Through the integrated fixed formwork and adjustable steel top support of the sliding concrete side formwork trolley, the problems of inconvenient formwork reinforcement and low safety during tunnel construction are solved, the efficiency and safety of concrete construction are improved, and the construction cost is reduced.

CN221823816UActive Publication Date: 2024-10-11SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420253595.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-10-11
Estimated Expiration
2034-02-02

AI Technical Summary

Technical Problem

In tunnel construction, during the concrete lining process of long tunnels, material transfer is difficult, formwork reinforcement is inconvenient, repeated installation and dismantling affects the progress, and the existing trolleys are less safe during use.

Method used

A sliding concrete side formwork trolley is provided, which uses an integrated integrated formwork and an adjustable-length steel top support. It is reinforced by the tunnel side wall support to ensure the stability of the formwork, reduce repeated installation and disassembly of the formwork, and improve construction efficiency.

Benefits of technology

Through integrated shaping formwork and adjustable steel top supports, repeated installation and disassembly of formwork can be avoided, concrete construction efficiency can be improved, construction costs can be reduced, and construction safety can be enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823816U_ABST
    Figure CN221823816U_ABST
Patent Text Reader

Abstract

The utility model relates to a sliding concrete side form trolley. The sliding concrete side formwork trolley comprises a trolley framework, a shaping formwork and a working platform, the trolley framework is of a rectangular frame structure, a steel back shore is installed on one side of the trolley framework, the working platform is installed on the other side of the trolley framework by arranging an inclined strut, and the shaping formwork is installed at the bottom of the working platform along the inclined strut and the side face of the trolley framework. And a protective barrier is mounted on the working platform. According to the scheme, the formwork can be prevented from being repeatedly mounted and dismounted by integrating the integrated shaping formwork, the formwork is supported and reinforced through the length-adjustable steel back shore mounted on the trolley and the side wall of the tunnel, the stability of the formwork is guaranteed, the construction efficiency of concrete in the tunnel is improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction, and in particular to a sliding concrete side form trolley. Background Art

[0002] After the tunnel excavation is completed, the tunnel needs to be lined with concrete. If the tunnel is long, the material transportation is difficult, the formwork reinforcement is inconvenient, and the dismantling work affects the construction progress. At the same time, the existing trolley needs to be repeatedly installed and disassembled during use, and the safety is low during use. Utility Model Content

[0003] In order to solve or partially solve the problems existing in the related technology, the present application provides a sliding concrete side form trolley. The solution provided by the present application can avoid repeated installation and disassembly of the formwork by integrating an integrated fixed formwork. The adjustable length steel top support installed on the trolley can support and reinforce the formwork using the side wall of the tunnel, thereby ensuring the stability of the formwork, accelerating the efficiency of concrete construction in the tunnel, and reducing construction costs.

[0004] The first aspect of the present application provides a sliding concrete side form trolley, comprising:

[0005] The trolley frame, the shaping template and the working platform are rectangular frame structures with walking steel wheels installed at the bottom. A steel top support is installed on one side of the trolley frame and a working platform is installed on the other side by setting diagonal supports. The shaping template is installed at the bottom of the working platform along the diagonal supports and the sides of the trolley frame, and a guardrail is installed on the working platform.

[0006] Optionally, the shaping template is formed by assembling and connecting steel templates.

[0007] Optionally, the steel top support includes a support fixed on the trolley frame, and a screw threadedly connected to the support.

[0008] The technical solution provided by this application may have the following beneficial effects:

[0009] The solution provided in this application can avoid repeated installation and disassembly of the formwork by integrating an integrated fixed formwork, and use the adjustable length steel top support installed on the trolley to support and reinforce the formwork using the side wall of the tunnel, thereby ensuring the stability of the formwork, accelerating the efficiency of concrete construction in the tunnel, and reducing construction costs.

[0010] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The above and other objects, features and advantages of the present application will become more apparent through a more detailed description of exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.

[0012] Figure 1 It is a schematic diagram of the structure of the overall device shown in the embodiment of the present application;

[0013] Figure 2 It is a schematic diagram of the back side of the embodiment of the present application;

[0014] Figure 3 It is a schematic diagram of a working platform shown in an embodiment of the present application.

[0015] Figure numerals: 1-trolley frame, 2-forming template, 3-walking steel wheel, 4-steel top support, 5-working platform, 6-guardrail, 7-steel template, 8-channel steel, 9-steel mesh. DETAILED DESCRIPTION

[0016] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0017] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0018] In the description of the present application, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0019] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0020] After the tunnel excavation is completed, the tunnel needs to be lined with concrete. If the tunnel is long, the material transportation is difficult, the formwork reinforcement is inconvenient, and repeated formwork installation and removal work affects the construction progress. At the same time, the safety is low during use.

[0021] In response to the above problems, an embodiment of the present application provides a sliding concrete side form trolley device, which can avoid repeated installation and disassembly of the formwork by integrating an integrated fixed formwork. The adjustable length steel top support installed on the trolley can support and reinforce the formwork using the side wall of the tunnel, thereby ensuring the stability of the formwork, accelerating the efficiency of concrete construction in the tunnel, and reducing construction costs.

[0022] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0023] See also Figure 1-3 The present application provides a sliding concrete side form trolley device, including a trolley frame 1, a shaping template 2, and a working platform 5. The trolley frame 1 is a rectangular frame structure, and a walking steel wheel 3 is installed at the bottom. The walking steel wheel 3 is installed at the bottom of the trolley for easy movement. A steel top support 4 is installed on one side of the trolley frame 1, and a working platform 5 is installed on the other side by setting an inclined support. The shaping template 2 is installed at the bottom of the working platform 5 along the inclined support and the side of the trolley frame 1, and a protective railing 6 is installed on the working platform 5. Specifically, the trolley frame 1 is welded with [10 channel steel 8, and the shaping template 2 is assembled and connected with steel templates 7, and P3015 steel templates 7 are assembled and shaped and welded. A steel mesh 9 is laid on the top of the channel steel 8 to form a concrete pouring and vibrating working platform 5. A steel pipe guardrail is welded on the top of the platform, and the steel mesh 9 is welded with φ6 steel bars.

[0024] In this embodiment, the steel top support 4 includes a support fixed on the trolley frame 1, and a screw threadedly connected to the support. The lateral screw length is 65 cm. By adjusting the screw length, the construction trolley template and the tunnel side wall are adjusted to be firmly fixed.

[0025] The installation method is as follows:

[0026] 1) Manufacturing and processing of the trolley frame: The trolley frame 1 is made of [10 channel steel 8 welding. First, each component is cut and blanked, and then each [10 channel steel component is welded into a whole.

[0027] 2) Forming template production: The forming template 2 is assembled with commonly used P3015 steel templates 7 and fixed on the trolley frame 1 by wire or welding.

[0028] 3) Lateral steel support for the trolley: The finished steel support 4 is used, and the length of the support is 650mm, and the length can be adjusted by the screw rod. The support is fixed on the side of the trolley.

[0029] 4) Installation of bottom traveling wheels: 4 traveling steel wheels 3 with a diameter of 200 mm are installed at the bottom of the trolley.

[0030] The top of the trolley is welded with a channel steel 8 to form a working platform 5, and a steel mesh 9 is laid on the platform to form a concrete pouring and vibrating working platform. The steel mesh is welded with φ6 steel bars, and a steel pipe guardrail 6 is welded on the top of the platform.

[0031] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A sliding concrete side form trolley, characterized in that: include The trolley frame, the shaping template and the working platform are rectangular frame structures with walking steel wheels installed at the bottom. A steel top support is installed on one side of the trolley frame and a working platform is installed on the other side by setting diagonal supports. The shaping template is installed at the bottom of the working platform along the diagonal supports and the sides of the trolley frame, and a guardrail is installed on the working platform.

2. The sliding concrete side form trolley according to claim 1, characterized in that: The shaping template is formed by assembling and connecting steel templates.

3. The sliding concrete side form trolley according to claim 1 or 2, characterized in that: The steel top support comprises a support fixed on the trolley frame and a screw threadedly connected to the support.