member are respectively connected to the top of the movable front support rod module and the anchoring section truss connecting segment, and the two ends of the second upper diagonal web member are respectively connected to the top of the movable front support rod module and the cantilever section truss connecting segment.

[0082] The detachable connection assemblies AE are all splicing connection assemblies, including a web splicing assembly, a top plate splicing assembly and a bottom plate splicing assembly; wherein: the web splicing assembly includes two web splicing plates and a plurality of bolt assemblies, the two web splicing plates are arranged on both sides of the web at the splicing position, and are fastened with bolt assemblies; the top plate splicing assembly includes two top plate splicing plates and a plurality of bolt assemblies, the two top plate splicing plates are arranged on both sides of the top plate at the splicing position, and are fastened with bolt assemblies; the bottom plate splicing assembly includes two bottom plate splicing plates and a plurality of bolt assemblies, the two bottom plate splicing plates are arranged on both sides of the bottom plate at the splicing position, and are fastened with bolt assemblies.

[0083] The movable front support rod module is a modular component prefabricated in the factory, including a front support crane, a front support lower chord rod, a front support lower vertical rod, a front support middle chord rod, a front support middle vertical rod, a front support upper chord rod and a front support upper vertical rod. The front support lower chord rod is arranged horizontally, and the front support crane is installed at the bottom of the front support lower chord rod, while the front support lower vertical rod is installed vertically above the front support lower chord rod. In addition, the rear end of the front support lower chord rod is provided with a splicing joint A and a splicing joint B. The splicing joint A is arranged horizontally along the front support lower chord rod, and the splicing joint B is arranged obliquely relative to the front support lower chord rod. A front fulcrum middle chord is installed transversely at the upper end of the front fulcrum lower vertical rod, and the two ends of the front fulcrum middle chord are symmetrically arranged relative to the front fulcrum lower vertical rod, and a splicing joint is arranged at each end of the front fulcrum middle chord: the splicing joint at the left end of the front fulcrum middle chord is marked as splicing joint C, and the splicing joint at the right end of the front fulcrum middle chord is marked as splicing joint D; the front fulcrum middle vertical rod is installed vertically above the front fulcrum middle chord, and the front fulcrum upper chord is arranged transversely above the front fulcrum middle vertical rod, and a splicing joint is arranged at each end of the front fulcrum upper chord: the splicing joint at the left end of the front fulcrum upper chord is marked as splicing joint E, and the splicing joint at the right end of the front fulcrum upper chord is marked as splicing joint D. The splicing joint at the end is recorded as splicing joint F, and a truss splicing node is arranged on both sides of the left and right sides of the connection point between the upper chord of the front support and the middle vertical bar of the front support: the truss splicing node on the left is recorded as truss splicing node A, and the truss splicing node on the right is recorded as truss splicing node B; the upper end of the upper chord of the front support is vertically installed with the upper vertical bar of the front support, and a truss splicing node is arranged on both sides of the top of the upper vertical bar of the front support: the truss splicing node on the left side of the top of the upper vertical bar of the front support is recorded as truss splicing node C, and the truss splicing node on the right side of the top of the upper vertical bar of the front support is recorded as truss splicing node D.

[0084] The movable rear support rod module is a modular component prefabricated in the factory, including a rear anchor lower rod, a rear anchor upper rod, a jack, a tank, a rear anchor lower chord rod, a rear anchor lower vertical rod, a rear anchor middle chord rod, a rear anchor upper vertical rod and a rear anchor upper chord rod; wherein: the rear anchor lower chord rod is arranged horizontally, and the lower part of the rear anchor lower chord rod is connected to the rear anchor lower rod through the rear anchor upper rod, and the tank and the jack are installed below the rear anchor lower chord rod, and in addition, a splicing joint G is arranged at the front end of the rear anchor lower chord rod; the rear anchor lower vertical rod is installed vertically above the rear anchor lower chord rod, and the rear anchor A splicing joint H is arranged on the lower chord rod of the rear anchor point close to the connection position with the lower vertical rod of the rear anchor point. The splicing joint H is arranged obliquely relative to the lower chord rod of the rear anchor point, and the upper end of the lower vertical rod of the rear anchor point is transversely installed with the middle chord rod of the rear anchor point, and the front end of the middle chord rod of the rear anchor point is provided with a splicing joint I, the upper vertical rod of the rear anchor point is vertically installed with the upper vertical rod of the rear anchor point at the upper end of the middle chord rod of the rear anchor point, and a truss splicing node E is arranged on the inner side of the connection position between the middle chord rod of the rear anchor point and the upper vertical rod of the rear anchor point, the upper chord rod of the rear anchor point is transversely installed with the upper vertical rod of the rear anchor point, and the front end of the upper chord rod of the rear anchor point is provided with a splicing joint J.

[0085] The two ends of the lower connecting chord are each provided with a splicing joint, which corresponds to the splicing joint A of the lower chord of the front support point and the splicing joint G of the lower chord of the rear anchor point, respectively, so that the two ends of the lower connecting chord can be connected to the lower chord of the front support point and the lower chord of the rear anchor point through the splicing assembly, thereby forming a transversely placed lower chord.

[0086] The anchoring section truss connection segment is a modular component prefabricated in the factory, including two anchoring section connection trusses parallel to each other and arranged along the longitudinal direction of the bridge, and an anchoring section transverse connection system connecting the two anchoring section connection trusses and arranged along the transverse direction of the bridge; the anchoring section connection truss is provided with a splicing joint C' and a splicing joint E' at positions corresponding to the splicing joint C and the splicing joint E of the movable front support module, and a splicing joint I' and a splicing joint J' are provided at positions corresponding to the splicing joint I and the splicing joint J of the movable rear support module, respectively; by configuring a splicing connection assembly between the splicing joint C and the splicing joint C', between the splicing joint E and the splicing joint E', between the splicing joint I and the splicing joint I', and between the splicing joint J and the splicing joint J', the movable front support module can be connected into one with the movable rear support module through the anchoring section truss connection segment. The anchoring section truss connection segment includes an upper connecting chord, a middle connecting chord, two main truss connecting vertical rods, and a main truss middle diagonal web rod, and the two main truss connecting vertical rods correspond to the first main truss connecting vertical rod and the second main truss connecting vertical rod; the upper connecting chord is located above the middle connecting chord, and the two main truss connecting vertical rods are arranged parallel to each other between the upper connecting chord and the middle connecting chord, and the upper connecting chord and the middle connecting chord are welded and connected by the two main truss connecting vertical rods mentioned above, and the main truss middle diagonal web rod is arranged on the diagonal line of the square frame surrounded by the upper connecting chord, the middle connecting chord and the two main truss connecting vertical rods, so as to form a modular component; in addition, a splicing joint is respectively provided at both ends of the upper connecting chord, which respectively corresponds to the splicing joint E of the upper chord of the front support point and the splicing joint J of the upper chord of the rear anchor point, so that during on-site assembly, the upper connecting chord can be installed between the upper chord of the rear anchor point and the upper chord of the front support point through a splicing assembly. In addition, the lower surface of the middle connecting chord is respectively provided with a splicing joint at a position corresponding to the connection position of the two main truss connecting vertical rods. Specifically, the two splicing joints provided on the lower surface of the middle connecting chord correspond to the splicing joints G' and B'; the upper surface of the upper connecting chord is provided with a truss splicing node C'. In the attached drawings, the connection position of the right main truss connecting vertical rod and the upper connecting chord is marked as connection position A, and the layout position of the truss splicing node C' on the upper connecting chord basically corresponds to the connection position A. The truss splicing node C and the truss splicing node C' are connected at the construction site through the first upper diagonal web member.

[0087] The cantilever section truss connection segment is a modular component prefabricated in the factory, comprising two cantilever section connection trusses which are parallel to each other and arranged along the longitudinal direction of the bridge, and a cantilever section transverse connection system which connects the above two cantilever section connection trusses and is arranged along the transverse direction of the bridge; the cantilever section connection trusses are respectively provided with splicing joints D' and splicing joints F' at positions corresponding to the splicing joints D and splicing joints F of the movable front support module; the cantilever section truss connection segment can be installed on the movable front support module by configuring splicing connection components between the splicing joints D and the splicing joints D' and between the splicing joints F and the splicing joints F'. Specifically, the cantilever section connecting trusses includes a cantilever upper chord, a cantilever lower hanger, three cantilever vertical rods and two cantilever middle diagonal web rods, the three cantilever vertical rods correspond to the cantilever first vertical rod, the cantilever second vertical rod and the cantilever third vertical rod; the two cantilever middle diagonal web rods correspond to the cantilever first diagonal web rod and the cantilever second diagonal web rod; the cantilever upper chord and the cantilever lower hanger are arranged parallel to each other, and the cantilever upper chord is located above the cantilever lower hanger, and the three cantilever vertical rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower hanger, so that two rectangular frames are formed between the cantilever upper chord and the cantilever lower hanger, and each rectangular frame is arranged with a cantilever middle diagonal web rod along its own diagonal, and the two cantilever middle diagonal web rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower hanger. In addition, the left end of the cantilever upper chord described in the utility model is provided with a splicing joint F' corresponding to the splicing joint F of the front support upper chord, so that the cantilever upper chord can be spliced ​​into one with the front support upper chord through a splicing connection assembly. Similarly, the left end of the cantilever lower suspension rod is also provided with a splicing joint D' corresponding to the splicing joint D of the front support middle chord, so that the cantilever lower chord can be spliced ​​into one with the front support middle chord through a splicing connection assembly. Furthermore, the upper surface of the cantilever lower chord described in the utility model is provided with a truss splicing node B', so that the two ends of the cantilever third middle diagonal web can be welded into one with the truss splicing node B and the truss splicing node B' on site.

[0088] In order to obtain the above-mentioned supporting truss system, the utility model provides a specific assembly method, which specifically includes the following steps:

[0089] Step 1: Prefabricate the components of the supporting truss system in the factory and transport them to the construction site

[0090] The components of the supporting truss system include a movable front support module (with a lateral support system welded in the factory - the first cantilever beam), a front support parallel connection, a movable rear support module (with a lateral support system welded in the factory - the second cantilever beam), a rear support parallel connection, an anchor section truss connection segment, a cantilever section truss connection segment, a lower connecting chord, a lower diagonal web member, an upper diagonal web member and a horizontal tie rod; among which:

[0091] There are two movable front strut modules and two movable rear strut modules; there are one front support point parallel connection, one rear support point parallel connection, one anchor section truss connection segment and one cantilever section truss connection segment; there is one lower connecting chord; there are four lower diagonal web members; there are four upper diagonal web members; there are eight horizontal tie rods, and every two of them form a horizontal cross tie rod system;

[0092] Step 2: Install the removable front support module on site

[0093] On the bridge deck at the construction site, two movable front support modules are hoisted to the preset position and temporarily fixed with a hand winch and wire rope to prevent the movable front support modules from tipping over.

[0094] Step 3: Install the front pivot flat joint on site

[0095] The front fulcrum parallel joint is an integral structure, and two matching splicing nodes are arranged on the movable front strut module. The front fulcrum parallel joint can be installed between the two movable front strut modules by using bolts.

[0096] Step 4: Install the removable rear support module on site

[0097] On the bridge deck at the construction site, two movable rear support modules are hoisted to the preset position and temporarily fixed with a hand winch and wire rope to prevent the movable rear support modules from tipping over.

[0098] Step 5: Install the rear pivot point on site

[0099] The rear fulcrum parallel joint is an integral structure, and two matching splicing nodes are arranged on the movable rear support rod module. The rear fulcrum parallel joint can be installed between the two movable rear support rod modules by using bolts.

[0100] Step 6: Install the lower connecting chord on site

[0101] The lower connecting chord is installed between the front support point lower chord of the movable front strut module and the rear anchor point lower chord of the movable rear strut module, and a splicing connection component is used at the splicing site to realize the splicing of the two.

[0102] Step 7: Overall hoisting and anchoring section truss connection segment

[0103] The anchoring section truss connecting segment is hoisted as a whole between the movable front support module and the movable rear support module, and ensure that the two ends of the upper connecting chord of the anchoring section truss connecting segment are aligned with the upper chord of the front support point of the movable front support module and the upper chord of the rear anchor point of the movable rear support module, respectively, and the two ends of the middle connecting chord of the anchoring section truss connecting segment are aligned with the middle chord of the front support point of the movable front support module and the middle chord of the rear anchor point of the movable rear support module, respectively, and then a splicing connection component is used at the splicing point to realize the splicing of the two.

[0104] Step 8: Install the lower diagonal brace, the left upper diagonal brace, and the horizontal tie rod system of the anchor section truss connection segment

[0105] The first lower diagonal web member is placed between the splicing joint G' of the middle connecting chord and the splicing joint G of the movable rear strut module, and a splicing connection assembly is used to realize the splicing of the two at the splicing site.

[0106] The second lower diagonal web member is placed between the splicing joint B' of the middle connecting chord and the splicing joint B of the movable front strut module, and a splicing connection assembly is used to realize the splicing of the two at the splicing site.

[0107] The left upper diagonal web member (ie, the first upper diagonal web member) is placed between the truss splicing node C of the movable front strut module and the truss splicing node C' of the upper connecting chord, and bolts are used to realize the splicing of the two at the splicing position.

[0108] A horizontal cross-tie rod system is arranged between the transverse connecting beams close to the front support parallel connection and the rear support parallel connection respectively to improve the overall rigidity of the structure.

[0109] Step 9: Integral hoisting of cantilever truss connecting segments

[0110] The cantilever section truss connecting segment is hoisted as a whole to the preset position of the movable front support module, and it is ensured that the connecting end of the upper connecting chord of the cantilever section truss connecting segment is aligned with the upper chord of the front support of the movable front support module, and the connecting end of the middle connecting chord is aligned with the middle chord of the front support of the movable front support module, and then a splicing connection component is used at the splicing point to realize the splicing of the two.

[0111] Step 10: Install the upper diagonal web member on the right side and the horizontal tie rod system of the cantilever section truss connecting segment.

[0112] The right upper diagonal web member (ie, the second upper diagonal web member) is placed between the truss splicing node D of the movable front strut module and the truss splicing node D' of the cantilever upper chord, and bolts are used to achieve splicing of the two at the splicing location.

[0113] A horizontal cross-tie rod system is arranged between each transverse connecting beam of the cantilever section truss connecting segment to improve the overall rigidity of the structure.

[0114] By implementing the above steps 1 to 10, the construction of the entire supporting truss system can be completed.

Claims

1. A modular support truss system for a cantilever bridge erecting machine. It is characterized in that It is assembled on site using modular components prefabricated in multiple factories; the modular components prefabricated in each factory include movable front strut modules, front support point parallel joints, movable rear strut modules, rear support point parallel joints, anchor section truss connection segments, cantilever section truss connection segments, lower connecting chords, lower diagonal web members and upper diagonal web members; among which: The number of movable front strut modules and movable rear strut modules are both two; the two movable front strut modules are respectively the first and second movable front strut modules, which are symmetrically arranged on both sides of the bridge in the transverse direction, and are connected on site to form movable front strut segments through front support points; the two movable rear strut modules are respectively the first and second movable rear strut modules, which are symmetrically arranged on both sides of the bridge in the transverse direction, and are connected on site to form movable rear strut segments through rear support points; The number of the anchoring section truss connection segment and the cantilever section truss connection segment is one, and the anchoring section truss connection segment and the cantilever section truss connection segment are respectively arranged on both sides of the movable front strut segment, and both ends of the anchoring section truss connection segment are connected between the movable front strut module and the movable rear strut module through a detachable connection component A, while the cantilever section truss connection segment is cantilever-connected to the movable front strut module through a detachable connection component B, and a V-shaped lateral support is installed at the cantilever end of the cantilever section truss connection segment; The movable front strut module and the movable rear strut module are also connected by a lower connecting chord, and both ends of the lower connecting chord are respectively connected to the movable front strut module and the movable rear strut module via a detachable connecting component C; The number of lower oblique abdominal rods and upper oblique abdominal rods are both two, the two lower oblique abdominal rods correspond to the first and second lower oblique abdominal rods, and the two upper oblique abdominal rods correspond to the first and second upper oblique abdominal rods; The first and second lower diagonal web members are symmetrically arranged between the anchoring section truss connection segment and the lower connection chord, and both ends of the first lower diagonal web member are respectively connected to the movable rear support rod module and the anchoring section truss connection segment through a detachable connection component D, and both ends of the second lower diagonal web member are respectively connected to the movable front support rod module and the anchoring section truss connection segment through a detachable connection component E; The first and second upper diagonal web members are respectively arranged on both sides of the top of the movable front support module and are arranged symmetrically with each other, and the two ends of the first upper diagonal web member are respectively connected to the top of the movable front support module and the anchor section truss connecting segment, and the two ends of the second upper diagonal web member are respectively connected to the top of the movable front support module and the cantilever section truss connecting segment.

2. The modular support truss system of the cantilever bridge erecting machine according to claim 1, It is characterized in that The detachable connection assemblies AE are all splicing connection assemblies, including a web splicing assembly, a top plate splicing assembly and a bottom plate splicing assembly; wherein: the web splicing assembly includes two web splicing plates and a plurality of bolt assemblies, the two web splicing plates are arranged on both sides of the web at the splicing position, and are fastened with bolt assemblies; the top plate splicing assembly includes two top plate splicing plates and a plurality of bolt assemblies, the two top plate splicing plates are arranged on both sides of the top plate at the splicing position, and are fastened with bolt assemblies; the bottom plate splicing assembly includes two bottom plate splicing plates and a plurality of bolt assemblies, the two bottom plate splicing plates are arranged on both sides of the bottom plate at the splicing position, and are fastened with bolt assemblies.

3. The modular support truss system of the cantilever bridge erecting machine according to claim 1, It is characterized in that The movable front support rod module is a modular component prefabricated in a factory, including a front support point carriage, a front support point lower chord rod, a front support point lower vertical rod, a front support point middle chord rod, a front support point middle vertical rod, a front support point upper chord rod and a front support point upper vertical rod; The front pivot lower chord is arranged horizontally, and the front pivot travel is installed at the bottom of the front pivot lower chord, and the front pivot lower vertical rod is installed vertically above the front pivot lower chord. In addition, the rear end of the front pivot lower chord is provided with a splicing joint A and a splicing joint B. The splicing joint A is arranged along the horizontal direction of the front pivot lower chord, and the splicing joint B is arranged obliquely relative to the front pivot lower chord. A front fulcrum middle chord is transversely mounted on the upper end of the front fulcrum lower vertical rod, and two ends of the front fulcrum middle chord are symmetrically arranged relative to the front fulcrum lower vertical rod, and two ends of the front fulcrum middle chord are respectively arranged with a splicing joint C and a splicing joint D; A front support middle vertical bar is installed vertically above the front support middle chord bar, and a front support upper chord bar is arranged horizontally above the front support middle vertical bar. Splicing joints E and splicing joints F are arranged at both ends of the front support upper chord bar, and truss splicing nodes A and truss splicing nodes B are arranged on the left and right sides of the connection point of the front support upper chord bar with the front support middle vertical bar. The upper end of the front support upper chord rod is vertically installed with the front support upper vertical rod, and the left and right sides of the top end of the front support upper vertical rod are respectively arranged with a truss splicing node C and a truss splicing node D.

4. The modular support truss system of the cantilever bridge erecting machine according to claim 3, It is characterized in that The movable rear support rod module is a modular component prefabricated in a factory, including a rear anchor lower rod, a rear anchor upper rod, a jack, a tank, a rear anchor lower chord rod, a rear anchor lower vertical rod, a rear anchor middle chord rod, a rear anchor upper vertical rod and a rear anchor upper chord rod; wherein: The lower chord of the rear anchor point is arranged transversely, and the lower part of the lower chord of the rear anchor point is connected to the lower chord of the rear anchor point through the upper rod of the rear anchor point. At the same time, a tank and a jack are installed under the lower chord of the rear anchor point. In addition, a splicing joint G is arranged at the front end of the lower chord of the rear anchor point. A rear anchor lower vertical rod is vertically installed above the rear anchor lower chord rod, and a splicing joint H is arranged at the rear anchor lower chord rod close to the connection position with the rear anchor lower vertical rod, and the splicing joint H is arranged obliquely relative to the rear anchor lower chord rod; A rear anchor point middle chord rod is transversely installed at the upper end of the lower vertical rod of the rear anchor point, and a splicing joint I is arranged at the front end of the rear anchor point middle chord rod; The upper end of the rear anchor middle chord is vertically installed with the rear anchor upper vertical rod, and a truss splicing node E is arranged inside the connection point between the rear anchor middle chord and the rear anchor upper vertical rod; The upper end of the upper vertical rod of the rear anchor point is transversely installed with the upper chord rod of the rear anchor point, and the front end of the upper chord rod of the rear anchor point is provided with a splicing joint J.

5. The modular support truss system of the cantilever bridge erecting machine according to claim 4, It is characterized in that The two ends of the lower connecting chord are each provided with a splicing joint, which corresponds to the splicing joint A of the lower chord of the front support point and the splicing joint G of the lower chord of the rear anchor point, respectively, so that the two ends of the lower connecting chord can be connected to the lower chord of the front support point and the lower chord of the rear anchor point through the splicing assembly, thereby forming a transversely placed lower chord.

6. The modular support truss system of the cantilever bridge erecting machine according to claim 5, It is characterized in that The anchorage truss connection segment is a modular component prefabricated in a factory, comprising two anchorage connection trusses parallel to each other and arranged along the longitudinal direction of the bridge, and an anchorage transverse connection system connecting the two anchorage connection trusses and arranged along the transverse direction of the bridge; The anchoring section connecting truss has splicing joints C' and E' respectively arranged at positions corresponding to the splicing joints C and E of the movable front support module, and splicing joints I' and J' respectively arranged at positions corresponding to the splicing joints I and J of the movable rear support module. By configuring splicing connection components between splicing joints C and C', between splicing joints E and E', between splicing joints I and I', and between splicing joints J and J', the movable front support module can be connected to the movable rear support module as a whole through the anchoring section truss connecting segment.

7. The modular support truss system of the cantilever bridge erecting machine according to claim 6, It is characterized in that The anchoring section connecting truss comprises an upper connecting chord, a middle connecting chord, two main truss connecting vertical rods, and a main truss middle diagonal web rod, and the two main truss connecting vertical rods correspond to the first connecting vertical rod of the main truss and the second connecting vertical rod of the main truss; The upper connecting chord is located above the middle connecting chord, and the two main truss connecting vertical rods are arranged parallel to each other between the upper connecting chord and the middle connecting chord, and the two main truss connecting vertical rods are connected to the upper connecting chord and the middle connecting chord by rigid nodes, and the main truss middle diagonal web rod is arranged on the diagonal line of the square frame surrounded by the upper connecting chord, the middle connecting chord and the two main truss connecting vertical rods, so as to form a modular component; both ends of the main truss middle diagonal web rod are respectively connected and fixed to the truss welding nodes arranged on the upper connecting chord and the middle connecting chord by welding; The two ends of the upper connecting chord are respectively provided with a splicing joint E' and a splicing joint J', so that during on-site assembly, the upper connecting chord can be installed between the upper chord of the rear anchor point and the upper chord of the front support point through the splicing connection assembly; The lower surface of the middle connecting chord is provided with a splicing joint G' and a splicing joint B' at positions corresponding to the connection points of the two main trusses connecting the vertical rods; the upper surface of the upper connecting chord is provided with a truss splicing node C'; The truss splicing node C and the truss splicing node C' are connected by the first upper diagonal web member at the construction site; The anchoring section transverse connection system comprises a first anchoring section connecting crossbeam and a second anchoring section connecting crossbeam, wherein the first anchoring section connecting crossbeam is connected between the upper connecting chords of the two anchoring section connecting trusses, and the second anchoring section connecting crossbeam is installed between the middle connecting chords of the two anchoring section connecting trusses; A horizontal cross-tie rod system is arranged between the upper connecting chord and the middle connecting chord of the trusses connecting the two anchor sections.

8. The modular support truss system of the cantilever bridge erecting machine according to claim 7, It is characterized in that The cantilever section truss connection segment is a modular component prefabricated in a factory, comprising two cantilever section connection trusses which are parallel to each other and arranged along the longitudinal direction of the bridge, and a cantilever section transverse connection system which connects the above two cantilever section connection trusses and is arranged along the transverse direction of the bridge; the cantilever section connection truss is provided with a splicing joint D' and a splicing joint F' at positions corresponding to the splicing joint D and the splicing joint F of the movable front support module, respectively; the cantilever section truss connection segment can be installed on the movable front support module by configuring a splicing connection assembly between the splicing joint D and the splicing joint D' and between the splicing joint F and the splicing joint F'.

9. The modular support truss system of the cantilever bridge erecting machine according to claim 8, It is characterized in that The cantilever section connecting trusses include a cantilever upper chord, a cantilever lower suspender, three cantilever vertical rods and two cantilever middle diagonal web rods, the three cantilever vertical rods correspond to the cantilever first vertical rod, the cantilever second vertical rod and the cantilever third vertical rod; the two cantilever middle diagonal web rods correspond to the cantilever first diagonal web rod and the cantilever second diagonal web rod; the cantilever upper chord and the cantilever lower suspender are arranged parallel to each other, and the cantilever upper chord is located above the cantilever lower suspender, and the three cantilever vertical rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower suspender, so that two rectangular frames are surrounded by the cantilever upper chord and the cantilever lower suspender, and each rectangular frame is arranged with a cantilever middle diagonal web rod along its own diagonal line, and the two cantilever middle diagonal web rods are arranged parallel to each other between the cantilever upper chord and the cantilever lower suspender; The left end of the cantilever upper chord is provided with a splicing joint F' corresponding to the splicing joint F of the front fulcrum upper chord, so that the cantilever upper chord can be spliced ​​into one with the front fulcrum upper chord through the splicing connection assembly; The left end of the lower suspension rod of the cantilever is also provided with a splicing joint D' corresponding to the splicing joint D of the middle chord rod of the front support, so that the lower chord rod of the cantilever can be spliced ​​into one with the middle chord rod of the front support through the splicing connection assembly; A truss splicing node B' is arranged on the upper surface of the cantilever lower chord, so that the two ends of the cantilever third middle diagonal web member can be welded to the truss splicing node B and the truss splicing node B' on site respectively.

Citation Information

Cited By

  • Cantilever bridge girder erection machine and modular assembling method of supporting truss system of cantilever bridge girder erection machine

    CN117702637A