Modularized multi-layer steel bar support for super-thick raft

Through the design of modular multi-layer steel brackets, channel steel and water-stopping steel plates are used to solve the problems of long construction period of steel pipe scaffolding and difficulty in concrete pouring, improve construction efficiency and quality, and achieve efficient raft construction.

CN221823232UActive Publication Date: 2024-10-11CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420358598.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-10-11
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

In the existing construction of ultra-thick rafts, the construction period of steel pipe scaffolding is long, concrete pouring is difficult, and there are hidden dangers in construction quality.

Method used

Modular multi-layer steel supports are used, including horizontal beams, vertical columns and diagonal braces. They are made of channel steel. Water-stopping steel plates are added to prevent leakage. Modular prefabricated processing and assembly technology are used to reduce the amount of on-site welding.

Benefits of technology

The construction process is simplified, construction efficiency is improved, concrete density is ensured, leakage problems are avoided, and bearing capacity calculation requirements are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823232U_ABST
    Figure CN221823232U_ABST
Patent Text Reader

Abstract

The utility model discloses an ultra-thick raft modularization multilayer steel bar support which comprises a plurality of modularization prefabricated support assembling units, each support assembling unit comprises a horizontally-arranged cross beam, and a plurality of stand columns arranged in the vertical direction are fixed to the bottom end face of each cross beam at intervals in the length direction of the cross beam. Two inclined struts are correspondingly fixed to the middle of each stand column, the top ends of the two inclined struts are fixed to the stand columns, the bottom ends of the two inclined struts are oppositely arranged in the direction away from the stand columns and perpendicular to the cross beam, the distance between the stand columns is determined according to the modulus of the distance between the steel bars, and at least one end of the cross beam extends to the outer sides of the stand columns and is arranged in an overhanging state. And the overhanging sections of the two adjacent truss bracket assembly units are connected into a whole by matching the lengthening connecting pieces with a plurality of groups of connecting bolts. The modular prefabricated steel support is simple in structure and ingenious in design, the finished steel support is prefabricated in a modular mode in a stock ground, the modular splicing technology is adopted in a construction site, the site welding amount is greatly reduced, the construction difficulty is lowered, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of super-thick valve plate construction, in particular to a super-thick raft plate modular multi-layer steel bar bracket. Background Art

[0002] As a by-product of super-high-rise buildings, ultra-thick raft slabs are located in densely populated urban areas. Their advantages and disadvantages make construction companies "love and hate". The large operating output value is its biggest advantage, but problems such as small construction space and long construction period have long plagued construction companies. The raft foundation generally requires double-layer bidirectional reinforcement, and support treatment is required between the two layers of steel bars before concrete pouring can be carried out to ensure the stability of the position of the raft steel bars during the pouring process. In the prior art, steel pipe scaffolding is generally used to erect support structures. The steel pipe scaffolding is used to support the weight of the upper steel bars, control the elevation of the steel bars and all construction loads of the upper operations. However, the support structure in the form of steel pipe scaffolding generally has a long construction period, a small opening of the steel pipe cavity, and it is difficult to pour concrete. It is difficult to ensure that the concrete poured into the steel pipe is dense, resulting in hidden dangers in the construction quality of the raft slab. Utility Model Content

[0003] The utility model aims to provide an ultra-thick raft modular multi-layer steel bar bracket to solve the technical problems described in the background technology.

[0004] In order to achieve the above technical purpose, the utility model adopts the following technical solutions:

[0005] A modular multi-layer steel support for an ultra-thick raft slab comprises a plurality of modular prefabricated support assembly units, wherein the support assembly units comprise a horizontally arranged crossbeam, a plurality of vertically arranged columns are fixed at intervals on the bottom end surface of the crossbeam along its length direction, and two diagonal braces are correspondingly fixed to the middle of each column, the top ends of the two diagonal braces are fixed on the columns, and the bottom ends of the two diagonal braces are arranged opposite to each other in a direction away from the columns and perpendicular to the crossbeam, the column spacing is determined according to the module of the steel bar spacing, at least one end of the crossbeam extends to the outside of the column in a cantilevered state, and the cantilevered sections of two adjacent support assembly units are connected as a whole by an extension connector in combination with a plurality of groups of connecting bolts.

[0006] Preferably, a waterstop steel plate is vertically fixed to the bottom end and the middle position of the column, the cross-sectional size of the waterstop steel plate is larger than the cross-sectional size of the column, and the four sides of the waterstop steel plate are all set beyond the four sides of the column.

[0007] Preferably, a reinforcing steel plate is welded and fixed to both ends of the top end of the crossbeam facing the column.

[0008] Preferably, each bracket assembly unit is provided with at least two sets of lifting ears, and the lifting ears are correspondingly welded to the top surface of the beam directly above the column.

[0009] Preferably, the cross beam, column and diagonal brace are all made of channel steel, the webs of the two diagonal braces are correspondingly welded to the two side wing plates of the column, the webs of the diagonal brace and the wing plates of the column are overlapped at a certain angle and fixedly connected by double-sided welding.

[0010] Compared with the prior art, the utility model has the following beneficial effects: the utility model has a simple structure and an ingenious design. It uses channel steel instead of steel pipe as the manufacturing material of the steel support, thus avoiding the problem of difficulty in ensuring the density of the concrete poured into the steel pipe. At the same time, the setting of the upper and lower water-stop steel plates can effectively avoid the problem of groundwater returning to the raft surface through the cavity of the channel steel to form leakage. The finished steel support is further prefabricated and processed in a modular manner in the material yard, and the modular assembly technology is adopted at the construction site, which greatly reduces the amount of on-site welding, reduces the construction difficulty, and improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The above and / or other aspects and advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:

[0012] Figure 1 This is a schematic diagram of the installation structure of a modular multi-layer steel bar support for an ultra-thick raft slab involved in the utility model;

[0013] Figure 2 This is a structural schematic diagram of a single bracket assembly unit located at the edge of a steel bar bracket according to the utility model;

[0014] Figure 3 This is a structural schematic diagram of a single bracket assembly unit located in the middle of a steel bar bracket according to the utility model;

[0015] Figure 4 It is a structural schematic diagram of the lifting eye and the extension connector of the utility model.

[0016] Figure numerals: 1. cross beam; 2. column; 3. diagonal brace; 4. water stop steel plate; 5. reinforcing steel plate; 6. lifting ear; 7. extension connector; 8. connecting bolt. DETAILED DESCRIPTION

[0017] Hereinafter, an embodiment of a modular multi-layer steel bar support for ultra-thick raft slabs of the utility model will be described with reference to the accompanying drawings. The embodiments described herein are specific embodiments of the utility model, which are used to illustrate the concept of the utility model, are explanatory and exemplary, and should not be interpreted as limiting the implementation methods and scope of the utility model. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the contents disclosed in the claims and the specification of this application, including technical solutions that adopt any obvious replacements and modifications to the embodiments described herein.

[0018] In the description of the present invention, it should be noted that the terms "front", "rear", "left", "right", "top", "bottom", "up", "down", "inside", "outside", "horizontal", "longitudinal", "vertical", "oblique" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0019] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.

[0020] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The embodiments are only used to explain the present invention and are not intended to limit the scope of the present invention. Figure 1-4 , the preferred embodiments of the utility model are further described in detail:

[0021] like Figure 1-4As shown, the utility model preferably adopts an ultra-thick raft modular multi-layer steel bar support, comprising a plurality of modular prefabricated support assembly units, the support assembly units comprising a horizontally arranged cross beam 1, a plurality of vertically arranged columns 2 are fixed at intervals on the bottom end surface of the cross beam 1 along its length direction, and two diagonal braces 3 are fixed to the middle of each column 2, the top ends of the two diagonal braces 3 are fixed on the column 2, and the bottom ends of the two diagonal braces 3 are arranged opposite to each other in a direction away from the column 2 and perpendicular to the cross beam 1, the spacing between the columns 2 is determined according to the modulus of the spacing between the steel bars, so that each column 2 can be smoothly inserted into the mesh of the lower steel mesh for installation, at least one end of the cross beam 1 extends to the outside of the column 2 and is arranged in a cantilevered state, and the cantilevered sections of two adjacent support assembly units are connected as a whole by extending the connector 7 in combination with a plurality of groups of connecting bolts 8;

[0022] Considering that the channel steel surface and the raft concrete are prone to become seepage channels, in order to prevent groundwater from returning to the raft surface through the channel steel cavity to form leakage, a water-stop steel plate 4 is vertically fixed at the bottom and middle of each column 2. The cross-sectional size of the water-stop steel plate 4 is larger than the cross-sectional size of the column 2, and the four edges of the water-stop steel plate 4 are all set beyond the four edges of the column 2. The water-stop steel plate 4 at the bottom of the column 2 can not only play a water-stopping role, but also serve as a foot of the bracket assembly unit, thereby increasing the support area of ​​the column 2 and improving the stability of the bracket assembly unit.

[0023] In order to improve the structural strength of the bracket assembly unit, the crossbeam 1, the column 2 and the diagonal brace 3 are all made of channel steel, and the webs of the two diagonal braces 3 are welded to the two side wing plates of the column 2 respectively. The webs of the diagonal braces 3 and the wing plates of the column 2 are overlapped at a certain angle and fixedly connected by two-sided welding. A reinforcing steel plate 5 is welded and fixed at both ends of the top of the crossbeam 1 facing the column 2. At least two sets of lifting ears 6 are provided on each bracket assembly unit to facilitate the lifting construction of the bracket assembly unit. Based on stability considerations, the lifting ears 6 should be welded and fixed to the reinforcing steel plate 5.

[0024] In a preferred embodiment of the present invention, 10# channel steel is used for the column 2 and the beam 1, 6# channel steel diagonal braces 3 are provided for the column 2, the spacing between the columns 2 is determined according to the module of the steel bar spacing, a finite element model is established using 3D3S software, and a specification inspection is carried out based on the calculation and analysis model. The inspection results show that the structure can meet the bearing capacity calculation requirements.

[0025] The specific construction process of the utility model includes the following design points:

[0026] Key point 1: modular prefabrication of the bracket assembly unit. According to the plane positioning drawing of the steel bar bracket, the steel bar bracket is segmented and numbered. Before on-site installation, modular prefabrication of each bracket assembly unit is carried out according to the segmentation requirements. The span of a single bracket assembly unit is 2 spans and the length is 4m. φ16 round steel lifting ears 6 are welded on both sides for hanging tower crane hoisting wire ropes. In order to improve the hoisting stability, the lifting ears 6 are welded on the top surface of the beam 1 just above the column 2;

[0027] Point 2: A 150mm×150mm×2mm steel plate is spot welded at the bottom of the 10# channel steel column 2 as a water-stop steel plate 4 to increase the pressure area. Due to the limitation of the processing length of the steel section and based on water-stop considerations, the column 2 is lengthened and a 150mm×150mm×2mm steel sheet is welded at its 1 / 2 height connection as the second water-stop steel plate 4. Before construction, the sample needs to be welded and a 72h closed water test is carried out to ensure no leakage. The two water-stop steel plates 4 work together to prevent groundwater from returning to the raft surface through the steel section cavity to form leakage;

[0028] Point 3: The channel steel column 2 and the beam 1 are connected by welding. A 200mm long 100mm×48mm×6mm steel plate is welded on the top of the channel steel column 2 as a reinforcing steel plate 5. The bottom of the channel steel beam 1 is welded and fixed to the reinforcing steel plate 5 on the top of the column 2. Another reinforcing steel plate 5 is welded on the top of the beam 1 to increase the overall stability. The lifting lugs 6 are correspondingly welded to the reinforcing steel plate 5.

[0029] Point 4: The channel steel column 2 and the diagonal brace 3 are welded on both sides (the upper and lower connection parts between the back web of the diagonal brace 3 and the wing plate of the column 2). The back of the diagonal brace 3 and the wing plate of the column 2 form an angle of about 56°, and the height of the weld foot is 4mm;

[0030] Point five: The steel bar support is assembled in units. A single support assembly unit is hoisted to the designated position according to the positioning line. The crossbeam 1 of the two support assembly units is connected with a customized channel steel connector as an extension connector 7. The size of the channel steel connector must match the size of the crossbeam 1 so that it can be fastened to the crossbeam 1. Four M16 bolts are used as connecting bolts 8 to fix it at the upper and lower wing plates.

[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A modular multi-layer steel bar support for ultra-thick raft slabs, characterized by: The invention comprises a plurality of modular prefabricated bracket assembly units, wherein the bracket assembly units comprise a horizontally arranged crossbeam (1), a plurality of vertically arranged columns (2) are fixed at intervals on the bottom end surface of the crossbeam (1) along its length direction, and two diagonal braces (3) are correspondingly fixed to the middle of each column (2), the top ends of the two diagonal braces (3) are fixed on the column (2), the bottom ends of the two diagonal braces (3) are arranged opposite to each other in a direction away from the column (2) and perpendicular to the crossbeam (1), at least one end of the crossbeam (1) extends to the outside of the column (2) and is arranged in a cantilevered state, and the cantilevered sections of two adjacent bracket assembly units are connected as a whole through an extension connector (7) in conjunction with a plurality of groups of connecting bolts (8).

2. The ultra-thick raft modular multi-layer steel bar support according to claim 1, characterized in that: A water-stop steel plate (4) is vertically fixed at the bottom and middle of the column (2); the cross-sectional dimensions of the water-stop steel plate (4) are larger than the cross-sectional dimensions of the column (2), and the four edges of the water-stop steel plate (4) are all arranged beyond the four edges of the column (2).

3. The ultra-thick raft modular multi-layer steel bar support according to claim 1, characterized in that: A reinforcing steel plate (5) is welded and fixed to both ends of the top end of the crossbeam (1) facing the column (2).

4. The ultra-thick raft modular multi-layer steel bar support according to claim 1, characterized in that: Each bracket assembly unit is provided with at least two groups of lifting ears (6), and the lifting ears (6) are correspondingly welded to the top surface of the crossbeam (1) directly above the column (2).

5. The ultra-thick raft modular multi-layer steel bar support according to claim 1, characterized in that: The cross beam (1), the column (2) and the diagonal brace (3) are all made of channel steel, and the webs of the two diagonal braces (3) are correspondingly welded to the two side wing plates of the column (2). The webs of the diagonal brace (3) and the wing plates of the column (2) are overlapped at a certain angle and fixedly connected by welding on both sides.

Citation Information

Cited By

  • Construction method for load bearing of large modular foundation

    CN120925523A

  • Super-thick raft reinforcing steel bar type steel supporting structure

    CN224705395U