Through the support frame and spring structure of the simple concrete trolley, combined with the use of sleepers and jacks, the problem of inconvenient formwork reinforcement during tunnel construction is solved, fast and stable formwork support is achieved, and the appearance quality of the concrete is improved.
Patent Information
- Application Number
- CN202420253592.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-02
AI Technical Summary
In tunnel construction, during the lining concrete pouring process of long tunnels, material transfer is difficult and formwork reinforcement is inconvenient. Existing trolleys cannot effectively support the formwork, resulting in slow formwork speed and low stability, which affects the appearance quality of the concrete.
A simple concrete trolley is designed, which adopts a combined structure of support brackets and springs. The formwork is quickly supported by dragging the trolley and using sleepers and jacks. The restoring force of the spring is used to provide support and ensure the flatness of the formwork. and stability.
It achieves fast and stable formwork support, reduces manual operations, improves the appearance quality of concrete, has fast formwork speed, high formwork flatness and good stability.
Smart Images

Figure CN221823815U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tunnel construction, and in particular to a simple concrete trolley. Background Art
[0002] After the tunnel excavation is completed, the tunnel needs to be lined with concrete. If the tunnel is long, the material transportation is difficult, the formwork reinforcement is inconvenient, and repeated formwork installation and removal work affects the construction progress. At the same time, the existing trolley cannot play an effective role in supporting the formwork during use, but the formwork support speed is slow and the stability is low. Utility Model Content
[0003] In order to solve or partially solve the problems existing in the related technology, the present application provides a simple concrete trolley. The solution provided by the present application can ensure the support effect through the support frame and the restoring force of the spring. The tunnel lining concrete preparation warehouse formwork only needs to drag the trolley to the corresponding position, and the formwork can be quickly set up by using sleepers and jacks. There is less manual dragging, the formwork is fast, the formwork is flat and stable, and the appearance quality of the concrete is guaranteed.
[0004] The first aspect of the present application provides a simple concrete trolley, comprising
[0005] A supporting frame and a supporting frame, wherein the supporting frame comprises a middle supporting frame, an upper supporting frame and a trolley base installed along the top and bottom of the middle supporting frame, and side supporting frames installed on both sides of the middle supporting frame, the side supporting frames are installed with supporting frames for supporting transverse horizontal steel pipes, the trolley base is installed with running wheels, tracks are arranged at the lower side of the running wheels, and sleepers and jacks are arranged along both sides of the tracks.
[0006] Optionally, the upper support frame and the side support frame are formed with an arc matching the tunnel on one side corresponding to the tunnel.
[0007] Optionally, the support frame includes a support seat, a sleeve, and a spring. A through groove is formed on the side support frame, and the spring is installed in the through groove. A sleeve is sleeved on the side support frame corresponding to the through groove, and the support seat is installed on the sleeve, and the spring rests against the support seat.
[0008] The technical solution provided by this application may have the following beneficial effects:
[0009] The solution provided in the present application can ensure the supporting effect by using the restoring force of the spring through the support frame. The tunnel lining concrete preparation warehouse formwork can be erected by simply dragging the trolley to the corresponding position. The formwork can be quickly erected by using sleepers and jacks. There is less manual labor, the formwork is quickly erected, the formwork is flat and stable, and the quality of the concrete appearance is guaranteed.
[0010] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The above and other objects, features and advantages of the present application will become more apparent through a more detailed description of exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.
[0012] Figure 1 is a schematic diagram of the front structure of the overall device shown in the embodiment of the present application;
[0013] Figure 2 It is a cross-sectional schematic diagram showing an embodiment of the present application;
[0014] Figure 3 is a schematic diagram of a base shown in an embodiment of the present application;
[0015] Figure 4 is a schematic diagram of an upper support frame shown in an embodiment of the present application;
[0016] Figure 5 is a schematic diagram of a side support frame shown in an embodiment of the present application;
[0017] Figure 6 It is a partial schematic diagram of a steel pipe support shown in an embodiment of the present application.
[0018] Figure numerals: 1. Upper supporting frame; 2. Left supporting frame; 3. Right supporting frame; 4. Support frame; 5. Middle supporting frame; 6. Trolley base; 7. Traveling wheels; 8. Tracks; 9. Jacks; 10. Sleepers; 11. I-beams; 12. Axles; 13. Steel pipes; 14. Rebars; 15. Shaped steel molds; 16. Support seats; 17. Through slots; 18. Sleeves; 19. Springs. DETAILED DESCRIPTION
[0019] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.
[0020] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0021] In the description of the present application, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0022] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0023] After the tunnel excavation is completed, the tunnel lining concrete needs to be poured. If the tunnel is long, the material transportation is difficult, the formwork reinforcement is inconvenient, and repeated formwork installation and removal work will affect the construction progress.
[0024] In response to the above problems, the embodiments of the present application provide a simple concrete trolley device, which can ensure the support effect through a support frame and the restoring force of a spring. The tunnel lining concrete preparation warehouse formwork can be set up by simply dragging the trolley to the corresponding position. By using sleepers and jacks, the formwork can be quickly set up, with less manual dragging, fast formwork speed, high formwork flatness, good stability, and guaranteed concrete appearance quality.
[0025] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.
[0026] See also Figure 1-6The present application provides a simple concrete trolley device, including a support frame and a support frame 4. The support frame includes a middle support frame 5, an upper support frame 1 and a trolley base 6 installed along the top and bottom of the middle support frame 5, and side support frames installed on both sides of the middle support frame 5. The side support frame is installed with a support frame 4 for supporting a horizontal steel pipe 13. The trolley base 6 is installed with a running wheel 7. A track 8 is arranged under the running wheel 7. Sleepers 10 and jacks 9 are arranged along both sides of the track 8. In this embodiment, the side support frame includes a left support frame 2 and a right support frame 3. The surfaces of the upper support frame 1, the left support frame 2, and the right support frame 3 are paved with an integrated fixed steel mold 15. The fixed steel mold 15 is modified from a P3015 steel mold. The support frame 4 is installed on the middle support frame 5. The positions of the upper support frame 1, the left support frame 2, and the right support frame 3 can be fine-tuned by the support frame 4 during the installation process so that the template meets the shape of the lining concrete casting. The trolley base 6 is welded by I16 I-beams 11. Three axles 12 are installed on the trolley base 6 at intervals of 4.5m. Three pairs of running wheels 7 are installed on the axles 12. Tracks 8 are laid on the trolley running path to facilitate the running of the trolley.
[0027] After the trolley moves to the concrete preparation position, the trolley is lifted up by the 620T jack 99 of the trolley base, and sleepers 10 are padded on the base to provide support for the trolley.
[0028] Specifically, the upper support frame 1 and the side support frame are formed with an arc matching the tunnel on one side corresponding to the tunnel. The support frame 4 includes a support seat 16, a sleeve 18, and a spring 19. A through slot 17 is formed on the side support frame, and the spring 19 is installed in the through slot 17. The sleeve 18 is sleeved on the side support frame corresponding to the through slot 17, and the support seat 16 is installed on the sleeve 18. The spring 19 abuts against the support seat 16.
[0029] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A simple concrete trolley, characterized by: include The supporting frame and the supporting frame include a middle supporting frame, an upper supporting frame and a trolley base installed along the top and bottom of the middle supporting frame, and side supporting frames installed on both sides of the middle supporting frame. The side supporting frames are installed with supporting frames for supporting horizontal steel pipes. The trolley base is equipped with running wheels, tracks are arranged under the running wheels, and sleepers and jacks are arranged along both sides of the tracks.
2. The simple concrete trolley according to claim 1, characterized in that: The upper support frame and the side support frame are both formed with an arc matching the tunnel on one side corresponding to the tunnel.
3. The simple concrete trolley according to claim 1 or 2, characterized in that: The support frame includes a support seat, a sleeve, and a spring. A through slot is formed on the side support frame, and a spring is installed in the through slot. A sleeve is sleeved on the side support frame corresponding to the through slot, and a support seat is installed on the sleeve. The spring rests on the support seat.