Construction waste transfer device
By designing the control components and dustproof boards of the construction waste transfer device, the problems of heavy human labor and dust exposure during construction waste transfer were solved, automatic transfer and dust protection were realized, and work efficiency and safety were improved.
Patent Information
- Application Number
- CN202420496380.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-14
AI Technical Summary
During the transfer process of construction waste, the existing technology requires multiple transfers by human carts, which increases the workload of the staff, and the dust is easily scattered and causes harm to the human body.
A construction waste transfer device is designed, including a control component, an unloading controller, a route detection panel, a receiver, an obstacle avoidance locator and a dustproof board. The transfer route is set through the obstacle avoidance locator, and the receiver receives signals and avoids them. People and objects, and dust-proof boards are installed in the transfer chamber to seal in dust and reduce human labor and dust exposure.
It reduces the workload of the staff, avoids the harm of dust to the human body, and improves the transfer efficiency and safety through the sealing of the dustproof board and the water source cleaning function.
Smart Images

Figure CN221836029U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of transfer devices, in particular to a construction waste transfer device. Background Art
[0002] Construction waste refers to the slag, abandoned soil, abandoned materials, silt and other wastes generated during the construction, laying, demolition and repair of various buildings, structures, pipe networks, etc. by construction units or individuals. Construction waste refers to the construction waste generated due to human or natural reasons in the project, including waste slag, abandoned soil, silt and abandoned materials. These materials are of no help to the building itself, but they are substances generated in the process of construction and need to be treated accordingly in order to achieve the ideal construction of the project. Because it is an overall process, the consideration of its links is more important;
[0003] At present, when construction waste is transported, it is usually transported to garbage disposal by human-powered carts. During the transportation process, when the amount of construction waste is large, multiple transportations are required, which increases the workload of the workers. At the same time, during the unloading process, the dust inside the construction waste floats and is easily inhaled by the workers, causing harm to their bodies.
[0004] In view of this, we propose a construction waste transfer device. Utility Model Content
[0005] In order to make up for the above deficiencies, the utility model provides a construction waste transfer device.
[0006] The technical solution of the utility model is:
[0007] A construction waste transfer device comprises a construction waste transfer device body, a control component is installed below the construction waste transfer device body, a discharge controller is fixedly installed above the control component, a route detection panel is fixedly installed at the front end of the control component, a first receiver is installed on the left side of the route detection panel, a second receiver is installed on the right side of the route detection panel, an obstacle avoidance locator is installed below the second receiver, and a second discharge rack is provided at the rear end of the control component.
[0008] As a preferred technical solution, a first unloading rack is installed on the side of the second unloading rack, and a fixing rack is installed on the side of the second unloading rack.
[0009] As a preferred technical solution, a transfer component is installed above the fixed frame, a transfer inner cavity is installed on the inner side of the transfer component, a connecting plate is opened at the front end of the transfer inner cavity, a pipeline connecting hole is opened above the connecting plate, and a first dustproof plate is installed above the transfer inner cavity.
[0010] As a preferred technical solution, a second dustproof plate is installed on the side of the first dustproof plate, a discharge plate is installed at the rear end of the second dustproof plate, and a mounting base is provided at the front end of the discharge plate.
[0011] As a preferred technical solution, a driving column is installed on the side of the mounting base, and a transmission wheel is installed on the outer side of the driving column.
[0012] As a preferred technical solution, a tire protection pad is installed on the outer side of the transmission wheel, and a transmission column is opened on the side of the driving column.
[0013] As a preferred technical solution, a climbing rod is installed at the front end of the transmission column, and a guardrail is provided above the climbing rod.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The utility model has a discharge controller fixedly installed above the control component, a route detection panel fixedly installed at the front end of the control component, a first receiver installed on the left side of the route detection panel, a second receiver installed on the right side of the route detection panel, an obstacle avoidance locator installed below the second receiver, and a second discharge rack at the rear end of the control component. The garbage transfer route is set in advance by the obstacle avoidance locator, the first receiver and the second receiver receive signals from the cloud, and when staff or other objects appear at the front end of the device, the route detection panel transmits a signal to the obstacle avoidance locator for avoidance and makes a sound to remind. When it moves to the garbage disposal point, the second discharge rack and the first discharge rack are adjusted to transfer and process the construction waste, thereby reducing the workload of its staff and preventing the staff from being disturbed by dust.
[0016] 2. The utility model installs a transfer cavity on the inner side of the transfer component, a connecting plate is provided at the front end of the transfer cavity, a pipe connecting hole is provided above the connecting plate, and a first dustproof plate is installed above the transfer cavity. Construction waste is stored in the transfer cavity. When the storage is completed, the first dustproof plate and the second dustproof plate are contracted to seal the interior to prevent dust from floating out. At the same time, after use, the pipe connecting hole can be used to connect the garbage to an external water source pipe, and the connecting plate allows it to clean the interior of the transfer cavity. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the main structure of the construction waste transfer device of the utility model;
[0018] Figure 2 This is a schematic diagram of the appearance component structure of the utility model;
[0019] Figure 3This is a schematic diagram of the control component structure of the utility model;
[0020] Figure 4 This is a schematic diagram of the structure of the transfer component of the utility model.
[0021] In the figure: 1. Main body of the construction waste transfer device; 11. Guardrail; 12. Climbing rod; 13. Transmission column; 14. Tire protection pad; 15. Transmission wheel; 16. Drive column; 17. Mounting base; 2. Control component; 21. Fixed frame; 22. First unloading rack; 23. Second unloading rack; 24. Unloading controller; 25. Route detection panel; 26. First receiver; 27. Obstacle avoidance locator; 28. Second receiver; 3. Transfer component; 31. Unloading plate; 32. First dustproof plate; 33. Transfer inner cavity; 34. Pipe connection hole; 35. Connecting plate; 36. Second dustproof plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0024] See also Figures 1 to 4 , the utility model provides a technical solution:
[0025] A construction waste transfer device includes a construction waste transfer device body 1, a control component 2 is installed below the construction waste transfer device body 1, a discharge controller 24 is fixedly installed above the control component 2, a route detection panel 25 is fixedly installed at the front end of the control component 2, a first receiver 26 is installed on the left side of the route detection panel 25, a second receiver 28 is installed on the right side of the route detection panel 25, an obstacle avoidance locator 27 is installed below the second receiver 28, a second discharge rack 23 is opened at the rear end of the control component 2, a first discharge rack 22 is installed on the side of the second discharge rack 23, and a fixed rack 21 is installed on the side of the second discharge rack 23.
[0026] It should be added that the garbage transfer route is set in advance through the obstacle avoidance locator 27, the first receiver 26 and the second receiver 28 receive the signal from the cloud, and when a staff member or other object appears in front of the device, the route detection panel 25 transmits a signal to the obstacle avoidance locator 27 for avoidance, and at the same time makes a sound to remind. When moving to the garbage disposal point, the second unloading rack 23 and the first unloading rack 22 are adjusted to transfer and process the construction waste, thereby reducing the workload of its staff and preventing the staff from being disturbed by dust.
[0027] As a preferred embodiment of the present invention, a transfer component 3 is installed above the fixing frame 21, a transfer inner cavity 33 is installed on the inner side of the transfer component 3, a connecting plate 35 is provided at the front end of the transfer inner cavity 33, a pipe connecting hole 34 is provided above the connecting plate 35, a first dustproof plate 32 is installed above the transfer inner cavity 33, a second dustproof plate 36 is installed on the side of the first dustproof plate 32, a discharge plate 31 is installed at the rear end of the second dustproof plate 36, and a mounting base 17 is provided at the front end of the discharge plate 31.
[0028] It is worth mentioning that the construction waste is stored in the transfer cavity 33. When the storage is completed, the first dustproof plate 32 and the second dustproof plate 36 are contracted to seal the inside to prevent the dust from floating out. At the same time, after use, the pipe connecting hole 34 can be used to connect the garbage to the external water source pipe, and the connecting plate 35 can be used to clean the inside of the transfer cavity 33.
[0029] As a preferred embodiment of the present invention, a driving column 16 is installed on the side of the mounting base 17, a transmission wheel 15 is installed on the outer side of the driving column 16, a tire protection pad 14 is installed on the outer side of the transmission wheel 15, a transmission column 13 is opened on the side of the driving column 16, a climbing rod 12 is installed at the front end of the transmission column 13, and a guardrail 11 is opened above the climbing rod 12.
[0030] During specific use, the tire protection pad 14 is used to protect the outer side of the driving wheel 15 to prevent it from being disturbed by the terrain and causing tire damage.
[0031] When a construction waste transfer device of the utility model is used, firstly, the waste transfer route is set in advance through the obstacle avoidance locator 27, the first receiver 26 and the second receiver 28 receive the signal from the cloud, and when a staff or other objects appear in front of the device, the route detection panel 25 transmits a signal to the obstacle avoidance locator 27 for avoidance, and at the same time makes a sound to remind, when it moves to the garbage processing point, the second unloading rack 23 and the first unloading rack 22 are adjusted to transfer and process the construction waste, reduce the workload of its staff, and prevent the staff from being disturbed by dust, and store the construction waste through the transfer cavity 33. When the storage is completed, the first dustproof plate 32 and the second dustproof plate 36 are contracted to seal the inside to prevent the dust from floating out, and after use, the pipe connection hole 34 can be used to connect the garbage to the external water source pipe, and the connecting plate 35 allows it to clean the inside of the transfer cavity 33, and the tire protection pad 14 is used to protect the outside of the transmission wheel 15 to prevent it from being disturbed by the terrain and causing tire damage.
[0032] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A construction waste transfer device, comprising a construction waste transfer device body (1), characterized in that: A control component (2) is installed below the main body (1) of the construction waste transfer device, a discharge controller (24) is fixedly installed above the control component (2), a route detection panel (25) is fixedly installed at the front end of the control component (2), a first receiver (26) is installed on the left side of the route detection panel (25), a second receiver (28) is installed on the right side of the route detection panel (25), an obstacle avoidance locator (27) is installed below the second receiver (28), and a second discharge rack (23) is provided at the rear end of the control component (2).
2. A construction waste transfer device as claimed in claim 1, characterized in that: The first unloading frame (22) is installed on the side of the second unloading frame (23), and the fixing frame (21) is installed on the side of the second unloading frame (23).
3. A construction waste transfer device as claimed in claim 2, characterized in that: A transfer assembly (3) is installed above the fixing frame (21), a transfer inner cavity (33) is installed on the inner side of the transfer assembly (3), a connecting plate (35) is provided at the front end of the transfer inner cavity (33), a pipeline connecting hole (34) is provided above the connecting plate (35), and a first dustproof plate (32) is installed above the transfer inner cavity (33).
4. A construction waste transfer device as claimed in claim 3, characterized in that: A second dustproof plate (36) is installed on the side of the first dustproof plate (32), a discharge plate (31) is installed at the rear end of the second dustproof plate (36), and a mounting base (17) is provided at the front end of the discharge plate (31).
5. A construction waste transfer device as claimed in claim 4, characterized in that: A driving column (16) is installed on the side of the installation base (17), and a transmission wheel (15) is installed on the outer side of the driving column (16).
6. A construction waste transfer device as claimed in claim 5, characterized in that: A tire protection pad (14) is installed on the outer side of the transmission wheel (15), and a transmission column (13) is provided on the side of the driving column (16).
7. A construction waste transfer device as claimed in claim 6, characterized in that: A climbing rod (12) is installed at the front end of the transmission column (13), and a guardrail (11) is provided above the climbing rod (12).