Adjustable steel support forward extending arm for foundation pit

The design of the adjustable steel support forward arm solves the problems of cumbersome pre-embedding and fixed length restrictions in the connection between the foundation pit steel support and the concrete beam, achieves flexible overlap and improves construction efficiency, and avoids structural collision and cutting. Promotes the recyclability of steel components.

CN221822919UActive Publication Date: 2024-10-11XIAMEN ANJIE CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420313200.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-11
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing method of connecting steel supports and concrete beams in foundation pits involves cumbersome pre-embedding, on-site installation restrictions, and the unsuitability of fixed forward arm lengths, which results in limited construction progress and the need for cutting due to structural collisions, affecting the structural stress and recycling.

Method used

Design an adjustable steel support forward arm, including an overlap beam, an adjustment beam, fixing bolts and nuts. The length of the adjustment beam can be adjusted as needed. The overlap beam is connected through the fixing bolts and nuts to achieve flexible matching with the concrete beam. catch.

Benefits of technology

It realizes the flexible overlap of steel supports and concrete beams, controls the spacing, simplifies the construction process, avoids on-site cutting, and improves the installation efficiency and the recyclability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822919U_ABST
    Figure CN221822919U_ABST
Patent Text Reader

Abstract

The utility model discloses an adjustable steel support front extending arm for a foundation pit. The adjustable steel support front extending arm comprises a lap joint beam, an adjusting beam, a plurality of fixing bolts and a plurality of nuts. The inner side of the adjusting beam is fixed to the lap joint beam through a fixing bolt and a nut. Due to the fact that the lap joint beam and the adjusting beam are connected together through the fixing bolts and the fixing nuts, the fixing positions of the connecting holes in the adjusting beam and the fixing holes in the lap joint beam can be selected according to needs, the length of the portion, extending outwards, of the adjusting beam can be adjusted, and in the installation process of the foundation pit beam string structure steel support, installation is convenient. One end of the front extending arm is connected with the steel support, the other end of the front extending arm is in lap joint with the concrete beam, the lap joint length on the concrete beam is controlled by adjusting the connecting position of the adjusting beam and the connecting beam, and the advantages that the lap joint length can be flexibly controlled and adjusted, installation is convenient, and the construction period is shortened are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation pit steel support, in particular to an adjustable steel support front extension arm for a foundation pit. Background Art

[0002] At present, the connection between the foundation pit steel support and the concrete beam is generally achieved by setting embedded parts at the bottom of the concrete beam, installing the corbel bracket so that the steel support is overlapped on the corbel bracket; or installing the front arm at the end of the steel support to overlap the concrete beam. The use of the corbel bracket method requires pre-embedding in advance, the process is cumbersome, and there are requirements for the on-site pre-embedding site, which is not conducive to the construction progress; while the traditional front arm overlap method is convenient and fast to install on site, and can be overlapped directly, but the fixed front arm length also has certain restrictions on the site requirements. If there is a collision with other structures, the front arm or the collision object must be cut on site so that the front arm can overlap the concrete beam smoothly. Cutting and damage not only affects the structural stress but also is not conducive to the recycling of steel components. Utility Model Content

[0003] The utility model aims to provide an adjustable steel support front extension arm for a foundation pit with adjustable overlapping length.

[0004] To achieve the above purpose, the technical solution of the utility model is:

[0005] The utility model discloses an adjustable steel support front extension arm for foundation pit, comprising a lap beam, an adjusting beam, a plurality of fixing bolts and a plurality of nuts; the inner side of the adjusting beam is fixed on the lap beam; the lap beam is composed of a top plate and a supporting column, the top plate is vertically fixed on the top end of the supporting column, a plurality of fixing holes are opened on the top plate, the plurality of fixing holes are arranged in two rows, and the two rows of fixing holes are parallel to each other; a plurality of connecting holes are arranged on the adjusting beam, the plurality of connecting holes are arranged in two rows, the two rows of connecting holes are arranged along the length direction of the adjusting beam and are parallel to each other, the hole spacing of the plurality of connecting holes on the adjusting beam is the same as that of the plurality of fixing holes on the lap beam, the fixing bolts pass through the connecting holes of the adjusting beam and the fixing holes of the lap beam and are screwed with nuts to fix the lap beam and the adjusting beam together.

[0006] The utility model also comprises a stiffening plate; the stiffening plate is fixed at the junction of the top plate and the supporting column.

[0007] After adopting the above scheme, since the lap beam of the utility model is connected with the adjustment beam by fixing bolts and nuts, the multiple connection holes on the adjustment beam and the multiple fixing holes on the lap beam can be selected to fix positions according to needs, so that the length of the adjustment beam extending outward can be adjusted; during the installation of the foundation pit tension beam steel support, one end of the utility model is connected to the steel support, and the other end is overlapped on the concrete beam. By adjusting the position where the adjustment beam is connected to the connecting beam, the overlap length on the concrete beam is controlled. The utility model can make the steel support and the foundation pit enclosure structure overlap flexibly, control the distance between the steel support and the concrete beam, solve the restrictions on the placement of the front extension arm such as the construction site, foundation pit enclosure and construction errors, and has the advantages of flexible control and adjustment of the overlap length, convenient installation and shortened construction period.

[0008] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a bottom-up axonometric drawing of the present utility model;

[0010] Figure 2 It is a top axonometric view of the utility model;

[0011] Figure 3 It is a schematic diagram of the utility model in use. DETAILED DESCRIPTION

[0012] like Figure 1-Figure 3 As shown, the utility model is an adjustable steel support front extension arm for foundation pit, comprising a lap beam 1, an adjustment beam 2, a plurality of fixing bolts 3, and a plurality of nuts 4.

[0013] The inner side of the adjusting beam 2 is fixed on the lap beam 1; the lap beam 1 is composed of a top plate 11, a support column 12, and a stiffening plate 13. The top plate 11 is vertically fixed to the top of the support column 12. A plurality of fixing holes 111 are opened on the top plate 11. The plurality of fixing holes 111 are arranged in two rows. The two rows of fixing holes 111 are parallel to each other. The stiffening plate 13 is fixed at the junction of the top plate 11 and the support column 12.

[0014] The adjusting beam 2 is provided with a plurality of connecting holes 21, which are arranged in two rows. The two rows of connecting holes 21 are arranged along the length direction of the adjusting beam 2 and are parallel to each other. The hole spacing of the plurality of connecting holes 21 on the adjusting beam 2 is the same as that of the plurality of fixing holes 111 on the lap beam 1. The fixing bolts 3 pass through the connecting holes 21 of the adjusting beam 2 and the fixing holes 111 of the lap beam 1 and are screwed with the nuts 4 to fix the lap beam 1 and the adjusting beam 2 together.

[0015] The working principle of this utility model:

[0016] The utility model lap beam 1 and the adjustment beam 2 are connected together by fixing bolts 3 and nuts 4. The multiple connection holes 21 on the adjustment beam 2 and the multiple fixing holes 111 on the lap beam 1 can be fixed at the desired positions, so that the length of the adjustment beam 1 extending outward can be adjusted. During the installation of the foundation pit steel support, one end of the utility model is connected to the steel support 10, and the other end is overlapped on the concrete beam 20. By adjusting the position where the adjustment beam 2 is connected to the connection beam 1, the overlap length on the concrete beam 20 is controlled.

[0017] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of implementation of the present invention. That is, equivalent changes and modifications made according to the scope of the patent application of the present invention and the contents of the specification should still fall within the scope covered by the patent of the present invention.

Claims

1. An adjustable steel support front extension arm for foundation pit, characterized in that: It includes a lap beam, an adjusting beam, a plurality of fixing bolts, and a plurality of nuts; the inner side of the adjusting beam is fixed on the lap beam; the lap beam is composed of a top plate and a supporting column, the top plate is vertically fixed on the top of the supporting column, a plurality of fixing holes are opened on the top plate, the plurality of fixing holes are arranged in two rows, and the two rows of fixing holes are parallel to each other; the adjusting beam is provided with a plurality of connecting holes, the plurality of connecting holes are arranged in two rows, the two rows of connecting holes are arranged along the length direction of the adjusting beam and are parallel to each other, the plurality of connecting holes on the adjusting beam have the same hole spacing as the plurality of fixing holes on the lap beam, the fixing bolts pass through the connecting holes of the adjusting beam and the fixing holes of the lap beam and are screwed with the nuts to fix the lap beam and the adjusting beam together.

2. The adjustable steel support front extension arm for foundation pit according to claim 1 is characterized in that: It also includes a stiffening plate; the stiffening plate is fixed at the junction of the top plate and the support column.