Building construction drainage structure
By designing water collection tanks and flexible boxes during building construction, combined with water inlet holes and embedded feet, the problems of small pumping surface and unstable position of traditional water pumps are solved, centralized collection and smooth drainage of rainwater are achieved, and stable pumping is ensured. performance and ease of operation.
Patent Information
- Application Number
- CN202420327216.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-22
AI Technical Summary
During the construction process, the traditional water pump has a small pumping surface, which is easily blocked by impurities, and the position of the puddle is not fixed, making the drainage operation troublesome, especially in rainy weather.
A construction drainage structure is designed, including a water collection tank and a flexible tank. Long rows of water inlets, short rows of water inlets and small water inlets are set up to block impurities. It is combined with embedded feet to increase stability. By connecting pipes and soft The pipe realizes centralized collection and smooth drainage of rainwater.
This structure can collect rainwater concentratedly according to the gathering location, prevent impurities from entering the water pumping pipe, ensure smooth water pumping, and improve placement stability through embedded feet, simplifying drainage operations during building construction.
Smart Images

Figure CN221823038U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction drainage, in particular to a building construction drainage structure. Background Art
[0002] Building construction refers to the process of transforming design drawings into real buildings. It includes multiple stages from planning, design, construction to completion, and requires the collaboration and cooperation of various professional and technical personnel.
[0003] During construction, it is necessary to dig pits on the ground. When it rains, rainwater will gather in the pits, so workers need to use water pumps to drain the water. However, traditional water pumps have a small pumping surface, and the pumping end is easily blocked by impurities. In addition, the positions of the pits are different, so the pumping position needs to be changed, which makes the operation more troublesome. Utility Model Content
[0004] In order to overcome the shortcomings of the prior art, one of the purposes of the utility model is to provide a drainage structure for construction. By setting up a water collection box and a flexible box, rainwater can be collected centrally according to the location where it gathers, which is convenient for drainage. The long row of water inlet holes, short row of water inlet holes, and small water inlet holes can block impurities and prevent impurities from entering the pumping pipe, thereby ensuring smooth pumping. The embedded feet can avoid being washed away by rainwater, increase the stability of placement, and are very convenient for use in construction.
[0005] One of the purposes of the utility model is achieved by the following technical solution: a construction drainage structure, including a water collecting box, a long row of water inlet holes and a short row of water inlet holes are arranged on the side wall of the water collecting box, a connecting pipe is fixedly connected to the front of the water collecting box, a connecting flange is fixedly connected to the connecting pipe, a connecting hose is fixedly connected to the rear of the water collecting box, a flexible box is fixedly connected to the rear of the connecting hose, a small water inlet hole is arranged on the side wall of the flexible box, a handle 1 is fixedly connected to the upper part of the water collecting box, a handle 2 is fixedly connected to the upper part of the flexible box, an embedded foot 1 is fixedly connected to the lower part of the water collecting box, and an embedded foot 2 is fixedly connected to the lower part of the flexible box. By setting the water collecting box and the flexible box, rainwater can be collected according to the location where it is gathered, which is convenient for drainage, and the long row of water inlet holes, the short row of water inlet holes and the small water inlet holes can block impurities and prevent impurities from entering the pumping pipe, ensuring the smooth pumping, and the embedded feet can be prevented from being washed away by rainwater, increasing the stability of placement, which is very convenient for construction use.
[0006] According to the construction drainage structure, the inner bottom surface of the water collecting box is provided with a water collecting slope, and the water collecting slope is inclined toward the connecting pipe.
[0007] According to the drainage structure for building construction, the number of the embedded foot 1 and the embedded foot 2 are both two, and both are axially symmetrically arranged.
[0008] According to the drainage structure for building construction, the shapes of the embedded foot 1 and the embedded foot 2 are both conical.
[0009] According to the drainage structure for building construction, the connecting hose is a corrugated pipe.
[0010] According to the drainage structure for building construction, the flexible box is smaller than the water collecting box.
[0011] According to the construction drainage structure, the length of the long row of water inlet holes is greater than the length of the short row of water inlet holes.
[0012] According to the drainage structure for building construction, the water collecting tank and the flexible tank are both made of stainless steel.
[0013] Beneficial Effects
[0014] Compared with the prior art, the utility model provides a water collection box and a flexible box, which can collect rainwater according to the location where rainwater gathers, and is convenient for drainage. The long row of water inlet holes, short row of water inlet holes, and small water inlet holes can block impurities and prevent impurities from entering the pumping pipe, thereby ensuring smooth pumping. The embedded feet can prevent them from being washed away by rainwater, increase the stability of placement, and are very convenient for use in construction.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0017] Figure 1 This is a structural schematic diagram of a construction drainage structure of the utility model;
[0018] Figure 2 This is a structural schematic diagram of a construction drainage structure of the utility model from a bottom perspective;
[0019] Figure 3 It is a structural schematic diagram of a construction drainage structure of the utility model from another perspective;
[0020] Figure 4 The utility model is a cross-sectional view of a water collecting tank of a building construction drainage structure.
[0021] Legend:
[0022] 101. Water collecting box; 102. Handle 1; 103. Connecting pipe; 104. Connecting flange; 105. Embedded foot 1; 106. Long row water inlet hole; 107. Connecting hose; 108. Embedded foot 2; 109. Small water inlet hole; 110. Handle 2; 111. Flexible box; 112. Short row water inlet hole; 1101. Water collecting slope. DETAILED DESCRIPTION
[0023] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0024] Reference Figure 1-4The utility model embodiment provides a construction drainage structure, which includes a water collecting box 101. The inner bottom surface of the water collecting box 101 is provided with a water collecting slope 1101. The water collecting slope 1101 is inclined toward the connecting pipe 103. The side wall of the water collecting box 101 is provided with a long row of water inlet holes 106 and a short row of water inlet holes 112. The length of the long row of water inlet holes 106 is greater than the length of the short row of water inlet holes 112. The front part of the water collecting box 101 is fixedly connected to the connecting pipe 103. The connecting pipe 103 A connecting flange 104 is fixedly connected to the upper part of the water collecting tank 101, a connecting hose 107 is fixedly connected to the rear part of the water collecting tank 101, and the connecting hose 107 is a corrugated tube. A flexible box 111 is fixedly connected to the rear part of the connecting hose 107. The water collecting tank 101 and the flexible box 111 are both made of stainless steel. The flexible box 111 is smaller than the water collecting tank 101. A small water inlet hole 109 is provided on the side wall of the flexible box 111. The upper part of the water collecting tank 101 is fixedly connected to a handle 102. The upper part of the flexible box 111 A handle 2 110 is fixedly connected, an embedded foot 105 is fixedly connected to the lower part of the water collecting box 101, and an embedded foot 2 108 is fixedly connected to the lower part of the flexible box 111. There are two embedded feet 105 and two embedded feet 108, and they are both axially symmetrically arranged. The shapes of the embedded feet 105 and the embedded feet 2 108 are both conical. When in use, the water pump end is connected to the connecting flange 104 through a pipeline, and then the water collecting box 101 and the flexible box 111 are placed in the water. In the pit, the water collecting box 101 is preferably placed in a large puddle, and the flexible box 111 is placed in a small puddle. Rainwater can enter the flexible box 111 and the water collecting box 101. The long row of water inlet holes 106, the short row of water inlet holes 112, and the small water inlet holes 109 can block impurities and prevent impurities from entering the pumping pipe, ensuring the smooth progress of water pumping. The embedded foot 105 and the embedded foot 2 108 can be embedded in the soil to increase the stability of the overall placement and avoid being washed away by rainwater, which is very convenient for construction and construction. By setting the water collecting box 101 and the flexible box 111, rainwater can be collected centrally according to the location where it gathers, which is convenient for drainage. The long row of water inlet holes 106, the short row of water inlet holes 112, and the small water inlet holes 109 can block impurities and prevent impurities from entering the pumping pipe, ensuring the smooth progress of water pumping. The embedded feet can avoid being washed away by rainwater, increase the stability of placement, and are very convenient for construction and construction.
[0025] Working principle: When in use, connect the pumping end of the water pump to the connecting flange 104 through a pipe, and then place the water collecting box 101 and the flexible box 111 in a puddle. The water collecting box 101 is preferably placed in a large puddle, and the flexible box 111 is placed in a small puddle. Rainwater can enter the flexible box 111 and the water collecting box 101. The long row of water inlet holes 106, the short row of water inlet holes 112, and the small water inlet holes 109 can block impurities and prevent impurities from entering the pumping pipe to ensure smooth pumping. The embedded foot 105 and the embedded foot 2 108 can be embedded in the soil to increase the stability of the overall placement and avoid being washed away by rainwater. It is very convenient for construction use.
[0026] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A construction drainage structure, comprising a water collecting tank (101), characterized in that: The side wall of the water collecting box (101) is provided with a long row of water inlet holes (106) and a short row of water inlet holes (112); the front of the water collecting box (101) is fixedly connected with a connecting pipe (103); the connecting pipe (103) is fixedly connected with a connecting flange (104); the rear of the water collecting box (101) is fixedly connected with a connecting hose (107); the rear of the connecting hose (107) is fixedly connected with a flexible box (111); a small water inlet hole (109) is provided on the side wall of the flexible box (111); the upper part of the water collecting box (101) is fixedly connected with a handle 1 (102); the upper part of the flexible box (111) is fixedly connected with a handle 2 (110); the lower part of the water collecting box (101) is fixedly connected with an embedded foot 1 (105); the lower part of the flexible box (111) is fixedly connected with an embedded foot 2 (108).
2. A construction drainage structure according to claim 1, characterized in that: The inner bottom surface of the water collecting box (101) is provided with a water collecting slope (1101), and the water collecting slope (1101) is inclined toward the connecting pipe (103).
3. A construction drainage structure according to claim 1, characterized in that: The number of the embedded foot one (105) and the embedded foot two (108) is two, and both are arranged in an axisymmetric manner.
4. A construction drainage structure according to claim 1, characterized in that: The shapes of the embedded foot 1 (105) and the embedded foot 2 (108) are both conical.
5. A construction drainage structure according to claim 1, characterized in that: The connecting hose (107) is a corrugated tube.
6. A construction drainage structure according to claim 1, characterized in that: The flexible tank (111) is smaller than the water collecting tank (101).
7. A construction drainage structure according to claim 1, characterized in that: The length of the long row of water inlet holes (106) is greater than the length of the short row of water inlet holes (112).
8. A construction drainage structure according to claim 1, characterized in that: The water collecting box (101) and the flexible box (111) are both made of stainless steel.
Citation Information
Cited By
Building construction drainage structure
CN223706639U
