Drift road type filling retaining wall
Through the design of the convex arc-shaped filling retaining wall, combined with the blasting system and the filling bleeding system, it solves the problems in the existing technology that the retaining wall affects the stability of the layered channel and the liquid level monitoring, and achieves a safe and efficient filling process and rapid dismantling. .
Patent Information
- Application Number
- CN202420547367.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-20
AI Technical Summary
The existing approach filling retaining wall easily affects the stability of the layered tunnel during the construction process, and is difficult to dismantle quickly, affecting the safety and efficiency of mining operations. Moreover, the height of the filling slurry level is difficult to accurately monitor, resulting in filling efficiency and retaining wall stability. question.
It adopts a convex arc-shaped filling retaining wall design, with built-in blasting system and filling bleeding system, combined with a laser ranging liquid level detection device to ensure accurate monitoring of the filling material slurry level and rapid removal of the retaining wall.
It improves the safety of mining operations and the stability of the layered tunnel, achieves accurate monitoring of the filling slurry level, avoids the problems of retaining wall collapse and bleeding water flowing into the layered tunnel, and simplifies the removal process of the retaining wall.
Smart Images

Figure CN221823870U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of underground mine filling, in particular to an approach type filling retaining wall. Background Art
[0002] As the country pays more and more attention to environmental issues, the solid waste generated by goaf and mine production has brought about prominent safety and environmental problems. The backfill mining method has been more and more widely used because of its significant advantages of reducing ore loss and depletion, effectively maintaining the stability of surrounding rock, utilizing mine solid waste and protecting the environment. Among them, the approach backfill mining method has significant advantages such as flexible mine layout, excellent mining loss and depletion rate indicators, and is suitable for crushing ore and rock. It is currently more and more widely used in underground mines. In the approach backfill mining in underground mines, the construction of backfill retaining walls is an indispensable process link. Its main function is to separate the goaf from the working area, prevent the backfill slurry from overflowing from the goaf during the backfill process, and realize the seepage and dehydration of the mining area. In order to ensure the safety and efficiency of the filling process, the backfill retaining wall must have good permeability, a quick and simple construction process, and sufficient strength to resist the pressure exerted on it by the backfill slurry. At present, the construction forms of approach-type filling retaining walls mainly include brick structure retaining walls, wooden structure retaining walls, cast-in-place concrete retaining walls, steel structure retaining walls, etc.
[0003] The filling retaining wall of the existing approach mining method has the following shortcomings:
[0004] (1) The general appearance of the road-type filling retaining wall is usually "I"-shaped. The advantage of the "I"-shaped filling retaining wall is that the structure is relatively simple. However, in the process of road-type mining, in order not to affect the trackless equipment from the stratified road to the mining road (usually the mining road and the stratified road are arranged vertically), the entrance of the mining road is usually expanded into a trumpet shape (such as Figure 7 As shown in the figure, the advantage of this is that it is convenient for trackless equipment such as scrapers and rock drills to enter and exit the mining access from the stratified road. However, its disadvantage is that since the mining access is excavated in a trumpet shape, two problems need to be faced when constructing the filling retaining wall. For example, the cross-sectional size of the downward mining access of a mine is 4m (width) × 4m (height), but the width of the trumpet where the mining access and the stratified road intersect is at least 8m. If a filling retaining wall is constructed at the intersection of the mining access and the stratified road, the construction width of the straight-line filling retaining wall will be significantly increased (as shown in the figure). Figure 8 As shown in the figure); if the I-shaped filling retaining wall is constructed at the inner side of the bell mouth (as shown in the figure); Fig. 9 As shown in the figure, although there is no need to increase the width of the filling retaining wall, the width of the original layered road is increased from 3.5m to 5.5m, which significantly increases the width of the original layered road. In particular, if all approaches adopt this construction mode, the stability of the original layered road will be greatly reduced, affecting the safety of mining operations;
[0005] (2) Some mines use a concave filling retaining wall similar to a dam structure. Compared with a straight filling retaining wall, the concave filling retaining wall has better stress state and stability. However, if the filling retaining wall of the approach mining method adopts a concave structure, it will also lead to a significant increase in the width of the stratified road (such as Fig.10 As shown in the figure), it will also have a serious impact on the stability of the stratified channel;
[0006] (3) During the filling process, a drainage pipe made of a steel wire skeleton wrapped with a seepage filter cloth is usually used. One end of the drainage pipe is suspended on the roof of the mining area, and the other end passes through the filling retaining wall and is placed in the stratification channel. Its function is to discharge the water exuded from the filling slurry in the mining area out of the filling retaining wall. Discharging the filling seepage water in the mining area can not only reduce the pressure of the filling slurry on the filling retaining wall and improve the stability of the filling retaining wall, but also improve the strength of the filling body in the mining area. However, in actual production on site, due to the high hydrostatic pressure of the filling slurry, the drainage pipe is easily deformed or even closed under pressure, which seriously affects the discharge effect of the seepage water in the filling retaining wall; at the same time, in the general approach filling process, the filling seepage water flows into the stratification channel, which will cause the slurry to overflow in the stratification channel, seriously affecting the good working environment of the stratification channel; some mines also build small water dams or dig water pits, which also have problems such as large engineering volume and relatively serious mining area pollution;
[0007] (4) The goaf is closed under the barrier of the backfill retaining wall, and it is difficult to obtain the slurry level of the backfill slurry in the goaf. The approach-type mining field is generally divided into primary filling and secondary filling. For example, taking a mining approach with a height of 4m as an example, the primary filling height is usually 2.5m. The secondary filling is carried out several days after the primary filling and reaches the filling top. If the slurry level of the primary filling does not reach the expected height, it will affect the filling efficiency. The thickness of the primary filling body is too thin and is not conducive to the stability of the filling body of the lower layer top plate. If the slurry level of the primary filling exceeds the expected height and the filling is not stopped in time, the pressure of the filling slurry on the backfill retaining wall is too large, which may cause serious problems such as retaining wall collapse and slurry leakage. Similarly, if the secondary filling does not reach the expected height, it will cause the filling to not be connected to the top. If the amount of slurry exceeds the actual need of the mining field, the pressure head of the filling slurry will increase rapidly and form a huge hydrostatic pressure, which is very easy to crush the backfill retaining wall. Since the height and width of each mining area at the underground site are different to a certain extent, and the length of each access road is also different, the filling volume of each mining area is also different. In actual production on site, operators often judge the actual height of the filling slurry in the mining area based on the time consumed for filling and the traces of water in the filling slurry gradually seeping out of the filling retaining wall. The operators judge the actual height of the filling slurry in the mining area based on the height of the seepage level traces. However, since the specifications and dimensions of each mining area are different, it is difficult to accurately calculate the liquid level of the filling slurry based on the filling time. At the same time, due to the different compactness and permeability of each retaining wall, the method of judging the height of the filling slurry based on the height of the seepage level is also very error-prone;
[0008] (5) After the goaf is filled, some mines need to pass through the filling body to enter the upper plate of the ore body to carry out shaft and tunnel construction or mining and other practical needs. It is necessary to dismantle the filling retaining wall of the mining access road. However, the filling retaining wall is very strong and difficult to dismantle. There are prominent problems such as low construction efficiency, long cycle, high demolition cost and high construction risk. Utility Model Content
[0009] In view of the above technical problems, the utility model provides an entry-type filling retaining wall.
[0010] In order to achieve the above purpose, the technical solution of the utility model is as follows:
[0011] An approach type filling retaining wall, comprising
[0012] Outward convex arc filling retaining wall;
[0013] A blasting system is arranged in the outer convex arc filling retaining wall and is used for rapid demolition of the outer convex arc filling retaining wall;
[0014] The filling water seepage system is arranged in the convex arc filling retaining wall, and the water inlet end is arranged in the filling operation area;
[0015] The filling material slurry level height detection device is installed in the goaf.
[0016] The outwardly convex arc-shaped filling retaining wall comprises:
[0017] Several horizontal and vertical bars are cross-connected to form a mesh wall;
[0018] The first layer of steel mesh is fixedly installed on the mesh wall;
[0019] a burlap layer, covering the first layer of steel mesh;
[0020] A second layer of steel mesh, covering the burlap layer and fixed to the first layer of steel mesh;
[0021] The concrete wet spraying layer is set on the second layer of steel mesh.
[0022] The blasting system comprises:
[0023] The blasting conduit is vertically arranged in the concrete wet spraying layer;
[0024] Among them, a horizontal loading pipe is arranged on the top of the blasting conduit, and explosives are loaded into the blasting conduit through the loading pipe.
[0025] There are three blasting tubes, which are arranged from left to right in the concrete wet spraying layer.
[0026] The filling and bleeding system comprises:
[0027] A number of transverse seepage cages are arranged on the wall of the outwardly convex arc-shaped filling retaining wall facing the goaf;
[0028] The water inlet end of the water diversion pipe passes through the outer convex arc-shaped filling retaining wall and is connected with the water seepage cage;
[0029] The water tank has a water inlet connected to the water outlet of the water diversion pipe.
[0030] The water seepage cage comprises:
[0031] A hollow steel pipe, with a steel mesh on the inlet end and water filtering holes evenly distributed on the side wall of the inlet end;
[0032] Geotextile, wrapped around the inlet end of the hollow steel pipe;
[0033] The water tank is internally provided with a float valve water level controller and a drainage pump.
[0034] The filling material slurry level detection device comprises:
[0035] Fixed pole, installed on the bottom plate of the access road in the goaf;
[0036] A laser distance measuring sensor is arranged on the top of a fixed pole;
[0037] The reflective floating plate is horizontally arranged on the fixed pole and corresponds to the laser emitting end of the laser ranging sensor;
[0038] An external relay is connected, and a freewheeling diode is connected in parallel at both ends of its driving coil and then connected to the laser ranging sensor;
[0039] An LED liquid level indicator is arranged on the convex arc filling retaining wall and is connected to the transistor switch of the laser distance measuring sensor.
[0040] The beneficial effects of the utility model are:
[0041] 1. The overall shape of the utility model is an outward convex arc, which avoids the problem of layering road stability caused by increasing the width of the original layering road in the "I"-shaped filling retaining wall and the inward concave filling retaining wall, thereby improving the safety of mining operations;
[0042] 2. The application of the laser ranging system can monitor the liquid level of the filling slurry in the goaf at any time during filling, so that the primary filling and secondary filling can reach the expected filling height, preventing the primary filling from failing to reach the expected height and affecting the filling efficiency, or the filling slurry during the secondary filling exceeding the actual filling volume in the mining area, causing the filling retaining wall to collapse, slurry leakage and other problems;
[0043] 3. The filling seepage system is used to make the filling retaining wall have a good filling slurry seepage effect, which improves the seepage efficiency in the goaf and prevents the filling seepage from flowing into the stratified channel, ensuring a good working environment in the stratified channel;
[0044] 4. Several blasting pipes are installed on the filling retaining wall, which facilitates the filling of explosives into the retaining wall through the blasting pipes, so as to realize the rapid blasting demolition of the filling retaining wall;
[0045] 5. Compared with the traditional straight-line filling retaining wall and the concave filling retaining wall, the utility model has the characteristics of simple construction process, good stability, low construction cost, and is also conducive to maintaining the stability of the layered road;
[0046] 6. The filling material slurry level detection device can monitor the filling material slurry level in the goaf, so that the primary filling and secondary filling can reach the expected filling height respectively, avoiding the filling retaining wall being crushed and unstable due to overfilling of the mining area, or the filling volume is too small (the filling body thickness is small) resulting in poor stability of the filling body roof during the lower layer mining.
[0047] 7. The application of the filling seepage system can enhance the permeability of the filling retaining wall and improve the seepage efficiency in the goaf. At the same time, it can prevent the filling slurry in the goaf from seeping into the stratified channel, ensure a good working environment in the stratified channel, and optimize the current backward construction technology such as using water nests and half-board walls to store filling seepage. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 It is a schematic diagram of the structure of the utility model;
[0049] Figure 2 It is a schematic diagram of the connection between the horizontal reinforcement and the vertical reinforcement;
[0050] Figure 3 This is the position relationship diagram of the water seepage cage;
[0051] Figure 4 The top view of the filling retaining wall;
[0052] Figure 5 Wiring diagram for external relay of laser distance sensor;
[0053] Figure 6 This is a diagram of the use state of the utility model;
[0054] Figure 7 It is a top view of the relationship between the mining approach and the layering road in the prior art;
[0055] Figure 8 A top view of a filling retaining wall constructed at the intersection of a mining approach and a stratification road in the prior art;
[0056] Fig. 9 It is a top view of a filling retaining wall constructed at the inner side of the bell mouth in the prior art;
[0057] Fig.10 A top view of a retaining wall filled with a concave structure in the prior art. DETAILED DESCRIPTION
[0058] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.
[0059] like Figure 1 and Figure 6 As shown, an approach-type filling retaining wall comprises an outwardly convex arc-shaped filling retaining wall 22; a blasting system arranged in the outwardly convex arc-shaped filling retaining wall 22 for rapid demolition of the outwardly convex arc-shaped filling retaining wall 22; a filling seepage system arranged in the outwardly convex arc-shaped filling retaining wall 22, with the water inlet end arranged in the filling operation area; and a filling material slurry level height detection device arranged in the goaf.
[0060] like Figures 1 to 3As shown, the outwardly convex arc-shaped filling retaining wall 22 includes: a plurality of transverse ribs 18 and vertical ribs 16, which are cross-connected to form a mesh wall; a first layer of steel mesh 8, fixedly installed on the mesh wall; a burlap layer 7, covering the first layer of steel mesh 8; a second layer of steel mesh 6, covering the burlap layer 7 and fixed to the first layer of steel mesh 8; and a concrete wet spray layer 5, arranged on the second layer of steel mesh 6.
[0061] like Figure 1 and Figure 4 As shown, the blasting system includes: a blasting conduit 13, which is vertically arranged in the concrete wet spraying layer 5; wherein a horizontally placed filling pipe is arranged on the top of the blasting conduit 13, and explosives are filled into the blasting conduit 13 through the filling pipe.
[0062] like Figure 1 and Figure 4 As shown, there are three blasting tubes 13, and the three blasting tubes 13 are arranged from left to right in the concrete wet spraying layer 5.
[0063] like Figure 1 and Figure 4 As shown, the filling seepage system includes: a plurality of horizontally placed seepage cages 4, which are arranged on the wall of the convex arc filling retaining wall 22 facing the goaf; a water diversion pipe 12, the water inlet end of which passes through the convex arc filling retaining wall 22 and is connected to the seepage cage 4; a water tank 10, the water inlet of which is connected to the water outlet end of the water diversion pipe 12. The seepage cage 4 includes: a hollow steel pipe, a steel mesh is arranged on the inlet end thereof, and water filtering holes are evenly distributed on the side wall of the inlet end; a geotextile wrapped on the inlet end of the hollow steel pipe; and the water tank 10, a float valve water level controller and a drainage pump 11 are arranged inside.
[0064] like Figure 1 and Figure 5 As shown, the filling material slurry level detection device includes: a fixed pole 2, installed on the bottom plate of the goaf access road; a laser distance sensor 1, arranged on the top of the fixed pole 2; a reflective floating plate 3, horizontally arranged on the fixed pole 2, and corresponding to the laser emitting end of the laser distance sensor 1; an external relay 21, a freewheeling diode 20 is connected in parallel at both ends of its driving coil and then connected to the laser distance sensor 1; an LED liquid level height display 17, arranged on the convex arc filling retaining wall 22, which is connected to the transistor switch of the laser distance sensor 1.
[0065] Specifically, the utility model can construct a retaining wall body with sufficient strength to resist the slurry pressure, and isolate the filling slurry in the goaf. The vertical reinforcement 16 and the transverse reinforcement 18 are both steel bars with a diameter of φ12mm, and their function is to construct the filling retaining wall frame. Taking the 4m×4m mining access section as an example, in the construction of the filling retaining wall, holes are drilled in advance on the access roof and both sides to fix the transverse reinforcement 18 and the vertical reinforcement 16. The installation steps of the vertical reinforcement 16 and the transverse reinforcement 18 are to install the vertical reinforcement first and then install the transverse reinforcement. First, three vertical reinforcements 16 with a spacing of about 1m are erected. The lower end of the vertical reinforcement 16 is directly inserted into the drilled hole fixed to the bedrock of the access bottom plate, with an insertion depth of 300mm, and the upper end is inserted into the drilled hole on the access roof, with an insertion depth of 200mm. When installing the transverse reinforcement 18, three reinforcements are installed at the positions of 1m, 2m and 3m away from the access bottom plate. The ends of the transverse reinforcement 18 are inserted and fixed to the drilled holes on the access side wall, and the insertion depth is 300mm. The intersection of the vertical reinforcement 16 and the transverse reinforcement 18 is fixed with a U-shaped clip 15. The depth of the slot of the U-shaped clip 15 is not less than 25mm, and the width of the slot is not less than 30mm.
[0066] After the vertical reinforcement 16 and the horizontal reinforcement 18 are erected, the first steel mesh 8 is laid on the frame formed by the vertical reinforcement 16 and the horizontal reinforcement 18. The function of the first steel mesh 8 is to provide attachment and support for the subsequent burlap layer 7. The first steel mesh 8 uses steel bars with a diameter of φ4mm and a mesh parameter of 150mm×150mm. The steel mesh is fixed to the frame formed by the vertical reinforcement 16 and the horizontal reinforcement 18 with a tray and bolts. The first steel mesh 8 should be close to the retaining wall frame, and the first steel mesh 8 should be tightly fixed on the vertical reinforcement 16 and the horizontal reinforcement 18 with a plastic tie; then install a layer of burlap layer 7 on the first steel mesh 8 and fix it with a plastic tie; finally, install the second layer of steel mesh 6 on the burlap layer 7.
[0067] In order to facilitate the rapid demolition of the wet-sprayed concrete filling retaining wall at a later stage, three blasting tubes 13 are evenly arranged in the filling retaining wall. The blasting tube 13 is made of electrostatic flame-retardant PVC material. The blasting adopts an interval charging structure. First, the columnar emulsion explosive is loaded into the filling retaining wall through the blasting tube 13, and then loaded into the gas spacer. A gas spacer is loaded between two emulsion explosives. The emulsion explosive and the gas spacer are regularly loaded in a charging sequence. After the charging is completed, the blasting network is connected. When the amount of charge in the blasting tube 13 reaches the requirements of the blasting design, the blasting operation can be carried out to blast and demolish the filling retaining wall.
[0068] The model of the laser distance sensor 1 is LDS30A / B, and the dimensions are 123×60×30.7 mm. The laser distance sensor 1 plays the role of transmitting and receiving signals, and performs non-contact measurement according to the transmitted and received signals. The laser distance sensor 1 is an open-circuit collector output and cannot directly output voltage and current, so an external relay 21 is required. The function of the external relay 21 is to convert and transmit control signals. A freewheeling diode (20) is connected in parallel at both ends of the drive coil of the external relay 21. The transistor switch output of the laser distance sensor 1 is externally connected to an LED liquid level display 17. The wiring method of the LED liquid level display is that the positive pole is connected to the positive pole of the DC power supply, the negative pole is connected to the RELAY (transistor positive pole +) of the rangefinder, and the negative pole of the DC power supply is connected to the GND (-) of the instrument. The liquid level LED height display 17 is installed on one side of the filling retaining wall at a height of 1500 mm from the ground. The liquid level in the goaf area is read out by the LED liquid level display 17.
[0069] The function of the fixed vertical pole 2 is to connect the reflective floating plate 3 so that the reflective floating plate 3 can float up and down on the fixed vertical pole 2 as the height of the filling material slurry surface changes. The fixed vertical pole 2 is made of Q235 steel, the diameter of the steel pipe is φ10mm, and the length is 4000mm. A disc base with a thickness of 5mm and a diameter of φ50mm is welded at one end of the fixed vertical pole 2, and is fixed to the tunnel floor and close to the filling retaining wall by two expansion screws. The function of the reflective floating plate 3 is to provide a reflection surface for the red laser beam emitted by the laser ranging sensor 1. After the laser beam is irradiated on the reflective floating plate 3, the signal is returned, and the laser ranging sensor 1 receives the return signal for non-contact measurement. The reflective floating plate 3 is connected to the fixed vertical pole 2 by a connecting rope. The reflective floating plate is a circular floating plate with a thickness of 10mm and a diameter of φ500mm. Its material is EVA ethylene-vinyl acetate copolymer.
[0070] The function of the filling seepage system is to discharge the water seeped out of the filling slurry in the goaf through the seepage cage 4 to the outside of the filling retaining wall and finally to the underground mud drainage system. The function of the seepage cage 4 is to discharge the water seeped out of the goaf to the maximum extent. It is composed of a hollow steel pipe, a steel mesh and a geotextile. The external dimensions of the seepage cage 4 are hollow steel pipes with an outer diameter of φ100mm, a length of 1500mm, and a wall thickness of 2mm. Three seepage cages 4 are installed at positions 1m, 2m, and 3m away from the bottom plate of the access road respectively. The hollow steel pipe of the seepage cage 4 is inserted into the part within 400mm of the length on one side of the goaf, and the water filter holes are evenly arranged. The diameter of the water filter holes is φ10mm, the spacing is 50mm, and the row spacing is 25mm. The hollow steel pipe of the seepage cage 4 is welded with a steel mesh at the port on one side of the goaf. Finally, the part of the hollow steel pipe of the seepage cage 4 connected to the goaf is wrapped with a geotextile with a specification of 300g / m2, and the geotextile is firmly fixed to the steel pipe with 8# iron wire to prevent the filling slurry from entering the seepage cage 4. The other end of the seepage cage 4 passes through the filling retaining wall and is connected to the water diversion pipe. The interface length is 100mm. The water diversion pipe 12 is a PE hose with an inner diameter of 100mm and a wall thickness of 2mm. Its function is to discharge the water secreted by the filling slurry in the goaf into the water tank 10. One end of the water diversion pipe 12 is inserted into the outer end of the steel pipe of the water seepage cage 4, and the insertion length is 100mm. The interface is fixed with a double steel wire clamp, and the other end is connected to the water tank 10. The water tank 10 is a square structure of 1000×1000mm, with a built-in float valve water level controller and a drainage pump 11. Its function is that when the water level in the water tank 10 exceeds the highest water level line, the float valve water level controller is triggered, and the drainage pump starts to pump out water and discharge it into the mud drainage system. When the water level in the water tank 10 is lower than the lowest water level line, the water pump stops working.
[0071] The construction process of the utility model comprises the following steps:
[0072] S1: The laser distance sensor 1 and the external relay 21 are installed and fixed on the top plate of the access road at a distance of 700mm from the retaining wall. The base of the fixed pole 2 is fixed to the bottom plate of the access road in the goaf at a distance of 500mm from the convex arc-shaped filling retaining wall 22 by expansion screws. The reflective floating plate 3 is connected to the fixed pole 2 by a connecting rope, so that the laser emitted by the laser distance sensor 1 is vertically facing the reflective floating plate 3 on the fixed pole 2. The laser distance sensor 1 is connected to the external relay 21, and a freewheeling diode 20 is connected in parallel at both ends of the driving coil of the external relay 21. The transistor switch output of the laser distance sensor 1 is externally connected to the LED liquid level display 17, and the LED liquid level display 17 is installed on one side of the convex arc-shaped filling retaining wall 22, 1700mm from the bottom.
[0073] S2: The horizontal reinforcement 18 and the vertical reinforcement 16 are fixedly connected by U-shaped clips 15 to form a filling retaining wall frame. Before erecting the retaining wall frame, holes are drilled on the top, bottom and two sides of the access road to fix the horizontal reinforcement 18 and the vertical reinforcement 16. First, the vertical reinforcement 16 is installed, and its upper and lower ends are respectively inserted into the holes in the top and bottom plates of the access road, and then the horizontal reinforcement 18 is installed. The two ends of the horizontal reinforcement 18 are inserted and fixed in the holes in the two sides of the access road, and then the intersection of the vertical reinforcement 16 and the horizontal reinforcement 18 is fixed with a U-shaped clip 15. When the filling retaining wall frame is completed, the first layer of steel mesh 8 is hung first. The steel mesh should be close to the side side and also close to the retaining wall frame, and plastic The first layer of steel mesh 8 is fixed tightly on the vertical reinforcement 16 and the transverse reinforcement 18 by cable ties, and then a layer of 350g / m2 burlap layer 7 is installed on the first layer of steel mesh 8 and fixed with plastic cable ties; finally, the second layer of steel mesh 6 is installed on the burlap layer 7, and the two steel meshes and the burlap layer 7 are firmly fixed on the frame composed of the vertical reinforcement 16 and the transverse reinforcement 18 by pallets and bolts. After the two steel meshes and the burlap layer 7 are fixed on the frame composed of the vertical reinforcement 16 and the transverse reinforcement 18, the spraying operation of the concrete wet spraying layer 5 is carried out. Before spraying, 6 thickness indicators are fixed to the bolts fixing the two steel meshes;
[0074] S3: A PE pipe with a diameter of 108mm is installed at the connection between the access filling retaining wall and the top plate for exhaust. When the filling retaining wall is built to the top, a 400mm×400mm filling observation opening is reserved. The opening is reserved in the middle of the filling retaining wall, staggered with the filling pipe and the exhaust pipe. At the same time, in order to meet the needs of rapid demolition of the filling retaining wall, three blasting conduits 13 are reserved for the filling retaining wall. The blasting conduits 13 are evenly arranged. The blasting adopts an interval charging structure. First, the columnar emulsion explosive is loaded into the filling retaining wall through the blasting conduit 13, and then the gas spacer is loaded. A gas spacer is loaded between two emulsion explosives. The emulsion explosive and the gas spacer are regularly loaded according to the charging sequence. After the charging is completed, the blasting network is connected. When the charge amount in the blasting conduit 13 reaches the requirements of the blasting design, the blasting operation can be carried out to blast and demolish the filling retaining wall.
[0075] S4: Install the filling seepage system, install three seepage cages 4 at the positions of 1m, 2m and 3m away from the bottom plate of the access road respectively, the hollow steel pipe of the seepage cage 4 has the filter holes evenly arranged within a length of 400mm on one side of the goaf, the hollow steel pipe of the seepage cage is welded with a steel mesh at the port on one side of the goaf, and finally the hollow steel pipe of the seepage cage is connected to the goaf and wrapped with geotextile, and the geotextile is firmly fixed with 8# iron wire, the other end of the seepage cage passes through the filling retaining wall and is connected to the water diversion pipe 12, the interface length is 100mm, the water diversion pipe 12 is a PE hose, one end of the water diversion pipe 12 is inserted into the inside of the seepage cage 4, the insertion length is 100mm, the interface is fixed with a double steel wire clamp, and the other end is connected to the water tank 10, the water tank 10 is a square structure of 1000×1000mm, with a built-in float valve water level controller and a drainage pump 11.
[0076] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. An approach-type filling retaining wall, characterized in that: include An outwardly convex arc-shaped filling retaining wall (22); A blasting system, arranged in the outwardly convex arc-shaped filling retaining wall (22), and used for rapid demolition of the outwardly convex arc-shaped filling retaining wall (22); A filling water seepage system is arranged in the outwardly convex arc-shaped filling retaining wall (22), and the water inlet end is arranged in the filling operation area; The filling material slurry level height detection device is installed in the goaf.
2. The entry-type filling retaining wall according to claim 1, characterized in that: The outwardly convex arc-shaped filling retaining wall (22) comprises: A plurality of transverse reinforcements (18) and vertical reinforcements (16) are cross-connected to form a mesh wall; A first layer of steel mesh (8) is fixedly mounted on the mesh wall; A burlap layer (7) covering the first layer of steel mesh (8); A second layer of steel mesh (6) is covered on the burlap layer (7) and fixed to the first layer of steel mesh (8); The concrete wet spraying layer (5) is arranged on the second layer of steel mesh (6).
3. The entry-type filling retaining wall according to claim 2, characterized in that: The blasting system comprises: A blasting conduit (13) is vertically arranged in the concrete wet spraying layer (5); A horizontally placed loading pipe is provided on the top of the blasting conduit (13), and explosives are loaded into the blasting conduit (13) through the loading pipe.
4. The entry-type filling retaining wall according to claim 3, characterized in that: There are three blasting conduits (13), and the three blasting conduits (13) are arranged from left to right in the concrete wet spraying layer (5).
5. The entry-type filling retaining wall according to claim 1, characterized in that: The filling and bleeding system comprises: A plurality of transverse seepage cages (4) are arranged on the wall of the outwardly convex arc-shaped filling retaining wall (22) facing the goaf; A water diversion pipe (12), the water inlet end of which passes through the outwardly convex arc-shaped filling retaining wall (22) and is connected to the water seepage cage (4); The water tank (10) has a water inlet connected to the water outlet of the water diversion pipe (12).
6. The entry-type filling retaining wall according to claim 5, characterized in that: The water seepage cage (4) comprises: A hollow steel pipe, with a steel mesh on the inlet end and water filtering holes evenly distributed on the side wall of the inlet end; Geotextile, wrapped around the inlet end of the hollow steel pipe; The water tank (10) is provided with a float valve water level controller and a drainage pump (11) therein.
7. The entry-type filling retaining wall according to claim 1, characterized in that: The filling material slurry level detection device comprises: A fixed vertical pole (2) is installed on the bottom plate of the access road to the goaf; A laser distance measuring sensor (1) is arranged on the top of a fixed pole (2); A reflective floating plate (3) is horizontally arranged on the fixed upright pole (2) and corresponds to the laser emitting end of the laser distance measuring sensor (1); An external relay (21) has a freewheeling diode (20) connected in parallel at both ends of its driving coil and then connected to the laser ranging sensor (1); An LED liquid level display (17) is arranged on the outwardly convex arc-shaped filling retaining wall (22) and is connected to a transistor switch of the laser distance measuring sensor (1).
Citation Information
Cited By
Access road type filling retaining wall and construction process thereof
CN118208287A
