Deformation-coordinating pavement differential settlement repairing structure after composite foundation treatment

By adopting the structure of composite foundation pile filling and cushion grouting hard shell layer in the deep soft soil area after composite foundation treatment, the problem of uneven settlement and uncoordinated deformation of the road surface after composite foundation treatment is solved, and the repair quality is improved and realized long-term settlement control.

CN221837345UActive Publication Date: 2024-10-15ARCHITECTURAL DESIGN INST FUKIEN PROV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420165602.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-10-15
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

With the existing technology, after composite foundation treatment, road pavements in deep soft soil areas still have uneven settlement problems, and the deformation of the repair area and surrounding areas is uncoordinated, resulting in difficulty in controlling the construction quality and poor long-term effects.

Method used

A structure of composite foundation piles combined with cushion grouting and hard shell layer is adopted. Composite foundation piles and defective composite foundation piles are set on the deep soft soil foundation, and a pavement layer is laid on the graded sand and gravel cushion. Grouting is used to form The hard shell layer coordinates local deformation and distributes loads to high-stiffness foundation piles.

Benefits of technology

It effectively controls the uneven settlement of composite foundation pavement, improves the quality of repair, solves the problem of uneven settlement and uncoordinated deformation of road pavement in deep soft soil areas, and achieves long-term settlement repair effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837345U_ABST
    Figure CN221837345U_ABST
Patent Text Reader

Abstract

The utility model relates to a deformation-coordinated pavement differential settlement repairing structure after composite foundation treatment, which is arranged on a pavement after differential settlement of a composite foundation treatment and comprises a composite foundation repairing pile and a cushion layer grouting hard shell layer, the pavement treated by the differential settlement composite foundation comprises composite foundation piles, defective composite foundation piles, a graded gravel cushion layer and a pavement layer, the composite foundation piles and the defective composite foundation piles are arranged on the deep soft soil foundation, the graded sandstone cushion layer is laid on the deep soft soil foundation, and the pavement layer is laid on the graded sandstone cushion layer; the composite foundation patching piles are arranged in the deep soft soil foundation and located beside the defective composite foundation piles, and the cushion layer grouting hard shell layer is arranged on the graded gravel cushion layer and located on the upper portions of the composite foundation patching piles, the defective composite foundation piles and the composite foundation piles. On the basis of pile repairing treatment of the composite foundation, grouting is conducted through the graded sand gravel hardcore, a local hard shell layer is formed on the tops of the new and old composite foundation piles, and local deformation is coordinated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of foundation repair, in particular to a structure for repairing uneven road surface settlement after composite foundation treatment with coordinated deformation. Background Art

[0002] At present, most of the road construction in my country uses traditional composite foundations such as cement mixing piles, high-pressure rotary jet piles, and CFG piles for deep soft foundations. The construction quality of these traditional foundation treatment methods is difficult to control, and it is common for the treated roads to still be uneven and bumpy after a period of operation.

[0003] In response to uneven road settlement, currently only crushed stone, dry-laid or mortar-laid slabs, grouting, etc. are generally used to refill the upper roadbed and then lay the surface layer. This treatment method can only guarantee short-term effects. As the consolidation and compression of the lower soft base continue to develop, the road surface will still produce new settlement; some projects also choose to re-treat the uneven settlement area where the original foundation treatment construction quality does not meet the standards with deep reinforcement treatment measures such as cement mixing piles, high-pressure rotary jet piles, and CFG piles, striving to permanently solve the road settlement problem. However, after the treatment, due to differences in the age, spacing, stiffness, construction quality, etc. of the new and old foundation piles, settlement differences will still appear at the junction.

[0004] In summary, the prior art has the following two shortcomings: 1) For deep soft soil foundations that have been treated with a composite foundation, after uneven settlement occurs due to construction quality problems, the shallow treatment method is only a temporary solution and does not address the root cause, and uneven settlement will still occur in the later period; 2) For deep soft soil foundations that have been treated with a composite foundation, after uneven settlement occurs due to construction quality problems, the pile supplement method is used for treatment, but due to differences in age, spacing, stiffness, construction quality, etc. between the new and old foundation piles, uneven settlement will still occur in the later period. Utility Model Content

[0005] The purpose of the utility model is to provide a structure for repairing uneven settlement of a road surface after composite foundation treatment with coordinated deformation, which solves the problem that uneven settlement still occurs on the road surface in a deep soft soil area after composite foundation treatment, and also solves the problem of uncoordinated deformation between the repaired area and the surrounding area of ​​the road surface in a deep soft soil area after composite foundation treatment.

[0006] The utility model is realized by the following technical scheme: a coordinated deformation structure for repairing uneven settlement of a road surface after composite foundation treatment, characterized in that: it is arranged on a road surface after composite foundation treatment with uneven settlement, and comprises composite foundation supplementary piles and a cushion layer grouting hard shell layer; the road surface after composite foundation treatment with uneven settlement comprises composite foundation piles, defective composite foundation piles, a graded sand and gravel cushion layer and a road surface layer; the composite foundation piles and the defective composite foundation piles are placed in a deep soft soil foundation, the graded sand and gravel cushion layer is laid on the deep soft soil foundation, and the road surface layer is laid on the graded sand and gravel cushion layer; the composite foundation supplementary piles are placed in a deep soft soil foundation with uneven settlement and are located next to the defective composite foundation piles, the cushion layer grouting hard shell layer is arranged on the graded sand and gravel cushion layer, and the cushion layer grouting hard shell layer is located on the composite foundation supplementary piles, the defective composite foundation piles and part of the composite foundation piles.

[0007] Compared with the previous technology, the beneficial effects of the utility model are:

[0008] 1. On the basis of the composite foundation pile treatment, the graded sand and gravel cushion layer is used for grouting to form a local hard shell layer on the top of the new and old composite foundation piles, coordinate the local deformation, and allocate the upper load to the foundation piles with better pile quality and greater rigidity. This will improve the quality of composite foundation pavement repair and achieve the effect of controlling uneven settlement.

[0009] 2. It solves the problem of uneven settlement of road pavement in deep soft soil areas after composite foundation treatment, and also solves the problem of inconsistent deformation between the repaired area and the surrounding area of ​​road pavement in deep soft soil areas after composite foundation treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a structural schematic diagram of the utility model.

[0011] Explanation of numbers: 1 composite foundation supplementary piles, 2 cushion grouting hard shell layer, 8 deep soft soil foundation, 91 composite foundation piles, 92 defective composite foundation piles, 93 graded sand and gravel cushion layer, 94 pavement layer. DETAILED DESCRIPTION

[0012] The utility model is described in detail below in conjunction with the accompanying drawings:

[0013] like Figure 1As shown: a coordinated deformation structure for repairing uneven settlement of a pavement after composite foundation treatment, which is arranged on a pavement after composite foundation treatment with uneven settlement, comprises a composite foundation supplementary pile 1 and a cushion grouting hard shell layer 2; the pavement after composite foundation treatment with uneven settlement comprises a composite foundation pile 91, a defective composite foundation pile 92, a graded sand and gravel cushion layer 93 and a pavement layer 94; the composite foundation pile 91 and the defective composite foundation pile 92 are placed on a deep soft soil foundation 8, the graded sand and gravel cushion layer 93 is laid on the deep soft soil foundation 8, and the pavement layer 94 is laid on the graded sand and gravel cushion layer 93; the composite foundation supplementary pile 1 is placed in the deep soft soil foundation 8 with uneven settlement, the cushion grouting hard shell layer 2 is arranged on the graded sand and gravel cushion layer 93 and the cushion grouting hard shell layer 2 is located on the composite foundation supplementary pile 1, the defective composite foundation pile 92 and the upper part of part of the composite foundation pile 91.

[0014] Generally speaking, the composite foundation supplementary pile 1 is located beside the defective composite foundation pile 92 .

[0015] The cushion layer grouting hard shell layer 2 is formed by grouting on the graded sandstone cushion layer 93. Grouting generally adopts flower pipe grouting, and the grouting material can be selected from cement slurry, cement mortar or cement clay slurry according to the conditions such as cushion layer particle grading and hard shell layer strength requirements.

[0016] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A structure for repairing uneven road settlement after composite foundation treatment with coordinated deformation, characterized in that: The invention relates to a road surface after composite foundation treatment with uneven settlement, comprising composite foundation supplementary piles (1) and a cushion layer grouting hard shell layer (2); the road surface after composite foundation treatment with uneven settlement comprises composite foundation piles (91), defective composite foundation piles (92), a graded sand and gravel cushion layer (93) and a road surface layer (94); the composite foundation piles (91) and the defective composite foundation piles (92) are placed on a deep soft soil foundation (8), the graded sand and gravel cushion layer (93) is laid on the deep soft soil foundation (8), and the road surface layer (94) is laid on the graded sand and gravel cushion layer (93); the composite foundation supplementary piles (1) are placed in the deep soft soil foundation (8) with uneven settlement, the cushion layer grouting hard shell layer (2) is arranged on the graded sand and gravel cushion layer (93), and the cushion layer grouting hard shell layer (2) is located on the composite foundation supplementary piles (1), the defective composite foundation piles (92) and part of the composite foundation piles (91).

2. According to claim 1, a coordinated deformation composite foundation treatment uneven road settlement repair structure is characterized by: The composite foundation supplementary pile (1) is located beside the defective composite foundation pile (92).

3. The structure for repairing uneven road surface settlement after composite foundation treatment with coordinated deformation according to claim 1 is characterized by: The cushion layer grouting hard shell layer (2) is formed by grouting on the graded sand and gravel cushion layer (93).

4. The structure for repairing uneven road surface settlement after composite foundation treatment with coordinated deformation according to claim 3 is characterized by: The grouting adopts cement slurry, cement sand mortar or cement clay slurry.