Separating type reinforcing steel bar binding platform

Through the block production and splicing method of the separated steel bar binding platform, the problems of long construction time, high mechanical cost and poor adaptability in the steel bar binding construction of high piers and piers are solved, and efficient and safe pier construction is realized, adaptable to different piers. Column size, reducing material and time investment.

CN221837410UActive Publication Date: 2024-10-15ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323661430.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-15
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

In the existing steel bar tying construction of high piers and columns, the safety performance and stability of the scaffolding platform are poor, and the integral platform is heavy and has low adaptability, resulting in long construction time, high mechanical costs and laborious modification time.

Method used

A separate steel bar binding platform is used, and the splicing platform is made according to the minimum cross-section standard. Connectors and flip platforms are used to splice into an overall platform to adapt to different pier sizes, reduce the use of large-tonnage hoisting equipment, and use pull-in steel pipes to enhance structural strength.

Benefits of technology

Reduce mechanical cost investment, shorten the construction period, improve construction efficiency and safety, adapt to a variety of pier sizes, reduce material investment and modification time, and ensure the construction quality and speed of high piers and piers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837410U_ABST
    Figure CN221837410U_ABST
Patent Text Reader

Abstract

The utility model provides a separating type steel bar binding platform which comprises at least one section of splicing platform and a connecting piece arranged at the end of the splicing platform, a pier column with the smallest section serves as the size standard of a single section of splicing platform, and the transverse size of the single section of splicing platform is matched with the width of the pier column with the smallest section. The longitudinal height of the splicing platform is also matched with the height of the pier column with the smallest section, the splicing platform is arranged in a concave shape, the splicing platform is connected with a structure through connecting pieces at the ends of the splicing platform, or a plurality of sections of splicing platforms are spliced into an integral support through the connecting pieces. The construction mode that the reinforcing steel bar binding platform is manufactured in a partitioning mode and then connected into the whole platform is adopted, large-tonnage hoisting equipment is reduced, the investment of mechanical cost is saved, the construction method can adapt to pier column construction of various section sizes and different heights, the turnover performance is high, the material investment is reduced, the platform remanufacturing time is saved, the construction period is shortened, and the construction efficiency is improved; the construction safety is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pier column construction, and in particular to a separate steel bar binding platform. Background Art

[0002] At present, conventional high pier column reinforcement adopts scaffolding to build a safety platform or an integral steel platform for construction. However, the construction of the scaffolding safety platform consumes more time for the pier column construction, affecting the progress of the pier column construction; the integral steel safety platform has low adaptability.

[0003] For example, when constructing high pier columns with steel bars, conventional techniques generally use scaffolding platforms and integral steel bar tying platforms. This has the following disadvantages:

[0004] (1) The safety performance and stability of the scaffolding construction platform are poor. After the reinforcement of each pier column segment is completed, it needs to be dismembered and then hoisted. Before the reinforcement of the next pier column segment is tied, it needs to be repeatedly erected, which is time-consuming and laborious.

[0005] (2) The self-weight of the integral steel bar binding platform is relatively large. During the construction of high piers and columns, a large-tonnage crane is required for auxiliary installation and removal, which results in high machinery costs.

[0006] (3) The integral steel bar binding platform has poor adaptability. When facing piers with different cross-sectional sizes, it is necessary to cut and modify or remake the steel bar binding platform of the corresponding size, which is time-consuming and labor-intensive. Utility Model Content

[0007] The main purpose of this application is to provide a separate steel bar binding platform that is easy to install and can adapt to different pier sizes.

[0008] In order to achieve the above objectives, this application provides the following technical solutions:

[0009] The present application relates to a split steel bar binding platform, which includes at least one section of a splicing platform and a connector arranged at the end of the splicing platform. The single section of the splicing platform takes the pier with the smallest cross-section as the size standard, its transverse dimension is adapted to the width of the pier with the smallest cross-section, and its longitudinal height is also adapted to the height of the pier with the smallest cross-section. The splicing platform is concavely arranged, and the splicing platform is connected to the structure through the connector at its end, or multiple sections of the splicing platform are spliced ​​into an integral bracket through the connector.

[0010] Further configuration: each section of the splicing platform includes columns, flat joints and panels, the columns are arranged in the vertical direction and in two groups side by side, the flat joints are arranged in two groups corresponding to the two groups of columns, and the two groups of flat joints are arranged in parallel, each group of the flat joints is used to connect each group of columns into a whole, and the panel is arranged between the two groups of the flat joints.

[0011] It is further configured that: the flat links are arranged in a plurality of rows along the height direction of the column, and the panels are arranged in a plurality of pieces corresponding to the flat links along the height direction of the column.

[0012] It is further provided that: the connecting member comprises a flip platform hinged at the end of the panel of the splicing platform, and the flip platform can be flipped to the connection point of two adjacent splicing platforms and is used to connect the panels of the two adjacent splicing platforms.

[0013] It is further configured that: a plurality of the flip platforms are provided along the height direction of the pillars and are arranged one-to-one corresponding to the panels.

[0014] Further configuration: the splicing platform is located above the panel and is provided with a safety guardrail arranged parallel to the flat joint.

[0015] It is further configured that a pull-out steel pipe is inserted into the safety guardrail, and both ends of the pull-out steel pipe can be respectively inserted into the safety guardrails of two adjacent splicing platforms.

[0016] Further configuration: the safety guardrail adopts a steel pipe with a diameter of 48 mm, and the pull-out steel pipe adopts a steel pipe with a diameter of 42 mm.

[0017] Compared with the prior art, the solution of this application has the following advantages:

[0018] 1. The separate steel bar binding platform involved in the present application adopts a construction method in which the steel bar binding platform is made in blocks and then connected into an integral platform. This can reduce the use of large-tonnage lifting equipment and save investment in machinery costs. In addition, the small-sized splicing platform can adapt to the construction of piers with various cross-sectional sizes and heights. It has strong turnover and can facilitate the streamlined construction of piers, reduce material investment, save platform modification time, shorten the construction period, improve construction efficiency, and ensure construction safety.

[0019] 2. The separate steel bar binding platform involved in this application adopts a flip platform and a pull-out steel pipe as a gap supplement during the separate assembly process, which can ensure the integrity of the platform and improve the structural strength of the construction platform.

[0020] 3. The assembly method of the separate steel bar binding platform involved in this application does not require on-site disassembly and assembly of the platform, which reduces the amount of high-altitude operations, effectively ensures the construction quality and construction speed of high pier columns, and also improves the safety factor of high pier column construction.

[0021] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0023] Figure 1 This is a schematic diagram of the structure of a splicing platform in one embodiment of a separate steel bar binding platform of the present application;

[0024] Figure 2 This is a schematic diagram of the structure of an embodiment of a separate steel bar binding platform of the present application assembled into an integral platform.

[0025] In the figure, 1. splicing platform; 11. column; 12. flat joint; 13. panel; 14. safety guardrail; 2. connecting parts; 21. flip platform; 22. pull-out steel pipe. DETAILED DESCRIPTION

[0026] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.

[0027] See also Figure 1 and Figure 2 In view of the shortcomings of the current scaffolding platforms and integral steel bar binding platforms, this application proposes a separated steel bar binding platform, which is manufactured by dividing the overall steel bar binding platform into blocks and then connecting them into an integral platform. There is no need to use large-tonnage lifting equipment, which can save machinery cost investment. At the same time, different numbers of steel bar binding platforms can be used to meet the construction requirements of piers of different sizes. It has wide applicability and strong turnover.

[0028] Specifically, the separate steel bar binding platform of the present application includes at least one section of splicing platform and a connector provided at the end of the splicing platform. The splicing platform can be connected to the structure through the connector, or multiple sections of splicing platforms are provided and spliced ​​into an integral bracket through the connector. The single-section splicing platform in this embodiment uses the pier with the smallest cross-section as the size standard, and its transverse dimension is adapted to the width of the pier with the smallest cross-section, and its longitudinal height is also adapted to the height of the pier with the smallest cross-section. When the pier to be constructed is the pier with the smallest cross-section, a single-section splicing platform can be directly used as the construction platform for the construction pier; and when the cross-section of the pier to be constructed is larger than the cross-section of the smallest pier, a multi-section splicing platform can be used for on-site assembly to adapt to the size of the pier to be constructed.

[0029] In addition, the single-section splicing platform can be spliced ​​horizontally to widen the width, and can also be spliced ​​vertically to increase the height of the platform to meet the construction needs of different piers and to facilitate workers to tie the pier steel bars.

[0030] Specifically, each section of the splicing platform 1 includes columns 11, flat joints 12 and panels 13. The columns 11 extend in the vertical direction, and two groups of the columns 11 are arranged side by side, and each group of the columns 11 is provided with multiple columns. Two groups of flat joints 12 are provided corresponding to the two groups of the columns 11, and each group of the flat joints 12 is used to connect the multiple columns 11 of each group into a whole. The panel 13 is arranged between the two groups of the flat joints 12 as a working platform for construction workers.

[0031] Furthermore, the flat links 12 are arranged in multiple rows along the height direction of the column 11, and the panels 13 are arranged in multiple pieces corresponding to the flat links 12 along the height direction of the column 11, so as to meet the steel bar binding construction at different height positions of the pier column and improve the applicability of the separate steel bar binding platform of the present application.

[0032] In a preferred embodiment, the splicing platform 1 of this embodiment is concavely arranged, and two splicing platforms 1 can be spliced ​​to form a U-shaped construction platform, and the steel bars of the pier column can be built at the middle opening of the U-shaped, which is convenient for assembly. In other embodiments, the splicing platform 1 can also be set as a straight line, and the U-shaped construction platform needs four groups of splicing platforms 1 to be connected. It should also be noted that the present application does not limit the shape of the splicing platform 1, and splicing platforms 1 of different specifications can be selected for assembly according to different construction sites to meet the construction requirements of different ground conditions.

[0033] Two adjacent splicing platforms 1 are connected by a connecting member 2, and the connecting member 2 includes a flipping platform 21 hinged at the end of the panel 13 of the splicing platform 1, and the flipping platform 21 can be flipped to the connection between the two adjacent splicing platforms 1 to connect the panels 13 of the two adjacent splicing platforms 1. When connecting two adjacent splicing platforms 1, the flipping platform 21 is flipped to make it flush with the panel 13 connected to it, and connected to the panel 13 of the splicing platform 1 to be assembled through the panel 13, so that the panels 13 of the two adjacent splicing platforms 1 are connected together, and the flipping panel 13 serves as a channel for connecting the two adjacent splicing platforms 1.

[0034] At the same time, since the splicing platform 1 is provided with multiple pieces along the height direction of the column 11, the flip platform 21 is provided with multiple pieces along the height direction of the column 11 to correspond to the panel 13 one by one, so that passages can be formed at different heights to facilitate the movement of construction personnel. And by connecting two adjacent splicing platforms 1 with multiple flip platforms 21, the connection strength between the splicing platforms 1 can be improved, thereby improving the stability of the entire construction platform and ensuring the safety of construction personnel.

[0035] In order to further improve the safety of construction workers, each of the splicing platforms 1 is provided with a safety guardrail 14 arranged parallel to the flat joint 12 above its panel 13, and the height of the safety guardrail 14 relative to the panel 13 in this embodiment is not less than 1.2 meters. The safety guardrail 14 reduces the probability of construction workers falling from a height, so as to ensure the safety of construction workers moving on the splicing platform 1.

[0036] The safety guardrail 14 is plugged with a pull-out steel pipe 22, and both ends of the pull-out steel pipe 22 can be respectively inserted into the safety guardrails 14 of two adjacent splicing platforms 1. Preferably, the safety guardrail 14 adopts a steel pipe with a diameter of 48 mm, and the pull-out steel pipe 22 adopts a steel pipe with a diameter of 42 mm. When connecting two adjacent splicing platforms 1, the pull-out steel pipe 22 can be pulled out of the safety guardrail 14 and inserted into the safety guardrail 14 of the adjacent splicing platform 1 for connection. The two adjacent splicing platforms 1 are connected by the pull-out steel pipe 22, which can protect the gap between the two adjacent splicing platforms 1 and further improve the safety of the construction workers; at the same time, the pull-out steel pipe 22 can strengthen the connection strength of the two adjacent splicing platforms 1 to further improve the stability of the spliced ​​construction platform.

[0037] In summary, the separate steel bar binding platform of the present application adopts the construction method of making the steel bar binding platform in blocks and then connecting them into an integral platform, which can reduce the use of large-tonnage lifting equipment and save investment in machinery costs. In addition, the small-sized splicing platform 1 can adapt to the construction of piers with various cross-sectional sizes and heights, has strong turnover, can facilitate the streamlined construction of piers, reduce material investment, save platform modification time, shorten the construction period, improve construction efficiency, and ensure construction safety.

[0038] The present application also relates to an assembly method of a separate steel bar binding platform, wherein the separate steel bar binding platform is the separate steel bar binding platform mentioned above, and the assembly method specifically comprises the following steps:

[0039] First, prefabricate the splicing platform 1 according to the size standard of the pier with the smallest cross-section to be constructed, and transport the prefabricated splicing platform 1 to the construction site. This application has previously counted the cross-sectional dimensions of the piers described in the completed project. The size of the transition pier constructed in this embodiment is 7.5×4.0m, and the size of the auxiliary pier is 6.5×4.0m. The lateral dimension of the single-section splicing platform 1 in this embodiment is 6.5m and the height is 4.0m. In addition, the constructed piers can be grouped, specifically, the piers with a cross-sectional difference of 2.2m are grouped together, and then the splicing platform 1 of the separate steel bar binding platform is processed according to the minimum size in the grouping data and the steel bar binding platform structure, and the safety installation of the safety protection facilities is completed.

[0040] The splicing platform 1 is hoisted to the corresponding pier construction position according to the block situation by a crane, and the splicing platform 1 is connected to the on-site structure through the connecting piece 2, or multiple sections of the splicing platform 1 are connected to form a whole through the connecting piece 2. When connecting adjacent splicing platforms 1 through the connecting piece 2, the flip platform 21 is first flipped to be flush with the panel 13 to the panel 13 of the adjacent splicing platform 1, and then the pull-out steel pipe 22 is pulled out from the end of the safety guardrail 14 and the two ends of the pull-out steel pipe 22 are respectively inserted into the safety guardrails 14 of the two adjacent splicing platforms 1.

[0041] The pier construction is carried out within the construction range of the splicing platform 1 until the reinforcement construction is completed, the connectors 2 between the adjacent splicing platforms 1 are removed to release the lock of the splicing platforms 1, and the splicing platforms 1 are hoisted in blocks to another pier column construction site by a crane for pier column reinforcement binding construction. When removing the connectors 2 of adjacent splicing platforms 1, first pull out the pull-out steel pipe 22 from the safety guardrail 14 of one of the splicing platforms 1, and push the pull-out steel pipe 22 into the safety guardrail 14 of another splicing platform 1, then release the connection between the flip platform 21 and the panel 13 of its adjacent splicing platform 1, flip the flip platform 21 to separate the two adjacent splicing platforms 1, and then complete the removal of the connector 2.

[0042] Repeat the above steps until the reinforcement binding construction of all piers is completed.

[0043] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A separate steel bar tying platform, characterized in that: It includes at least one section of splicing platform and a connector arranged at the end of the splicing platform. The single section of the splicing platform takes the pier with the smallest cross-section as the size standard, its transverse dimension is adapted to the width of the pier with the smallest cross-section, and its longitudinal height is also adapted to the height of the pier with the smallest cross-section. The splicing platform is concavely arranged, and the splicing platform is connected to the structure through the connector at its end, or multiple sections of the splicing platform are spliced ​​into an integral bracket through the connector.

2. The separate steel bar binding platform according to claim 1 is characterized in that: Each section of the splicing platform includes columns, flat joints and panels. The columns are arranged in the vertical direction and two groups are arranged side by side. Two groups of flat joints are arranged corresponding to the two groups of columns, and the two groups of flat joints are arranged in parallel. Each group of flat joints is used to connect each group of columns into a whole, and the panel is arranged between the two groups of flat joints.

3. The separate steel bar binding platform according to claim 2 is characterized in that: The flat links are arranged in a plurality of rows along the height direction of the column, and the panels are arranged in a plurality of pieces corresponding to the flat links along the height direction of the column.

4. The separate steel bar tying platform according to claim 3 is characterized in that: The connecting member comprises a flipping platform hinged at the end of the panel of the splicing platform, and the flipping platform can be flipped to the connection point of two adjacent splicing platforms and is used to connect the panels of the two adjacent splicing platforms.

5. The separate steel bar binding platform according to claim 4 is characterized in that: The flip platforms are arranged in a plurality along the height direction of the pillars and are arranged one by one corresponding to the panels.

6. The separate steel bar binding platform according to claim 4, characterized in that: The splicing platform is located above the panel and is provided with a safety guardrail arranged parallel to the flat joint.

7. The separate steel bar binding platform according to claim 6 is characterized in that: A pull-out steel pipe is inserted into the safety guardrail, and both ends of the pull-out steel pipe can be respectively inserted into the safety guardrails of two adjacent splicing platforms.

8. The separate steel bar binding platform according to claim 7 is characterized in that: The safety guardrail adopts a steel pipe with a diameter of 48 mm, and the plug-in steel pipe adopts a steel pipe with a diameter of 42 mm.