High-rise large-span external scaffold shaping tool type wall connecting structure
By using horizontal connecting plates and steel wire rope fixed structures in non-standard-story buildings, the safety and cost issues of erecting high-rise, large-span external scaffolding are solved, and high-rigidity and low-cost external scaffolding erection is achieved, which is suitable for on-site processing and reduces construction costs. Trash and cost.
Patent Information
- Application Number
- CN202323454711.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-19
AI Technical Summary
In construction projects with non-standard floors (too high floor heights and too large spans), it is difficult to effectively erect safe and reliable external scaffolding with existing technology, and the construction cost is high, which affects the later construction process.
Multiple horizontal connection plates are used to connect to the main structure of the building through connectors, and vertical poles are connected to embedded rings through steel wire ropes. Anchor bars and anchor plates are used to fix the steel pipes to form a high-rise large-span external scaffolding stereotyped tool-type connecting wall structure, which avoids It overcomes the limitations of traditional embedded steel pipes.
It achieves safe and reliable external scaffolding erection in non-standard-story buildings, reduces construction costs, improves structural rigidity and bearing capacity, and reduces later dismantling and waste generation, making it suitable for on-site finalization processing.
Smart Images

Figure 1
Abstract
Description
Technical Field
[0001] The utility model relates to a high-rise large-span external scaffolding shaped tool-type wall connection structure, belonging to the technical field of building construction. Background Art
[0002] At present, when designing the erection plan of steel pipe coupler double-row scaffolding in conventional projects, the wall ties are basically arranged according to the "Safety Technical Specifications for Coupler Steel Pipe Scaffolding in Building Construction" JGJ 130-2011, and are arranged in two steps and three spans or three steps and three spans, and the coverage area of the wall ties generally does not exceed 40㎡. Two steps and three spans refers to the arrangement of the wall ties of the coupler steel pipe scaffolding, two steps refers to two step heights, and three spans refers to the distance of three spans of the crossbar. According to Article 6.4.3 of the specification, the arrangement of wall ties should preferably adopt a diamond arrangement, or a square or rectangular arrangement.
[0003] In conventional projects, the arrangement of the above-mentioned wall ties is easier to meet the requirements of the specifications. However, in public buildings and large shopping malls, there are often non-standard floors (i.e., the floor height is too high and the span is too large), and the main structure cannot provide wall tie attachment points according to the conventional two-step three-span or three-step three-span requirements; if the wall ties are only set at the floor elevation, the calculation length coefficient of the double-row scaffolding uprights will become larger, and it is impossible to look up the value according to the table of length coefficient calculation in the specification, which makes the design complicated and not suitable for use on the construction site. Therefore, when setting up scaffolding for non-standard floors (i.e., the floor height is too high and the span is too large) structural projects, the setting method of the wall ties needs to be adjusted.
[0004] In the prior art, the commonly used methods for scaffolding for non-standard floor (i.e., too high floor height and too large span) structural projects are: (1) setting embedded parts on the floor slab, using diagonal rods to support the scaffolding uprights laterally, and playing the role of wall connecting parts; (2) leading horizontal diagonal rods from the frame columns to support the scaffolding uprights, and playing the role of wall connecting parts; (3) setting rigid columns between floor columns to solve the problem of large column spacing, and then setting horizontal wall connecting parts on the rigid columns to constrain the scaffolding. The above methods can solve the problem of setting wall connecting parts, but the diagonal rods need to be set as rigid rods. For diagonal rods with longer lengths, a single steel pipe may be difficult to meet. At the same time, since these diagonal rods are all inside the floor, it affects the erection of the formwork support frame, and also affects the later construction processes, such as wall masonry, curtain wall construction, etc. If the rigid column solution is adopted, the construction measures cost is relatively high. In view of the above situation, it is urgent to design an external scaffolding erection structure for buildings with non-standard floors (i.e., buildings with too high floor height and too large span) to improve the strength of the scaffolding while reducing construction costs. Utility Model Content
[0005] In order to solve the technical problems existing in the prior art, the utility model provides a high-rise large-span external scaffolding shaped tool-type wall connection structure, which can solve the problems of too high floor height and too large span, unable to set wall connection parts according to the conventional method and ensure the safe use of external scaffolding.
[0006] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is a high-rise large-span external scaffolding shaped tool-type wall connection structure, wherein a plurality of horizontal connecting plates are arranged on the scaffolding, and the horizontal connecting plates and the main structure of the building are connected by connecting pieces, and the vertical uprights of the scaffolding and the embedded rings in the main structure of the building are connected by steel wire ropes, and the connecting pieces include a plurality of anchor bars buried in the main structure of the building and two anchor plates installed between the plurality of anchor bars, the tops of the two anchor bars extend to the outside of the main structure of the building, and the ends are welded with anchor bars, the two anchor plates are installed on the tops of the anchor bars, and a plurality of through holes for the anchor bars to pass through are arranged on the two anchor plates, and a steel pipe hole for the steel pipe to pass through is arranged in the middle, a steel pipe is fixed in the steel pipe hole, and the horizontal connecting plate is fixed on the steel pipe.
[0007] Preferably, the connecting members are arranged on the top and bottom surfaces of the main building structure, and the steel pipes are arranged between the connecting members on the top and bottom surfaces of the main building structure.
[0008] Preferably, the end of the wire rope is provided with a ring through a wire rope fixing clamp, a ring rigging is installed in the ring, the ring rigging is fixed on the embedded ring, the spacing of the wire rope fixing clamps should be 110 to 125 mm, and the end of the wire rope should extend beyond the wire rope fixing clamp by 120 mm.
[0009] Preferably, the anchor bar is in an L-shaped structure, and the length of the anchor bar pre-buried in the main structure of the building shall not be less than 250 mm.
[0010] Compared with the prior art, the utility model has the following technical effects: the utility model is easy to manufacture, can be recycled many times, can be manufactured on site, is safe and reliable, has good structural rigidity and large bearing capacity; and compared with the traditional pre-buried steel pipe wall connection parts, it avoids cutting the steel pipe after the later external frame is removed, and does not need to block the pipe eye. At the same time, the external scaffolding is set up with this structure, which can be processed on site in a standardized manner and has a low cost; and it can reduce the generation of construction waste, which is beneficial to environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a structural schematic diagram of the utility model.
[0012] Figure 2 It is a structural schematic diagram of the connecting piece in the utility model.
[0013] Figure 3It is a structural schematic diagram of the anchor plate in the utility model.
[0014] Figure 4 It is a schematic diagram of the installation structure of the steel wire rope in the utility model. DETAILED DESCRIPTION
[0015] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0016] like Figures 1 to 4 As shown, a high-rise large-span external scaffolding shaped tool-type wall connection structure includes a scaffolding 2 installed on the outside of a main building structure 1, a plurality of horizontal connecting plates 3 are arranged on the scaffolding 2, the horizontal connecting plates 3 and the main building structure 1 are connected by a connecting piece 4, the vertical uprights of the scaffolding 2 and the embedded rings in the main building structure 1 are connected by a steel wire rope 5, the connecting piece 4 includes a plurality of anchor bars 6 embedded in the main building structure and two anchor plates 7 installed between the plurality of anchor bars, the tops of the two anchor bars 6 extend to the outside of the main building structure 1, and the ends are welded with anchor bars, the two anchor plates 7 are installed on the tops of the anchor bars, and the two anchor plates 7 are provided with a plurality of through holes for the anchor bars to pass through, a steel pipe hole for the steel pipe to pass through is provided in the middle, a steel pipe 8 is fixed in the steel pipe hole, and the horizontal connecting plates 3 are fixed on the steel pipe 8.
[0017] In the utility model, the scaffold is fixed to the main structure 1 of the building by steel wire ropes and connectors. The connectors 3 are arranged on the top and bottom surfaces of the main structure 1 of the building, and the steel pipes 8 are arranged between the connectors on the top and bottom surfaces of the main structure of the building. The anchor plate adopts 10mmQ235B steel plate with a size of 200*300; the anchor plate has 4 anchor bar holes, and the diameter of the anchor bar holes is 32mm. The anchor plate is pre-buried and fixed with ∅32 anchor bars, and the anchor bars are L-shaped structures. The length of the anchor bars pre-buried in the concrete of the floor top beam shall not be less than 250mm. A ∅48*3 steel pipe is welded in the middle of the anchor plate, and the length of the steel pipe shall not be less than 250mm. The diameter of the steel wire rope 5 is 18mm. The end of the steel wire rope 5 is provided with a ferrule through the steel wire rope fixing clamp 9. The ferrule rigging 10 is installed in the ferrule. The ferrule rigging 10 is fixed on the embedded ring. The spacing of the steel wire rope fixing clamp 9 is preferably 110-125mm. The end of the steel wire rope 5 is preferably 120mm beyond the steel wire rope fixing clamp. The embedded ring is made of ∅20HPB300 steel bar, the height shall not be less than 200, and the horizontal straight section length of both ends of the embedded ring shall not be less than 150mm, and it is embedded in the floor concrete. After the embedded ring is embedded, it is connected to the scaffolding with a steel wire rope.
[0018] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the scope of the present invention.
Claims
1. A high-rise large-span external scaffolding shaped tool-type wall connection structure, including a scaffolding installed outside the main structure of the building, characterized in that: The scaffolding is provided with a plurality of horizontal connecting plates, the horizontal connecting plates are connected to the main structure of the building by connecting parts, the vertical uprights of the scaffolding are connected to the embedded rings in the main structure of the building by steel wire ropes, the connecting parts include a plurality of anchor bars embedded in the main structure of the building and two anchor plates installed between the plurality of anchor bars, the tops of the two anchor bars extend to the outside of the main structure of the building, and the ends are welded with anchor bars, the two anchor plates are installed on the tops of the anchor bars, and the two anchor plates are provided with a plurality of through holes for the anchor bars to pass through, and a steel pipe hole for the steel pipe to pass through is provided in the middle, a steel pipe is fixed in the steel pipe hole, and the horizontal connecting plates are fixed on the steel pipe.
2. The high-rise large-span external scaffolding fixed tool-type wall connection structure according to claim 1 is characterized in that: The connecting pieces are arranged on the top and bottom surfaces of the main building structure, and the steel pipes are arranged between the connecting pieces on the top and bottom surfaces of the main building structure.
3. The high-rise large-span external scaffolding fixed tool-type wall connection structure according to claim 1 is characterized in that: The end of the steel wire rope is provided with a ring through a steel wire rope fixing clamp, a ring rigging is installed in the ring, and the ring rigging is fixed on the embedded ring. The spacing of the steel wire rope fixing clamps should be 110-125mm, and the end of the steel wire rope should extend beyond the steel wire rope fixing clamp by 120mm.
4. The high-rise large-span external scaffolding fixed tool-type wall connection structure according to claim 1 is characterized by: The anchor bar is in an L-shaped structure, and the length of the anchor bar pre-buried in the main structure of the building shall not be less than 250 mm.